Loading...
HomeMy WebLinkAboutConditions of Permit.pdfCONDITIONS OF PERMIT BLRE-8-14-3343, SEPT -8-14-3344 Singer Addition 2621 CR 100 Carbondale, Colorado 1) SEE PLAN ATTACHMENTS FOR BUILDING REQUIREMENTS. 2) ALL WORK MUST COMPLY WITH THE 2009 IRC AND MANUFACTURERS SPECIFICATIONS. 3) ALL WORK MUST COMPLY WITH THE COMMUNITY DEVELOPMENT DIRECTORS DETERMINATION LETTER DATED AUGUST 13, 2014. 4) OPEN -HOLE SOILS REPORT REQUIRED AT FOOTING INSPECTION, 2500 PSF. 5) A POST CONSTRUCTION ELEVATION CERTIFICATE, (FEMA FORM 81-31) SEALED BY A COLORADO LICENSED SURVEYOR, IS REQUIRED TO VERIFY FLOOR ELEVATION IS ONE (1) FOOT ABOVE FLOOD PLAIN ELEVATION PRIOR TO FRAMING INSPECTION. 6) ELECTRICAL ROUGH IN APPROVAL IS REQUIRED AT FRAME INSPECTION. 7) ELECTRICAL FINAL APPROVAL IS REQUIRED FOR CO/FINAL INSPECTION. 8) ENGINEERED SEPTIC APPROVAL IS REQUIRED PRIOR TO CO/FINAL INSPECTION. 9) ROAD & BRIDGE DRIVEWAY APPROVAL 15 REQUIRED PRIOR TO CO/FINAL INSPECTION.