Loading...
HomeMy WebLinkAboutConditions of Permit.pdfCONDITIONS OF PERMIT BLCO-4-14-3198 OXY USA WTP LP Gen. Bldg. @ Pond 10 Water Facility 4110 CR 213/Conn Creek Rd. DeBeque, Colorado 1) ALL WORK MUST COMPLY WITH THE 2009 IBC AND MANUFACTURERS SPECIFICATIONS. 2) ALL WORK MUST COMPLY WITH STATE AND FEDERAL REGULATIONS. 3) ALL WORK MUST COMPLY WITH THE CONDITIONS OF THE CURRENT LAND USE PERMIT. 4) ENGINEER APPROVAL REPORT REQUIRED FOR EXISTING FOUNDATION, SEE ATTACHED. 5) ELECTRICAL FINAL APPROVAL IS REQUIRED FOR FINAL INSPECTION. 6) LIGHT AND VENTILATION PER 2009 IBC, CHAPTER 12. 7) LOCKS, LATCHES AND LANDINGS PER 2009 IBC, SECTION 1008. 8) VERIFY CDOH INSIGNIA IS AFFIXED FOR FINAL/COMPLETION INSPECTION. 9) GARFIELD COUNTY FINAL INSPECTION REQUIRED FOR COMPLETION APPROVAL. c/-_ Copy