Loading...
HomeMy WebLinkAboutEngineer Report.pdfCCI ENGINEERING 1129 -24-Road Cronk Construction Inc. Grand Junction, CO 81505 Grand Junction (970) 245-0577 •Glenwood Springs/Aspen (970) 640-5029 •Montrose/Delta (970) 640-5029 Email: ccigj@msn .com August 18, 2014 CERTIFICATE OF INSPECTION AND ACCEPTANCE Regarding: building pad soils bearing capacity For: Source Gas 0096 CR 160 Glenwood Springs, CO Contractor: TPI Industrial Inc. 2471 Riverside Parkway, Unit A Grand Junction, CO 81505 970-243-4642 The building pad for the project of reference has sufficient bearing capacity for the structure as designed. Please contact this office if you have additional questions concerning this issue. Thomas A. Cronk, P.E. 1129 -24-Road Grand Junction, CO 81505 970-245-0577 0 COLORADO STATE ELECTRICAL BOARD 1560 Broadway, Suite 1350 Denver, Colorado 80202 Automatic email · Do not reply 10 this email. Permit#: Permit Holder: Site: owner: Status: Inspector: Corrections: Comments: Inspection Report 763825 LEE BEMIS PO BOX 1908 GRAND JUNCTION 81502 Phone: (970) 241-1426 Fax: ( ) - Email : bemiselectric@msn.com 0096 County Rd 160 Glenwood Springs Source Gas Source Gas ACCEPTED County: Garfield Date Inspected: 08-AUG -14 Phone : (970) 241-1426 Inspection Type: Complete Final Trim Permit: N Constuctlon Type: NEW Building Type : COMMERCIAL Robert Fuller 303-869-3458 • Thunder Mountain Testing 2970 N. Ronlin A venue Grand Junction, CO 81504 Bill To TPI industrial Inc . 2471 Riverside Parkwuy #A Grand Junction, CO 81505 P.O. Number Terms Net JO Quantity Item Code 2 CWI I PCJ Rep Ship Via Baleu 7129/2014 Ship To TPI Industrial Inc. 2471 Riverside Pnrkwoy #A Grand Junction. CO 81505 F.O.B. Invoice Date Invoice# 712912014 14-622 Project Description Price Each Amount High Strength Bolt Inspection. per hour (2 Hour Minimum on s ite) on 7-17-14 al the Source Gas Warehouse projec t: 96 CR 160 in Glenwood Springs. CO . 82.00 164.00 2 lTI PCJ 90 MILES PCI 0.5 CWI 2PC2 Travel Time, per hour 60.00 0.57 60.00 120.00 51-30 30.00 Mileage, p<:r m ile Rcpon Preparation and Rev iew, per hour A "Moxwell Invcstments, LLC " compan y Total S365.30 THUNDER MOUNTAIN TESTING 2970 Ronlin Avenue, Grand Junction, Colorado 81504 Office (970) 256-9965 Cell (970) 210-7008 Fax (970) 314-7067 E-Mail: kxkid39@aol.com TPI Industrial Inc. 2471 River Road #A Grand Junction, CO 81505 ATfN: Mr. Mike Ballew RE : Source Gas Warehouse 96 County Rd . 160 Glenwood Springs, CO *Field Inspection Dear Mr. Ballew, July 17,2014 Permit # BLC0-4-14-3199 Job# 6887 As requested, structural steel special inspection was conducted per the IBC 2012 Edition -Chapter 17: Structural Tests and Special Inspection and Garfield County requirements. I arrived on site at 8:30AM. I met with Mr. Mike Garcia with TPI Industrial Inc . to review areas for inspection . Visual inspection was conducted at the Lower Roof Level on the 5/8" and W ' ASTM A325 High Strength rigid frame and rigid frame to column bolted connections. The Steel erector for the project is TPI Industrial Inc. Project bolt tension requirements ind icate "tum of the nut" as referenced in the approved jobsite drawings: General Notes -Sheet A-1 provided by B & C Steel from Scottsbluff, Nebraska dated 4/2912014 . As a minimum, I 0% of all connections, but not less than two bolts per connection were inspected for proper bolt tension requirements and match marking techniques as stated in IBC requ irements for Periodic Inspection. Bolt assemblies at grid lines I -5 & A -D were observed to be in place, correctly installed, faying surfaces matched, and correctly marked to indicate "tum of the nut" condition. All ASTM A325 High Strength bolts inspected were found to be adequately tensioned and in compliance with project specifications. Thunder Mountain Testing +Aelatll ... CWI 13080151 OCf EXP. W'l121He Thunder Mountain Testing +8=iLMa..,. CWI 910402cJt ac1 EXP. 41112015