HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT
BLC0-4-13-2801
Bill Inverso/Ron Radtke
GEM, LLC OPCO
Tenant Finish@ 3768 Hwy 82
Glenwood Springs, Colorado
1) ALL WORK MUST COMPLY WITH THE 2009 IBC, IMC, IPC, IFGC, IFC , IECC AND MANUFACTURERS
INSTALLATION SPECIFICATIONS .
2} ALL WORK MUST COMPLY WITH STATE AND LOCAL REGULATIONS .
3) ALL WORK MUST COMPLY WITH THE CONDITIONS OF THE CURRENT LAND USE CHANGE PERMIT .
4) TENANT SPACE APPROVED AS SPRINKLERED TYPE 3A CONSTRUCTION , F-1 OCCUPANCY .
y 5) CONTACT THE LOCAL FIRE PROTECTION DISTRICT FOR PERTINENT IFC REQUIREMENTS . FIELD VERIFY
SPRINKLER HEAD LOCATIONS AND INSURE STANDPIPE CAN BE READILY ACCESSED . FIRE DISTRICT FINAL
APPROVAL LETIER IS REQUIRED FOR FINAL/COMPLETION INSPECTION .
V 6} MAXIMUM ALLOWABLE QUANTITY OF FLAMMABLE AND COMBUSTIBLE MATERIALS PER 2009 IBC,
SECTION 414 AND 2009 IFC, CHAPTER 27 . yl) ENGINEER SEALED APPROVAL LETIER FOR BUILDING ALTERATIONS, SPECIFICALLY PARTITION
FRAMING, STORAGE PLATFORMS , CABLES AND ASSEMBLIES SUPPORTING LIGHTING AND VENTILATION
SYSTEMS, IS REQUIRED FOR FINAL/COMPLETION INSPECTION .
.,/ 8} ENVIRONMENTAL MONITORS WITH C02 SENSORS/ALARMS MUST BE INSTALLED IN ALL PLANT
GROWING AREAS TO INSURE HUMIDITY LEVELS , AIR QUALITY, SAFE AND SANITARY CLIMATIC
CONDITIONS ARE MAINTAINED.
V 9} PROVIDE VENT TERMINATION CAPS AND/OR SCREENS AS REQUIRED. A MECHANICAL FINAL APPROVAL
REPORT SEALED BY A COLORADO LICENSED DESIGN PROFESSIONAL IS REQUIRED FOR
FINAL/COMPLETION INSPECTION.
Via) PROVIDE BOTH EXIT DIRECTIONAL AND EXIT SIGNS , EQUIPPED WITH EMERGENCY LIGHTING , (BATIERY
BACK UP), AT ALL EXIT DOORS, SPECIFICALLY IN "DARK AREA" PLANT GROWING ROOMS (GREEN
LETIERING OKAY}. AN ELECTRICAL PERMIT MAY BE REQUIRED.
y/11) STATE ELECTRICAL FINAL APPROVAL IS REQUIRED FOR FINAL/COMPLETION INSPECTION.
12} EXISTING LOWER LEVEL TOILET ROOM MUST BE ACCESSIBLE . A UNISEX ACCESSIBLE TOILET ROOM WILL
BE PERMITIED . ACCESSIBILITY PER 2009 IBC, CHAPTER 11, 34, AND ICC/ANSI A117.1-2003.
y' 13} PROVIDE NONABSORBANT FLOORS AND 4" BASE BOARDS IN ALL WET AREAS . A PLUMBING FINAL
APPROVAL REPORT SEALED BY A COLORADO LICENSED DESIGN PROFESSIONAL IS REQUIRED FOR
FINAL/COMPLETION INSPECTION.
V 14} STATE OF COLORADO MEDICAL MARIJUANA ENFORCEMENT DIVISION (MMED) COMPLIANCE REPORT
IS REQUIRED FOR FINAL/COMPLETION INSPECTION.
15} GARFIELD COUNTY FINAL/COMPLETION INSPECTION IS REQUIRED .
16) ALL WORK MUST BE COMPLETED AND CONDITIONS SATISFIED WITHIN THIRTY (30) DAYS FROM DATE