HomeMy WebLinkAboutCompliance Certificate.pdf2009 IECC
COMcheck Software Version 3.9.2
Envelope Compliance Certificate
Section 1: Project Information
Project Type: New Construction
Project Title : Hunter Ridge - Booster
Construction Site:
Parachute, CO
Owner/Agent: Designer/Contractor:
Hunter Ridge Energy Services, LLC
Section 2: General Information
Building Location (for weather data): Parachute, Colorado
Climate Zone: Sb
Building Space Conditioning Type(s): Nonresidential
Vertical Glazing / Wall Area Pct.: 2%
AcsLyilYTYFMS) Floor Area
Manufacturing Facility 550
Section 3: Requirements Checklist
Envelope PASSES. Debign 0.1% better than code.
Climate -Specific Requirements:
Component NamelDescription
Gross
Cavity
Cont. Proposed
Budget
Area or
R -Value
R -Value U -Factor
LI-Factor(a)
Perimeter
Roof 1: Metal Building, Screw Down
560
25.0
0.0 0.098
0.055
Exterior Wall 1: Steel -Framed, 16" o.c.
333
25.0
0.0 0.093
0.064
Exterior Wall 2: Steel -Framed, 16" o.c.
333
25.0
0.0 0.093
0.064
Exterior Wall 3: Steel -Framed, 16" o.c.
152
25.0
0.0 0.093
0.064
Exterior Wall 4: Steel -Framed, 16" o.c.
152
25.0
0.0 0.093
0.064
exhaust fan: Metal Frame:Single Pane, Clear, SHGC 0.01
4
---
--- 1.100
0.550
louver: Metal Frame:Single Pane, Clear, SHGC 0.01
5
-•
--- 1.100
0.550
Pipe port: Metal Frame:Single Pane, Clear, SHGC 0.01
4
---
--- 1.100
0.550
Pipe port copy 1: Metal Frame:Single Pane, Clear, SHGC 0.01
4
--
-- 1.100
0.550
Pipe port copy 2: Metal Frame:Single Pane, Clear, SHGC 0.01
3
---
-- 1.100
0.550
Pipe port copy 3: Metal Frame:Single Pane, Clear, SHGC 0.01
1
---
-- 1.100
0.550
Pipe port copy 4: Metal Frame:Single Pane, Clear, SHGC 0.01
1
---
-- 1.100
0.550
Door 1: Insulated Metal, Swinging
21
---
--- 0.067
0.700
Door 2: Insulated Metal, Swinging
56
---
--- 0.067
0.700
Door 1 copy 1: insulated Metal, Swinging
21
•--
--- 0.067
0.700
Floor 1: Steel Joist
560
38.0
0.0 0.032
0.033
(a) Budget U -factors are used for software baseline calculations ONLY, and are not code requirements
Air Leakage, Component Certification, and Vapor Retarder Requirements:
Lj 1. All joints and penetrations are caulked, gasketed or covered with a moisture vapor -permeable wrapping material installed in accordance
with the manufacturer's installation instructions.
Lj 2. Windows, doors, and skylights certified as meeting leakage requirements.
17 3. Component R -values & U -factors labeled as certified.
O 4. No roof Insulation Is installed on a suspended ceiling with removable ceiling panels.
Project Title: Hunter Ridge - Booster Report date: 12/14/13
Data filename: D:\Projects\Quadna\Booster\Energy Analysis\Hunter Ridge - Booster - Energy Analysis 2009.cck Page 1 of 2
S. 'Other' components have supporting documentation for proposed U -Factors.
0 8. Insulation installed according to manufacturers Instructions, in substantial contact with the surface being insulated, and in a manner that
achieves the rated R -value without compressing the insulation.
7. Stair, elevator shaft vents, and other outdoor air Intake and exhaust openings in the building envelope are equipped with motorized
dampers.
8. Cargo doors and loading dock doors are weather sealed.
9. Recessed lighting fixtures installed in the building envelope are Type IC rated as meeting ASTM E283, are sealed with gasket or caulk.
10.Building entrance doors have a vestibule equipped with self-closing devices.
Exceptions:
Building entrances with revolving doors.
C1 Doors not intended to be used as a building entrance.
Doors that open directly from a space less than 3000 sq. ft. in area.
L) Doors used primarily to facilitate vehicular movement or materials handling and adjacent personnel doors.
L] Doors opening directly from a sleeping/dwelling unit.
Section 4: Compliance Statement
Compliance Statement: The proposed envelope design represented In this document is consistent with the building plans, specifications
and other calculations submitted with this permit application. The proposed envelope system has been designed to meet the 2009 IECC
requirements In COMcheck Version 3.9.2 and to comply with the mandatory requirements In the Requirements Checklist,
John J. Migliaccio, PE, LEED AP _ _______
Structural_Engineering_Manager 12/15/13
Name - Title Signature Date
Project Title: Hunter Ridge - Booster Report date: 12114/13
Data filename: D:\Projectsl0uadnalBoosterlEnergy Analysis\Hunter Ridge - Booster - Energy Analysis 2009.cck Page 2 of 2