Loading...
HomeMy WebLinkAboutApplication- Permit.pdfGarfield County Building & Planning Department 108 8th Street Suite 401 Glenwood Springs, CO 81601-Phone: (970)945-8212 Fax: {970)384-3470 Project Address PARACHUTE, CO OWner Information Williams Production RMT Parcel No. Subdivision 217133200019 Address PO Box 370 Parachute CO 81635 Expires: 10/02/2010 Section Township Range 33 6 96 Phone Cell 970-683-2288 Contractor(sl Phone Primary Contractor Required Inspections: Proposed Construction I Details FEES DUE Fee Re-Roofing Permit Fee Total: Monday, April 5, 2010 AlT10unt $100.00 $100.00 Valuation: Total Sq Feet: FEES PAID Inv # ROOF-4-10·20145 $ 100.00 Credit Card $ 150,000.00 14064 $100.00 $ 0.00 Fo"",p"t1ons c.lI, 1 (970)384-5003 Inspection IVR See Permit Record Building Department Copy 2 I 2 3 4 5 6 7 8 9 to 11 12 GARFIELD COUNTY BUILDING PERMIT APPLICATION 108 81h Street, Suite 401, Glenwood Springs, Co 81601 Phone: 970-945-82121 Fax: 970-384-34701 Inspection Line: 970-384-5003 www.garficld~county.com Parcel No: (this infonnation is available at the assessors office 970-945-9134) 2171-332-00-019 Job Address: (if an address has not been assigned, please provide Cr, Hwy or Street Name & City) or and legal description 4289B County Road 215 Parachute, CO 81635 Lot No: Block No: SubdJ Exemption: Owner: (proper~ owner) Mailin, Address: Ph: Williams Pro uction RMT Co. POB 3 0 Parachute, CO 81635 970-589-5905 Contractor: Maili~~ Address: Ph: Williams Production RMT CO. POB 3 0 Parachute, CO 81635 970-589-5905 Architect /Engineer: Mailing Address: Ph: NA Sq. Ft. of Building: 14,064 s.f. S~ Ft. or Acres of Lot: 13 3.33 acre parcel He~ht: 15'-" Use of Building: Office Building Describe Work: Re-roof of the existing building. Please contact Phil Vaughan 970-625-5350 Class of Work: o New Ei Alteration 0 Addition Garage: Septic: o Attached 0 Detached ~ ISDS Driveway Permit: Owners valuation of Work: $150,000.00 $ NOTICE AitPh; All Ph: AitPh: No. of Floors: 1 o Community Authority. This application for a Building Permit must be signed by the Owner of the property, described above, or an authorized agent. If the signature below is not that of the Owner, a separate letter of auUlOrity, signed by tIle Owner, must be providcd with this Application. Legal Access. A Building Permit cannot be issued witllOUt proof ofJegal and adcqllate access to the property for pUlposes of inspections by the Building Department. Other Permits. Multiple separate permits may be required: (1) State Electrical Permit, (2) County ISDS Permit, (3) another permit required for use on tlleproperty identified above, e.g. State or County Highway/Road Access or a State Wastewater Discharge Permit. Void Permit. A Building Permit becomes nul! and void if the work authorized is not commenced within 180 days of the date of issuance and if work is suspended or abandoned for a period of 180 days after commencement. CERTIFICATION I hereby certify that I have read this Application and that the information contained above is true and correct. I understand that the Building Department accepts the Application, along with the plans and specifications and other data sllbmitted by me or on my behalf (submittals), based upon my certification as to accuracy. Assuming completeness of the submittals and approval ofthls Application, a Building Permit will be issucd granting permission to me, as Owner, to construct the stmcture{s) and facHities dctailed on the submittals reviewed by the Building Department In consideration oftlle issuance of the Building Permit r agree that I and my agents will comply With provisions of any federal, state or Jocallaw regulating the work and the Garfield County Building Code, ISDS regulations and applicable land use regulations (County Rcgulation(s»). I acknowledge tllat the Building Permit may be suspended or revoked, upon notice from the County, if the location, construction or lise oflhe structure{s) and facility(ies), described above, are not in compliance with County Regulation(s) or any other applicable law. I hercby grant permission to the Building Department to enter the property, described above, to inspect the work. I further acknowledge that the issuance of the Building Permit docs not prevent the Building Official from: (J) requiring the correction of errors in the submittals, if any, discovered after issuance; or (2) stopping construction or use of the stJUcture(s) or fadlity(ies) ifsuch is in violation of County Regnlation(s) or any other applicable law. Review oftllis Application, including submittals, and inspections ofthe work by the Building Department do not constitute an acceptance of responsibility or liability by the County of errors, omissions or discrepancies. As the Owner, I aclmowledge that responsibility fur compliance with federal, state and local laws and COUIlty Regulations rcst witl) me and my authOlized agents, including without limitation my architect designer, enginecr and! or builder. 1 HEREBY ACKNOWLEDGE THAT I HAVE READ AND UNDERSTAND THE NOTICE & CERTIFICATION ABOVE: ~G1~--OWNER'SIGNAT~ &\~'\~ -~W-\~ ATE STAFF USE ONLY Special Conditions: Adjusted Valuation: Plan Check Fee: Permit Fee: Manu home Fee: Mise Fees: ISDSFee: Total Fees: Fees Paid: B.Ian@e: BP No & Issue Date: ISDS No & Issued Date: IDD. O-V -J50(o Setbacks: OCC Group: ConstType: Zoning: B(~ EPT: PLNGDEPT: .,/APPRO AL DATE APPROVAL DATE V The following items are required by Garfield County for a final Inspection: I) A final ElectJical Inspection from the Colorado State Electrical Inspector. 2) Permanent address assigned by Garfield County Building DepartJnent and posted at the structure and where readily visible from access road. 3) A finished roof; a lockable building; completed exterior siding; exterior doors and windows installed; a complete kitchen with cabinets, sink with hot & cold running water, non-absorbent kitchen floor covering, counter tops and finished walls, ready for stove and refrigerator; all necessary plumbing. 4) All bathrooms must be complete, with washbowl, tub or shower, toilet, hot and cold running water, non-absorbent floors, walls finished, and privacy door. 5) Steps over three (3) risers, outside or inside must be must have handrails. Balconies and decks over 30" high must be constructed to all IBC and IRC requirements including guardrails. 6) Outside grading completed so that water slopes away from the building; 7) Exceptions to the outside steps, decks, grading may be made upon the demonstration of extenuating circumstances., i.e. weather. Under such circmnstances A Certificate of Occupancy may be issued conditionally. 8) A final inspection sign off by the Garfield County Road & Bridge Department for driveway installation, where applicable; as well as any final sign off by the Fire District, and/or State Agencies where applicable. A CERTIFICATE OF OCCUPANCY (C.O.) WILL NOT BE ISSUED UNTIL ALL THE ABOVE ITEMS HAVE BEEN COMPLETED. A C.O. MAY TAKE UP TO 5 BUSINESS DAYS TO BE PROCESSED AND ISSUED. OWNER CANNOT OCCUPY OR USE DWELLING UNTIL A C.O. IS ISSUED. OCCUPANCY OR USE OF DWELLING WITHOUT A C.O. WILL BE CONSIDERED AN ILLEGAL OCCUPANCY AND MAY BE GROUNDS FOR VACATING PREMISES UNTIL ABOVE CONDITIONS ARE MET. I understand and agree to abide by the above conditions for occupancy, use and the issuance of a C.O. for the building identified in the Building Permit. ~-"s~~ ~~~~ OWNERS SIGNATURE Bapplicationdcccmber2007 GARFIELD COUNTY BUILDING AND PLANNING 970-945-8212 MINIMUM APPLICATION REQUIREMENTS FOR CONSTRUCTION OF COMMERCIAL OR MULTI-FAMILY RESIDENTIAL BUILDINGS Including NEW CONSTRUCTION ADDITIONS ALTERATIONS And MOVED BUILDINGS In order to understand the scope of the work intended under a permit application and expedite the issuance of a permit it is important that complete information be provided. When reviewing a plan and it's discovered that required information has not been provided by the applicant, this will result in the delay of the permit issuance and in proceeding with building construction. The owner or contractor shall be required to provide this information before the plan review can proceed. Other plans that are in line for review may be given attention before the new information may be reviewed after it has been provided to the Building Department. Please review this document to determine if you have enough information to design your project and provide adequate information to facilitate a plan review. Also, please consider using a design professional for assistance in your design and a construction professional for construction of your project. Any project with more than teu (10) occupants requires the plans to be sealed by a Colorado Registered Design Professional. To provide for a more understandable plan and in order to determine compliance with the building, plumbing and mechanical codes, applicants are requested to review the following checklist prior to and during design. Plans to be included for a Buildiug Permit must be on draft paper at least 18"x 24'''' and drawn to scale. Plans must include a floor plan, a concrete footing and foundation plan, elevations all sides with decks, balcony steps, hand rails and guard rails, windows and doors, including the finish grade and original grade line. A section showing in detail, from the bottom of the footing to the top of the roof, including re-bar, anchor bolts, pressure treated plates, floor joists, wall studs and spacing, insulation, sheeting, house-rap, (which is required), siding or any approved building material. Engineered foundations may be required. Check with the Building Department. 1 A window schedule. A door schedule. A floor framing plan, a roofing framing plan, roof must be designed to withstand a 40 pound per square foot up to 7,000 feet in elevation, a 90 M.P.H. windspeed, wind exposure B or C, and a 36 inch frost depth. All sheets need to be identified by number and indexed. All of the above requirements must be met or your plans will be returned. All plans submitted must be in compliance with the 2003 mc, IPC, IMC, IFGC, and IFC. Applicants are required to indicate appropriately and to submit completed checklist at time of application for a permit: 1. Is a site plan included that identifies the location of the proposed structure, additions or other buildings, setback easements, and utility easements showing distances to the property lines from each corner of the proposed structure prepared by a licensed surveyor and has the surveyors signature and professional stamp on the drawing? Slopes of 30% or more on properties must be show on site plan. (NOTE: Sectiou 106.2) Any site plan for the placement of any portion ofa structure within 50 ft. of a property line and not within a previously surveyed building envelope on a subdivision final plat shall be prepared by a licensed surveyor and have the surveyors signature and professional stamp on the drawing. Any structure to be built within a building envelope of a lot shown on a recorded subdivision plat, shall include a copy of the building envelope as it is shown on the final plat with the proposed structure located within the envelope. Yes,_X _ _ 2. Does the site plan when applicable include the location of the I.S.D.S. (Individual Sewage Disposal System) and distances to the property lines, wells (on subject propelty and adjacent properties), streams or water courses? This information must be certified by a licensed surveyor with their signature and professional stamp on the design. Yes Not necessary for this project X __ 3. Does the site plan indicate the location and direction of the State, County or private road accessing the property? YesX_ 4. Is the l.S.D.S. (Individual Sewage Disposal System) designed, stamped and signed by a Colorado Registered Engineer? Yes Not necessruy for this project._X __ 5. Are the plans submitted for application review construction drawings and not drawings that are stamped or marked identifying them as "Not for consttuction, for permit issuance only", "Approval drawings only", "For permit issuance only" or similar language? YesX Not necessary for this project. _ _ 6. Do the plans include a foundation plan indicating the size, location and spacing of all reinforcing steel in accordance with the buildirig code or per stamped engineered design? Yes _ Not necessary for this project_X _ 2 7. If the building is a pre-engineered structure, is there a stamped, signed engineered foundation plan for this building? Yes _ Not necessary for this project_X _ 8. Do the plans indicate the location and size of ventilation openings for under floor crawl spaces and the clearances required between wood and earth? Yes _ Not necessary for project_X _ 9. Do the plans indicate the size and location of the ventilation openings for the attic, roof joist spaces and soffits? Yes_ _ Not necessary for this projectX_ _ 10. Do the plans include design loads as required under the IBC or IRC for roof snowloads, (a minimum of 40 pounds per square foot in Garfield County)? Yes_ _ Not necessary for this projectX_ _ II. Do the plans include design loads as required for floor loads under the mc or IRC? Yes _ Not necessary for this project_X _ 12. Does the plan include a building section drawing indicating foundation, wall, floor, and roof construction? Yes_ _ Not necessary for this projectX_ _ 13. Is the wind speed and exposure design included in the plan? Yes _ Not necessary for this project_X _ 14. Does the building section drawing include size and spacing of floor joists, wall studs, ceiling joists, roof rafters or joists or trusses? Yes __ Not necessary for this project_X _ 15. Does the building section drawing or other detail include the method of positive connection ofal! columns and beams? Yes_ _ Not necessary for this projectX_ _ 16. Does the elevation plan indicate the height of the building or proposed addition from the undisturbed grade to the midpoint between the ridge and eave of a gable or shed roof or the top of a flat roof? (Check applicable zone district for building height maximum) Yes_ _ Not necessary for this projectX_ _ 3 17. Does the plan include any stove or zero clearance fireplace planned for installation including make and model and Colorado Phase II certifications or Phase II EPA certification? Yes _ Not necessary for this projectX_ _ 18. Does the plan include a masonry fireplace including a fireplace section indicating design to comply with the IBC or IRC? Yes _ Not necessary for this project_X _ 19. Does the plan include a window schedule or other verification that egress/rescue windows from sleeping rooms and/or basements comply with the requirements of the IBC or IRC? Yes _ Not necessary for this projectX_ _ 20. Does the plan include a window schedule or other verification that windows provide natural light and ventilation for all habitable rooms? Yes_ _ Not necessary for this projectX_ _ 21. Do the plans indicate the location of glazing subject to human impact such as glass doors, glazing immediately adjacent to such doors; glazing adjacent to any surface nonnally used as a walking sUiface; sliding glass doors; fixed glass panels; shower doors and (ub enclosures and specify safety glazing for these areas? Yes_ _ Not necessary for this projectX_ _ 22. Do the plans include a complete design for all mechanical systems planned for installation in this building? Yes _ No Not necessary for this project_X _ 23. Have all areas in the building been accurately identified for the intended use? (Occupancy as identified in the IBC Chapter 3) Yes_ _ Not necessary for this projectX_ __ 24. Does the plan indicate the quantity, form, use and storage of any hazardous materials that may be in use in this building? Yes _ Not necessaJY for this project_X _ 25. Is the location of all natural and liquid petroleum gas furnaces, boilers and water heaters indicated on the plan? Yes_ _ Not necessaJY for this projectX_ _ 26. Do the plans indicate the location and dimension of restroom facilities and if more than four employees and both sexes are employed, facilities for both sexes? Yes_ _ Not necessary for this projectX_ _ 4 27. Do the plans indicate that restrooms and access to the building are handicapped accessible? Yes _ Not necessary for this project_X _ 28. Have two (2) complete sets of construction drawings been submitted with the application? YesX 29. Have you designed or had this plan designed while considel1ng building and other construction code requirements? YesX_ _ 30. Does the plan accurately indicate what you intend to construct and what will receive a final inspection by the Garfield County Building Department? Yes_X __ 31. Do your plans comply with all zoning rules and regulations in the County related to your zone district? For corner lots see supplemental section 5.05.03 in the Garfield County Zoning Resolution for setbacks. Yes,_X _ 32. Do you lffiderstand that approval for design and/or construction changes are required prior to the implementation of these changes? YesX_ _ 33. Do you understand that the Bnilding Department will collect a "Plan Review" fee from you at the time of application and that you will be required to pay the "Pelmit" fee as well as any "Septic System" or "Road Impact" fees required, at the time you pick up your building permit? YesX 34. Are you aware that you are required to call for all inspections required under the !BC including approval on a final inspection prior to receiving a Certificate of Occupancy and occupancy of the building? YesX 35. Are you aware that the Permit Application must be signed by the Owner or a written authority be given for an Agent and that the party responsible for the project must comply with the UnifOlm Codes? YesX 36. Are you aware that you must call in for an inspection by 3:30 the business day before the requested inspection in order to receive it the following business day? Inspections will be made between 7:30 a.m. and 3:30 p.m. Monday through Friday. Inspections are to be called in to 384-5003. YesX_ _ 5 . 37. Are you aware that requesting inspections on work that is not ready or not accessible will result in a $50.00 re-inspection fee? Yes_X __ 38. Are you aware that prior to submittal of a building permit application you are required to show proof of a legal and adequate access to the site? This may include (but is not limited to) proof of your right to use a private easement/right of way; a County Road and Bridge pelmit; a Colorado Dept. of Highway Pennit including a Notice to Proceed; a permit from the federal government or any combination. You can contact the Road & Bridge Department at 625-860 I. See Phone book for other agencies YesX 39. Do you understand that you will be required to hire a State of Colorado Licensed Electrician and Plumber to perform installations and hookups? The license number will be required at time of inspection. YesX_ _ 40. Are you aware, that on the front of the building permit application you will need to fill in the Parcell Schedule Number for the lot you are applying for this pelmit on prior to submittal of the building permit application? Your attention in this is appreciated. YesX 41. Do you know that the local fire district may require you to submit plans for their review of fire safety issues? YesX_ _ (Please check with the building department about this requirement) 42. Do you understand that if you are planning on doing any excavating or grading to the property prior to issuance of a building permit that you will be required to obtain a grading permit? Yes X__ Not necessary for this project _ 43. Did an Architect seal the plans for your commercial project? State Law requires any commercial project with occupancy of more than 10 persons as per Section 1004 of the IBC to prepare the plans and specifications for the project. Yes _X__ Not Necessary for this project ____ _ 44. If you anticipate obtaining a water tap from the City of Rifle, please provide a letter indicating that the City will provide water service. No building permit application will be accepted without such a letter. Yes 6 I hereby acknowledge that I have read, nnderstand, and answered these questions to the best of my ability. 970-625-5350 Phone: _______ ,C days); . ________ Cevenings) . Williams ManCamp Building-Reroofing Project Project Name: ___ . ____________ _ 4289B County Road 215 Parachute, CO 81635 Project Address: ______________ _ Note: On any of these questions you may be required to provide this information. If required information is not supplied, delays in issuing the pennit are to be expected. Work may not proceed without the issuance of the permit. *Ifyou have answered "Not necessary for this project" on any of the questions and it is determined by the Building Official that the information is necessary to review the application and plans to detennine minimum compliance with the adopted codes, please expect the following: A. The application may be placed behind more recent applications for building pennits in the review process and not reviewed until required information has been provided and the application rotates again to first position for review. B. Delay in issuance of the permit. C. Delay in proceeding with construction. BpcommDec2007 7 ...... February 11,2010 Mr. Fred Jarman Director Garfield County Building and Planning Department· 108 81h Street, 41h Floor Glenwood Springs, CO 81601 Dear Mr. Jarman, EXPLOMTION & PRODUCTION 105BCR#215 P.O. Box 370 Parachute. CO 81635·0370 97012B5-9377 970/285·2047 fax By this letter Williams Production RMT Company authorizes Phil Vaughan Construction Management, Inc. to represent us in any and all matters related to demolition pennit, modular office pennit and building pennit applications for the project known as the Williams ManCamp Office Building located at 4289B County Road 215 Parachute, CO 81635. This includes the preparation and submission of documents associated with these applications and representation of these applications before the applicable appointed and elected boards. Sincerely, Williams Production RMT Company ~J~ Sandra J. Hotard CPL Attorney-In-Fact .111:. POWER OF ATTORNEY KNOW ALL MEN BY THESE PRESENTS, that Williams Production RMT Company, a Delaware corporation, having its principal place of business in the City of Tulsa, County of Tuls~ State of Oklahom~ hereinafter sometimes referred to as the "Company," does hereby make, constitute and appoint Sandra J. Hotard with the full authority hereinafter provided, the true and lawful Attorney-in-Fact of the Company, authorized and empowered on behalf of the Company and in the Company's name, and for the sole and exclusive benefit of the Company and not on behalf of any other person, corporation or association, in whole or in part, to enter into, execute, deliver, file and accept all instmrnents and documents affecting the real property or real estate rights of the Company the following described instmrnents and documents: (1) Agreements that grant easements, rights of way, licenses, or permits; (2) Releases and Partial Releases of easements and rights of way; (3) Agreements allowing encroachments onto easements and rights of way owned by Company; (4) Agreements subordinating easements, lease or mortgage rights; (5) Agreements relating to the modification and relocation of facilities; (6) Rental or lease agreements and all notices related to lease agreements; (7) Agreements modifying, amending, renewing, extending, ratifying forfeiting, canceling and terminating any and all of the aforementioned types of instmrnents and documents; (8) Agreements for the purchase or sale of real property or facilities; and (9) Agreements to obtain the provision of utility services to facilities. with such terms and conditions as said Attorney-in-Fact shall deem proper and advisable, giving and granting unto said Attorney-in-Fact full and complete power and authority to do and perform any and all acts and things as may be necessary and proper in the premises. This Power of Attorney shall remain in full force and effect for twelve months from the effective date of this Power of Attorney unless terminated sooner by an officer of the Company. Not by way of limitation, but by way of confirmation, the powers of authority conferred shall extend to and include any and all of the instruments and/or acts above described which may pertain to lands of the United States of Americ~ or to be acquired by the United States of Americ~ lands of any state, lands of any fee owner, and tribal or allotted Indian lands. I111 Wd. ~:J')I~llMJIly lI!r1. Ni"C 1~~·rII~~I-\~II!l'IP.~'!III,~"1. 11111 ReceptionH: 775225 09/17/2009 12:55:31 PM Jean Alberico 2 of 2 Ree Fee:$11.00 Doc Fee:O.00 G~P.FIELD COUNTY CO The Company hereby declares that each and every act, matter and thing which shall be given, made and done by the said Sandra J. Hotard in connection with the exercise of any or all of the aforesaid powers shall be as good, valid and effectual to all intents and purposes as if the same had been given, made and done by the said Company in its legal presence and it hereby ratifies whatsoever the said Attorney-in-Fact shall lawfully do or cause to be done by virtue hereof. IN WITNESS WHEREOF, Williams Production RMT Company has caused this Power of Attorney to be signed as effective as of September 17,2009. STATEOFCOLORADO ) ) ss. WILLIAMS PRODUCTION RMT COMPANY By: ~c!"4 .~ Name Alan C. Harrison Title: Vice President COUNTY OF ~ie f/) BEFORE ME, a Notary Public in and for the State of Colorado, on this J 7+k.day of September, 2009, personally appeared Alan C. Harrison, a Vice President of Williams Production RMT Company, who acknowledged to me that he has executed the above POWER OF ATTORNEY as his free and voluntary act and deed and as the free and voluntary act and deed of Williams Production RMT Company for the uses and purposes therein set forth. Given under my hand and seal the day and year last ~e wri~ MY COMMISSION EXPIRES: ~ 2 /OI;w./,;;2011 NOTARY PUBLIC , Commission No.: ,;)00 740"3 "1 bC,::;::1 DASA R. BRYAN NOTARY PUBLIC STATE OF COLORADO My Commission Expl,.s10/22/2011 Legend """~'"""' Existing Road '''''''''''''1 Creek Subject Property !',;;~"":J ~-' " .... ~~ .. -. Proposed Trailer Vicinity Map T:\Proiects\P!C\GrandVa!!ev\10\0202 TrailerLocationDurinaRemodel\Vici m1v.mxd hhancock 218/20103:21:31 PM Willi~ ~~ ~. Williams Operations Support Building Parachute, CO Johnson Carter Architects PC March 24, 2010 SECTION 07540-THERMOPLASTIC MEMBRANE ROOFING PART 1 GENERAL 1.1 SUMMARY A. Provide thermoplastic membrane roofing overlay, insulating substrate, edging, and other accessories. 1.2 SUBMITTALS A. Product Data: Submit manufacturer's product data and installation instructions for each material and product used. B. Shop Drawings: Submit shop drawings indicating material characteristics, details of construction, connections, and relationship with adjacent construction. 1.3 QUALITY ASSURANCE A. Comply with governing codes and regulations. Provide products of acceptable manufacturers, which have been in satisfactory use in similar service for three years. Use experienced installers. Deliver, handle, and store materials in accordance with manufacturer's instructions. B. Listing: UL Class A external fire exposure: See Underwriter's Laboratory Certification TGFU.R1 0128-Class A Mechanically Fastened 24. C. Listing: FM Class I construction. D. Warranties: Manufacturer's standard form, without monetary limitation, signed by roofing manufacturer agreeing to repair leaks due to defects in materials or workmanship for period of 15 years. PART 2 PRODUCTS 2.1 MATERIALS A. Thermoplastic Polyolefin Sheet (TPO) Roofing: 1. Manufacturer: Duro-Last Roofing, Inc. 2. Type: Single-ply, mechanically fastened system. 3. Membrane: TPO, 50 mils, fabric reinforced. white 4. Prefabricated roof flashings, as required, heat welded 4010 at rectangular penetrations 4070 at round 3040 at rake 3070 at eave line 5. Two-Way Vent with prefabricated skirt. Detail 5010. To be installed every 1,000 sq. ft. B. Substrate Board: 1. G-P Gypsum Primed Densdeck, 1/2" in. 07540-1 Williams Operations Support Building Parachute, CO PART 3 EXECUTION 3,1 INSTALLATION Johnson Carter Architects PC March 24, 2010 A Provide and inspect substrate and report unsatisfactory conditions in writing, Beginning work means acceptance of substrate, B, Coordinate with Owners Representative and General Contractor regarding all current and anticipated roof penetrations, The General Contractor is responsible for cutting the roof penetrations, The Roofing Contractor is responsible for final flashing of all roof penetrations, The General Contractor will coordinate with the Roofing Contractor to schedule this work, C, Remove the existing screws from the high rib of the existing steel R-panel roof sheeting, Install fasteners as necessary to verify that the existing steel R-panel roof sheeting is adequately fastened to the roof purlins, D, Install 2x6 treated materials at the eave edge to support the densdeck, The 2x4 nailer on the metal R-panel and the 2x4 soffit will be provided and installed by the General Contractor. E. Install G-P Gypsum Primed Densdeck, 1/2" in, F, Install TPO sheet, seams and flashings according to roofing system manufacturer's written instructions, G, Correct deficiencies in or remove and reinstall roofing and sheet flashing that does not comply with requirements, H, Roofing contractor will include in their pricing 12-2" to 4" plumbing vent flashings, This work will require one additional trip to the project by the Roofing Contractor. END OF SECTION 07540-2