Loading...
HomeMy WebLinkAbout4.0 Land Use Change Permit1111 fli1 r_.R'~m'1i'j0ill~ ~,,,I\~· 1-.1~,~·i~·~,1.~··~~i:-iJ.liv~ 11111 Reception~: 848942 05/07/2014 03 19.56 PM Jean ~lberico 1 of 4 Rec Fee $0 00 Doc Fee:O_QQ GFlRFIELD COUNTY CO LAND USE CHANGE PERMIT FOR DEVELOPMENT OF THE CHEVRON INTERIM SALES LINE, FOR TRANSPORTATION OF NATURAL GAS IN AN 8", 6.8-MILE PIPELINE LOCATED IN NORTHWESTERN GARFIELD COUNTY AND AS SHOWN IN EXHIBIT A -SITE PLAN In accordance with and pursuant to the provisions of the Garfield County 2013 Land Use and Development Code, as amended, and the attached decision by the Director of Community Development who hereby authorizes, by Land Use Change Permit, the following activity: PIPELINE DEVELOPMENT The Land Use Change Permit is issued subject to the conditions set forth in the attached Director Determination, and shall be valid only during compliance with such conditions and other applicable provisions of the Garfield County 2013 Land Use and Development Code, as amended, Building Code, and other regulations of the Board of County Commissioners of Garfield County, Colorado. COMMUNITY DEVELOPMENT DEPARTMENT GARFIELD COUNTY, COLORADO Fred A. Jarman, Al Director FILE NUMBER PDPA7804 -·--- 1111 w.r~J~IU,,"J IHI~ Qlrlr. ~l ·,.,~. ~~· ~i~n~•Jm,~ Ill·.·/, 11111 REeeption": 845942 05/07/2014 03.19 56 PM Jean Alberico 2 of 4 Reoc Fee SO 00 Ooc Fee 0 00 C::ARFIELD COIJNTY CO March 4, 2014 Garfield County Community Development 108 8th Street Suite 401. Glenwood Springs. CO 81601 Office: 970-945-8212 Fax: 970-384-3470 Julie Justus Regulatory/Health/Environment Specialist Chevron USA, Inc. 760 Horizon Drive Grand Junction, CO 81506 iiustus@chevron.com DIRECTOR DETERMINATION -Chevron Piceance Interim Sales Line Garfield County File Number PDPA7804 Dear Ms. Justus, EXHIBIT I .· i"\ This letter, and the attached staff report, is provided as notification that your request for a Land Use Change Permit for a ±6.8-mile, §'.'. natural gas pipeline in northwestern Garfield County has been reviewed and the Director hereby issues a determination conditionally approving the requested permit. Conditions of approval are: 1. All representations made in the submittal materials and other documentation provided shall be considered conditions of approval unless otherwise amended by this decision. 2. Pipeline operations shall be located in a manner to minimize their visual impact and disturbance of the land surface. Facilities shall be painted in a uniform, non-contrasting, non-renective color, to blend with the adjacent landscape. Right-of-way shall be located in existing disturbed areas unless safety or visual concerns or other adverse surface impacts clearly dictate otherwise. 3. Prior to issuance of the Pipeline Development Permit the Applicant shall provide the County with a revegetation bond in the amount of $173,700.00 due to the disturbance of 69.48-acres for construction of the pipeline. The security shall be held by Garfield County until vegetation has been successfully reestablished according to the Reclamation Standards in the Garfteld County Weed Management Pian. 4. Prior to issuance of the Pipeline Development Permit the Applicant shall provide the County copies of U.S. Army Corps of Engineer Nationwide #12 permit related to the jurisdictional waters of Wiesse Creek. 5. Prior to issuance of the Pipeline Development Pennit the Applicant shall provide the County with a copy of the Flare Penni! from CDPHE, if one should be required, or demonstration that a Flare Permit is not necessary. 6. Recommended mitigation measures contained in the Sensitive Areas Survey prepared by WesWVater Engineering, dated July 2013, shall be considered conditions of approval as itemized below: A Prior to issuance of the Pipeline Development Permit the Applicant shall provide an additional raptor survey containing infonnation on the occupied nests and potential impact of the construction of the pipeline on these species. If construction activities take place during future nesting season as itemized in the table below the Applicant shall abide by the timing limitations contained in the chart below: n e . m ·~ 811 11 fl' recommen a 011~ 01· er n motor 11nts Tbl?Tlh dbU dtl l ti Suedes Buftft·Zone Seasonal Restl1ctioo Ot'eat Homed OWi • • Loua-enred OWi 0.25mile 1 March - 1 S Julv Northern Gowwk O.SOmile 1 March-15 Seotember Northern Harritt 0.25 mile 1 Aoril-15 Auoust Northem Saw-whet Owl 0.25 mile I March-15 Julv usorev 0.25 mile 1 April -31 AUP.ttSI Pereorine Falcon 0.5 mile 15 March-31 Julv Prairie Falcon 0.5 mile IS Marcb-1 S Jwy Red-tailed Hawk O.H mile IS FebruarV-IS July Sham.shinned Hawk 0.2Smile I Anril-15 Au•11st Swainsou's Hawk 0.25 mile I AnriJ -15 Julv .. . . . . • Great Homo4 Owls and Ktstrol• aro rtlativoly tolmnt of hllman activity. Kttp acll\,ty to a 0Ullllll11114uriag blffiling soason. B. Solid waste management practices to minimize potential human-black bear interactions shall be implemented in the project. 7. In no case shall an operator engage in activities which impact Federal or State threatened and endangered species. 8. Applicant shall use Colorado Department of Agriculture certified weed-free bales for any straw or hay bales used on the site. 9. Any equipment used in construction or operation of a pipeline shall comply with the Colorado Oil and Gas Conservation Commission Rules and Regulations, Section 802, Noise Abatement. Additionally, all power sources used in pipeline operations shall have electric motors or muffled internal combustion engines. 2 1111 W/rJ~;~~MNJ~ itr~ l,'1,'°'~l~ll~t·t·.F1'l.~~.·~.W.·,•I, 11111 Recepliontt: 848942 05/0712014 03 19:56 PM Jean Alberico 4 of 4 Rec Fee $0.00 Doc Fee:O 00 Gl=!RFIELD COU~TV CO materials for the pipeline construction will abide by Garfield County Road & Bridge Departments oversize/overweight regulations. 11. Once the construction of the pipeline is completed the Applicant shall provide the County Geographic lnfonnation System (GIS) analyst with a digital alignment of the pipeline in a fonnat readable to the County. 12.Air contaminant emissions shall be in compliance with the applicable pennit and control provisions of the Colorado Air Quality Control Program, Title 25, Resolution 7, C.R.S. 13.All operations shall comply with all applicable Federal and State Public Health and Environment, Noise, and Air and Water Quality Control standards. 14.Should the pipeline be abandoned and removed, it shall be subject to the original revegetation and weed management requirements in the application. The Applicant has seven (7) calendar days to appeal the conditional approval of the pipeline. Further, this information will be forwarded to the Board of County Commissioners for a fourteen (14) day review period. If no request for appeal or call-up is received within these tlmeframes the determination will be final and a Land Use Change Permit can be issued upon compliance with conditions of approval. Feel free to contact myself or Kathy Eastley, the staff planner, if you have any questions regarding this decision. J Fred A. Jannan, AICP Director of Building and Planning Attachment Cc: BOCC File 3