Loading...
HomeMy WebLinkAboutEngineer's Report-Site Survey Plan & Profile. sTABILIzar� ROCK SOLID DESIGN • BUILD Mesa Pipeline Site Survey Plan & Profile July 13, 2014 To: LIMN Energy Attention Tom Hoeglin Project: Mesa Pipeline Alignment — CSI Mesa Pipeline Layout June 25, 2014 RE: Review of CSI Site Survey Plan and Profile Tom, As requested, Rock Solid Solutions has conducted a review of Construction Survey Inc's drawings of the proposed Mesa Pipeline Alignment from CR215 to the top of Old Mountain. This evaluation consisted of reviewing the proposed pipeline alignment and design as well as engineering experience and judgment in the area. The civil design of the plan layout and profile developed for this pipeline alignment appear to meet standards of the industry for this type of work. These assumptions are also based upon our knowledge of the site geology, our experience with cuts and fills in the area for roads and pads, maintenance of site facilities in the Pieance Basin and standard designs for public sector roads as well. Construction Surveys, Inc. has developed, prepared and sealed the drawings in accordance with the requirements for a Professional Land Surveyor and as such is complete for submittal to the governing agencies for their review. Rock Solid's review of the drawings further confirms the drawings present the information available within the accuracy of measurements taken and provided to the design team. Please call or email if you have any questions. Respectfully, Donald J. Berger, P.E. Sr. Engineer Rock Solid Solutions (970) 987-2743 195 Lodgepole Circle, Parachute, CO 81635 Office: (970) 987-4247 Fax: (970) 712-5715