At a regular meeting of the Board of County Commissioners for Garfield County,
Colorado, held in the Commissioners' Meeting Room, Garfield County Administration Building
in Glenwood Springs on Tuesday, the 11t day of December A.D. 2012, there were present:
John Martin
Mike Samson
Tom Jankovsky
Carey Gagnon
Frank Hutfless
Jean Alberico
Andrew Gorgey
, Commissioner Chairman
, Commissioner
, Commissioner
, Assistant County Attorney
, County Attorney
, Clerk of the Board
, County Manager
when the following proceedings, among others were had and done, to -wit:
RESOLUTION NO. 2 0 /3- 06
A RESOLUTION OF APPROVAL FOR A LAND USE CHANGE PERMIT FOR A
SOLID WASTE TRANSFER FACILITY AND A RECYCLING PROCESSING
FACILITY ON A 35.3 ACRE PROPERTY OWNED BY IRMW II LLC, LOCATED AT
1058 COUNTY ROAD 100, IN SECTIONS 35 AND 36, TOWNSHIP 7 SOUTH, RANGE
88 WEST AND SECTIONS 1 AND 2, TOWNSHIP 8 SOUTH, RANGE 88 WEST OF THE
6TH P.M., GARFIELD COUNTY
PARCEL #2393 - 363 -00 -063
Recitals
A. The Board of County Commissioners of Garfield County, Colorado ( "Board "),
received a request for a Land Use Change Permit to allow for a Solid Waste Transfer Facility
and a Recycling Processing Facility as further described in Exhibit A, SITE PLAN ( "Facility ").
B. The Facility is located within a 35.3 acre parcel of land owned by IRMW II LLC. The
ownership of this property is described in a Warranty Deed found at Reception Number 819166
in the records of the Garfield County Clerk and Recorder. The application was filed in
conjunction with the Facility operator, Mountain Roll -Offs Inc. ( "MRI ").
C. The subject property is located within unincorporated Garfield County in the Industrial
(I) Zone District, at 1058 County Road 100, Carbondale, CO 81623, approximately 1 mile east
of the Town of Carbondale.
1
VIII 1POJ' IV.14h14160WWICIiiili k 1I III
Reception*1: 829910
01/14/2013 01:58:18 PM Jean Rlberico
2 of 9 Rec Fee•$0.00 Doc Fee:0.00 GARFIELD COUNTY CO
D. The application was deemed to be "technically complete" by the Building and
Planning Department on July 27, 2012, thus the Garfield County Unified Land Use Resolution of
2008, as amended prior to August 13, 2012 ( "ULUR "), applied to this application.
E. "Solid Waste Transfer Facility" and "Recycling Processing Facility" are land uses
which may be permitted in the Industrial Zone District with a Limited Impact review.
F. The Board is authorized to approve, approve with conditions, or deny a Limited
Impact application. Approval or approval with conditions may result in issuance of a Land Use
Change Permit pursuant to the ULUR.
G. On September 10, 2012 the Board conducted a site visit to the IRMW II parcel.
H. The Board opened a public hearing on September 17, 2012, to consider whether the
proposed Land Use Change Permit should be approved, approved with conditions, or denied,
during which hearing the public and interested persons were given the opportunity to express
their opinions regarding the request. The Board continued the public hearing to November 19,
2012, for the purpose of receiving additional information.
I. The Board re- opened the continued public hearing on November 19, 2012, and took
additional testimony and public input on the Application. The Board continued the public
hearing to December 11, 2012, for the purpose of reviewing additional technical information.
J. The Board again re- opened the continued public hearing on December 11, 2012, and
took additional testimony and public input on the Application. The Board closed the public
comment and evidentiary portions of the hearing on the 1 1th day of December, 2012 to deliberate
and make a final decision.
K. The Board on the basis of substantial competent evidence produced at the
aforementioned hearing, has made the following determinations of fact:
1. That proper public notice was provided as required for the hearing before the
Board of County Commissioners.
2. The hearing before the Board of County Commissioners was extensive and
complete, that all pertinent facts, matters and issues were submitted and that all interested
parties were heard at that hearing.
3. That for the above stated and other reasons the proposed Land Use Change
Permit, Limited Impact Review for a Solid Waste Transfer Facility and Recycling
Processing Facility submitted by IRMW II and located at 1058 County Road 100 is in the
best interest of the health, safety, convenience, order, prosperity and welfare of the
citizens of Garfield County.
2
■III Iii Pnivii ANA Rol • III
Reception #: 829910
01/14/2013 01:58:18 PM Jean Rlberlco
3 of 9 Rec Fee:$0.00 Doc Fee:0.00 GARFIELD COUNTY CO
4. That with the adoption of conditions, the application is in general conformance
with the 2030 Comprehensive Plan, as amended.
5. That with the adoption of conditions, the application has adequately met the
requirements of the ULUR.
6. That the proposed use is located in the Industrial Zone District and that with the
adoption of conditions is found to be compatible with surrounding uses in accordance
with ULUR Section 7 -103.
RESOLUTION
NOW THEREFORE, BE IT RESOLVED by the Board of County Commissioners of Garfield
County, Colorado, that:
A. The forgoing Recitals are incorporated by this reference as part of the resolution.
B. The Land Use Change Permit for a Solid Waste Transfer Facility and Recycling
Processing Facility requested by property owner IRMW II LLC, and operator MRI is
hereby approved subject to compliance with the following conditions:
1. That all representations made by the Applicant in the application, and at the public
hearing before the Board of County Commissioners shall be conditions of approval,
unless specifically altered by the Board of County Commissioners.
2. The operation of this facility and any future amendments shall be done in accordance
with all applicable Federal, State and Local regulations governing the operation of
this type of facility including, but not limited to, permitting and review by the
Colorado Department of Public Health and Environment ( "CDPHE ").
3. The Applicant shall maintain compliance with the provisions of the Unified Land Use
Resolution of 2008 including but not limited to 7 -810, Standards for Industrial Uses
including the screening of outdoor storage or demonstration of effective screening
through topography and berms.
4. Prior to operation of the facility, the Applicant shall provide a weed inventory of the
site and a weed management plan. The plan shall be reviewed and approved by the
County's Vegetation Manager.
5. Heavy truck haul routes shall be limited to County Road 100, east of the facility, and
access directly to Highway 82 in accordance with the County Road and Bridge
referral comments.
3
no In PJ' it SInI' M,miari 1 ialtim 11111
Reception #: 829910
0111412013 01:58:18 PM Jean Rlherico
4 of 9 Rec Fee:$0.00 Doc Fee:0.00 GARFIELD COUNTY CO
a. In order to mitigate the health, safety and welfare impacts posed by heavy
trucks on the Catherine's Store County Road 100 Bridge, Applicant shall
contribute 35% of $504,680 towards the realignment of the Bridge. This
amount represents Applicant's proportional share of increased impact
generated by Applicant's use in light of the Preliminary Engineer's Opinion of
Probable Costs for widening the Bridge. Should the actual total project costs
be less than $504,680, Applicant's contribution shall be 35% of the actual
costs. This amount shall be paid at the time the County begins construction of
improvements to the Bridge.
b. Improvements at the existing access shall be required in accordance with the
County Road and Bridge review reflected in their 8/30/12 referral comments
including turning and acceleration lanes.
c. An updated access permit from Road and Bridge shall be required and the
final access plan shall be subject to RFTA approval regarding trail
improvements and safety. Access approvals shall be finalized prior to
issuance of the Land Use Change Permit.
d. The Applicant shall be limited to a maximum of 5 heavy truck round trips per
day, averaged on a weekly basis, until the Catherine Store Bridge is repaired
or replaced.
6. The Applicant's Facility will only be open to MRI and MRI's subcontractors, and
shall not be open to the public.
7. Prior to operation of the facility the Applicant shall provide documentation of
compliance with all CDPHE Air Quality and Water Quality Regulations including
Storm Water Management, Industrial Stormwater Discharge Permits, and Air
Pollutant Emissions Notices (APEN) as may be required. Compliance shall include
proper spill prevention and protection for all storage including waste water storage
and fuel storage.
8. The Individual Sewage Disposal Systems shall be evaluated by the Garfield County
Building and Planning Department and any upgrades or improvements required shall
be installed prior to operation of the facility.
9. Prior to operation of the facility the Applicant's Fire Protection Plan shall be
reviewed and approved by the Carbondale Fire Protection District and the Garfield
County Building Department. In addition, engineered plans for the installation of the
fire protection tanks on the upper slope/bench shall be provided for review and
approval by the county including outside consulting engineers as necessary. The
main operations building shall be equipped with a fire suppression sprinkling system
as required by the Building Code and subject to approval by the Garfield County
4
1111 Ira p:rmireimni pri. ' wokyierviel.wi IN 1111
Reception #: 829910
01/14/2013 01:58:18 PM Jean Rlberico
5 of 9 Rec Fee.$0.00 Doc Fee :0.00 GARFIELD COUNTY CO
Building Department and Carbondale Fire Protection District. Plans shall provide
adequate water storage for operation of the system including minimum water levels to
be maintained and monitored in the fire suppression storage tanks at all times.
10. All improvements or modifications to existing buildings on the site shall be subject to
obtaining all required Building Permits and compliance with all building code
requirements. The Building permit review shall include additional engineering
evaluation of the potential for building protection from rock fall and hyper -
concentrated debris mud flows. All grading activity on the site shall require grading
permits and revegetation in accordance with County Regulations.
11. Prior to the issuance of the Land Use Change Permit, the Applicant shall demonstrate
that all utility relocations have been approved by Holy Cross Electric and any
easements required for said relocations have been shall established and properly
recorded.
12. Within 30 days of adoption of a Resolution of Approval and in any case prior to the
issuance of the Land Use Change Permit the Applicant shall remove all non-
compliant uses from the property or obtain appropriate building permits. The
Applicant shall also demonstrate that the current uses including storage and servicing
of portable toilets and the small scale recycling operation are currently in compliance
with the County codes (ULUR) or will be permitted under the proposed Land Use
Change Permits.
13. Hours of operation for the recycling processing equipment and operation of the solid
waste transfer floor (i.e. emptying of trucks and loading of haul vehicles) shall be
limited to 6:00 a.m. to 7:00 p.m. Monday through Saturday. Other maintenance
operations may occur within the main operations building outside of those hours and
days but shall be subject to compliance with State and County regulations on noise
limits. Startup or idling of trucks prior to 6:00 a.m. or after 7:00 p.m. shall be limited
to a total of 5 trucks at any one time. Other industrial activities on the site shall
comply with operation and noise limits contained in the ULUR.
14. The site plan shall be updated with additional details on the location of the fueling
operation and outside recycling storage areas. In addition the propane use proposed
to remain on site needs to document that it is in compliance with all applicable State
and Federal Regulations. Referral comments from the Carbondale Fire Protection
District on the propane operation shall also be required.
15. The Applicant shall comply with the wildlife impact mitigation recommendations
provided by the Applicant's Environmental Consultant ERO Resources Corporation.
16. The Applicant shall expand dust mitigation plans for the site with additional details
on timing for application of magnesium chloride to the drivable surfaces. Dust
5
1111 1 1'1 C014410 I4'14I ?I+ '4iliMi 11111
Reception #: 829910
01114/2013 01:59 19 PM Jean Rlberico
6 of 9 Rec Fee:$0.00 Doc Fee:0.00 GARFIELD COUNTY CO
mitigation for areas of the site that have not been re- vegetated from previous grading
activities shall also be provided. Re- vegetation and stabilization is a preferred option
and shall be coordinated with the County Vegetation Manager.
17. The Facilities shall be limited to the areas of the site (dimensions) and capacities
indicated in the submittals. Any expansion beyond the Application representations
shall require submittal of an appropriate Land Use Change application for review by
the County. The facility shall be limited to the traffic generation estimates contained
in the Traffic Report and including an opening day estimate of 5 heavy truck waste
transport round trips per day and a maximum of 10 such round trips at full capacity.
Limitation on truck trips shall be averaged on a weekly basis.
18. The Applicant shall post a 4' x 8' sign with the Emergency Contact information,
consistent with past practice of the Board, on the site to facilitate public
communication should compliance issues occur.
19. Prior to issuance of the Land Use Change Permit, the Applicant shall demonstrate to
the County that they have obtained all required permitting from the CDPHE for a
Solid Waste Transfer Facility and Recycling Processing Facility. Further the
Applicant shall demonstrate compliance with any conditions contained within said
permits. The Applicant shall provide the County with copies of any notices of any
violations, or remedial actions required by the CDPHE. The Applicant shall make the
facility available for inspection upon request of the Garfield County Zoning
Enforcement Officer.
20. The site shall be fenced and securely gated consistent with CDPHE standards and
recommendations for site protection and control.
21. Prior to issuance of the Land Use Change Permit, the Applicant shall provide
additional Application materials and documents, including updated operations plans,
to demonstrate compliance with all CDPHE comments contained in the November 8,
2012, Detailed Review Letter from John O'Rourke, Solid Waste and Material
Management Program. Written confirmation of compliance from the CDPHE shall
be required.
22. Prior to the issuance of the Land Use Permit, the Applicant shall update the drainage
plan for the site to include the following:
a. Engineered drainage plans for the facility entrance to ensure that drainage
does not impact the County Road.
b. Engineered drainage plans for the drainage detention and outfall east of the
main building to ensure that it does not result in discharge of sediment or
debris off -site.
6
11111 A 11 CIf iffiIln1ifiVli X1+0,10 11 11 1
Reception #. 829910
01/1412013 01:58:18 PM Jean aiberico
7 of 9 Rec Fee$0.00 Doc Fee:0.00 GARFIELD COUNTY CO
c. A plan for improving the current condition of drainage facilities to acceptable
operational conditions including cleanup, stabilizing slopes, re- vegetation and
weed removal, and locating and cleaning out culverts.
d. Update the Operations Plan to include a Iong term maintenance plan to ensure
that the drainage facilities will be maintained and operated as designed. Said
plan shall document IRMW II's right to access and maintain the drainage
across IRMW I property.
this I
23. Representations contained in the Application and Operation Plan shall be conditions
of approval including, but not Iimited to, representations regarding all dumping and
transfer of trash will occur in the load -out building, implementation of odor
suppression systems, pest control, site maintenance, covered and sealed vehicles for
transportation of waste, use of white noise back -up alarms, removal of trash within 24
hours, any trash stored overnight shall be covered, floor drain systems, washing of
vehicles within the building, and installation of a concrete floor system covering the
entire floor of the operations building.
24. All exterior lighting shall be the minimum amount necessary and all exterior lighting
shall be directed inward and downward, towards the interior of the facility, except
that provisions may be made to allow for safety lighting that goes beyond the
property boundaries.
25. Notice to the County of a pending sale or a change in ownership shall be required and
shall immediately trigger the filing of a report by the new ownership to confirm that
all representations of the current Applicant shall be complied with including the
Operations Plan and all CDPHE permitting. The operations plan shall be reviewed
and approved by the Board of County Commissioners at a public meeting, prior to
operation by the new owner.
1/41A-
Dated day of Pi- , A.D. 20 i 3 .
ATTEST:
/rk of the Board
GARFIELD COUNTY BOARD OF
COMMISSIONERS, GARFIELD
COUNTY OLO DO
7
■ii11i��Nhi� ��Fl i1 l MAIM( WM 11111
Reception #. 829910
01/14/2013 01:58:18 PM Jean Alberioo
8 of 9 Rec Fee:$0.00 Doc Fee:0 -00 GARFIELD COUNTY CO
Upon motion duly made and seconded the foregoing Resolution was adopted by the
following vote:
COMMISSIONER CHAIR JOHN F. MARTIN
COMMISSIONER MIKE SAMSON
COMMISSIONER TOM JANKOVSKY
STATE OF COLORADO
)ss
County of Garfield
, Aye
, Aye
Aye
I, , County Clerk and ex- officio Clerk of the Board of
County Commissioners, in and for the County and State aforesaid, do hereby certify that the
annexed and foregoing Resolution is truly copied from the Records of the Proceeding of the
Board of County Commissioners for said Garfield County, now in my office.
IN WITNESS WHEREOF, 1 have hereunto set my hand and affixed the seal of said
County, at Glenwood Springs, this day of , A.D. 20
County Clerk and ex- officio Clerk of the Board of County Commissioners
8
■Ill Il iIITrial A r* WC rid inigligli16.10. ROI 11111
Reception##. 829910
05/1412013 01:59,18 PM Jean Alberico
9 of 9 Rec Fee:$0,00 Doc Fee.0,00 GARFIELD COUNTY CO
EXHIBIT "A" - SITE PLAN