HomeMy WebLinkAbout2.0 Special Use Permitoil F? anll
Reception#: 751990
1 of 2 Reo Fee:$0.00 Doc Fee:0.00 GRRFIELD COUNTY CO
ADMINISTRATIVE PERMIT
for
SG Interests I Ltd
[Bull Mountain Pipeline]
In accordance with and pursuant to Section 9.07 ofthe Garfield County Zoning Resolution of
1978, as amended, and Resolution No. 2005 - 53 of the Board of County Commissioners of
Garfield County, State of Colorado, the Director of the Building and Planning Department
hereby authorizes, by Administrative Permit, the following activity:
2.5 miles of pipeline within Garfield County to
transport natural gas and produced water to the
Divide Creek central distribution point. A 20 -inch
diameter pipeline will accommodate the transfer of
natural gas and an 8 -inch diameter pipeline for
produced water. The project also includes a
staging area to be located on private property off
County Road 342 near the Garfield/Mesa County
line.
The Administrative Permit is issued subject to the conditions set forth in Exhibit A (attached
hereto), and shall be valid only during compliance with such conditions and other applicable
provisions of the Garfield County Zoning Resolution, Subdivision Regulations, Building
Code, and other regulations of the Board of County Commissioners of Garfield County,
Colorado.
BUILDING AND PLANNING DEPARTMENT,
GARFIELD COUNTY, COLORADO
Director
Reception#: 751990
07/09/2008 04:43:30 PM Jean glberico
2 of 2 Rao Fee:$0. 00 Doc Fee: 0.00 GRRFIELD COUNTY CO
Exhibit A
1. Any equipment used in construction or operation of a pipeline must comply with
the Colorado Oil and Gas Conservation Commission Rules and Regulations,
Section 802, Noise Abatement. Additionally, all power sources used in pipeline
operations shall have electric motors or muffled internal combustion engines;
2. Pipeline operations shall be located in a manner to minimize their visual impact
and disturbance of the land surface. Facilities shall be painted in a uniform, non -
contrasting, non -reflective color, to blend with the adjacent landscape. Right-of-
way shall be located in existing disturbed areas unless safety or visual concerns
or other adverse surface impacts clearly dictate otherwise;
3. All access and oversize or overweight vehicle permits shall be obtained from the
County Road & Bridge Department prior to beginning operation. Any new roads
or intensified driveway accesses created as a result of the pipeline construction,
intended to be permanent for maintenance and repair operations shall be placed
behind a locked gate or other barriers preventing use by recreational vehicles.
Any gates or barriers need to be consistent with the surface owner's preferences;
4. All vehicles working within Garfield County Right of Ways will be licensed and
registered in the State of Colorado. All vehicles hauling equipment and materials
for the pipeline construction will abide by Garfield County Road & Bridge
Departments oversize%verweight regulations. All vehicles requiring an
oversize%verweight permit will send a letter showing proof that they can operate
under a known bond holder on file with Garfield County Road & Bridge
Department before a permit will be issued,
5. The Applicant shall provide the County with a digital alignment of the pipeline
once constructed in a format readable to the County Geographic Information
System (GIS) analyst;
6. In no case shall an operator engage in activities which impact Federal or State
threatened and endangered species;
7. Air contaminant emissions shall be in compliance with the applicable permit and
control provisions of the Colorado Air Quality Control Program, Title 25,
Resolution 7, C. R. S;
8. All operations shall comply with all applicable Federal and State Public Health
and Environment, Noise, and Air and Water Quality Control standards,
9. Any proposed waste disposal or treatment facilities shall comply with all
requirements of the County Individual Sewage Disposal System Regulations;
10. Should any abandoned pipeline be removed, it will be subject to the original
revegetation and weed management requirements in the original application;
11. The Applicant shall quantify the total disturbed area of the project and provide
revegetation security in the amount of $2,500 per acre of disturbed area prior to
the issuance of the Administrative Pipeline Permit;
12. The Applicant shall provide a copy of the Stormwater Management Plan for
Garfield County Records;