Loading...
HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT BLC0-4-13-2801 Bill Inverso/Ron Radtke GEM, LLC OPCO Tenant Finish@ 3768 Hwy 82 Glenwood Springs, Colorado 1) ALL WORK MUST COMPLY WITH THE 2009 IBC, IMC, IPC, IFGC, IFC , IECC AND MANUFACTURERS INSTALLATION SPECIFICATIONS . 2} ALL WORK MUST COMPLY WITH STATE AND LOCAL REGULATIONS . 3) ALL WORK MUST COMPLY WITH THE CONDITIONS OF THE CURRENT LAND USE CHANGE PERMIT . 4) TENANT SPACE APPROVED AS SPRINKLERED TYPE 3A CONSTRUCTION , F-1 OCCUPANCY . y 5) CONTACT THE LOCAL FIRE PROTECTION DISTRICT FOR PERTINENT IFC REQUIREMENTS . FIELD VERIFY SPRINKLER HEAD LOCATIONS AND INSURE STANDPIPE CAN BE READILY ACCESSED . FIRE DISTRICT FINAL APPROVAL LETIER IS REQUIRED FOR FINAL/COMPLETION INSPECTION . V 6} MAXIMUM ALLOWABLE QUANTITY OF FLAMMABLE AND COMBUSTIBLE MATERIALS PER 2009 IBC, SECTION 414 AND 2009 IFC, CHAPTER 27 . yl) ENGINEER SEALED APPROVAL LETIER FOR BUILDING ALTERATIONS, SPECIFICALLY PARTITION FRAMING, STORAGE PLATFORMS , CABLES AND ASSEMBLIES SUPPORTING LIGHTING AND VENTILATION SYSTEMS, IS REQUIRED FOR FINAL/COMPLETION INSPECTION . .,/ 8} ENVIRONMENTAL MONITORS WITH C02 SENSORS/ALARMS MUST BE INSTALLED IN ALL PLANT GROWING AREAS TO INSURE HUMIDITY LEVELS , AIR QUALITY, SAFE AND SANITARY CLIMATIC CONDITIONS ARE MAINTAINED. V 9} PROVIDE VENT TERMINATION CAPS AND/OR SCREENS AS REQUIRED. A MECHANICAL FINAL APPROVAL REPORT SEALED BY A COLORADO LICENSED DESIGN PROFESSIONAL IS REQUIRED FOR FINAL/COMPLETION INSPECTION. Via) PROVIDE BOTH EXIT DIRECTIONAL AND EXIT SIGNS , EQUIPPED WITH EMERGENCY LIGHTING , (BATIERY BACK UP), AT ALL EXIT DOORS, SPECIFICALLY IN "DARK AREA" PLANT GROWING ROOMS (GREEN LETIERING OKAY}. AN ELECTRICAL PERMIT MAY BE REQUIRED. y/11) STATE ELECTRICAL FINAL APPROVAL IS REQUIRED FOR FINAL/COMPLETION INSPECTION. 12} EXISTING LOWER LEVEL TOILET ROOM MUST BE ACCESSIBLE . A UNISEX ACCESSIBLE TOILET ROOM WILL BE PERMITIED . ACCESSIBILITY PER 2009 IBC, CHAPTER 11, 34, AND ICC/ANSI A117.1-2003. y' 13} PROVIDE NONABSORBANT FLOORS AND 4" BASE BOARDS IN ALL WET AREAS . A PLUMBING FINAL APPROVAL REPORT SEALED BY A COLORADO LICENSED DESIGN PROFESSIONAL IS REQUIRED FOR FINAL/COMPLETION INSPECTION. V 14} STATE OF COLORADO MEDICAL MARIJUANA ENFORCEMENT DIVISION (MMED) COMPLIANCE REPORT IS REQUIRED FOR FINAL/COMPLETION INSPECTION. 15} GARFIELD COUNTY FINAL/COMPLETION INSPECTION IS REQUIRED . 16) ALL WORK MUST BE COMPLETED AND CONDITIONS SATISFIED WITHIN THIRTY (30) DAYS FROM DATE OF BUILDING PERMIT ISSUANCE.