HomeMy WebLinkAboutStorm Water Construction Permit.pdfStormwater Construction
Permit
Ursa Operating Company
Valley Farms L
Pad Access Roadway
OA Project No. 014-1606
STATE OF COLORADO
John W. Hickenlooper, Governor
Christopher E. Urbina, MD, MPH
Executive Director and Chief Medical Officer
Dedicated to protecting and improving the health and environment of the people of Colorado
4300 Cherry Creek Dr. S.
Denver, Colorado 80246-1530
Phone (303) 692-2000
Located in Glendale, Colorado
http://www.cdphe.state.co.us
5/21/2013
Robert W Biel!, Reg and Env Mgr
Ursa Operating Co LLC
105017 St Ste 2400
Denver, CO 80202
Laboratory Services Division
8100 Lowry Blvd.
Denver, Colorado 80230-6928
(303) 692-3090
Colorado Department
of Public Health
and Environment
RE: Certification, Colorado Discharge Permit System
Permit No., COR030000, Certification Number COR03K564
Dear Mr./Ms. Bleil;
The Water Quality Control Division (the Division) has reviewed the application submitted for the Gravel Trend Well Field facility and determined that it
qualifies for coverage under the CDPS General Permit for Stormwater Discharges Associated with Construction Activities (the permit). Enclosed please
find a copy of the permit certification, which was issued under the Colorado Water Quality Control Act.
Facility: Gravel Trend Well Field
Construction Activities: Oil and Gas Production and/or Exploration,
Legal Contact (receives oil legal documentation pertaining to the permit certifi
Robert W Bleil, Reg and Env Mgr
Ursa Operating Co LLC
1050 17 St Ste 2400
Denver, CO 80202
Facility Contact (contacted for general inquiries regarding the facility):
Robert W Bleil, Reg and Env Mgr
Billing Contact (receives the invoice pertaining to the permit certification):
Robert W Blell, Reg and Env Mgr
Ursa Operating Co ILC
1050 17 St Ste 2400
Denver, CO 80202
Garfield County
cation):
Phone number: 970625-9922
Email: rbleil@ursaresources.com
Phone number: 970-625-9922
Email: rbleil@ursaresources.com
Phone number: 970-625-9922
Email: rbleil@ursaresources.com
Any changes to the contacts listed above must be provided to the Division on a Change of Contact form. This form is available on the Division's website
at coloradowaterpermits.com.
The Annual Fee for this certification is $245.00, and is invoiced every July. Do Not Pay This Now. The initial prorated invoice will be sent to the legal
contact shortly,
The Division Is currently developing a new permit and associated certification for the above permitted facility. The development and review
procedures required by law have not yet been completed. The Construction Stormwater General Permit, which will expire June 30, 2012, will be
administratively continued and will remain in effect under Section 104(7) of the Administrative Procedures Act, C.R.S. 1973, 24-4-101, et seq (1982
rept. vol. 10) until a new permit/certification is issued and effective. The renewal for this facility will be based on the application that was received
5/14/2013.
Please read the enclosed permit and certification. If you have any questions please contact Kathleen Rosow, Environmental Protection Specialist, at
(303) 692-3521.
Sincerely,
Karen Harford, Administrative Assistant!!
WATER QUALITY CONTROL DIVISION
Enclosures: Certification page; General Permit; Highlight Sheet; Termination form
xc: Permit File
/keh cert
Colorado Department
of Public}Iralrb
and Environment
CERTIFICATION TO DISCHARGE
UNDER
CDPS GENERAL PERMIT COR -0300000
STORMWATER ASSOCIATED WITH CONSTRUCTION ACTIVITIES
Certification Number: COR03K564
This Certification to Discharge specifically authorizes:
Ursa Operating Co LLC
to discharge stormwater from the facility identified as
Gravel Trend Well Field
To the waters of the State of Colorado, including, but not limited to:
Beaver Creek Mamm Creek Divide Creek Garfield Creek and Alkali Creek - Colorado River
Facility Industrial Activity : Oil and Gas Production and/or Exploration,
Facility Located at:
US 6 and Miller Rd, Silt
Garfield County, CO 81652
Latitude 39.531, Longitude -107.653
Certification is effective: 5/21/2013 Certification Expires: 6/30/2012
ADMINISTRATIVELY CONTINUED
This certification under the permit requires that specific actions be performed at designated times. The
certification holder is legally obligated to comply with all terms and conditions of the permit.
Signed,
Nathan Moore
Construction/MS4/Pretreatment Unit Manager
Water Quality Control Division
Page 1 of 22