HomeMy WebLinkAbout1.14 Section 4-108Source Gas
SECTION 4 -108 VACATION OF A COUNTY ROAD OR PUBLIC RIGHTS OF WAY.
This project will not be vacating a public or county road or right -of -way. The Spring Valley
Compressor Station (SVCS) can be accessed by taking 1 -70 to Exit 116 (Glenwood, CO) to CO-
82E south towards Aspen. The SVCS is located off of County Road 115 on a private access. The
closest intersection to the SVCS is County Road 119 and County Road 115, which is
approximately 0.9 miles to the northwest of the turnoff onto the private drive leading to the
SVCS. The private drive is located on the south side of County Road 115. The closest major
intersection is Spring Valley Road and Highway 82 approximately 5.3 miles to the southwest.
The site is located in the SE '/a NW ' /a, Section 34, T6S, R88W, 6th Principal Meridian.
The access off of County Road 115 will be upgraded and has been discussed with Garfield
County Road and Bridge (see e-mails included).
SVCS — Location & Extent
Ashlee Lane
From: Ashlee Lane
Sent: Thursday, May 30, 2013 11:15 AM
To: Ashlee Lane
Subject: FW: Planning Meeting Handout
Follow Up Flag: Follow up
Flag Status: Flagged
From: Green, Donald fmailto :Donald.Green @sourcegas.com]
Sent: Monday, March 04, 2013 1:57 PM
To: Ashlee Lane
Cc: Dick, Cliff
Subject: RE: Planning Meeting Handout
Ashlee,
I met with Mike Prehm with Garfield County Road and Bridge today. Garfield County is ok with our driveway access plan
as long as we follow the guidelines outlined in the Garfield County Drive way permit. Mike was going to contact Molly
and relay the same message to her.
Thanks
Donald Green
Project Manager
970 -618 -1521
970- 928 -0418
Donald.green @sourcegas.com
1
Ashlee Lane
From: Ashlee Lane
Sent: Thursday, May 30, 2013 11 :18 AM
To: Ashlee Lane
Subject: FW: New Compressor Station Site Access
Follow Up Flag: Follow up
Flag Status: Flagged
Original Message
From: Green, Donald jmailto :Donald.Grcen(rasourcegas.comj
Sent: Monday, March 04, 2013 2:16 PM
To: Ashlee Lane
Subject: FW: New Compressor Station Site Access
Just an FYI on the road Access. See Below.
Donald Green
Project Manager
970 - 618 -1521
970 -928 -0418
Donald.grcen(d), sourccgas.com
Original Message
From: Michael Prehm jmailto:ninrchnu'o garlield- county.comy
Sent: Monday, March 04, 2013 2:14 PM
To: Molly Orkild - Larson
Cc: Green, Donald
Subject: New Compressor Station Site Access
Hi Molly,
I met with Source Gas (Don) today at the new location along County Road 115. He showed me were the new driveway
access would be located. We went over the requirements for a driveway permit. With the drawings you sent me and what
Don explained to me, this location would be a good spot to access their new site.
let me know if I can help you on anything.
Mike
1
Ashlee Lane
From: Green, Donald <Donald.Green @sourcegas.com>
Sent: Thursday, June 20, 2013 5:15 PM
To: Ashiee Lane
Subject: Fwd: Sourcegas Access Road design question
Just an FYI to the access road
Sent from my iWhone
Donald green
Project manager
Sourcegas
618 -1521
Begin forwarded message:
From: Michael Prehm <mprehm kgarficld- county.eom <mailto:mprchm garfcld- county.com»
Date: June 20, 2013, 4:34:08 PM MDT
To: "Green, Donald" <Donald.Grecn @sourcegas. com <mailto:Donald.Grccn &source as.com»
Subject: RE: Sourcegas Access Road design question
Donald,
Thanks for running this by me. While under construction this would be fine. I would like to see it brought back to the
original design after. It is important that vehicles are 90 degrees to the roadway so that they have a clear view both
directions.
Mike
Road & Bridge
Foreman / Glenwood District
From: Green, Donald [Donald. Green @sourcegas.com< mailto :Donald.Grcen @sourcegas.coin >]
Sent: Thursday, June 20, 2013 2:01 PM
To: Michael Prehm
Subject: Sourcegas Access Road design question
Mike,
Here is the Drawing for the entry way off of County road 115. Can you please review and give me a call if you have any
questions.
Thanks
i
Donald Green
Project Manager
970- 618 -1521
970 - 928 -0418
Donald.grccnOisourccgas. coin< mailto :Donald.grccn(sourccgas.com>
2
• f
•
it .0..
Legend
zi■NER County Roads
Proposed Access
Proposed Compressor Site
Township
Section
QtrSection till
S
0 250 500 1,000 Feet
Author: jharris
Date: 6/21/2013
Spring Valley Compressor Station
Proposed Site Access
Source Gas
DISCLAIMER : This Geographic Information System (GIS) and its
components are designed as a source of reference for answering
inquiries, for planning and for modeling. GIS is not Intended, nor does it
replace legal description information in the chain of title and other
information contained in official government records such as the County
Clerk and Recorders office or the courts. In addition. the representations
of locations in this GIS cannot be substituted for actual legal surveys.