Loading...
HomeMy WebLinkAboutConditions of Permit.pdfCONDITIONS OF PERMIT BLC0-3-14-3150 EnCana/Hunter Ridge Energy Divide Rd Water Facility, PDC Bldg. Parachute, Colorado 1) ALL WORK MUST COMPLY WITH THE 2009 IBC AND MANUFACTURERS SPECIFICATIONS. 2) ALL WORK MUST COMPLY WITH STATE AND FEDERAL REGULATIONS. 3) ALL WORK MUST COMPLY WITH THE CONDITIONS OF THE CURRENT LAND USE PERMIT. 4) OPEN-HOLE SOILS REPORT REQUIRED AT FOOTING INSPECTION, SEE REPORT FOR PSF. 5) PRIOR TO CONSTRUCTION, CONTACT LOCAL FIRE DISTRICT FOR PERTINENT IFC REQUIREMENTS PER RESOLUTION No. 2013-14. FIRE DISTRICT FINAL APPROVAL REPORT IS REQUIRED FOR CO/FINAL INSPECTION. 6) ALL HIGH STRENGTH BOLTING AND FIELD WELDING REQUIRES SPECIAL INSPECTOR. PROVIDE APPROVAL REPORT AT FINAL INSPECTION. 7) ELECTRICAL FINAL APPROVAL IS REQUIRED FOR FINAL INSPECTION. 8) LIGHT AND VENTILATION PER 2009 IBC, CHAPTER 12. 9) LOCKS, LATCHES AND LANDINGS PER 2009 IBC, SECTION 1008. 10) VERIFY CDOH INSIGNIA IS AFFIXED FOR FINAL/COMPLETION INSPECTION. 11} GARFIELD COUNTY FINAL INSPECTION REQUIRED FOR COMPLETION APPROVAL.