Loading...
HomeMy WebLinkAbout2.0 Special Use Permitoil F? anll Reception#: 751990 1 of 2 Reo Fee:$0.00 Doc Fee:0.00 GRRFIELD COUNTY CO ADMINISTRATIVE PERMIT for SG Interests I Ltd [Bull Mountain Pipeline] In accordance with and pursuant to Section 9.07 ofthe Garfield County Zoning Resolution of 1978, as amended, and Resolution No. 2005 - 53 of the Board of County Commissioners of Garfield County, State of Colorado, the Director of the Building and Planning Department hereby authorizes, by Administrative Permit, the following activity: 2.5 miles of pipeline within Garfield County to transport natural gas and produced water to the Divide Creek central distribution point. A 20 -inch diameter pipeline will accommodate the transfer of natural gas and an 8 -inch diameter pipeline for produced water. The project also includes a staging area to be located on private property off County Road 342 near the Garfield/Mesa County line. The Administrative Permit is issued subject to the conditions set forth in Exhibit A (attached hereto), and shall be valid only during compliance with such conditions and other applicable provisions of the Garfield County Zoning Resolution, Subdivision Regulations, Building Code, and other regulations of the Board of County Commissioners of Garfield County, Colorado. BUILDING AND PLANNING DEPARTMENT, GARFIELD COUNTY, COLORADO Director Reception#: 751990 07/09/2008 04:43:30 PM Jean glberico 2 of 2 Rao Fee:$0. 00 Doc Fee: 0.00 GRRFIELD COUNTY CO Exhibit A 1. Any equipment used in construction or operation of a pipeline must comply with the Colorado Oil and Gas Conservation Commission Rules and Regulations, Section 802, Noise Abatement. Additionally, all power sources used in pipeline operations shall have electric motors or muffled internal combustion engines; 2. Pipeline operations shall be located in a manner to minimize their visual impact and disturbance of the land surface. Facilities shall be painted in a uniform, non - contrasting, non -reflective color, to blend with the adjacent landscape. Right-of- way shall be located in existing disturbed areas unless safety or visual concerns or other adverse surface impacts clearly dictate otherwise; 3. All access and oversize or overweight vehicle permits shall be obtained from the County Road & Bridge Department prior to beginning operation. Any new roads or intensified driveway accesses created as a result of the pipeline construction, intended to be permanent for maintenance and repair operations shall be placed behind a locked gate or other barriers preventing use by recreational vehicles. Any gates or barriers need to be consistent with the surface owner's preferences; 4. All vehicles working within Garfield County Right of Ways will be licensed and registered in the State of Colorado. All vehicles hauling equipment and materials for the pipeline construction will abide by Garfield County Road & Bridge Departments oversize%verweight regulations. All vehicles requiring an oversize%verweight permit will send a letter showing proof that they can operate under a known bond holder on file with Garfield County Road & Bridge Department before a permit will be issued, 5. The Applicant shall provide the County with a digital alignment of the pipeline once constructed in a format readable to the County Geographic Information System (GIS) analyst; 6. In no case shall an operator engage in activities which impact Federal or State threatened and endangered species; 7. Air contaminant emissions shall be in compliance with the applicable permit and control provisions of the Colorado Air Quality Control Program, Title 25, Resolution 7, C. R. S; 8. All operations shall comply with all applicable Federal and State Public Health and Environment, Noise, and Air and Water Quality Control standards, 9. Any proposed waste disposal or treatment facilities shall comply with all requirements of the County Individual Sewage Disposal System Regulations; 10. Should any abandoned pipeline be removed, it will be subject to the original revegetation and weed management requirements in the original application; 11. The Applicant shall quantify the total disturbed area of the project and provide revegetation security in the amount of $2,500 per acre of disturbed area prior to the issuance of the Administrative Pipeline Permit; 12. The Applicant shall provide a copy of the Stormwater Management Plan for Garfield County Records;