Loading...
HomeMy WebLinkAbout1.0 ApplicationENCANA.. SPECIAL USE PERMIT APPLICATION HIGH MESA WATER STORAGE & EVAPORATION POND GARFIELD COUNTY COLORADO, USA WAGON WHEEL CONSULTING 111 E. Third St, Suite 213 Rifle, CO 81650 (970) 625 -8433 GARFIELD COUNTY RECEIVED Building & Planning Department APR 2 0 2005 108 8th Street, Suite 201 Glenwood Springs, Colorado 81601 GARFIELD COUNTY Telephone: 970.945.8212 Facsimile: 970 '4A.Wf& PLANNING www.garfield- county.com Special Use Permit GENERAL INFORMATION (To be completed by the applicant.) Street Address / General Location of Property: Approximately 1.4 miles east of the intersection of County Rd 300 and County Rd 304. Project sit is adjacent to County Rd 304 Legal Description: N1/2, Section 36, Township 7 South. Range 96 West, 6th P.M. Existing Use & Size of Property in acres: Rangeland; Oil & gas exploration Description of Special Use Requested: Operation of water storage and evaporation pond. The pond will store and evaporate produced water from EnCana wells as well as river water for use during drilling and completion operations. Zone District: Name of Property Owner (Applicant): EnCana Oil & Gas U.S.A., Inc. Address:792 Buckhorn Drive Telephone: 970- 625 -4209 City: Rifle State: Co. Zip Code: 81650 FAX: 970 - 625 -4636 Name of Owner's Representative, if any (Attorney, Planner, etc): Jimmy Smith, Wagon Wheel Consulting, Inc. Address: 111 East 3rd Street, Suite 213 Telephone: 970 -625 -8433 City: Rifle State: Co. Zip Code: 81650 FAX: 970- 625 -8435 STAFF USE ONLY Doc. No.: Date Submitted: TC Date: Planner: Hearing Date: I. APPLICATION SUBMITTAL REQUIREMENTS As a minimum, specifically respond to all the following items below and attach any additional information to be submitted with this application: 1. Please submit, in narrative form, the nature and character of the Special Use requested. Submit plans and supporting information (i.e. letters from responsible agencies). Include specifications for the proposed use including, but not limited to, the hours of operation, the number and type of vehicles accessing the site on a daily, weekly and/or monthly basis, and the size and location of any existing and/or proposed structures that will be used in conjunction with the proposed use, and provisions for electric power service and any other proposed utility improvements. Be specific. 2. If you will be using water or will be treating wastewater in conjunction with the proposed use, please detail the amount of water that would be used and the type of wastewater treatment. If you will be utilizing well water, please attach a copy of the appropriate well permit and any other legal water supply information, including a water allotment contract or an approved water augmentation plan to demonstrate that you have legal and adequate water for the proposed use. 3. Submit a site plan /map drawn to scale that portrays the boundaries of the subject property, all existing and proposed structures on the property, and the County or State roadways within one (1) mile of your property. If you are proposing a new or expanded access onto a County Or State roadway, submit a driveway or highway access permit. 4. Submit a vicinity map showing slope 1 topography of your property, for which a U.S.G.S. 1:24,000 scale quadrangle map will suffice. 5. Submit a copy of the appropriate portion of a Garfield County Assessor's Map showing all mineral rights owners of the subject property and public and private landowners adjacent to your property (which should be delineated). In additional, submit a list of all property owners and their addresses adjacent to or within 200 ft. of the site. This information can be obtained from the Assessor's Office. 6. Submit a copy of the deed and a legal description of the subject property. 7. If you are acting as an agent for the property owner, you must attach an acknowledgement from the property owner that you may act in his/her behalf. 8. Submit an statement that specifically responds to each of the following criteria from Section 5.03 of the Zoning Regulations: (1) Utilities adequate to provide water and sanitation service based on accepted engineering standards and approved by the Board of County Commissioners shall either be in place or shall be constructed in conjunction with the proposed use. (2) Street improvements adequate to accommodate traffic volume generated by the proposed use and to provide safe, convenient access to the use shall either be in place or shall be constructed in conjunction with the proposed use; (3) Design of the proposed use is organized to minimize impact on and from adjacent uses of land through installation of screen fences or landscape materials on the periphery of the lot and by location of intensively utilized areas, access points, lighting and signs in such a manner as to protect established neighborhood character; 9. Depending on the type of Special Use Permit requested, you may need to respond to additional review standards in the Garfield County Zoning Resolution Section 5.00 [Supplementary Regulations]. This may include uses such industrial uses [section 5.03.07 & 5.03.081, Accessory Dwelling Units [section 5.03.21], Utility line /Utility Substations, etc. Specific sections of the Zoning Resolution which can be located on the Garfield County web site at http : / /www.garfield- county.com/ building _and_planning /index.htm, or information can be obtained from this office 10. A $400.00 Base Fee: Applicant shall sign the "Agreement for Payment" form and provide the fee with the application. 11. Submit 2 copies of this completed application form and all the required submittal materials to the Building and Planning Department. Staff will request additional copies once the Special Use Permit application has been deemed technically complete. II. PROCEDURAL REQUIREMENTS (The following steps outline how the Special Use Permit Application review process works in Garfield County.) 1. Submit this completed application form, base fee, and all supplemental information to the Garfield County Planning Department. It will be received and given to a Staff Planner who will review the application for technical completeness. 2. Once the application is deemed technically complete, the Staff Planner will send you a letter indicating the application is complete. In addition, Staff will also send you a "Public Notice Form(s)" indicating the time and date of your hearing before the Board of County Commissioners. Prior to the public hearing, Staff will provide you with a Staff Memorandum regarding your requested Special Use. (If Staff determines you application to be deficient, a letter will be sent to you indicating that additional information is needed to deem your application complete.) 3. It is solely the Applicant's responsibility to ensure proper noticing occurs regarding the requested Special Use and the public hearing. If proper notice has not occurred, the public hearing will not occur. Notice requirements are as follows: a. Notice by publication, including the name of the applicant, description of the subject lot, a description of the proposed special use and nature of the hearing, and the date, time and place for the hearing shall be given once in a newspaper of general circulation in that portion of the County in which the subject property is located at least thirty (30) but not more than sixty (60) days prior to the date of such hearing, and proof of publication shall be presented at hearing by the applicant. b. Notice by mail, containing information as described under paragraph (1) above, shall be mailed to all owners of record as shown in the County Assessor's Office of lots within two hundred feet (200') of the subject lot and to all owners of mineral interest in the subject property at least thirty (30) but not more than sixty (60) days prior to such hearing time by certified return receipt mail, and receipts shall be presented at the hearing by the applicant. c. The site shall be posted such that the notice is clearly and conspicuously visible from a public right -of -way, with notice signs provided by the Planning Department. The posting must take place at least thirty (30) but not more than sixty (60) days prior to the hearing date and is the sole responsibility of the applicant to post the notice, and ensure that it remains posted until and during the date of the hearing. 4. The Applicant is required to appear before the Board of County Commissioners at the time and date of the public hearing at which time the Board will consider the request. In addition, the Applicant shall provide proof, at the hearing, that proper notice was provided. 5. Once the Board makes a decision regarding the Special Use request, Staff will provide the Applicant with a signed resolution memorializing the action taken by the Board. Following the Board's approval, this office will issue the Special Use Permit to the applicant. If the Board's approval includes specific conditions of approval to be met, this office will not issue the Official Special Use Permit certificate until the applicant has satisfied all conditions of approval. The Special Use Permit approval is not finalized until this office has issued the Official Special Use Permit certificate signed by the Chairman of the Board of County Commissioners. I have read the statements above and have provided the required attached information whic i rrectpnd , -ccvr e to the best of my knowledge. r (Sign re of applicant/owner) Last Revised: 11/07/2002 April 22, 2005 Fred Jarman, AICP Garfield County Building & Planning Department 108 8th Street, Suite 201 Glenwood Springs, Co. 81601 RE: Agent Authorization Mr. Jarman, RECEIVED APR 2 5 2005 GAFIELD COUNTY B R U ING & LANNING Wagon Wheel Consulting, Inc. (Jimmy Smith) has been retained by EnCana Oil & Gas (USA), Inc. to request a Garfield County Special Use Permit for a water Storage and evaporation facility located at EnCana's High Mesa property, southwest of Parachute, Colorado. I authorize Wagon Wheel Consulting, Inc. to act as agent on my behalf. Please feel free to call me at 970 -625 -6601 or Wagon Wheel Consulting, Inc. at 970 -625 -8433 if you have any questions or concerns. Sincerely, David Grisso EnCana Oil & Gas (USA), Inc. acs2r,Zzcee 6021 -Z6ve Pcaizete4A10 05/25/2005 08:56 9706250908 GARFIELD COUNTY PAGE 01 kr79 A iL/L) GAR.FIELD COUNTY GRADING PERMIT APPLICATION 108 84e Strew, Site 201, Glenwood Spins, , CO 81601 Phone: 970 - 945 -8 22121 Fax 974- 384 -3470 / Lnlpectton Line; 970- 384 -5003 Permit No" . G D O — t g Pet c l /Schedute Na: Job Address; Lot No: .1 -] - ... 4 .4 .• .4r A �a>vy� 9� ��� l f/+ P. M. ialack No: Subd.1 R.Rmption: - - _ L J M a,•/ 1 T 1. 0 Vwuel: E. - . / Li Sao (U5A ) ZYC. t#ddrese 79 & ck�I »w D,a:..e Rifle c9 . fit`a 5c7 Address: P•d. Box aa8 avow/dale Cis, :1� Phs 376-6a5-‘604) Ph; '70-' 9 77 Wk Ph; 5a•r,2e Sante I Contractor: �. i M , :. . u :� . Engineer: ,7"�ts,N PR O/4714 � • �>v- ' :.: 641 - Sq. Ft. Grading . . - Address: ��oa SfackfoMN�7 /Xd• s�IM A . - „..• ..; _. .1b C I X. of Grading Ph: . 9a : - 3 -. Gc 7 Lic. No. /4 973 Describe Work: Oge..d; 47 and excczt.va.(!'ew of o- ENezaiva O�'/ e gas has fled ai ' /awv /41,9 OepaAtrne,a' foR a 'Special C O N S RVClIoA of Me asse)C eLAsc rp/nwloe a 1.fZRrva l es�e SUP�r p oposed atp /►ca. olv Use 1;;; e i/ y, /NC hie QdCC. DAYS A.TANY OF LA W WREATHER NOT PROVISIONS OF N OR THE w&te12 s la "ale (Loyd 2, va-pae/a24.43A/ a wifh Me t aefie1d Coe, dy Bc.'id FA/ le fiainiji” An the e,vf%,ae Pel6ci. /ud ' ? 71-lit. pcmia fi'veR) *t I rnrnuvCe Fee: �/ Dated Portrait Ieeued: 111/66. sp TT • THIS AUTEORILSD OR WORT( TIME I BERzeY AND GOVERNING SPECIFIED PRESUME ANY PERPO PERMIT BECOMESULL AND VOID IF WORK OR CONSTRUCTION 15 NOT COMMeNCED WITAW ISO DAYS, OR. IF CONSTRUCTION IS SUSPENDED OR ABANDONED FOR A FERIOD OF 180 AFTER WORK 15 COMMENCED. CERTIFY THAT I RANT READ AND EXA•iQNED THIS APPLICATION KNOW THE SANE TO 8E TRUE AND CORRECT. ALL PROVISIONS TDIS TEFL OF WORK WILL RE COMPLETED WITHIN HEREIN ORNOT. THE GRANTING OF A FERMI DOES TO GIVE AUTHORITY TO VIOLATE OR CANCEL THE OTHER STATE OR LOCAL LAW MUTATING CONSTRUCTI • 1 CE OF CONSTRUCTION. ,(tl f._. _ ..4., Conditions to Permit: — 1'4 "%G t-4 raLcA.A._ e.1 -'i' F3$a2-L o-ly c,¢auv" yrlar. i HAVE ors ati� fIAi6PVCrbR. 04..112.Ifvh5 ianitrlaticrsohi Mg 400E4 'a E..34I,06E .1i,z6-1 D4-P1"; 7. Ni.,../....4.-..- I • ' . I . OF 0 Tr. • 2 dr :.3s APP.ROV �A._ i G A + p '4 1NG ENGINEER ► •. • PPROVALlDATE AGREEMENT IN CONSIDERATION OF THE ISSUUANCE- OF TE lS PERMIT, THE SIGNER. HEREBY AGREES TO COMPLY WITH ALL CODES AND LAND USE REGULATIONS ADOPTED BY GARFIELD COUNTY PURSUANT TO AUTHORITY GIWE,N IN 80.18301 CRS AS AMENDED. ME SI(NFR FURTHER AGREES THAT IF THE ABOVE SAID ORDINANCES ARE NOT FULLY COMPILED WITH IN THE LCOATION, ERECTION, CONSTRUCTION, AND USE OF THE ABOVE DESCRIBED WORK TEE PERMIT MAY EL REVOKED BY NOTICE FROM TEE COUNTY AND THAT THEN AND THERE IT SHALL DECOKE NUL.I. AND VOID. - THE ISSUANCE OF A PERMT EASED UPON PLANS, srECIFICATIONS AND OTHER DATA SHALL NOT PREVENT THE BUILDING OFFICIAL FROM THEREAFTER REQUIRING THE CORRECTION OF ERRORS IN SAID PLANS, SPECIFICATIONS AND OTHER DATA OR FROM PREVENTING CONSTRUCTIONOPEILATION BEING CARRIED ON THEREUNDER WREN IN VIOLATION OF TITS CODE OR ANY OTHER ORDINANCE OR REGULATION OFTHIS JURISDICTION, . THE REVIEW OP sum...Dr= PLANS AND SPECZPICATIONB AND TN5PECTIONS CONDUCTED THEALA rum DOGS II4T CONSTITUTE Alf ACCEP'TANCI3 OF ANY RESPONSIBILITIES OR LIABLITIES BY. GARSIEW COUNTY FOE ERRORS, OMISSIONS OR DISCREPENCIES. THE RESPONSInIJ TTY FOR THESE ITEMS AND IMPLEMENTATION DURING CONSTRUCTION RESTS SPECIFICIALLY WITH THE ARTICTECT, DESIGNER, BUILDER, AND OWNER. COMI4IENTS ARE INTENDED TO BE CONSERVATIVE AND IN SUPPORT OF TICE OWNERS INTEREST. GeAom.003 I HEREBY ACKNOWLEDGE THAT I HAVE READ AND UNDERSTAND THE AGREEMENT ABOVE (INITIAL,: ? -P; 4100 C *&aiz 11-