Loading...
HomeMy WebLinkAboutCompliance Certificate.pdf2009 IECC COMcheck Software Version 3.9.2 Envelope Compliance Certificate Section 1: Project Information Project Type: New Construction Project Title : Hunter Ridge - Booster Construction Site: Parachute, CO Owner/Agent: Designer/Contractor: Hunter Ridge Energy Services, LLC Section 2: General Information Building Location (for weather data): Parachute, Colorado Climate Zone: Sb Building Space Conditioning Type(s): Nonresidential Vertical Glazing / Wall Area Pct.: 2% AcsLyilYTYFMS) Floor Area Manufacturing Facility 550 Section 3: Requirements Checklist Envelope PASSES. Debign 0.1% better than code. Climate -Specific Requirements: Component NamelDescription Gross Cavity Cont. Proposed Budget Area or R -Value R -Value U -Factor LI-Factor(a) Perimeter Roof 1: Metal Building, Screw Down 560 25.0 0.0 0.098 0.055 Exterior Wall 1: Steel -Framed, 16" o.c. 333 25.0 0.0 0.093 0.064 Exterior Wall 2: Steel -Framed, 16" o.c. 333 25.0 0.0 0.093 0.064 Exterior Wall 3: Steel -Framed, 16" o.c. 152 25.0 0.0 0.093 0.064 Exterior Wall 4: Steel -Framed, 16" o.c. 152 25.0 0.0 0.093 0.064 exhaust fan: Metal Frame:Single Pane, Clear, SHGC 0.01 4 --- --- 1.100 0.550 louver: Metal Frame:Single Pane, Clear, SHGC 0.01 5 -• --- 1.100 0.550 Pipe port: Metal Frame:Single Pane, Clear, SHGC 0.01 4 --- --- 1.100 0.550 Pipe port copy 1: Metal Frame:Single Pane, Clear, SHGC 0.01 4 -- -- 1.100 0.550 Pipe port copy 2: Metal Frame:Single Pane, Clear, SHGC 0.01 3 --- -- 1.100 0.550 Pipe port copy 3: Metal Frame:Single Pane, Clear, SHGC 0.01 1 --- -- 1.100 0.550 Pipe port copy 4: Metal Frame:Single Pane, Clear, SHGC 0.01 1 --- -- 1.100 0.550 Door 1: Insulated Metal, Swinging 21 --- --- 0.067 0.700 Door 2: Insulated Metal, Swinging 56 --- --- 0.067 0.700 Door 1 copy 1: insulated Metal, Swinging 21 •-- --- 0.067 0.700 Floor 1: Steel Joist 560 38.0 0.0 0.032 0.033 (a) Budget U -factors are used for software baseline calculations ONLY, and are not code requirements Air Leakage, Component Certification, and Vapor Retarder Requirements: Lj 1. All joints and penetrations are caulked, gasketed or covered with a moisture vapor -permeable wrapping material installed in accordance with the manufacturer's installation instructions. Lj 2. Windows, doors, and skylights certified as meeting leakage requirements. 17 3. Component R -values & U -factors labeled as certified. O 4. No roof Insulation Is installed on a suspended ceiling with removable ceiling panels. Project Title: Hunter Ridge - Booster Report date: 12/14/13 Data filename: D:\Projects\Quadna\Booster\Energy Analysis\Hunter Ridge - Booster - Energy Analysis 2009.cck Page 1 of 2 S. 'Other' components have supporting documentation for proposed U -Factors. 0 8. Insulation installed according to manufacturers Instructions, in substantial contact with the surface being insulated, and in a manner that achieves the rated R -value without compressing the insulation. 7. Stair, elevator shaft vents, and other outdoor air Intake and exhaust openings in the building envelope are equipped with motorized dampers. 8. Cargo doors and loading dock doors are weather sealed. 9. Recessed lighting fixtures installed in the building envelope are Type IC rated as meeting ASTM E283, are sealed with gasket or caulk. 10.Building entrance doors have a vestibule equipped with self-closing devices. Exceptions: Building entrances with revolving doors. C1 Doors not intended to be used as a building entrance. Doors that open directly from a space less than 3000 sq. ft. in area. L) Doors used primarily to facilitate vehicular movement or materials handling and adjacent personnel doors. L] Doors opening directly from a sleeping/dwelling unit. Section 4: Compliance Statement Compliance Statement: The proposed envelope design represented In this document is consistent with the building plans, specifications and other calculations submitted with this permit application. The proposed envelope system has been designed to meet the 2009 IECC requirements In COMcheck Version 3.9.2 and to comply with the mandatory requirements In the Requirements Checklist, John J. Migliaccio, PE, LEED AP _ _______ Structural_Engineering_Manager 12/15/13 Name - Title Signature Date Project Title: Hunter Ridge - Booster Report date: 12114/13 Data filename: D:\Projectsl0uadnalBoosterlEnergy Analysis\Hunter Ridge - Booster - Energy Analysis 2009.cck Page 2 of 2