Loading...
HomeMy WebLinkAbout1.02 Plans�!r rr r. f i, . �f i I ; •• /rjs1 1 1 II :)111..'1/4:- \ -Jr.-- t 1 ] i r R 98 w R 97 w PROPOSED LOCATION: PICEANCE BASIN WATER MANAGEMENT FACILITY 35BV (NAD 83) LATITUDE: 39 °34'21.01 "N LONGITUDE: 108°21'00.17"W 0.2 MI. +r -;' • LEGEND: ---- •••••11MINIM■--. - -r PROPOSED AC CES S ROJ D EXISTING ROAD Uintah Engineering & Land Suxveyuig SS South 200 East Vernal, Utah S40 7S (435) 7S9 -1017 F_- (435) 7S9 -1S13 CHEVRON U.S.A. INC. PICEANCE BASIN WATER MANAGEMENT FACILITY 35BV SECTION 35, T5S, R9SW, 6th P.M. 'TOPOGRAPHICI02108I11 ears DAY YEAR MAP SCALE: 1" = 2000" I DRAWN BY J.L.G. IREVISED: 00.00.00 B TOPO 1 1 PROPOSED LOCATION: PICEANCE BASIN WATER MANAGEMENT FACILITY 35BV CLEAR CREEK ROAD EXISTING ROAD 3 MILE BOUNDARY PARCELS 213732 100008 PARCEL CHEVRON U.S,A. INC. 760 HORIZON DRIVE GRAND JUNCTION. CO. 81506 970 -257 -6042 Uintah Engineering & Land Surveying 85 St,utlti 200 East .t V riiu1. Utah 84078 (435) 789- 1()17 "4 FAX (435) 789- 1813 N CHEVRON U.S.A. INC. PICEANCE BASIN WATER MANAGEMENT FACILITY 35BV SECTION 35, TSS, R98W, 6th P.M. VICINITY MAP MONTH QS 11 YEAR SCALE: 1" _ S000' 1 DRAWN BY: J.L.G. REVISED: 02 -14-11 C TOPO FROM THE JUNCTION OF 1-70 AND COUNTY ROAD 204, PROCEED INA NORTHWESTERLY DIRECTION ALONG COUNTY ROAD 204 APPROXIMATELY 13.8 MILES TO THE JUNC TION OF THIS ROAD AND COUNTY ROAD 211 TO THE NORTHEAST. TURN RIGHT ONT 0 THIS ROAD AND PROCEED INA NORTHEASTERLY, THEN NORTHWESTERLY DIRECTIONAPPROXIMAIELY 4.3 MILES TO THE HINER GATE ALONG THE CLEAR CREEK ROAD. THIS ENDS THE USE OF PUBLIC ROADS FOR THE REMAINDER OF THE ROUTE TO THE LOCATION. CONTINUE IN A NORTHWESTERLY DIREC TIONAPPRO.XINIATELY 2.7 MILES TO THE JUNCTION OF THIS ROAD AND WEST LOOP ROAD TO THE SOUTHWEST. TURN LEFT AND PROCEED IN A SOUTHWE STERLY DIRECTION APPROXIMATELY 0.2 MILES TO THE FACILITY TOTAL DISTANCE FROM DERE QUE, COLORADO TO THE FACILITY IS Al:PROM:NAT ELY 21.0 MILE S. LEGEND: PROPOSED LOCATION CI-MI:RON- U.S.A. INC. PICEANCE BASIN WATER MANAGEMENT FACILITY 35BV SECTION 35, T5S, R98W 6th P.M. Uintah Engineering & Land Surveying 85 South 200 East 'Vernal, Utah 84078 (435) 789-1017 '" FAX (435) 789-1813 SCALE: 1:100.000 REVISED: 02-22-11 N3A i EL ( +) 29' -0 F.O.F. EL ( +) 30' -9 7 /B" F.O.F. EL ( +) 31' -1 3/4" F.O.F. EL ( +) 30' -7 3/16' t /1 "T' WALKWAY CLIPS (ETA) EL m DOWNCO4ER EL ( +) "Core/4' OOUBLERJ II II II II II II I II II II UPPER BOLT HOLE UPPER BOLT HOLE 004ND0MER "A" EL ( +) 1' -0• ELEVATION AT 180' SCALE- I/2'•5' -2 EL ( +) l EL L) 29' -0" N3B F.0.6. EL ( +) 30' -9 7/5' 1.0,7. EL ( +1 31' -1 3/4' /—SEE MANWAY COYER PLATE DETAIL SHEET 04 EL ( +) 0" -0" EL 1) 22' -0• SEE MANWAY COVER —\\PL41E OCTAL SHEET C4 EL (*] 2' -0" N7 a + 5 -4" GROUND LUG ELEVATION AT 0' 56116: 1/2' =1' -0 EL ( +) 0' -0' NOZZLE SCHEDULE MK. REQ' D SIZE O.S. PROJ. I.S. PROD. ANSI RAT'G. TYPE SERVICE N1A /B N2A /B N3A /B 1 2 2 6'I 6' 150 RFWN INLET 4.. 150 6" 6" 150 RFWN 3558 OUTLET (NOTE 12) OVERFLOW 84 3" 150 RFWN DRA1 N N5 150 RFWN GUIDED WAVE RADAR N6 6" 150 RFWN PRESSURE TRANSMITTER N7 150 RFWN DRAT N NB 1 8' API FF THIEF HATCH N9 16" 6 1/2 2 1/2" PLA75 EMERGENCY VENT N10 NI1A /B 6" 6" 150 RFWN VENT 2 4" 6" 150 RFWN ANODES N 1 2 4" 6" 150 RFWN SKIM 82 24 "x36" PLATE 2 PIECE MANWAY (80TTOM FLUSH) DESIGN DATA TANK DIMENSIONS DIAMETER: 15' -6" 0.D. HEIGHT' 30' -0" OPERATING PRESSURE' 4 OZ /IN2 OPERATING TEMPERATURE: 50 -100'F DESIGN INTERNAL PRESSURE" 8 OZ./IN7 DESIGN INTERNAL TEMPERATURE' 150'F DESIGN EXTERNAL PRESSURE 0.5 OZ /IN2 DESIGN EXTERNAL TEMPERATURE: 1507E MINIMUM DESIGN METAL TEMPERATURE -20'F NOTE 10 MAX LIQUID LEVEL: 15.-6" IN SPECIFIC GRAVITY OF LIQUID' 0.685 -1.10 INSULATION TYPE: NONE THICKNESS' NONE WORKING CAPACITY: 479 BBL. 000E: API -12F REF SPEC: 2081- 200- 92 -PO- 0301 -01 MAWP: 8 01/I8 2 0 150 'F NAACP: 0.5 OZ /IN2a. 150 "F CORR. ALLOW,: ROOF /WALL /BOTTOM: N/A NOZZLES INTERNALS NDT: ® YES ❑ NO DIVERTERS: ❑ YES ® NO VORTEX BREAKER: ❑ YES ® NO DOWNCOMER: ® YES ❑ NO INSULATION SUPPORTS: ❑ YES ® NO LADDER /PLATFORM CLIPS; ® YES ❑ NO PLATFORM: ®YES 0 N FIREPROOFING CLIPS: ❑ YES ® NO LIFTING LUGS: ❑ YES ® NO PAINTING (EXT): ® YES ❑ NO LINING: ® 555 ❑ N0 TYPE: INTERNALS: ® REMOVABLE ® NONREMOVABLE (SEE DETAILS) N/A MATERIALS WALLS, TOP & BOTTOM' A36 NOZZLE NECKS LIFTING LUGS: - SUPPORTS: A36 GASKETS: NOTE 5 DECK THICKNESS 1/4" FLOOR THICKNESS 1/4 SHELL THICKNESS 1/4 A106B/A36 NOZZLE FLANGES A105/A36 CLEANOUT FLANGES /COVERS: 5105/A36 EXTERNAL RINGS' A30 BOLTING: INTERNALS' NOTE 7 SEE NANWAY 607616 PLATE DETAIL SHEET 04 0747 NOTES; 3, TANK SHALL BE CONSTRUCTED PER CHEVRON SPECIFICATIONS AND ACCORDING TO 7HE LATEST EDITION OF API SPECIFICATION 12F, SPECIFICATION FOR SHOP WELDED TANKS F05 STORAGE OF PRODUCTION LIQUIDS. 2, DELETED. 3. ALL NOZZLE PROJECTIONS ARE FROM TANK 0.0. UNLESS OTHERWISE NOTED. 4_ ALL TANK ELEVATIONS ARE REFERENCED TO GRADE_ 5. GASKETS'. SPIRAL WOUND 316 5S 8/ FLEXIBLE INHIBITED GRAPHITE FILLER ASME 816.20, W/ INNER RING OR AS SPECIFIED IN DETAILS 6. DELETED. 7, INTERNALS: SEE ATTACHED DETAILS. B. LUGS TO BE PROVIDED FOR MANWAY. 9. CONTRACTOR TO VERIFY BOLT TOROING FOR TIGHTNESS_ 16, A SITE SPECIFIC PROCESS HAZARD ANALYSIS (PHA) SHALL BE CONDUCTED AND APPROVAL OBTAINED FOR LOCATIONS WHERE LOW TEMPERATURES CAN BE EXPECTED THAT WOULD REQUIRE ALTERNATE MATERIAL SELECTION AND /OR TESTING TO PROVIDE A PROPER INSTALLATION AS WELL AS FOR THE PROPOSED USE OF THE DIRECT FIRE TUBE HEATER. 11. DIMENSIONS AND ELEVATIONS TO BE VERIFIED BEFORE FABRICATION. 12. CHECK NPSHn FOR GRAVITY FEED APPLICATIONS SUCH AS FEEDING A POSITIVE DISPLACEMENT PUMP. 315 Y -B 7/5. 0 -B 7/8' • GROUND LUG 225' 180' ORIENTATION PLAN SCALE: 1/2' =1' -0" 56 r16'y1 /4' DOUBLER PLATE (SEAL YIELDED) 135' SEE 5574)AT COVER PLATE PETAL SHEET 04 O a e•es *o" ewe P "a c.. «ie.. MG. SCALE: DRAWN 1110: RJP ORIG. PATE: 3/7/2011 CHECKED BY: PROJECT AFT: 1200600 9T: PLOT SCALE: PL4T DATE: CHEVRON MIDCONTINENT / ALASKA MCA GENERAL STANDARDS STANDARD 1000 BBL FLAT BOTTOM STORAGE TANK 15' -6" OD x 30' -0" SHEET GRAWINC NHNBER AEV D 2081- 200 -10 —DD — 0002 -01 o 0 VARIES PER TANK HEIGHT 1 1/2' Q 1/2' DRILL 9/16m HOLE SLOTTED (T(P) 1 1/2" 5/8"o SLOTTED TANK WALL HOLE (TYP) WALKWAY CLIP DETAIL SCALE. 3 "= 1' -0" 01,02,03 VAEIES PER TANN HEIGHT 4' 155# FLAT FACE FLANGE WALKWAY CLIP DETAIL SCALE: 3 "= r -a' 01.02.03 4' STD. FIBERGLASS FLAT FACE FLANGE WRH 316 SS BOLTING ANTI- SIPHON SLOT SEE DETAIL THIS SHEET D0WNCOMER SUPPORT SEE DETAIL THIS SHEET TANK WALL 4" STD. FIBERGLASS 9E0 THREAD II OR EQUIVALENT PIPE 4" STD- FIBERGLASS RED THREAD 11 OR EQUIVALENT COUPLING (A5 REDID) 4' SID, FIBERGLASS RED THREAD 11 OR EQUIVALENT PIPE DIFFU5E9 SLOTS [SEE DETAIL THIS SHEET 4" STD. FIBERGLASS RED THREAD 11 OR EQUIVALENT P1PE BOTTOM Or TANK DOWNCOMER "A" (6918 LODSE) (NOTE 3) DETAIL f I SCALE: NTS 0102,03 EL +) 12' -0" 8"0 H0LE 10 3/8" BOLT CIRCLE 3/8' PLATE 11 3/4'0 HOLES HOLE PATTERN MATCHES API 8' FLANGE TAN6 EDGE 90' L.R. ELBOW FACE FLANGE TANK WALL — EL (+) 8' -6" EL ( +) 5 -0" 4" 150# FLAT FACE FLANGE CARBON STEEL 4" STC. FIBERGLASS FLAT FACE FLANGE WITH 316 5S BOLTING 4' STD. FIBERGLASS DOWNCOMER SUPPORT SEE DETAIL THIS SHEET 1 "0 SLOT (TYPICAL) 4" s10. FIBERGLASS R10 THREAD 11 OR EQUVALENT CAP DOWNCOMER "8" (SHIP LOOSE) DETAIL SCALE: NTS 9/16'0 HOLES (1YP 16) TANK DECK 8 "0 SCH.10 THIEF HATCH ENAROO MODAL 660-LB DETAIL SCALE: 1 1/2-- 1' -0" 0102"03 3" 150" 1 1/2' 316 SS THICK BLEED RING /7 WINSTON FIGURE 7 (0R EQUAL) TANK WALL BY VENDOR 101 411 3VBRA BY OTHERS 1/8'54' NEOPRENE PAD (TYP) E 1/4"x6 "46 TANK WALL DRAM Jr 3/8" PLATE 11 3/4 "0 SEAL WELD PRESSURE TRANSMITTER I MI PRESSURE TRANSMITTER DETAIL SCALE: 3 "- 1' -0" 01,02,03 B PIPING TECHNOLOGY HEAVY TWO BOLT PIPE CLAMP 4' 316 SS SEE TABLE = I C 3 14 6 DOWNCOMER SUPPORT DETAIL SCALE: 3 "= 1 -0" 16 "0 HOLE GROUNDING CONNECTOR BURNOY CAT. N0. 42C31058 (17P 2) PIPE 011 'MAX. RECOM. LOAD 155. 06507 ID750'F 8 C 0 E F STOCK SIZE H 1( APPROX. WEIGHT 165, EACH PER G 4" 3515 3135 3 9/15 1 4 7/8 3 3/4 7/8 3/8 4 2 4 11/16 5/8 5.50 BOTTOM OF TANK 3/8" PLATE 23 I/2 "6 ASME 6TT 150 MATCHES 16 "0 5C9.10 EMERGENCY VENT ENARDO MODEL 2516 DETAIL n SCALE: 1 1/2"= 1' -0" 01,0 2,03 GROUNDING LUG DETAIL n SCALE: 3 "= 1' -D" 01 02.03 2 1/2 "R 3'6 HOLE 0 3 "R 1'848' LONG 5107 (2 REQUIRED) CHEEK I) 1/4" OUTS1DE OF TANK ONLY Q S' TOP Or TANK LIFTING LUG (3 - REQUIRED) DETAIL 1 SCALE: 3 "- 1' -0" 01,02,03 TANK WALL 4' STD. F1BERGLASS FLAT FACE FLANGE ANK WALL ELEVATION ANTI - SIPHON SLOTS DETAIL 5041E: 1 "- 1. -0' Tor OF TANK 16' THIEF HATCH BUMPER PLATE DETAIL n SCALE: 3 "- 1' -D" 01,02,03 1 '046' LONG SLOT (5 REVD) 4" STD. FIBERGLASS RED THREAD II OR EQUVALENT CAP P LAN ANK WALL ---1'0 SLOT (TYPICAL) A.NK WALL TANK BOTTOM ELEVATION DIFFUSER SLOTS DETAIL SCALE: I'- 1' -0" 0/18'4 HOLE (TYP) C 000000000 HANDLES 1' 13 SPACES W 1" MANWAY COVER PLATE DETAIL M2 NOTE 1. LUGS TO BE PROVIDED FOR IVANWAY. 2, DIMENSIONS AND ELEVATIONS TO BE VER1F110 BEFORE FABRICATION. 3_ DOWNCOMER TO BE INSTALLED BY COATING 4E6009. 4. SHAPED TO FIT WALL CURVATURE A4D SEAL WELD TO FLOOR AND WALL. N0 BY REVISION DESCRIPTION RJP ISSUED FOR CONSTRUCTION 1141 Chevron North America Exploration & Production - MCBU DWG. SCALE: NOTED DRAWN BY: RT PINELL 0610. DATE: 3/7/11 PROJECT AFC: PLOT SCALE: CH11KL2 BY: APPROVED BY: PLOT DATE: SHEET D CHEVRON MIDCONTINENT / ALASKA MCA GENERAL STANDARDS STANDARD FLAT BOTTOM STORAGE TANK DETAILS DRAWING NUMBER 2081- 200- 10 --DD- 0002 -04 REV 0 A11 -0303A -00003 WP 3034 MAY FLOW BACK IS 450 GPM AND 130 PSIG DUE TO PSV CAPACITY AND SET POINT WP 3030 FRAC WATER TO DISTRIBIIIIDN HEADER/ FLOW BACK WATER FROM WELLPADS FROM FRESH WATER POND` 41-03034 -00003 PRODUCED WATER 1 FROM CPF -2 WP 3036 WP 30301 TO FILTER TANKS RENTAL BY OTHERS 1 A11-0303A -00003 FROM FRAC WATER STORAGE TANKS 59835BVW —ABJ -0211 PRODUCED WATER SUMP TANK WIDTH - 5, -0' HEIGHT - 6-O' CAPACITY - 703 GALLONS �EIiNCE PAD 596 -35 -Bd OPS TRUCK UNLOADING 59835BVW —PBA- 1216/1217 INJECTION WATER FILTER PUMPS OPER: 180 GPM OPER: DP 59 PSI POWER 7 IMP SKID MOUNTED 59135838-MM- 1001/1002 59835BVW— PEA - 1214/1215 INJECTION WATER FILTERS PRODUCED WATER INJECTION PUMPS 180 OPM 0 5 P51 DP CLEAN 1130 GPM 0 20 PSI DP DID1Y 10 MICRONS OPER 180 GPM OPER: DP 1477 PSI POWER: 184 HHP SKID MOUNTED r X LA X v BLANKET GAS SCRUBBER (NOTE 7) a WP 3030 WP 3038 (N01E 6) TYPICAL 1 OF 2 55111146 TANKS TYPICAL OF 3 OPERATING TANKS L -_ STREAM SUMMARY TABLE REM O TEMPERATURE CF) 32 -105 32 -105 32 -105 32 -105 32 -105 32 -105 PRESSURE (P510) (NORM/11404) 100/900 5/52 56/87 20/51 1497/1497 380/1125 WATER SP GRAVITY 1.014 1.014 1.014 1.014 1.014 1.014 FLOW RATE (GPM) (NORM/MAX) 0 /450 300/750 90/160 90/160 90/180 90/180 FLOW RATE (BBLS /DAY) (NORIA/14AX) 0/15,429 10,285/25,714 3086/8171 3088/6171 3066/6171 306/6171 TRUCK LOADING (NOTE 7) 59835BVW PBA- 1216/1217 1 59835BVW MAJ- 1001/1002 ■ 59835BVW PBA -12 4/1215 59835BVW A8J —Q211 4 1 2' F10ER SPAR 9001 (NOTE 2) LEGEND FROM 35 AY GAS LINE 59808AVW PFD STAGE 2 INJECTION DISPOSAL WELL 8-1 59817AVW PFD TO BY OTHERS FgT65 1. FRAC 04845 PROMO BY CHEVRON 2. INJECTION WELL CAPACITY 3000 681.5 RI 24 HOURS AT 59608A164 AID 1000 BBLS N 24 HOURS AT 5981706W. 3. LOCATED INSIDE 8UL010. 4. MAX 14JECTION WELL PRESSURE I5 365 PSG AT 59808AVW AND 565 PSG AT 5081761/W. 5 DELETED. HIGH LEVEL ON ANY TANK CLOSES NLET FLOW. . ONLY TIED TO 1 OF 2 SETTLING TANKS REM9ON APPROVAL RECORD RP/ DATE DISCIPLINE ARCH. BY DATE D450W HE BY DATE JpADirwPR DRAWING STATUS ISSUED REV DATE SCE P94 aWL ELECTRICAL MECHIAIMCAL NUCLEAR PPNG PROCESS PREUMNARY 601 02/23/11 COL WARM HVAC I90 0A / OC STRUCTURAL CONSTRUCT N K 8 7 F01 02/23/11 1SSUED FOR 0E900 00W PW 140T APPROVED FOR 604510U0110H MESS WO 9 0 1E0 DESTROY ALL PANTS BEAM EARLIER PROJECT NO.: 29454 ORAWI* MOW 041E 02/23/11 Chevrsn idG4n tTn en t /Ala sko SE3LJ wooCPiavrorn North Am ericc Exploratio n or-1d Pro GluctiOn D AB A CFEC10 R 061E NONE 5 STAGE2 ■ IP�RO�CE�SA�S�ROWryyDIIA�GyRA�Mp �F �/�7F�LF STAGE 2 TIMER M MAGDU11- FRYYV4[V WATER f1 C!IO1 CHEVRON PICEANCE PBSR- 59$35BVW -PRO- PFD- CHV- 40000-00001-0Q F01 2 1 8 / • - • • • • • Jr • • • /y • ▪ • • • r • / / �•▪ ' / / • J J •l • • . / r J • J • • • • • / JJ / / /^ I 1 I ✓ / / I / J / / / /' / / / / r 'f / / / // ,/ I ! J / / • r/ ♦ ,P / t , / / /. / l / / . /• ' • • • / ' / / • • • / r` / • • r 1 1 01. • O9S1P1G POKR PRl CHEVRON NORTH AMERICA EXPLORATION AND PRODUCTION PICEANCE BASIN WATER MANAGEMENT FACILITY 598 -35BV TANK PROJECT LOCATED IN SECTION 35, T5S, R98W, 6th P.M. GARFIELD COUNTY, COLORADO • / £ GSMG GU'UU1M -MUM 19 OE VOW) MATERIALS FOR RE2IOYAL AND DIOPOIAL It MAW $.14 OF (OSMG & P P.M 110' OF 4175114 G PPr PAM t GLOM 11S' Of 1»31014 PPVR2'RM &M E* A MOOS( N RAr MP T tS 5 AT -OXAW DOW GOFR4,04 MEDI 0. PflalOrrE 4 STAR SIW00I10LS DAg0WC33' Irnaril:r.�M! TOTAL NEAT LM'0 (NANNY TO HE REMOVED; 830 C1)1D5 5 GS • : / • MidCont'nent / Alaska SBU Chevron North Americo Exploration and Production f SCALE: 1 20' UINTAH ENGINEERING & LAND SURVEYING 85 SOUTH 200 EAST - VERNAL. UTAH 84078 U, (436) 789 -1019 REV NO L02 U01 REVISIONS COMPANY REYIEW COMMENTS -- 2/26/11 APPROVED FO0 CONSTRUCTION - 3/4/11 SCALE: 0RA1YN 8l 000 EYEO BY: 20 Cd C. E -n LE: /CHEVIicN/WATER MANAGEMENT rACIuTY /351178 .DWG PROJECT. 211 -1142 TUBE 20202 PICEANCE BASIN SKINNER RIDGE WATER MANAGEMENT TANK PROJECT (598 -35BV) SHEET NAME: DEMOLITION AND REMOVAL PLAN ATE: 2/18/2011 SHEET. 4 OF 10 DWG. NO. P991- 5983580- QV- 01T -UIN- 00000- 00002 -00 Y. 001 PROPOSED FUEL GAS PIPELINE ROW THE FUEL. OAS PIPELINE RIGHT -CIF -WAY 8;0.UDE5 15' ON E ACH SIDE OF THE FOLLOWNG DESCRL8E0 CENTERLINE AUQIMENT. THE BEONNING OF THE FOEL GAS PIPEUNE RIGHT -OF -WAY CENIERUNE ALGNMENT BEGINS Ai A POINT IN THE 5E1/4 NE1 /4 OF 5EC11GN 35, 155, R989, 6TH P.N. *111CH BEARS N24'27'51.59'W 1255.78' FROM THE EAST 1/4 CORNER OF 5010 SECTION 55, THENCE 02515'05.06'W 96.06', INDICT 5257'2536'W 19160', THENCE 535'27'27.76'E 62 -28'. THE PIPELINE ROW ENDS AT A POINT N32'06'51.56'W 948.77` FROM TIE EAST 1/4 CORNER OF SAID 5EDTION, . THE FUEL OAS PIPELINE ALIGNMENT ROW EXTENDS *351.91. O ASIS OF 8£AR94C5 15 THE EAST UNE Of THE 801/4 SECTION 35, T5S, R9871, 619 P.M, AN0 15 ASSUMED ID BEAR 50'05'27.00'E. f956'N' P0.54YIXE L14 WON PUTT CAS PMEUNE/ALW26AIENT STA 0 +00 [45!944' VAIW 20017004 4 flO *104' 171 -M 10 114 E7/ OCR 9EG 33. INK[ 69 w 124275159-E 129170 \ 4N61MO LADLE all® EN5W,G HATED PNMAE TO MF NE COR SECTION .55, y, T5S, R98111 brie P.M. BRASS CAP P01OI90.1 ( \ / ,' • Af1CNMEH7 '\ , ....„/ 4/6 STA 3157.94 f-, 1415' '' 476 ' .\ 1 41X40 00.71E26E *6184ENC6 1OO1T SUMO, P1114 416 1. 3034'2013X1 1.4 1.0021107422'311.17-e (ton ray BM /2 I � 1\ 35' SETBACK FROM ORDINARY 19071 WATER MARIE £X /SANG CENTRAL FRAC PAD (OUTSIDE SCOPE OF X41 TEN MANAGEMENT FAC1UT)1 BM '1 ti 4` POLNT OF B CINNINd I� y. 1 EAST 1/44 COR SECTION 35, T5S, R98W, ITN P.M. UELS ALUM CAP CHEVRON NORTH AMERICA EXPLORATION AND PRODUCTION PICEANCE BASIN WATER MANAGEMENT FACILITY 598 -35BV TANK PROJECT MidCont'nent / Alaska SBU Chevron North America Exploration and Production REV NO BY NEw5P0140 LOCATED IN SECTION 35, T5S, R98W, 6th P.M. GARF]ELD COUNTY, COLORADO PICEANCE BASIN WATER MANAGEMENT FACILITY - 358VW TANK PROJECT BEGINNING AT A POINT IN THE SE1 /4 NE1 /4 OF %CROW 35. T5S, R9821, 6TH P.M. WI1NA1 BEARS 146915'46.30"8 191.40' FROM THE EAST 1/4 CORNER OF SAID SECTION 35, THENCE X82'21'00'8 29.99', THENCE 65'54'06'E 265.78', THENCE N1918'00'W 257.07', THENCE S65'33'42'W 247.45'" THENCE *36'4•59'W 88 -24, 131ENCE 563'43'21'84 4611', THENCE N20'35'01 -9 142.22'. THENCE N250'OS'W 54.26', THENCE N32'39'39'E 54.26', THENCE X5010'02'0 91.39', THENCE N35'27'28'9 43.93', THENCE N227'23'0 199.38', THENCE NT16'05'E 111,69', THENCE 582'43'55'4 30.05', 'THENCE 5414 "16 -W 298-00'. THENCE 5357728.E 34.47, THENCE N561102.0 36.62', THENCE S8a03'58'E 126.97'. THENCE S3255'28'E 140.59', THENCE 024'44'21'5 234.27', THENCE 515115.40.E 167.49', THENCE 59•2'24'W 277.60' MORE OR LE55 TO THE PC041 OF BEGINNING. CONTAINS 13.14 ACRES MORE OR LESS. BASIS OF BEARINGS I5 THE EAST LINE OF THE NEI /4 SECTION 35, T5S" R989, ERN P.M. AND 15 ASSUMED TO BEAR S095'27.00'E. 144 10111 LENGTH OPECIMH 1.1 2340' N1 2'210'W 19 21370 N1ro1' ®t 11 227.97 6111000111 14 347.25' 34457470 LI 8424' x262047''0 40,IT 1131721'W 1.7 14277 42039.0111 12 91.71' 6244'06'0 L7 3426' 63214'304 L10 4117' 42941062.E 411 4169 X111721. 112 19390 N27Y73'E 1.13 111.60 6714145'E 1.14 1.11 30.08 11227360E 27410 1414'16'. 114 34.17 1363T2KE 1.17 36.61 65110'020* UT 1244T 44212351i L12 19454' 14.90521E 420 234,2E 124 167.49 1119140'6 1.22 277.00 193614'0 BENCHMARKS BM #I DESC.: SURVEY PNT NO. 396 (B.M.) N:17748.11 E: 51962.06 EL: 5991.33' BM ;2 OESC.: SURVEY PNT N0. 398 (0.54.) N:18177.62 E: 52191.71 EL: 5993.82' SCALE: DRAWN et SURNETEO 85': - 60' C.A.C. 1 G.O, 8.0.8. PROJECT: 211 -1142 SCALE 1'- 60' UINTAH ENGINEERING & LAND SURVEYING 85 SOUTH 200 EAST - VERNAL, UTAR 84078 (4 3 5) 7 6 6 - 6 0 1 7 L52 030 COMPANY RENEW COMMENTS - 2/28/11 UOI C APPROVED FOR CON514UCT10N - 3/4/11 /CHEVRON/WATER MANAGEMENT FAOUTY /358N9DWG SHEET NAME: SEW PLAN TUBE FILE: 23262 OATS: SHEE F. 2/11/2011 2 Or TO PICEANCE BASIN SKINNER RIDGE WATER MANAGEMENT TANK PROJECT (598 -3581/) IRE) 001 DWG. N0. P65R- 59835848'- OV- 91- UIN- Oa0o2- 00001 -01 / / / / / / / / / / l r / / ,, / / - / / -4 / r4 r ,, f / f & r d f0 / / V / r f ✓ 1, / / / / / / / / / / / r eff� La 5000 022(0 72(1202 10 197 ;4- °`t,'d o o--", Malmo P2 / AMR. RM /2 ( n• wawa 1202 7,02172x7 woe, cu. 2w6I—\\\ CHEVRON NORTH AMERICA EXPLORATION AND PRODUCTION PICEANCE BASIN WATER MANAGEMENT FACILITY 598 - 35BV TANK PROJECT m52N2 AMMAN 01(2 PPE 2001 JIRSERRNCI P0017 9412Er PM14 414 LA1- 39,74321T0 00 10440'4.t5N 000 U) fl 9620 (II 1.2200.92 2,42,2(41 9,.20 1200 FORAM IAIRS (TR.) — 7048097 340400 2441125 0014020 4 10211222M2N1 0742215 62 070 A5) 81 Oe4AOo r) \ \\ E10SMO SECOIM001 COMA? 04 1411. IPAC PAM 110 14%4°60 R. 085100- • / 9° /� \ r O r \ rr 11 /r fr_ —_1 4 ✓ f r / \ \ I \ 1 \ EXISTING CENTRAL FRAC PAD \ (OUTSIDE SCOPE OF WATER \ MANAGEMENT FACILITY PROJECT) \ I I 1 Chernm REV 010 BY REVISIONS LOCATED IN SECTION 35, T5S, R98W, 6th P.M. GARFIELD COUNTY, COLORADO EQUIPMENT MST (598-35BV) EQUIPMENT DESCR /P17ON (00AYT 20-101 0areSto00 (002002, ,MaYDa 9000 iCR.rrm 0tl0. [20222* 2*2* tm-fl00 earma Paw P2, -NS, HP POOP 3,PRr 152-11028 m maws "• ma.�r m war Ma. 4MP 0440 112PLRA4Y 430Y AVM 420 AUK 41 SLAJAS (9 52010? IMP 07000440( Mum map A14-4114 sir MP 702* 1972 -1111 RAP 2012* N1 -0110 sup MT - l,IFR 020$71 5151EM 48202UCO06 ppopasEs 0,1 PN0P030 1.010 9a TAWS (l) Make= 082.041 000 PIPWp P MI RAMS BENCUY AR <S 820 1 DESC.: SURVEY PNT NO. 396 (B.M.) N:17748.11 (:51962.06 EL: 5991.33' BM #2 DESC.: SURVEY PNT NO. 398 (B.M.) N:18177.62 E. 52191, 71 EL: 5993.82' MidCont'nent / Alaska SBU Chevron North America Exploration and Production CRAW? BY, SURVEYED BE SCALE: = 20' C.J.C. 0.0., 102 L101 CJC CJC COMPANY RENEW COMMENTS - 2/28/11 APPROVED FOR CONSTRUCTION - 3/4/11 E -((LE: /CHEVRON/YIAIER MANAGEMENT FACILITY /338Y4.0WG SHEET NAME: SITE PLAN PROJECT: 211 -1142 9.18E FILE: 23262 DATE: SHEET. 2/16/2011 3 of 10 SCALE 1"= 20' UINTA"! ENGINEERING & LAND SURVEYLNG 85 SOUTH 200 EAST - VERNAL, UTAH 84078 (4 9 5) 7 8 0 - 1 0 5 7 PICEANCE BASIN SKINNER RIDGE WATER MANAGEMENT TANK PROJECT (598 -35BV) via - NO, 0000- 596359VW- C)V -5)T -MIN- 00060 - 00001 -02 REV. 001 CHEVRON NORTH AMERICA EXPLORATION AND PRODUCTION PICEANCE BASIN WATER MANAGEMENT FACILITY 598-35BV TANK PROJECT CIVIL GENERAL NOTES 1, THE PROJECT IS LOCATED IN GARFIELD COUNTY. COLORADO AND WITHIN THE RESOURCE LANDS - GENRE SLOPES ZONE DISTRICT 2, TEMPORARY BENCHMARKS SHALL BE ESTABLISHED BY SITE SURVEY AND LOCATED ON PBSR- 59835BVW- CIV- SRV -UIN- 00000 - 00007 -OD. 3. EXISTING PRIVATELY OWNED IMPROVEMENTS SHALL BE PROTECTED. IMPROVEMENTS DAMAGED 8Y CONSTRUCTION ACTIVITY SHALL BE CORRECTED BY THE CONTRACTOR AT HIS EXPENSE. 4. EXISTING UTILITIES ARE PRESENTED BASED UPON BEST AVAILABLE INFORMATION. EXACT UTILITY LOCATION SHALL BE FIELD VERIFIED. NOTIFY UTILITY OWNER 48 HOURS PRIOR TO COMMENCEMENT OF CONSTRUCTION. CONSTRUCTOR IS RESPONSIBLE FOR DAMAGE TO ANY EXISTING UTILITY. SHOWN OR NOT SHOWN ON PLANS, 5. THE CHEVRON FUGITIVE DUST CONTROL PLAN (FDCP) SPECIFICATION PBSR - ALL- CLV- SPC -URS- 0000 0- 04013-00 SHALL BE IMPLEMENTED To CONTROL FUGITIVE DUST SOURCES DURING ALL CONSTRUCTION OPERATIONS, 6. ALL NORTHING /EASTING COORDINATES ARE RELATIVE TO tJFL S, LLC SURVEY CONTROL (PICEANCE BASIN CONTROL). ALL LAT /LONG COORDINATES ARE REPORTED ACCORDING TO NAD 83. ALL NORTH ARROWS REFLECT TRUE NORTH BASED ON THIS COORDINATE SYSTEM. 7. SAFETY SUPERVISION SHALL BE EXERCISED N ACCORDANCE WITH RELATIVE LAWS, REGULATIONS AND ENGINEERS REQUEST. 8, THE SITE WILL BE RECLAIMED AFTER THE END OF ITS OPERATIONAL LIFE IN ACCORDANCE WITH COGCC REQUIREMENTS. RECLAMATION ACTIVITIES WAEL INCLUDE REMOVING PIPELINES, GRAVEL FROM ROADS AND ACCESS PADS; RE- GRADING THE SITE TO THE ORIGINAL CONTOURS (APPROXIMATE); REPLACING TOPSOIL; REVEGETATION WITH APPROPRIATE SEED MIX; AND INSTALLING ANO MAINTAINING ANY REQUIRED STORM -WATER CONTROLS UNTIL FINAL STABILIZATION IS ACHIEVED, RECLAMATION OF THE SITE SHALL TAKE PLACE IN ACCORDANCE WITH THE CHEVRON SKINNER RIDGE FIELD SPECIFIC STORM WATER MANAGEMENT PLAN. PROJECT CONTACT INFORMATION CLIENT: CHEVRON NORTH AMERICA EXPLORATION AND PRODUCTION COMPANY 1400 SMITH STREET, RM 46460 HOUSTON, TX 77002 (713) 372 -1324 PROJECT ENGINEER: ULNTAH ENGINEERING & LAND SURVEYING. ILO 85 SOUTH 200 EAST VERNAL. UTAH 84078 (435) 789 -1017 LOCATED I N SECTION 35, T5S, R98W, 6th P.M. GARFIELD COUNTY, COLORADO SHEET INDEX DRE /C'NERAL N07£s/LEDEND/SHEET MET' 9IE PLAN 87E PLAN DEMOLITION AND REMOVAL PLAN 97ADIND PLAN 7EMPOQARY AND PENVANENT £R0901 CONTROL 9TE GRACING PROFILES 081 L7IA0WG AND EROSION CONTROL DENTEs L000 Dot TANK FOUNDA 71fW PLAN STRUCTURAL GENERAL NOTES AND DEIA/LS LEGEND DAC N0 P89R- 5483581W- aV -LON- IAN - 00000- 00001 -00 D11C No P89Y- 548J58VW- aV- 9T- LW- A200 0- 01901-01 DAV NP P8SR- 598J581W- aV- 9T -1kN- 00000 - 00001 -02 ONO NO PSSR- 5583581'W- aV- 2T -+AN- 00000 - 00072 -00 DWG ND.' PBSR- 598318VW- pV -9T- OWN - 00000- ooDIS -00 PLAN Mac NO. P88R- 598J5814V- aV- 97- 1AN- 00000- 00004 -00 OMC NA P89R- 5481 59NV- aV- 077-4AV- 60000 - 0000E -00 0110 NO PBSR- 5583581W-aV -OR -OWN- 0 0000- 40 0.012 -0 0 DAC ND PSI'- 598J541,W -aV- END- C1V -00 ':0- 00001 -00 OWC NO P89P- 59835S0W- CIV- FND -84N- 00900- 00002 -00 11000 POW FG 8EII3IE CLA r Lw£R/SAND/ORAFEL CATERS EM511NG 10' MAJOR CONTOUR VW £X15RN0 2' MAYOR 00WTOL4i LINE PROPOSED 10' MAJOR CONTOUR LINE PROPOSED 2' ARMOR CEWTOTR LONE EAVSRNG DRAINAGE OKN PROPOSED SWALES AND DILER90Y DITCH EDGE OF PAD/IOLS Or EX ROAD MAYO PR01ECD1E DARR/ER (.ERSEY 8AR81ERI 11.65880 0881E80 840848 LNE 1 EA2514NG BURIED PIPELINE PROPOSED FUEL CAS PIPELINE g SLASH 8ERM (99191 DERV 9L T /Z5 WATTLE (F78ER ROLL) ■ 4 w N t 41ACN AND .SEEDING AREAS EXISTING 1ENLELAVE 51LR&Y 172' C£N1E81)8 OF CLEAR CREEK 35 FI SETBACK FROM 08O.NARY NNNM WA IER 8ARK 100 - rR FLDLIGPLAL4 GiallaTT MidContirent / Alaska SBU Chevron North America Exploration and Production new NO RE41110N5 !wain NO YALE C.J.C. ORA81 BY: I SURVEYED BY: 0.0., B.E.B. • SFEV.V481 CRAP EX1MING CAM( WARN 00511116 PDAERPCLE PL55 SWIM COTNER 40VDL1ENT /07185) 8ENCHMA K PIAN PROJECT: 211 -D47 UINTAH ENGINEERING & LAND SURVEYING 85 SOUTH 200 EAST - VERNAL, UTAH 84078 (435) 739 -1019 502 DJC COMPANY REVIEW COMMENTS - 2/28/11 U01 51C APPROVED FOR 5041180514014 - 3/4/11 E -FILE: /CHEVRON/WATER MANAGEMENT FAILITY /35BW1DW0 TUBE FILE: 23282 YILrtAN[:t DIAJIN J1UNNt11 NIU4t WATER MANAGEMENT TANK PROJECT (598 -35BV) SHEET NAME' TITLE /GENERAL NOTES/LEGEND /SHEET INDEX DATE: 2/13/2011 SHEET. 1 ac 10 04/6 - N0. PBSR- 594359Vw- 0IV- 1044 -U94- 00000- 00001 -00 _ REV. U01 1,000 BBL TANK 15' -6 "x30' -O "H STEEL TANK m 12" 16' 11" FT,FVATTQN VIEW 5' STEEL FIANCE (AS PER TANK MANUFACTURER) CHEVRON NORTH AMERICA EXPLORATION AND PRODUCTION PICEANCE BASIN WATER MANAGEMENT FACILITY 598 -35BV TANK PROJECT LOCATED IN SECTION 35, TSS, R98W, 6th P.M. GARFIELD COUNTY, COLORADO SLOPE FINISHED GRADE AWAY FROM TANKS (2% MIN.) NOTES 1, COMPACT MATERIAL BELOW FOOTINGS TO 95% MAXIMUM 09? DENSITY (STANDARD PROCTOR) PRIOR TO PLACING CONCRETE FOR FOUNDATION TO PR EVENT DETRIMENTAL SETREMENT 2. CONCRETE rc SHALL BE 3,000 PSI 3. TOP OF CONCRETE FOUNDATION SHALL BE LEVEL WITHIN *1 /4" IN THE TOTAL CIRCUMFERENCE (MEASURED FROM THE AVERAGE ELEVATION) 4. TOP OF COMPACIE0 BEARING SOIL SNAIL HE LEVEL WITHIN ±0/2" IN THE TOTAL ORCUMFERENCE (MEASURED FROM NE AVERAGE ELEVATION) a. 1 -1/2" ANCHOR BOLTS SHALL BE PLACED EVERY 6• AROUND THE CIRCUMFERENCE OF THE TANK. STEEL TANK MANUFACTURER RESPONSIBLE FER PROVIDING AN ANCHORING FLANGE WITH (9) LOCATIONS FOR I -1/2" ANC1-109 PROJECTIONS 16' 4" 16' 11' PLAN VIEW MidCont'nent / Alaska SBU Chevron North America Exploration and Production 9EV I SCALE: DRAWN 8Y: SURVEYED BY: SCALE: 1/2" - 1" UINTAH ENGINEERING & LAND SURVEYING i .� 85 SOUTH 200 EAST - VERNAL, UTAH 84078 .... ........ ............ (/36} 789 - l0 L7 PROJECT: NO BY REVISIONS 1/2" - 6 ! 0,2.0. I 0,0., B.E.D. 211 -1142 L02 CJC COMPANY 9E14E9 COMMENTS - 2/28/11 E -FLE, 1U80 FIE, U01 WC APPROVED FOR CONSTRUCTION - 3/4/11 fOFMIY!IAA E AM48 lDIT FAOUN -VWA rd...Torun 2 3 2 D 2 SHEET NAME: DATE: SHEET: DWG. NO. REV. 1,000 BBL TANK FOUNOAT ON PLAN & ELEV. 2/10/2011 9 or 10 PDSR- 598359VW- aV- F140 -UIN- 00000 - 00001 -00 801 rwr,ANCE BASIN SKINNER RIDGE WATER MANAGEMENT TANK PROJECT (508- -35BV) NE COR SECTION 35, T55, R98.1.4 6T14 PM, BRASS CAP r \ ♦ .\ 2,01230 PO' ♦ COSr112 GAUL 173N70 \ L 11 \ \ \ ' \ m' Sclera 5M G(001MY 1411 1 TATER MARX 3341190 PO4OMnw3 123743051st tar, MW Oro (14 I0 -11 LOG [.15540 2911130 .L 41417111 T 0 100.111 ILoWSE/ \ ♦ \ \ \ 1011-91 541202PNw, — — \ \ CHEVRON NORTH AMERICA EXPLORATION AND PRODUCTION PICEANCE BASIN WATER MANAGEMENT FACILITY 598 -35BV TANK PROJECT LOCATED IN SECTION 35, T5S, R981N, 6th P.M. GARFIELD COUNTY, COLORADO PROP03431 111 019 WE 34 ROA 411 µT. 3a541o.43L 4.aN1 1199139Jr W II EX /SRNC CENTRAL FRAC PAD O (OUTSIDE SCOPE OF WATER MANAAC�CFMENT FAGUTV) ^1 31' RRI (0 01m(NW1Y NRl WAIOi MW 1`` EAST 1/4 COR SCCOON R98W, 6711 P.M. LIEU ALUM. CAP PA011* OF BEC)NNTNC PICEANCE BASIN WATER MANAGEMENT FACILITY — 35BVW TANK PROJECT BEGINNING AT A PONT IN THE SE1/4 NE1 /4 OF SECTION 35, 05S, 6988, 6TH P.M. 10-1104 BEARS 44915'48.31'W 191.40' FROM THE EAST 1/4 CORNER of 5AJD SECTION 35, THENCE N82'21'O0'W 29.99', THENCE N6'54'06'E 265.76', THENCE N19113'00'W 257.07'. THENCE S66'33'42'W 247.15', THENCE 1136'46'59 °W 6624', THENCE S63'43'21'W 46.11', THENCE N20'35'01'W 142.27, THENCE N2'S0'06 "W 54.26', THENCE N32'39'39'E 54.26', THENCE N5610'02 "E 91.39', THENCE N35•27'2tew 43.93', THENCE 42'27'23'E 199.38'. THENCE N716'05'E 911.69', 1HENOE $62'43'55.5 3000', THENCE 5414'1614 298.00', THENCE 535'27'28'4 34.47, THENCE N5610'021 36.62', THENCE 582'03'56 "E 126.97, THENCE 535'55'28'E 140.50', THENCE S24'46'21'E 234.27', THENCE 515'05'40`( 167.49', THENCE 59'58'24°8 277.60' 8005 05 1455 TO RE POINT OF 130G1441NG. CONTAINS 33.14 ACRES MORE 0R LESS. BASS OF BEARINGS I5 THE EAST uNE OF THE NE1 /4 SECTION 35, T55, R98W, 6Th P.M. AND 15 ,05544940 TO BEAR 50.5127.09'4. — 5. �\ owns or o.11u91,ua1 (17111 1 T 2 or Au LEGEND EMSRNO 1D' MAJOR CGWIDUR UNE COSTING 2' AMOR CONTOUR UN£ PROPOSED 10' HATCH CEASITAIR LINE PROPOSED 2' MINOR GEWGAW LINE PROPOSED SHALES AND LN1477SON DITCH EDGE OP PAD/EDGE OF FK ROAD ERISRNC PROTECRIE BARRIER (JERSEY BARRIER) £JDSRNG 00£RN£A0 P01$RLIN£ CAWING HURREV PIPEZWE PROPOSED fT/E1 CAS LANE CRISPING FEN -CELINE <37S7WG CATTLE GO4RD COSTING PONERPIXI FESS SECTION CORNER MOAYINENT (FOUN0) DENIERLIHE OF CLEAR CREEK 35 FT SE]WACK FROM OVOXARV HIGH WATER MARX 100 YR J2000PLAAT REY NO L02 1101 BY CJC CJC 1018610311 MidCootinent / Alaska S8U Chevron North America Exploration and Production REVISIONS COMPANY RENEW COMMENTS - 2/28/71 APPR01'E0 FOR CON9TRl1C11aN - 3/4/11 SCALE: BRAWN BY: 71 5CR44YE0 BY: 60' C.J.C. G.O., B.E.B. E -ALE: /CHEVRON/WATER MANAGEM ENT FACIL/TY /3500.0WG SHEET NAME: FACILITY SURVEY PROJECT: 211 -1142 TUBE FILE: 23262 OA1E: SHEET: 2/18/201* 1 or 1 111E TABS UPON PEAPsOok L2 141171'OC'r 215,76' 1405406'4 951,07 NTniti0'0 L4 LB (4 141,15' $505341'4 9119 x34'49311'0 41 -11' 313'43'10'0 L7 11111 0103744117 0I 04,51' 925111'4 t1 3414 43739147 "1 u1 L11 L14 L13 31 34 1451'1441'0 N339T91-r 119.34 111.89. 5.917937E knrb5Y 0414 15445317 19600' xl4'111P L14 34.47 33397971 'I7 boar 5610OTE LI8 91.95 5404011'9 Lie 54134 532232E0 Lm 1.3.15 SS,44a1 Lt1 56144 11141'49'E 211 271.60 595414'0 UFNCHMARKS BM #1 DESC.: SURVEY PNT N0. 396 (B.M.) N:17740.11 E: 51962.06 EL: 5991.33' BM #2 OESC.: SURVEY PNT N0. 398 (0.M.) 9119177.62 E: 52191.71 El: 5993.82' s s 0 SCALE 1".80' UINTAH ENGINEERING & LAND SURVEYING 85 SOUTH 200 EAST - VERNAL, UTAH 84078 ( 4 3 6} 7 6 9 - 1 0 1 7 PICEANCE BASIN SKINNER RIDGE WATER MANAGEMENT TANK PROJECT (598 -35BV) OW0. NO P95R- 59835878- CIY- SRV -uIN -00000 -00001 -00 REV uOT DETAIL A - GRAVEL SURFACING DETAIL 2of eon 1' LOLA 3/.. Row I'. DaMFACT e! MAau a seail OaaWK r�977) �TMALT TO es: wneuu DD.p TY ISTMOM PROCTOR RSIM 06A1) DETAIL 0 - CULVERT OUTLET PROTECTION DETAIL IV SC41 RIP -RAP WLL BE PLACED AT ALL CULVERT INLETS AND OUTLETS AND RIP -RAP MIX BE SIZED DEPENDENT UPON PIPE DIAMETER AS SHOWN. RIP RAP SNA71 BE WELL GRADED WITH A SUFFICIENT AMOUNT OF SEIALLER STONES UNIFORMLY DISTRIBUTED THOUGHOUT. PIPE DRAM. -C D' -24" 25• -4B' 4B' -72- RIP -RAP SIZE 508 shall be 8` in diameter or Iprger 508 shall be. 12 In diameter or longer 505 shall be 18' In diameter or larger 10' 15' M 12' 15' 24' YARDAGE Al cyds *8 c1d, 8l8 side 'LIgar Than 72 , consult engineer, 1IIIIIILl.i///!llllI, 141 '"T n �R� i�Wtp r " \ I.I ! if, 1. 'l-0 SECTION A-A A DETAIL. 8 - SLASH 8ERM INSTALLATION DETAIL 4d, IEmovolt fl6' conch anoLitmrt: Ildbiu.!R4„J lynun„ ietdno-lNRia ae nawo ll. 404110.973471. Y. P'hm Toeo1•!Ww DETAIL E - EROSION CONTROL/TIBER ROLL INSTALLATION DETAIL DETAIL C - SEDI !ENT TRAP INSTALLATON DETAIL NO SCALE CATONI CfresoNinaot 0,r8■Hr,1111#1001^,4 n14111. II115.III141.l.!wIIWl ,Inllnn s111110mlaprn A111 *11 tJ.1(kr ARmylwmwwnrm Nonoi oteel rlllora BId.4riprsolhrt15.11 Om 18 Rrenr 9001),, NNIr4.141411 r Br®rConmi TROOSry BB@1: N01 TOSCO/9 .v Note: Install fiber roll along a level 00010*!. Molitor .paling measured along the lace of the slope re Eeleean 8 11 and 20 It TYPICAL FIBER ROLL INSTALLATION Instal{ o Mgr roll nar !lope where It transitions Into a steeper dope IT 15. ENTRENCHMENT DETAIL N: T.S. c 37502 CHEVRON NORTH AMERICA EXPLORATION AND PRODUCTION PICEANCE BASIN WATER MANAGEMENT FACILITY 598-35BV TANK PROJECT LOCATED IN SECTION 35, T5S, R98W, 6th P.M. GARFIELD COUNTY, COLORADO DETAIL £ - SILT FENCE INSTALLATION DETAIL AO scut • 50 FLOW O0 I6" 6` SECURE FABRIC TO STAKES STAKES 212 (NOMINAL) rpt NAR1110 WC0900D, T1)AL 1 -1/Y v 1-1/2' x a 6T7 NNI9tED WAGE �� 1. 9LT FENCE SHALL BE CONSTRUCTED BEFORE UPSLOPE GROUND COWER IS REMOVED. CLEARING, GRUBBING, AND STUMPING CAN OCCUR BEFORE 91.7 FENCE INSTALLATION IF GROUND COVER IS NOT REMOVED. 2. ALL SILL FENCE SHALL BE PLACED AS CL05E TO THE CONTOUR AS POSSIBLE 50 THAT WATER TILL NOT CONCENTRATE AT LOA POINTS IN THE FENCE AND S0 11187 SMALL BANES OR DEPRESSIONS 11181 MAY CARRY SMALL CONCENTRATED FLOWS TO 1HE 917 FENCE ME DISSIPATED ALONG 175 LENGTH. 3. ENDS OF THE 9L1 FENCES SHALL BE BROUGHT UPSLOPE SLIGHTLY SD )MAT WATER PONDED BY 111E SILT FENCE WILL BE PREVENTED FROM FLOWING AROUND THE EN05. 4. SILT FENCE SHOULD PREFERABLY BE A MINIMUM 00 ID FEET FROM THE TOE OF SLOE. 5. THE TRENCH SHALL BE MADE WITH A TRENCHER, CABLE LATINO MACHINE, SUCINO MACHINE, OR DIVER SUITABLE DEVICE THAT WILL ENSURE AN ADEQUATELY UNIFORM TRENCH DEPTH. B. 'WHERE TWO MORONS OF PREFABRICATED 9LT FENCE ARE COMBINED INTO ONE RUN, THE ENO POSTS SHALL et CONNECTED 5017 1HER. NOT SIMPLY OVERLAPPED. 7. 91T FENCE 91000 ALLOW RUNOFF TO PASS ONLY AS DIFFUSE FLOW 58018011 TIE 13E013011LE. IF RUNOFF 01ERT8PS 111E SILT FENCE, ROWS AROUND TIE EROS OR IN ANY OTHER WAY BECOMES A CONCENTRATED ROW, ONE OF THE FO110AIN0 SHALL BE P0011041000, AS APPROPRIATE'. A) AN 005111ONAL RUN OF 9LT FENCE 511011 BE RACED UPSTREAM. B) TIE LAYOUT OF 718E SILT FENCE SHALL BE CHANGED, C) ACCUMULATED SEDIMENT SHALL BE REMOVED, OR D) OTHER PRACTICES SHALL DE IMPLEMENTED_ 6 SE0MENT OEP0915 SHALL BE REMOVE° LINEN ME DEPOSIT REACHES .0'?OO 0MATELY ONE -KALE OF THE HEIGHT OF 111E 91.1 FENCE. 9. ALL STOMPI105 SHALL BE IN0RCLE8 NMI SILT FENCE. 1D 9LT FENCE FABRIC SHALL MEET THE FO.181MNG SPECIFICATIONS: NOM MOLE STRENGTH 120 LBS.. A501 D 4632; 6A)DM08 ELONGATION AT BO LBS. 151[ ANN 0 4632: MN0100 PUNCTURE STRENGTH 50 LBS. AVM D 4833; LRMMUO TEAR STRENGTH 40 185. 8518 0 4533. APPARENT OPENING 93E O. 0.8480. AST0 0 4251; 6*18NM PERMITDMTY 1x10- 25EC.. -1. A51M D 4491; WATER ROW RATE 15GAL/LRI/9D. FE; IN EXPOSURE STRENGTH RETENTION, 708 A51O 0 4355. MidCantinent / Alaska 5BU Chevron North Americo Exploration and Production L02 CJC CJC 5000005 COMPANY RENEW COMMENTS - 2/25/11 APPROVED FOR CONSTRUCTION - 3/4 /11 SCALE: DRAWN 8Y: 150855YED BY: PROJECT: NO SCALE C.J.C. ^" "'" 142 E -FILE: TUBE FILE: /CHEVRCN/WATER MANAGEMENT FAGLTY /35BVW-0WG 22131-2: 8 Z PROJECT (598-3SB V) SHEET NAME: DATE: HEET: DWG. 80, COAL GRADING AND EROSION CONTROL DETAILS 2/15/2011 8 OF 10 P85R- 59535®VA -CIV -811.- URN- 010000- 00002 -D0 UINTAN ENGINEERING It LAND SURVEYING 85 SOUTH 200 EAST - VERNAL, UTAH 84078 { 458) 788 -1017 PICEANCE BASIN SKINNER RIDGE WATER MANAGEMENT TANK REV. 1)01 GENERAL STRUCTURAL NOTES B ASIS OF DESIGN 1. GOVERNING BUILDING CODE INTERNATIONAL BURDING CODE 2009, API 650, ASCE 7-05. AG 316 -05 2. GRAVITY DESIGN ROOF '2D P5F SNOW LOAD 40 PSF 3. WIND OEGGN: BASIC NAND SPEED 90 MPH EXPO511RE C 4. SEISMIC DESIGN (26 P.E. IN 50 YEARS): GARFIELD COUNTY, COLORADO (LAT: 39.572311, LONG: 108.3498w NAD 83) 0068 G 5a - 0.287 0 SITE CLASS D SEISMIC OESGN CATEGORY B 5- SOILS: SOIL BEARING PRESSURE - - -2000 PSF MINIMUM 1001155 DEPTH 36 INCHES SITE PREPARATION 1. REQUIREMENTS: A. Al FOOTINGS SHALL BEAR ON UNDISTURBED NATURAL SOILS OR ON ENGINEERED COMPACTED FILL WHICH EXTENDS DOWN TO UNDISTURBED NATURAL 0011.0. 6. REMOVE ALL TOP 50L, ORGANICS. OR OTHER DELETERIOUS MATERIALS FROM THE PROPOSED BUILDING Silt. C. SCARIFY THE SUBORADE TO A DEPTH OF APPROXIMATELY 8 INCHES, ADJUST THE MOISTURE CONTENT TO WITHIN 26 OF OPTIMUM AND COMPACT THE SOIL TO AT LEAST 905 OE 711E MAXIMUM DRY DENSITY AS DETERMINED BY ASTM 0 -1557. 0. STRUCTURAL FILL SHALL BE NON - EXPANSIVE GRANULAR SOIL WITH -200 < 355. 11. C 305 BELOW FOOTINGS AND -200 c 505. LL < 305 BELOW SLABS. MAXIMUM PARTICLE 3ZE SHALL BE 4 INCHES BELOW FOOTINGS AND 6 INCHES BELOW SLABS. E. PROVIDE A MAXIMUM OF 4 INCHES OF SAND AND GRAVEL 00TH -200 < 50 AND A MAXMUIM PARTICLE 512E OF 2 INCHES DIRECTLY BELOW FLOOR SLABS. F. COMPACT STRUCTURAL FILL MATERIALS BELOW 10011805 TO A MINIMUM OF O 50 OF THE 00010UM DRY DENSITY AS DETERMINED BY ASTIR D -1557. COMPACT STRUCTURAL FILL MATERIALS BELOW SLABS TO A MINIMUM OF 905 OF THE MAXIMUM, 001 DENSITY AS DETERMINED BY ASIA 0 -1557, STRUCTURAL FILL SHALL BE COMPACTED AT A MOISTURE CONTENT WITHIN 26 OF THE OPTIMUM. G. STRUCTURAL FILL 004.08 FOOTINGS SHALL EXTEND CUT AWAY FROM THE EDGE OF THE FOOTINGS A DISTANCE EQUAL TO THE DEPTH OF THE Nu. BENEATH THE FOOTING. H. CONSTRUCTION DIFFICULTIES MAY VARY WITH SEASONAL FLUCTUATIONS IN THE GROUND MOISTURE THE CONTRACTOR SHALL TAKE 4ECE55ARY PRECAUTIONS TO MINIMIZE DISTURBANCE OF THE NATURAL SOILS IM THE BUILDING AREA. REINFORCING STEEL 1. CODES AND STANDARDS: A REINFORCING STEEL SHALL COMPLY WITH : I. CONCRETE REINFORCING STEEL INSTITUTE 'MANUAL OF STANDARD PRACTICE.' 11 AMERICAN CONCRETE INSTITUTE 'DETAILNC MANUAL'', ACI 315 (OR 5P -00). 2. MATERIALS: A REINFORCING STEEL SHALL BE NEW STOCK 0E1088E0 BARS AND SHALL CONFORM TO ASTM A615, GRADE 60, IBM A DESIGN YIELD STRENGTH OF 00.000 P51. 3, CONSTRUCTION: A REINFORCING SHALL BE DETAILED. 80LSTERE0, AND SUPPORTED PER ACI 315. B. RENFORCING STEEL SHALL BE FREE OF LOOSE FLAKY RUST. SCALE, GREASE, OIL, DIRT, AND OTHER MATERIALS WHICH MIGHT AFFECT OR IMPAIR 0300 11. REINFORCING SHALL BE CONTINUOUS IN WALLS, BEAMS, COLUMNS, SLABS, FOOTINGS, ETC. 0. SPLICES IN CONTINUOUS REINFORCING SHALL BE MADE IN AREAS OF COMPRESSION AND /OR AT POINTS OF MINIMUM STRESS, TYPICAL UNLESS 801ED OTHERWISE. LAP SPUCES SHALL BE 40 BAR DIAMETERS LONG IN CONCRETE AND 48 BAR DIAMETERS LUNG IN MASONRY. MINIMUM LAP SHALL BE 24 INCHES LONG. DOWELS SHALL HAVE A MINIMUM OF 30 BAR DIAMETERS EMBEDMENT. E, BENDS SHALL BE MADE COLD. DO NOT USE HEAT. BENDS SHALL BE DONE IN THE FABRICATOR'S SHOP UNLESS SPECIFICALLY NOTED FOR THE HELO. DO NOT 01 -BEND OR RE -BEND A PREVIOUSLY BENT BAR. F. REINFORCING STEEL IN CONCRETE SHALL BE SECURELY ANCHORED AND 11E0 IN PLACE PRIOR TO PLACING CONCRETE AND SHALL BE P059I011E3 WTH 111E FOLLOWING MINIMUM CONCRETE COVER: CONCRETE CAST AGAINST AND PERMANENTLY EXPOSED TO EARTH CONCRETE EXPOSED TO EARTH OR WEATHER: /6 AND LARGER 2' /5 AND SMALLER 1 -I/2' CONCRETE NOT EXPOSED TO EARTH OR WEATHER: SLABS AND WALLS, /T1 AND SMALLER 3/4' BEAMS AND COLUMNS, MAN REINFORCING OR TIES.... ..... 1 -1/2' SLABS ON GRADE .................._,_,_.__ .._._..___CENTER OF SLAB G. RENFORCIN5 STEEL IN MASONRY SHALL BE PLACED PRIOR TO GROUTING WINO SHALL BE PLACED, POSITIONED, AND LOCATED ACCORDING TO THE DRAWINGS. IT SHALL BE SECURED AGAINST D ISPLACEMENT AT INTERVALS 110T TO EXCEED 200 BAR DIAMETERS OR TEN FEET. CONCRETE 1. CODES AND STANDARDS: A. CONCRETE WORK SHALL COMPLY W1TH THE AMERICAN CONCRETE INSTITUTE (ACI) EDITIONS OF: I. AG 301, SPECIFICATIONS FOR STRUCTURAL CONCRETE FOR BUILDINGS. II. ACI 318 -05, BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE. III. AG 347, RECOMMENDED PRACTICE FOR CONCRETE FORM WORK. 2. MATERIALS: A. C MENT SHALL CONFORM TO ASTM C150, TYPE I, PORTLAND CEMENT. 8. HARD ROCK AGGREGATES SHALL CONFORM TO ASTM 5330. 11GH1WcIGHT AGGREGATES SHALL CONFORM TO ASTM 0330. C. WATER SHALL BE POTABLE. 0. AIR ENTRAINMENT SHALL CONFORM TO ASTM 0260. 0. FLY ASH SHALL CONFORM TO ASTM C618. F. CALCIUM CHLORIDE SHALL NOT BE USED. 3. MIx DESIGNS: A. ONLY ONE TYPE OF CONCRETE SHALL BE PLACED AT 111E SITE AT ANY GIVEN TIME. B. A MI5 DESIGN THAT PRODUCES THE LOWEST SLUMP COMPATIBLE 111TH PROPER PLACEMENT SHALL BE USED, 4' MAXIMUM. C. CONCRETE MIXES SHALL CONFORM TO THE FOLLOWING: TYPE OF MINIMUM MAX. STRENGTH W/5 MEMBER AT 28 DAYS (10) (RA710) 3000 0.50 FOOTINGS FOUNDATION WALLS: 3000 SLABS ON GRADE: INTERIOR 4000 EXTERIOR 4000 DRY MAX. AIR MIN. WEIGHT AGGREGATE ENTRAIN- CEMENT 5RE MEAT PER YO (PCP) (INCHES) (5) (LEIS) 145 3/4 3 +/ -1 517 0.50 145 3/4 3 +/ -1 517 0.45 145 3/4 3 +/ -1 564 0.45 145 3/4 6 +/ -1 564 D. PEA GRAVEL AGGREGATE AND /0111 PLA5T1Cl2ER MAY BE USED IN CONGESTED AREAS WHEN REQUIRED TO PROPERLY FILL ALL VOIDS AND /OR FOR WORKABILITY. (CONTRACTOR'S OPTION). E. LIMIT FLY ASH 10 150 OF THE TOTAL CEMENTATIOUS MATERIAL. 4.00NSTRUCTION: A. CONCRETE SHALL BE PROPERLY VIBRATED DURING PLACEMENT. 0, CONSTRUCTION JOINTS AND BULKHEADS SHALL 8E FORMED 00TH A KEY WAY. C. PRIOR TO PLACING CONCRETE, CHECK WITH ALL TRADES TO INSURE PROPER PLACEMENT OF OPENINGS. BLOCK OUTS. SLEEVES. CURBS. 00410U1TS. BOLTS. INSERTS, EMBEDS, ETC. 5. FOOTINGS: A. PROMOS 204 BEVELED KEY WAYS IN ALL WALL FOOTINGS. B . CENTER FOOTINGS WITH THE WALL WINO /OR COLUMN ABOVE, TYPICAL UNLESS NOTED OTHERWSE. C. REINFORCING IN CONTINUOUS FOOTINGS SHALL 8E CONTINUOUS AT CORNERS AN0 /OR INTERSECTIONS BY PROWDINO PROPER LAP LENGTHS AND /OR CORNER BARS. D. EXIEPJOR FOOTINGS SHALL BEAR BELOW 111E EFFECTS OF FROST. E. NO PENETRATIONS SHALL BE ALLOWED THROUGH ANY CONCRETE FOOTING. WHEN CONFLICTS ARISE BETWEEN UNDERGROUND PLUMBING, UTUTIES. ETC.. THE 10011MG SHALL BE STEPPED DOWN BELOW THE CONFLICT AND A 50008(TE WALL, PIER, COLUMN ETC., SHALL BE EXTENOEO TO THE FOOTING AS REQUIRED. F. BEARING SURFACES FOR FOOTINGS WHICH ARE, OR BECOME, UNDERMINED DURING CONSTRUCTION SHALL BE BACK FILLED WITH A LEAN -610 CONCRETE (2000 PSI MIN.). G. STAGGER COMMON FOOTING CONSTRUCTION JOINTS FROM WALL CONSTRUCTION JOINTS BY AT LEAST 6 FEET. 6. SLA85 ON GRADE: A. ALL SLABS ON GRADE SMALL BE A MINIMUM OF 4 INCHES THICK, SHALL BEAR ON A 4 INCH MINIMUM LAYER OF FREE - CRANING GRAVEL, AND SHALL DE OFINFO65ED WITH /4 BARS AT 16' 0 -C BOTH WAYS. TYPICAL UNLESS 00150 OTHERWISE. PROVIDE CHAIRS WITH SAND PLATES FOR PROPER PLACEMENT. 7. WALLS: A. CONCRETE WALLS SHALL BE REINFORCED AS FOLLOWS, UNLESS NOTED OTHERWISE: THICKNESS VERTICAL REINFORCING HORIZONTAL REINFORCING 12' /3 0 24' 0.C. (STIRRUPS) 14 0 12° 0.C. EACH FACE SEE PLANS. SCHEDULES. AND [WEALS FOR OTHER REINFORCING REQUIREMENTS. B. PLACE VERTICAL REINFORCING IN CENTER OF WALL (EXCEPT FOR RETAINING WALLS AND WHEN EACH FACE 15 SPECIFIED). DOWEL TO 500111N0 OR STRUCTURE BELOW AND TO STRUCTURE ABOVE 00TH THE SAME SZE BAR AND SPACING AS THE VERTICAL REINFORCING. C. PROW0E CORNER BARS AT ALL INTERSECTIONS AND CORNERS, USE SAME SZE BAR AND SPACING AS THE HORIZONTAL REINFORCING. D. P100140T10NS THROUGH ANY CONCRETE WALL SHALL BE BUILT INTO THE WALL AS THE WALL IS CONSTRUCTED. CHEVRON NORTH AMERICA EXPLORATION AND PRODUCTION PICEANCE BASIN WATER MANAGEMENT FACILITY 598 -35BV TANK PROJECT LOCATED IN SECTION 35, T5S, R98W, 6th P.M. GARFIELD COUNTY, COLORADO CONCRETE RINGWYALL FOUNDATION DETAIL SCALE.' I'!' LAYER 1" TO 1 -1/2" CRUSHED GRAVEL (APPROX. 3.2 CUYDS) SECONDARY CONTAINMENT LINER 60 -80 MIL CIRCULAR POLY SHEET EXTEND UP FOUNDATION WALL TO BASE OF TANK NOTES: 1,000 BBL TANK 15' -6 "'x30' -0 "H STEEL TANK 5" STEEL ANCHORING FLANGE-•-•-• INSTALL (8) 1 --1/2" POLY PIPE SLEEVES EQUALLY SPACED AROUND FOUNDATION (7' -10 ") APPROX. 6" BELOW TOC WELD POLY PIPE SLEEVES TO LINER 1 -1/2 "016" ANCHOR BOLTS ASTM A307 SPACE EVERY 6' O.C. AROUND TANK FINAL BOLT HOLE LOCATIONS TO BE PROVIDED AS PER MANUFACTURER'S SPECIFICATIONS OF ANCHORING FLANGE 1" CHAMFER ON EXPOSED CONCRETE EDGES -1 1 �... k 1 ICI I I III. SLOPE 2% MIN.:. 111 -1 1 I -11 i1 ICI I _ _ 1 I I -I -1 1_1I I -1 I -1I I -I I -I I III III - I -I -III -111 C =111= 111 =�1= 11= 1 1-1 11 =111= 111 =1 I 1=111 =1 1 -1 -1 1�111 =1 II- 1 - III 11 -II- BACKFILL USING NATIVE MATERIAL -I I 1=.T111-1 COMPACT TO 95% MAXIM1 DRY DENSITY (STANDARD UPROCTOR) I1 (8) HORIZONTAL #4 REBAR SPACED ' I= EQUALLY IN WALL (4 EACH FACE) PROVIDE 2" CONCRETE COVER #3 STIRRUPS SPACED AT 24" O.C. ALONG WALL 1. COMPACT MATERIAL BELOW FOOTINGS TO 95% MAXIMUM DRY DENSITY (STANDARD PROCTOR) PRIOR TO PLACING CONCRETE FOR FOUNDATION TO PREVENT DETRIMENTAL SETTLEMENT 2. CONCRETE f'c SHALL BE 3,000 PSI 3. TOP OF CONCRETE FOUNDATION SHALL BE LEVEL WITHIN ±1/4" IN THE TOTAL CIRCUMFERENCE (MEASURED FROM THE AVERAGE ELEVATION) 4. TOP OF COMPACTED BEARING SOIL SHALL BE LEVEL WITHIN ±1 /2" IN THE TOTAL CIRCUMFERENCE (MEASURED FROM THE AVERAGE ELEVATION) 5. CONCRETE VOLUME: 7.5 CUYDS. 6. #4 REBAR = 1,320 FT (INCLUDES 20% FOR LAP SPLICES) #3 STIRRUPS 25 EACH (APPROX. 220 FT) SLOPE FINISHED GRADE AWAY FROM TANKS (2% MIN.) II III !Il- 1 I 111- -1 V- COMPACT TO 95% MAXIMUM TERIAL DRY DENSITY (STANDARD PROCTOR) =11 r 111 F1 X12 °� MidCont nent / Alaska SBU Chevron North Americo Exploration and Production (3 #4 REBAR CONTINUOUS THROUGHOUT FOOTING SPACED EQUALLY PROVIDE 3" CONCRETE COVER ON BASE 50 A L E: 1' -1' UINTAIE ENGINEERING & LAND SURVEYING 85 SOUTH 200 EAST - VERNAL, UTAH 84078 (4 B 5) 7 8 8 - 1 0 1 7 REV SCALE: DRAWN Br. SURVEYED Br: PROJECT, PICEANCE BASIN SKINNER RIDGE WATER MANAGEMENT TANK PROJECT (598 -35BV) NO 102 1.101 BY CJ5 CJC REW30N5 COMPANY REVIEW COMMENTS - 2/28/11 APPROVED FOR CONSTRUCTION - 3/4/11 1... 1' ! C.J.C. 1 C.O., B.E.B. E -FILE: ,t.101/5A104 W1.1A5Dld 1AGLTI/IlA% Nx8OAROLaaa SHEET NAME: STRUCTURAL GENERAL NOTES & DETAILS 211 -1142 TUBE FILE: 23262 OATS: SHEET: DWG. N0. 2/16/2011 /0 OF /0 PBSR- 090356Yw- GY- FNO -UIN- 00000 - 00002 -00 REV. DOT w \.Pox r P pow POW poW Facility Access Road ri94P - 0/KA37'PV pIQY -8A! j2 STA Df 017 QI POWrt---8 _- lini4$ 311nalla7 & L6x �� 6027 �6009� , 091 aryl 37 F neon! MIN 52 Ad MO Af91- Sa221ra0-2w0+L- 2209»0 01 -20 i TOP �Ipfp1 PROW WV PO OAS *0 10152 - 51103144 - 844- fA -cuao - + -20 1 114 CGI�V Autinsierr 0143M( 0964 1.O OIL AO AFif -31 ssrAr- O1'OR -O?W9- 09009.00 4 Toe 4- MOW' {fW1140. A -AI NM* 201710C An + "90145.0- ormn- aaao-o0aom/ OFT WPC 1414143E EIL 410152 904131 4 51 END SWALE /2 SFA 7 +36 ]S 81101 11104 dpUJIY 44• lgla Y,11M I a 5WALE /1 SFA 4168 0T01 140E 910PEs 70 44 00329401401 6T 33I0 (RP.) 4.00: FG r Q - l 0 603tl 0 6031, 6070 of 6429 ®6028 5000 1590112 _-_.-_----. 599000 3091E1 0200 5491 II 5197.94 r '-- -N r T T. r \ 1157632 • 255505E3 4.09 d 1X1.4 5311907 _I/ / 7A'44p FIFO 0O.,1 5424 (BT 014907) (s. s= - 2.00 CHEVRON NORTH AMERICA EXPLORATION AND PRODUCTION PICEANCE BASIN WATER MANAGEMENT FACILITY 598 -35BV TANK PROJECT 1 i I . � c 801! 1 444 1., 7 / ng 4470 1401 70422 CAtb+rl ./ tik / T � �P I LOCATED IN SECTION 35, T5S, R98W, 6th P.M. GARFIELD COUNTY, COLORADO 6025 6024 �e1 6003 6001 ,454.0 - asx 8 ' S�ALLP��_ " I R 229300 \ 1 ,off% teaoz \\ 1 ♦� / \- i R 2.030 r \ £X/SRNC CENTRAL FRAC PAO (OU751OE SCOPE OF WA TER MANAGEM£NI FACILITY) f \ h l \ I\ \\ \ \\ \ \ 5 \ 1 \ \ \ 6023 692 Ate 8017 \ 6014 JP \ 6021 6020 \ \ 'q b EEIO- 040005100 037031 5TA 7190 '. \ \ N. \ \ \ \ \ \ \ \ 5 \\ 4 i \ \\ 1 \ \\ / _`Ar 601 GRADING PO1NT6 HOOK KIST 0911110 FASTING 0 901(44 9609310. 5000 1590112 51311.47 599000 3091E1 0200 5491 1100.02 5197.94 5511.42 5*4417 1,7 1003 1157632 51021.21 1e9941 50+121 2215 1005 1795333 1201315 1513+2 602021 2095 1534 11029.54 5223014 5917.01 311 1 4242 9099 11144.11 220,4.44 59505 60222 0410 1056 1091.11 42244.41 415.42 002012 1232 5001 11227.63 5215131 5119.99 arcs 04.00 5901 11142.42 503527 595617 0701 6016 1605112 52234.93 5406,55 0701 4410 ,5329 5224151 350.5.11 oms 6111 17167.75 5230694 542541 010 1142 1776330 5734672 535322 1041 1012 1772051 5235141 595499 5001 5444 17159.55 5157111 1219 1015 47192.21 525241 24021 1000 1111 11112.15 5260111 591944 EDGE 5017 1111900 5702175 519004 EDGE WO 1115352 11512.45 60026 079[ 3016 1791112 415 27 111.11 004E 4020 110263 511210 55050 033E 6079 1044.45 51191.21 521.55 208 6022 13515.01 51110.41 532350 FOR 0522 11i112 411162 553350 1040 604 9113135 51107.70 520.50 FOR 5025 1416112 51134.55 5994.50 EDGE 2026 152124 02015.42 19103 FOR 021 11100 42144.42 60.35 090E 1021 1034+1 521.2611 36110 1440 1 6021 1105114 52114,53 59661 INN 2 5370 1505695 5240101 16911 LDS 2 1031 11011.11 12091.14 5914.34 IAN+ 4 6032 1610140 520063 593155 TAM 5 BENCHMARKS B M #1 DESC.: SURVEY PNT NO. 396 (B.M.) N: 17748.11 E: 51962.06 EL: 5991.33' 8M #2 D ESC.: SURVEY PNT NO. 398 (8.19.) N:18177.62 0:52191.71 EL: 5993.82' SCOPE OF WORK I. 4002 SC" 96210414. 490 GRAM 1M7504ntsT713 r5 2110 03310 00+1964145 SSA 04 144[ 02005 DO +5 32 FA0214. 2 5 0 593503 1 X073 40.02. 10 A 6001 91 550242 SP.Or INE 5514400 MAX E1i*A00N /4 0144 722, 1 E16151.01 1 524421 0141 AS 910611 01 119 RA4. OR04 51443 HAVE A MGM. 100E Of 051 APO 3, SOE 39005 PUCE 90 riots eF 40200102 *000 919E 41707020 OM 4. IERLY 9WO1D 920 AKA R°0R TO 10142 `A' LM 010 N0 9541- 494344V' 00_05. -474- 0011 -1 W 6-01 221 154230 SA 0000 00424000119 3, 520701 4051[01 9691 - 441 +2+- 0V- 1r -WV- 00000 - 00004 -OP 2.01 910 501749 +4*1 S07AN49 10 640040 IT REED 5TO D+0011351 TO 4.5050 9 90V -3/13 `M4W-0000 -45 DISTURBANCE AREA (NEW GRADING, INCLUDING DITCH) 3.14 ACRES EARTHWORK VOLUMES E0S11NG SAND, BENTONITE, & GRAVEL REMOVAL (6') . 830 CU. YDS. EXCAVATION TO FINI0HE0 GRADE . 4430 CU. YDS. 7900 TO FINISHED GRADE ( +10x) - 60 CU. YDS. 6' DYER - EXCAVATION (FOR SURFACE GRAVEL) - 1340 CU. YDS. NET EXCAVATION 10 RE REMOVED - 5110 CU. 305. 6' COMPACTED ROAD BASE - 1340 CU. YDS. b SCALE: 1' -30' BY REVISIONS MidCont'nent / Alaska SR/ Chevron North America Exploration and Production SCAR: DRAWN BY: C.J.C. SURVEYED BY: PROJECT: 11 -1142 L02 C COMPANY RENEW COMMENTS - 2/28/11 ((01 JC APPROVED FOR CONSTRUCTION - 3/4/11 E -FILE: /CHEVRON/WATER MANAGEMENT FACILITY /35BVW.DWG SHEET NAME: GRADING PLAN 16/81 FILE: 23262 DATE: Sh1EE1: 2/16/2011 5 OF 10 UINTAN ENGINEERING & LAND SURVEYING 85 SOUTH 200 EAST - VERNAL. UTAH 84078 (436) 768 -1027 PICEANCE BASIN SKINNER RIDGE WATER MANAGEMENT TANK PROJECT (598 -35BV) DWG. NO REV. P85R- 59835BVW- CIV- 5+T -UIN- 00000 - 00003 -01 _ U01 BOP - OCI£N57pY DIV Bi STA O# 7 f CULVERT OUTLET PROTECTION •SEE DERAIL D ON DWG N0. 3'00-5583500-00--05-000-00000-00002-00 P pow POW - POW p0W r 'N. CD 35 Fr SETBACK FROM NIGH VTA1ER • 1C sYN yl B1' e2 sr - -� `" Sr SF SC — -------- SF ��� SLSF SF 100 -Y9 FL000PLAIN SF s1 SF SL�� 5100 L0L 40301 ID 0H 7? 10RIl) Al if IA II ».1 WATER 4 1 1 1 1 +n: to 1.010 DR M. NO 3117013011 13 a ICY 0005) /7 L- ------ - / CHEVRON NORTH AMERICA EXPLORATION AND PRODUCTION PICEANCE BASIN MANAGEMENT FACILITY 598 -35BV TANK PROJECT 41‘4, f 471 1 sow LOCATED IN SECTION 35, T5S, R98W, 6th P.M. GARFIELD COUNTY, COLORADO I 7" EX/SANG CENTRAL FRAC PAO (OUTSIDE SCOPE OF WATER MANAGEMENT FACILITY) \ £CP- DIVERSION 1070/1 TA 7 +90 7. \ asokLem Al IFaralal£ move 0 \ \ t 1050019 ECM TEMPORARY EROSION CONTROL (CONSTRUCTION BEST A04NAGEMENT PRACTICES - BMP ) SF SF-52T FENCE 'SF OETA9 )' air ONC NO PBSR- 59833BNr- OV -Orl- 00-00000- -0100102 -00 PERMANENT EROSION CONTROL (PERMAAENT BESr MANAGEMENT PRACTICES - BMPS) SL 32-3E49! (BRUSH BERM) .S'EE DETAIL 19' ON OAC NOL PBSR- 598358NF- 0Y- OA- UVN- 000027- 00007 -00 y)l W -WArRE (ELDER Rat) eat 0043 'E' 0W OMG ND PBSR- 598.158VW- CIV- 011- UOV -00 000OZ -O0 ST Sr- 530+(0£017 TRAP •5£E DEWS C' CAI OAG NO PBSR- 59435BVW- CTV- OR -l9N- 000037- 00002 -00 MULCH AND 5EEa 501E 530(£5 U 771 1£OETA RUE EROSON CONTROL IS £STAB1 /SNE0 AREAS usruBaE0 Br CLWSRWCR00 ACOMR£5 SNAIL ALSO BE MACHO, ANO SEEDED TO RE- ESTABLISH VECETARVE EROSION CONTROL (MAY INCLUDE AREAS OUTSIDE DE Woo SNOW ON P95 PLAN). DISTURBANCE AREA (NEW GRADING, INCLUDING DITCH) 3.14 ACRES 511E DRAINAGE CALCULATIONS APPROX. 9TE DRA0IAGE AREA. DRAINAGE LENGTH: RUNOFF COEFFICIENT (BUROLI-ZIEGLER) 25YR -1HR STORM 36 ACRES 2.222 Fr = 0.2 25014 -1HR STORM INTENSITY: STORM FLOW. DEPTH OF FLOW IN DIVERSION DITCH VELOCT0: = 130 n0IIr 1 = 15.2 cls = 1.47 11 c 2.3 fps 100YR -1HR STORM 2570 -100 STORM INTENSITY: 51ORM FLOW: DEPTH OF FLOW IN DIVERSION DITCH VELOCITY: 1.65 In/hr • 19.3 els 1.80 fl 2.5 fps 1YAAY 1IYA9(YS 05 3C/6Af 0 MA/ Hamm A11A4 A Se- • - 3240•0 0_ENCHMARKS TH /J1 DESC.: SURVEY PNT N:17748.11 E: 51962.06 EL: 5991.33' BM ,y2 DESC.: SURVEY PNT N:16177.62 5:52191.71 EL: 5993,82` in b SCALE: 1' N 30' N0. 396 (8.51.) N0. 398 (B.M.) INNO MidContinent / Alosko SBU Chevron North Americo Exploration and Production REV NO B L02 CJC 001 SCALE: REVISIONS 1' - 30. COMPANY RENEW COMMENTS - 2/28/11 APPROVED FOR CONSTRUCTION - 3/4/11 DRAM 8Y: —1 SURVEYED BY: 01,C. GO., B.E.B. E -FILE: /CHE8RON/WATER MANAGEMENT FACILITY /358VW.ONG SHEET NAME: TEMPORARY AND PERMANENT EROSION CONTROL PROJECT: 211-1142 TUBE FILE: 23 DATE: 2/16/2011 UINTA1l ENGINEERING k LAND SURVEYING 85 SOUTH 200 EAST - VERNAL. UTAH 84078 (455) 7 8 9 - 1 0 1 7 282 SHEET: DWG, NO, . 6 OF 10 PDSR- 59 6 3 58 49 -OV- SIT -UIN- 00000-017004 -01 PICEANCE BASIN SKINNER RIDGE WATER MANAGEMENT TANK PROJECT (598 -35BV) REV, 1101 , f--y- ) j \ +n: to 1.010 DR M. NO 3117013011 13 a ICY 0005) /7 L- ------ - / CHEVRON NORTH AMERICA EXPLORATION AND PRODUCTION PICEANCE BASIN MANAGEMENT FACILITY 598 -35BV TANK PROJECT 41‘4, f 471 1 sow LOCATED IN SECTION 35, T5S, R98W, 6th P.M. GARFIELD COUNTY, COLORADO I 7" EX/SANG CENTRAL FRAC PAO (OUTSIDE SCOPE OF WATER MANAGEMENT FACILITY) \ £CP- DIVERSION 1070/1 TA 7 +90 7. \ asokLem Al IFaralal£ move 0 \ \ t 1050019 ECM TEMPORARY EROSION CONTROL (CONSTRUCTION BEST A04NAGEMENT PRACTICES - BMP ) SF SF-52T FENCE 'SF OETA9 )' air ONC NO PBSR- 59833BNr- OV -Orl- 00-00000- -0100102 -00 PERMANENT EROSION CONTROL (PERMAAENT BESr MANAGEMENT PRACTICES - BMPS) SL 32-3E49! (BRUSH BERM) .S'EE DETAIL 19' ON OAC NOL PBSR- 598358NF- 0Y- OA- UVN- 000027- 00007 -00 y)l W -WArRE (ELDER Rat) eat 0043 'E' 0W OMG ND PBSR- 598.158VW- CIV- 011- UOV -00 000OZ -O0 ST Sr- 530+(0£017 TRAP •5£E DEWS C' CAI OAG NO PBSR- 59435BVW- CTV- OR -l9N- 000037- 00002 -00 MULCH AND 5EEa 501E 530(£5 U 771 1£OETA RUE EROSON CONTROL IS £STAB1 /SNE0 AREAS usruBaE0 Br CLWSRWCR00 ACOMR£5 SNAIL ALSO BE MACHO, ANO SEEDED TO RE- ESTABLISH VECETARVE EROSION CONTROL (MAY INCLUDE AREAS OUTSIDE DE Woo SNOW ON P95 PLAN). DISTURBANCE AREA (NEW GRADING, INCLUDING DITCH) 3.14 ACRES 511E DRAINAGE CALCULATIONS APPROX. 9TE DRA0IAGE AREA. DRAINAGE LENGTH: RUNOFF COEFFICIENT (BUROLI-ZIEGLER) 25YR -1HR STORM 36 ACRES 2.222 Fr = 0.2 25014 -1HR STORM INTENSITY: STORM FLOW. DEPTH OF FLOW IN DIVERSION DITCH VELOCT0: = 130 n0IIr 1 = 15.2 cls = 1.47 11 c 2.3 fps 100YR -1HR STORM 2570 -100 STORM INTENSITY: 51ORM FLOW: DEPTH OF FLOW IN DIVERSION DITCH VELOCITY: 1.65 In/hr • 19.3 els 1.80 fl 2.5 fps 1YAAY 1IYA9(YS 05 3C/6Af 0 MA/ Hamm A11A4 A Se- • - 3240•0 0_ENCHMARKS TH /J1 DESC.: SURVEY PNT N:17748.11 E: 51962.06 EL: 5991.33' BM ,y2 DESC.: SURVEY PNT N:16177.62 5:52191.71 EL: 5993,82` in b SCALE: 1' N 30' N0. 396 (8.51.) N0. 398 (B.M.) INNO MidContinent / Alosko SBU Chevron North Americo Exploration and Production REV NO B L02 CJC 001 SCALE: REVISIONS 1' - 30. COMPANY RENEW COMMENTS - 2/28/11 APPROVED FOR CONSTRUCTION - 3/4/11 DRAM 8Y: —1 SURVEYED BY: 01,C. GO., B.E.B. E -FILE: /CHE8RON/WATER MANAGEMENT FACILITY /358VW.ONG SHEET NAME: TEMPORARY AND PERMANENT EROSION CONTROL PROJECT: 211-1142 TUBE FILE: 23 DATE: 2/16/2011 UINTA1l ENGINEERING k LAND SURVEYING 85 SOUTH 200 EAST - VERNAL. UTAH 84078 (455) 7 8 9 - 1 0 1 7 282 SHEET: DWG, NO, . 6 OF 10 PDSR- 59 6 3 58 49 -OV- SIT -UIN- 00000-017004 -01 PICEANCE BASIN SKINNER RIDGE WATER MANAGEMENT TANK PROJECT (598 -35BV) REV, 1101 4, P-rii;eiterfft" w: - 1s �+ I I � • a`► elvvt r • 1? ill T tJ�2, CHEVRON NORTH AMERICA EXPLORATION AND PRODUCTION PICEANCE BASIN WATER MANAGEMENT FACILITY 598-35BV TANK PROJECT LOCATED IN SECTION 35, T5S, R96W, 6th P.M. GARFIELD COUNTY, COLORADO • e, .0 1 - 4. s BY CAC REVISIONS MidContinent / Alaska SBU Chevron North America Exploration and Production SCALE: 100` SCALE: 1.' l0* UINTAH ENGINEERING & LAND SURVEYING ILAINTAH 85 SOUTH 200 EAST — VERNAL. UTAH 84078 ... .................. ... (496) 769 —IDI7 DRAWN BY TI SURVEYED BY PROJECT: C.J.C. 1 C.C., 9 E.8. 211 -4442 COMPANY RENEW COMMENTS - 2/24/11 APPROVED FOR CONSTRUCTION - 3L4/10 E -FILE: /CHEVRON/WATER MANAGEMENT FADUTY /358VW.OWO SHEET NAME: AERIAL PHOTO 'WITH SITE PLAN OVERLAY TJBE. FILE: 23262 DATE: 2/10/2011 SHEET: i of r PICEANCE BASIN SKINNER RIDGE WATER MANAGEMENT TANK PROJECT (598- -35BV) DWG. N0 P808- 59835880- CIV- 54T- UIN- 00000- 00006 -00 REV. USN