HomeMy WebLinkAboutEngineer's Report-Site Survey Plan & Profile. sTABILIzar�
ROCK SOLID
DESIGN • BUILD
Mesa Pipeline
Site Survey Plan & Profile
July 13, 2014
To: LIMN Energy
Attention Tom Hoeglin
Project: Mesa Pipeline Alignment — CSI Mesa Pipeline Layout June 25, 2014
RE: Review of CSI Site Survey Plan and Profile
Tom,
As requested, Rock Solid Solutions has conducted a review of Construction Survey Inc's
drawings of the proposed Mesa Pipeline Alignment from CR215 to the top of Old Mountain.
This evaluation consisted of reviewing the proposed pipeline alignment and design as well as
engineering experience and judgment in the area. The civil design of the plan layout and profile
developed for this pipeline alignment appear to meet standards of the industry for this type of
work. These assumptions are also based upon our knowledge of the site geology, our
experience with cuts and fills in the area for roads and pads, maintenance of site facilities in the
Pieance Basin and standard designs for public sector roads as well.
Construction Surveys, Inc. has developed, prepared and sealed the drawings in accordance with
the requirements for a Professional Land Surveyor and as such is complete for submittal to the
governing agencies for their review. Rock Solid's review of the drawings further confirms the
drawings present the information available within the accuracy of measurements taken and
provided to the design team.
Please call or email if you have any questions.
Respectfully,
Donald J. Berger, P.E.
Sr. Engineer
Rock Solid Solutions
(970) 987-2743
195 Lodgepole Circle, Parachute, CO 81635
Office: (970) 987-4247 Fax: (970) 712-5715