Loading...
HomeMy WebLinkAbout1.06 Regulatory permitsSTANDARD FORM 299 (2!203) }Inscribed by DOIIUSDA/D(7r P.L. 96417 and Federal Register Notice 5-22-95 APPLICATION FOR TRANSPORT/010N AND UTILITY SYSTEMS AND FACILITIES ON FEDERAL LANDS FORM APPROVED OMB NO. 1004-0189 Expires: October 31, 2005 FOR AGENCY USE ONLY NOTE: Before completing and filing the application, the applicant should completely review this package and schedule a preapplication meeting with representatives of the agency responsible for processing the application. Each agency may have specific and unique requirements to be met in preparing and processing the application. Many times, with the help of the agency representative, the application can be completed at the prcapplicauon meeting. Application Number Date filed 1. Name and address of applicant (include yip code) EnCana Oil & Gas (USA) Inc. 2717 County Road 215, Sulte 100 Parachute, CO 81635 Name, title, and address of authorized agent if different from Item 1 (include ;Ip code) Wagon Wheel Consulting 111 East 3rd St, Suite 213 Rifle, CO 81650 LE ONE (area code Applicant 970-285-2600 Authorized Agent 970.625.8433 4. As applicant are you? (check one a. ❑ Individual b. ,✓ Corporation* c. Partnership/Association* d. State Governmern/State Agency e. Local Government f. Federal Agency • 11 checked, complete supplemental page 5. Specify what application is for: (check one) a b. c. d. c. f. • • 1 1 New authorization Renewing existing authorization No. Amend existing authorization No. Assign existing authorization No. Existing use for which no authorization has been received' Other* `Ifchecked provide derails under Item 7 6. [f an individual, or partnership are you a citizen(s) of the United States? 0 Yes ❑ No 7. Project description (describe in derail): (a) Type of system or facility, (e.g., canal, pipeline, road); (b) related structures and facilities; (c) physical specifications (length, width, grading, etc.); (d) term of years needed; (e) time of year of use or operation; (f) Volume or amount of product to be transported; (g) duration and timing of construction; and (h) temporary work areas needed for construction (Attach additional sheets If additional space it needed,) ;EnCana Oil & Gas (USA), Inc. proposes to construct, operate and maintain approximately 15 miles of natural gas, water distribution, and produced water gathering pipelines within the South Parachute Area. The proposed pipeline route will be immediately adjacent to the existing Canyon Gas Resources pipeline system. Right -of -Way required on BENI lands will be approximately 12 miles of the 15 mile total. EnCana plans to install these pipelines in order to begin gathering the natural gas and produced fluids form existing and future EnCana weals. The natural gas is currently gathered by Canyon Gas Resources. The current Canyon Gas system is limited due to capacity and high pressure. The proposed pipeline project will include a main trunk line system consisting of up to 20 inch (natural gas), 8 inch (water distribution), and 6 inch (water gathering) pipeline laterals from existing and planned well pads (see attached Exhibit B). These well pad laterals will connect to the mail trunk line system through above ground valve sets. Temporary Right -of -Way widths for construction will need to be 65 feet (Trunk Line System) and 55 feet (Well Pad Laterals) and will revert back to a 30 root permanent easement. No additional work space areas will be required on BLM lands. Construction is proposed to commence upon approval of land grand and(or following BLM (Winter Stips) and will have a completion duration of approximately 8 weeks. 8. Attach a map covering area and show location of project proposal 9. State or local government approval: ❑Attached Applied for ['Not required 10. Nonreturnable application fee. ®Attached pNot required 11. Does project cross international boundary or affect international waterways? 0 Yes ['No (!f 'yes," indicate on map) 12. Give statement of your technical and financial capability to construct, operate, maintain, and terminate system for which authorization is being requested. EnCana Oil & Gas is a financially secure, international company which owns and operates numerous wells, pipelines, and facilities in the United States and Canada including those In the Rifle, Colorado area. EnCana will utilize the services of contract companies, who specialize in the construction of oil and gas facilities, to construct and install the pipeline. EnCana will ensure compliance with all federal, state, and local regulation including all API specifications. (Continued on page 2) This form is authorized for local reproduction. 13a Describe other reasonable alternative routes and modes considered. Onc (1) alternative considered would be to allow Canyon Gas Resources to continue gathering the natural gas. b. Why were these alternatives not scieeted? 'The Canyon Gas system has 'Milted capacity due to smaller pipeline sizes and high operating pressures. The proposed EnCena system will increase potential natural gas produclinn volumes due to greater carrying rapacity and lower well head pressures. c Give explanation as to why itis necessary to cross Federal Lands The proposed R.O.W. across BLM land provides the most feasible route from and economical, and rnstructability stand point and emsnres that the least visual and human impact can be achieved by the project The proposed project utilizes existing pipeline Right -of -Ways to the greatest extent possible. 14. List authorisations and pending applications filed for similar projects which may provide information to the authorizing agency. (Specify number, date, code, or name) None 15. provide statement of need for project, including the economic feasibility and items such as: (a) cost of proposal (construction, operation. and maintenance); (b) estimated cost of next best alternative; and (e) expected public benefits. The proposed pipeline will be utilized to gather increased volumes of natural gas from producing welts then transport the gas to existing facilities where it will be compressed and sold to existing transmission companies. 16. Describe probable effects on thepopulation in the area, including the social and economic aspects, and the rural lifestyles. No adverse affects on the population in the area, including the social and economic aspect and the rural lifestyles are anticipated as a result of this project. The potential positive impact from this project may include temporary employment due to construction activities. 17. Describe likely environmental effects that the proposed project will have on: (a) air quality; (b) visual impact; (c) surface and ground water quality and quantity; (d) the control or structural change on any stream of other body of water; (e) existing noise levels; and (1) the surface of the land, meludirig vegetation, permafrost, soil, and soil stability. Bust control measures will be in plate during a mstrnetion to mitigate air quality issues. No streams or water bodies will be affected. Existing noise levels will not be changed as a result of this project. Topsoils will be preserved, re -spread, and re -seeded following construction. No ground water discharges are anticipated. I8. Describe the probable effects that the proposed project will have on (a) populations of fish, pIanllifc, wildlife, and marine life, including threatened and endangered species; and (h) marine mammals, including hunting, capturing, collecting, or killing these animals. The proposed project will parallel existing pipelines thereby utilizing previously disturbed areas as much as possible. 19. State whether any hazardous material, as defined in this paragraph, will be used, produced, transported or stored on or within theright-of-way or any of the right-of-way facilities, or used in the eonstruclion, operation, maintenance or termination of the right-of-way er any of its facilities. "Hazardous material" moans any substano , pollutant Of contaminant that is listed as hazardous under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980, as amcndcd, 42 U.S.C. 9601 et seq., and its regulations. The definition of hazardous substances under CERCLA includes any "hazardous waste" as defined in the Resource Conservation and Recovery Act of 1976 (RCRA), as amended, 42 If.S.C. 9601 et seeq,, and its regulations. The term hazardous materials also includes any nuclear or byproduct material as defined by the Atomic Energy Act of 1454, as amended, 42 U.S.C. 2011 et seq. The terra does not include petroleum, including crude oil or any fraction thereof that is not otherwise specifically listed or designated as a hazardous substance cinder CERCLA Section 101(14), 42 U.S.C. 9601(14), nor does the tem include natural gas. No lla2arrious Alateriais will be used, produced, transported, or stored on or within the proposed R.O.W.. 20. Name all the Deparfnxenl(s)JAgeney(ies) where this application is being filed. Department of the interior, Bureau or Land Management, Glenwood Springs Resource Area. Garfield County BOCC U.S. Arany Corp of Engineers 1 HEREBY CERTIFY, That I am of legal age and authorized to do business in the State and that 1 have personally examined the information curtained in the application and believe that the information submitted is correct to the best of my knowledge. Signature of Applicant %J Date 9/�?At Title 18,U.S.C. Section 1001 and Title 43 U.S.0 Section 1212, make it a erune for any person knowingly and willfully to make to any department or agency of the united States any false, fictitious, or fraudulent statements or representations as to any matter within its jurisdiction (Continued an page 3) SF -299, page 2 APPLICATION FOR TRANSPORTATION AND UTILITY SYSTEMS AND FACILITIES ON FEDERAL LANDS GENERAL INFORMATION ALASKA NATIONAL INTEREST LANDS This application will be used when applying for a right-of-way, permit, license, lease, or certificate for the use of Federal lands which lie within conservation system units and National Recreation or Conservation Areas as defined in the Alaska National Interest Lands Conservation Act. Conservation system units include the National Park System, National Wildlife Refuge System, National Wild and Scenic Rivers System, National 'Trails System, National Wilderness Preservation System, and National Forest Monuments. Transportation and utility systems and facility uses for which the application may he used are: 1. Canals, ditches, flumes, laterals, pipes, pipelines, tunnels, and other systems for the transportation of water. 2. Pipelines and other systems for the transportation of liquids other than water, including oil, natural gas, synthetic liquid and gaseous fuels, and any refined product produced therefrom. 3. Pipelines, slurry and emulsion systems, and conveyor belts for transportation of solid materials. 4, Systems for the transmission and distribution of electric energy, 5. Systems for transmission or reception of radio, television, telephone, telegraph, and other electronic signals, and other means of communications. 6. Improved rights-of-way for snow machines, air cushion vehicles, and all -terrain vehicles. 7. Roads, highways, railroads, tunnels, tramways, airports, landing strips, docks, and other systems of general transportation. This application must he filed simultaneously with each Federal department or agency requiring authorization to establish and operate your proposal. In Alaska, the following agencies will help the applicant file an applieatiori and identify the other agencies the applicant should contact and possibly file with: Department of Agriculture Regional Forester, Forest Service (USFS) Federal Office Building, PO. Box 21628 Juneau, Alaska 99802-1628 Telephone: (907) 586-7847 (ora local Forest Service Office) Department of the Interior Bureau of Indian Affairs (BIA) Juneau Area Office 9109 Mendenhall Mail Road, Suite 5, Federal Building Annex Juneau, Alaska 99802 Telephone: (907) 586-7177 Bureau of Land Management (BLM) 222 West 7th Ave., Box 13 Anchorage, Alaska 99513-7599 Telephone: (907) 271-5477 (ora loco, BIM Office) National Park Service (NPS) Alaska Regional Office, 2525 Gambell St., Rm. 107 Anchorage, Alaska 99503-2892 Telephone: (907) 257.2585 U.S. Fish&Wildlife Service (FWS) Office of the Regional Director 1011 East Tudor Road Anchorage, Alaska 99503 Telephone: (907)786-3440 Note -Filings with any Interior agency may be filed with any office noted above or with the: Office of the Secretary of the interior, Regional Environmental Officer, Box 120, 1675 C Street, Anchorage, Alaska 99513. Department of Transportation Federal Aviation Administration Alaska Region AA [ - 4,222 West 7th Ave., Box 14 Anchorage, Alaska 99513-7587 Telephone: (907) 271-5285 NOTE- The Department of Transportation has established the above central filing point for agencies within that Department, Affected agencies are: Federal Aviation Administration (FAA), Coast Guard (USCG), Federal Highway Administration ((I-HWA), Federal Railroad Administration (FRA). OTHER THAN AIA.IKA NATIONAL IMP:REST LANDS Use of this form is not limited to National Interest Conservation Lands of Alaska. Individual departments/agencies may authorize the use of this form by applicants for transportation and utility systems and facilities an other Federal lands outside those areas described above. For proposals located outside of Alaska, applications will be filed at the local agency office or at a location specified by the responsible Federal agency. SPECIFIC INSTRUCTIONS (Items nrir listed are .set explanatory) Item 7 Attach preliminary site and facility construction plans. The responsible agency will provide instructions whenever specific plans are required. 8 Generally, the map must show the section(s), township(s), and ranges within which the project is to be located. Show the proposed location of the project on the map as accurately as possible. Some agencies require detailed survey maps. The responsible agency will provide additional instructions. 9, 10, and 12 - The responsible ageney will provide additional instructions. 13 Providing information on alternate routes and modes in as much detail as possible, discussing why certain routes or modes were rejected and why it is necessary to cross Federal lands will assist the agency(ies) in processing your application and reaching a final decision. Include only reasonable alternate routes and modes as related to current technology and economics. 14 The responsible agency will provide instructions. 15 Generally, a simple statement of the purpose of the proposal will be sufficient. However, major proposals located in critical or sensitive areas may require a full analysis with additional specific information. The responsible agency will provide additional instructions. 16 through 19 - Providing this information in as much detail as possible will assist the Federal agency(ies) in processing the application and reaching a decision. When completing these items, you should use a sound judgment in furnishing relevant information. For example, if the project is not near a stream or other body of water, do not address this subject. The responsible agency will provide additional instructions. Application must be signed by the applicant or applicant's authorized representative. if additional space is needed to complete any item, please put the information on a separate sheet of paper and identify it as "Continuation of Rem". (For supplemental, .ree page 4) SF -299, page 3 S UPPLEMENTAL NOTE: The responsible agency(ies) will provide additional instructions CHECK nYYxdixlnTE BLOCK 1 - PRIVATE CORPORATIONS ATTACHED FILED' a. Articles of Incorporation h. Corporation Bylaws 0 ❑ c. A certification from the State showing the corporation is in good standing and is entitled to operate within the State. ❑ ❑ d. Copy of resolution authorizing filing ❑ ❑ e. The name and address of cub shareholder owning 3 percent or more of the shares, together with the number and percentage of any class of voting shares of the entity which such shareholder is authorized to vote and the nacre and address of each affiliate of the entity with, in the case of an affiliate controlled by the entity, the number of shares and the percentage of any class of voting stock of that affiliate owned, directly or indirectly, by that entity, and in the case of an affiliate which controls that entity, the number of shares and the percentage of any class of voting stock of that entity owned, directly or indirectly, by the affiliate. ❑ ID f. reapplication is for an oiler gas pipeline, describe any related right -of --way or temporary use permit applications, and identify previous applications ❑ ❑ gIf application is for an oil and gas pipeline, identify all Federal lands by agency impacted by proposal. 0 ❑ 11- PUBLIC CORPORATIONS a Copy of law fomaing corporation ❑ MI b. Proof of organization 0 ❑ c. Copy of Bylaws 0 0 d. Copy of resolution authorizing filing ❑ 151 e. If application is for an nil or gas pipeline, provide information required by item "l -f' and "i -g" above. ❑ II III - PARTNERSHIP OR OTHER UNINCORPORATED ENTflY a. Articles of association, if any 0 ❑ b. If one partner is authorized to sign, resolution authorizing action is e. Name and address of each participant. partner, association, or other ❑ 0 d. If application is for an oil or gas pipeline, provide information required by Item "l -f and "1-g" above. 0 II *If the required information is already filed with the agency processing this application and is current, check block entitled "Filed.' Provide the file identification information (e.g., number, date, code, name). If not on file or current, attach the requested information. f. I. Army Corp of Engineers Section 404 Permit 2. Garfield County Special Use Permit 3. Garfield County Conditional Use Permit 4. Colorado Division of Wildlife B. Department of the interior, Bureau of ].and Management, Glenwood Springs Resource Area. The Paperwork Reduction Act of 1995 requires us to inform you that: The Federal agencies collect this information From applicants requesting right-of- way, permit, license, lease, or certifications for the use of Federal lands. Federal agencies use this information to evaluate your proposal. No Federal agency may tequest or sp osisor, and you are not required to respond to a request for information which does not contain a cutrentiy valid OMB Control Number. BURDEN HOURS STATEMENT The public burden for this form is estimated et 25 hours per response including the time for reviewing irisIruciions, gathering and maintaining data, and completing and reviewing the form. Direct comments regarding the burden estimate or any other aspect of this form to: U.S. Department of the interior, Bureau of Land Management (91004-01$9), Bureau Information Collection Clearance Officer (WO -630), 1849 C Street, N.W., Mail Stop 4011.S, Washington, D.C. 20240 A reproducible copy of this form may be obtained from the Bureau of Land Management, Land and Realty Group, 1620 L Street, N.W., Rrn. 100ULS, Washington, D.{:. 20036. (Continued an page 5) SF -299, page 4 NOTICE NOTE: This applies to the Department of the Interior/Bureau of Land Management (Bl.M). The Privacy Act of 1974 provides that you he furnished with the following information in connection with the information provided by this application for an authorisation. AUTHORITY 16 U.S.C. 310 and 5 U.S.C. 301. PRINCIPAL PURPOSE: The primary uses of the records are to facilitate the (1) processing of claims or applications; (2) recordation of adjudicative actions; and (3) indexing of documentation in ease files supporting administrative actions. ROUTINE USES: BLM and the Departntent of the Interior (DOI) may disclose your information on this form: (1) to appropriate Federal agencies when concurrence or supporting information is required prior to granting or acquiring a right or interest in lands or resources; (2) to members or the public who have a need for the information that is maintained by BLM for public record; (3) to the U.S. Department of Justice, court, or other adjudicative body when DOI determines the information is necessary and relevant to litigation; (4) to appropriate Federal, State, local, or foreign agencies responsible for investigating, prosecuting violation, enforcing, or implementing this statute, regulation, or order; and (5) to a congressional office when you request the assistance of the Member of Congress in writing. EFFECT OF NOT PROVIDING THE INFORMATION: Disclosing this information is necessary to receive or maintain a benefit. Not disclosing it may result in rejecting the application. SF -299, page 5 GARFIELD COUNTY Road and Bridge Department Jake Mall Administrative Foreman Permit: County Road Crossing Road: County Road 302 DATE: November 16, 2005 Time: 1:00 PM Meeting Place: Garfield County Road & Bridge Department Attendant: Jake Mall and Tom Bettes (Wagon Wheel Consulting) EnCana Oil & Gas (USA) Inc. proposes to construct a 20 inch, 8 inch, and 6 inch pipeline that will cross county road 302. Information presented to Mr. Mall during the meeting was a map of proposed pipeline, engineering drawings, and a profile map of the proposed crossing site. The proposed crossin of county road 302 is Located in the SW Ya NE % of Section 15, T7S, R95W, 6t P.M. After a discussion of the proposed project Mr. Mall gave his verbal approval to cross county road 302. He stated that it would be OK to close county road 302 and open cut the road to install the pipeline. He also stated that boring this road would not be practical Because road crossing permit expires after 30 days, Mr. Mall agreed to issue a permit when construction begins. TA VIE Sw t^l4T w8r,UN:th 4C1ICS CAPPWrie �?PIM CLEal XSIlkv4 NJI O EnCan.a Ort Gas Inc. High Mesa Pipeline Extension 7z Stare 1l (4351 781-2501 ca.ne<u —maw Lege d — ��„ Proposed Plpehn0 e wenard LEM COM0610001. Stetfen PLAN SCAM NONE N h THIS DWG. K-50 .375 WT. X-50 .375 WT. X-60 WE. SECTION SCALE: NON x -EO .375 WT. 375 20" Pp'L NE r PALINE le AMOK THIS DRAWING HAS NOT BEEN PUBLISHED BLIT RATHER HAS BEEN PREPARED BY WAGON WHEEL CONSULTING, INC FOR • "vi THE CLIENT NAMED IN LE BLOCK SOLELY IN :CT OF THE CONSTRUCTION, IRON AND MAINTENANCE Op- 1HE WILITY NAMED IN THE TITLE BLOCK AND SHALI. NOT BE USED FOR ANY OTHER PURPOSE OR FURNISHED TO ANY OTHER PARTY WITHOUT THE EXPRESSED WRITTEN CONSENT OF WAGON WHEEL CONSULTING, INC REFERENCE DRAWIGS REVISIONS BY CH}( • •PPD DATE BY DATE ED -1 TOPOGRAPF€IC MAP DRAWN TSG 11-14-05 05-0313 PIPELINE PLANE& PROFILE CHECKED IS 11-14-05 ISSUED FOR PERMITTING 15 JS JS 11-14-05 E C AN A ru T€TLE SOUTH PARACHUTE 20"-8"-6" UNCASED CNTY RD 302 CROSSNG PLAN & SECTION WAGON WHEEL CONSULTING, INC 111 E 3RD. ST, SUITE 213 RIFLE, CO 81550 970-525-8433 WWCProject Number 05059 WWC Drawing Number 4733 SCALE "Ina BASIS OF ELEVA 770N5 Elevations ore based on the NGS Benchmark KCEPSELL Located al Lot 39254265" North and Long - 108'04'27.77" West (NAD 83). The NA VD 88 elevation of this Benchmark is 51230'. Centerline of Proposed Pipeline Right—of—Way E cm Sec, 15 John Clem Jr. Trust SW 1/4 NE 1/4 n 0 + N84'05'21"E 369.$4. Existing Pipeline / CORNER 77E NO7E- P.1. 313+80.84 bears N87'39'041 - 3066.35' 873904E.306$.35' from the West 1/4 Corner of Section 15. BASIS OF BEARINGS NOTE:' Basis of Bearings is the East line of the NE 1/4 of Section 30, T7.5. R95W, fish PAL which is taken from global positioning satellite observations to bear N00 D2'12'E o measured distance of 2574.97'. Plana View n — —o 6600' 6550' 6500' N 11"7 to 314+50 Pipeline Centerline Profile N hrs (17 315+00 5 C3 t Preconstruction Grade At Proposed Pipeline 6600' 6550' 6500' co w 1r1 0 0 Ln co 3154-50 316+00 316+50 317+00 KNCANA GATHERING SERVICES (USA) INC High Mesa Pipeline Extension COUNTY ROAD 302 CROSSING Located in the SW 1/4 NE 1/4 of Section 15, T7S. R95W. 6th P.M. Carfieid County, Colorado Tri State Land Surveying, .Inc. N 180 NORTH VERNAL AVE. VERNAL, UTAH 84078 (435) 781-2501 SURVEYED BY; L.V. SCALE: 1- = 50' DRAW' BY. M. W. OAT: 11/09/05 DWG'/ 05-0313 REVISION.- APPLICATION FOR DEPARTMENT OF THE ARMY PERMF- OMB APPROVAL NO. 0710-0003 (33 CFF? 325) Expires December 31, 2004 The public reporting burden for this collection of information is estimated to average 10 hours per response, although the majority of applications should require 5 hours or less. This includes the time for reviewing instructions. Searching existing data sources,. gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Service Directorate of Information Operations and Reports, 1215 Jefferson Davis Highway. Suite 1204 Arlington, VA 22202-4302; and to the Office of Management and Budget, Paperwork Reduction Project (0710-0003), Washington, DC 20503. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to either of those addresses. Completed applications must be submitted to the District Engineer having jurisdiction over the location of the proposed activity. PRIVACY ACT STATEMENT Authorities: Rivers and Harbors Act, Section 10, 33 USC 403; Clean Water Act, Section 444, 33 USC 1344; Marine Protection, Research, and Sanctuaries Act, Section 103, 33 USC 1413. Principal Purpose: Information provided on this form will be used in evaluating the application for a permit. Routine Uses; This information may be shared with the Department of Justice and other federal, state, and local government agencies. Submission of requested information is voluntary, however, if information is not provided. the permit application cannot be processed nor can a permit be issued. One set of original drawings or bond reproducible copies which show the location and character of the proposed activity must be attached to this application (see sample drawings and instructions) and be submitted to the District Engineer having jurisdiction over the location of the proposed activity. An application that is not compreted in full will be returned. 1. APPLICATION NO. TEAMS 1 THRU 4 TO BE FILLED BY THE CORPS 2. FIELD OFFICE CODE STEMS 8 3. DATE RECEIVED 4. DATE APPLICATION COMPLETED LOW TO BE FILLED BY APPLICANT) 5. APPLICANTS NAME EnCana Oil and Gas (USA) Inc. Dewey Neeley 8. AUTHORIZED AGENTS NAME AND TITLE an agent is not equired) Cody W Smith, Field Technician Wagon Wheel Consulting 6. APPLICANT'S ADDRESS 2717 County Road 215, Suite 100 Parachute, Co 81635 9. AGENT'S ADDRESS 111 E. 3rd St, Suite 213 Rifle Colorado 61650 7. APPLICANTS PHONE NUMBERS WITH AREA CODE a. Residence b. Business (970) 285- 2600 10.AGENTS PHONE NUMSERS WITH AREA CODE a. cell 3031802-1532 b. Business 970/625-8433 11. STATEMENT OF AUTHORIZATION I hereby authorize Cody W. Smith to act in my behalf as my agent in the processing of this application and to furnish upon request, supplemental information in support of this permit application it- 3 -as NAME, LOCATION AND DESCRIPTION OF PROJECT OR ACTIVITY 12. PROJECT NAME OR TITLE (see instructions) High Mesa Pipeline Extension DATE 13. NAME OF WATERBODY, IF KNOWN (if appIcable) 12 Drainages to include Dry Creek, Query Gulch, Monument Gulch 14. PROJECT STREET ADDRESS (if applicable) N/A 15. LOCATION OF PROJECT Garfield Colorado COUNTY STATE 16. OTHER LOCATION DESCRIPTIONS, IF KNOWN (see instructions) Located in Sections 15, 16, 20, 27, 28, 29, 30, 31, 36 all in Township 7 5, Range 95 W, 61' P.M. 17. DIRECTIONS TO THE SITE Project is located approximately two miles south of Battlement Mesa, CO in the High Mesa area. (See Project Map). ENG FORM 4345, Ju197 EDITION OF SEP 94 IS OBSOLETE (Proponent CEO W -OR) 18. Nature of Activity (Description of project, include all features) EnCana Oil and Gas (USA) Inc. is proposing to install three new pipelines, a new twenty (20") inch steel natural gas gathering pipeline, a new eight (8") steel water distribution pipeline, and a six (6") inch steel water gathering pipeline. The proposed pipelines will utilize land from private land owners as well as the Bureau of Land Management. The 20" pipeline will be constructed using .375" W.T., fusion bond epoxy coated pipe, the 8" and the 6" pipelines will be constructed with .188" W.T., fusion bond epoxy coated pipe. Pipelines will be installed to allow for a minimum of sixty (60") of cover above pipe. No import fill material will be used for backfill material. Once pipeline construction has been completed all contours will be reinstalled and stabilized to near original state. Re -vegetative seed mixes will be stipulated by the B.L.M. and private land owners. Rip Rap will be installed if required. 19. Project Purpose (Describe the reason or purpose of the project, see instructions) The proposed pipelines will be utilized to gather natural gas and produced water from EnCana's well pad locations located in the High Mesa area. The pipelines will gather the material and deliver it to an existing compressor station where compression will be added and to the gas and put into an additional pipeline where it will then be delivered to a treating facility and eventually onto market. The 6" water line will be utilized to gather produce water and to deliver the liquids to and existing evaporation and storage facility, where the water will be evaporate and recycled for use in the completion of drilling wells. The 8" pipeline will be utilized to deliver the recycled water to locations where water is needed for completion work. This techniques eliminates the need for fresh water. USE BLOCKS 20-22 IF DREDGED AND/OR FILL MATERIAL 15 TO BE DISCHARGED 20. Reason(s) for Discharge To install pipelines across drainages. 21. Type(s) of Materiel Being Discharged and the Amount of Each Type in Cubic Yards Native materials, Rock, Clay, Silt, Sand 22. Surface Area in Acres of Wetlands or Other Waters Filled (see instructions) N/A 23. Is Any Portion of the Work Already Complete? Yes No X IF YES, DESCRIBE THE COMPLETED WORK 24. Addresses of Adjoining Property Owners, Lessees, etc., Whose Property Adjoins the Water body (if more than can be entered here, please attach a supplemental list). Bureau of Land Management Glenwood Springs Field Office Glenwood Springs, CO 81601 Private Land Owners 25. List of Other Certifications or Approvals/Denials Received from other Federal, State, or Local Agencies for Work Described in This Application AGENCY TYPE APPROVAL* IDENTIFICATION NUMBER DATE APPLIED DATE APPROVED DATE DENIED B.L.M. Land Grant 9/30/05 Pending Would include but is not restricted to zoning, building and flood plain permits 26. Application is hereby made for a permit or permits to authorize the work described in this application. I certify that the information in this application is complete and accurate. I further certify that I possess the authority to undertake the work described herein or is acting as the duly authorized agent of the applicant. II -3 --cam SIGN . URE QF APPLICANT DATE 1f- 3.0- NATURE F AGE T DATE The application must be signed by the person who desires to undertake the proposed activity (applicant) or it may be signed by a duly authorized agent if the statement in block 11 has been filled out and signed. 18 U.S.C. Section 1001 provides that: Whoever, in any manner within the jurisdiction of any department or agency of the United States, knowingly and willfully falsifies, conceals, or covers up any trick scheme, or disguises a material fact or makes any false, fictitious or fraudulent statements or representations or makes or uses any false writing or document knowing same to contain any false, fictitious or fraudulent statements or entry, shall be fined not more then $10,000 or imprisoned not more then five years or both. N3512'19"E 195.20 Centerline of Proposed Pipeline Right—of—Way FREE STESS BEND Ez th CZ) 32. Plan View ELE57T�ITI❑OSppSHALL NOT GROUND/CHANNEL PIPELINE CONSTRUCTTiOflN (TYPICAL) BASIS OF BEARINGS NOTE Basis of Bearings is the Eastline of the NE 1/4 of Section 30 T7S, R95W, 6th P.M. which Its taken from global positioning satellite observations to bear NO0V2'12 E a measured distance of 2574.97' CORNER TIE NOTE: P.1. 291-36.60 bears N5.12441 "W 644.82' from the South 1/4 Corner of Section X. BASIS OF ELEVATIONS Elevations ore based on the NGS' Benchmark KOEPSELL Located of Lat. 3975'42.65" North and Long. 108174`2Z7r West SNA❑ 83j. The NAVD 88 elevation of this Benchmark is 51210: SEE NOTE 5 & 8 FREE STESS BEND REFER TO ALIGNMENT SHEETS FOR PIPE SIZE AND COATING Creek Crossing detail CALE: NONE "Ai 6075' 6050' 6025' t• to 0 Preconstruction Grade At Proposed Pipeline a 6075' 6050' 6025' 0 ca 6 In 0 :o 0 0 ca 0 r 0 to 28+00 28+50 29+00 29+50 Pipetine Centerline PRECAST BOLTED CONCRETE WEIGHT `MINIMUM WEiGHT.6000 POUNDS "CONCRETE SHALL BE NORMAL WEIGHT 1150 LEIS /CU. FT4MIN.]] AND UTILIZE ASTM 0150 TYPE>I iR IIA CEMENT *SUBMIT CONCRETE WEIGHT DRAWINGS TO ENGINEER FOR REVIEW ROCK SHIELD FABRIC REQUIRED BETWEEN PIPE AND CONCRETE WEIGHTS SECTION O A Profile Latitude & Longitude Datum: HotizortoI: NAD27 Veitica NAVD 88 U.S. Survey Feet UTM Coordinate Datum: Horizor1a1: HAD 83 UTM Tare 13, US. Survey Feet Vertical NAVD 88 U.S. Survey Feat DRAINAGE CROSSING COORDINATES DRAINAGE NORTI 1LATTTUDE WEST LONGflUDE [TTM NORTH VIM EAST STA. 28+63 39° 24' 0&02' 108° 02' 2626' 14,323,545.6 781,2502 NOTES: 1. SURVEY AND SUG NMENT BY "TRI STATE SURVEYING, INC' 2. PPEA E INSTAUAT1ON UNDER THE WATER CROSSING SHALL BE HORIZONTAL 3. THE USE OF FABRICATED BENDS, PROVIDED BY COMPANY, TO MEET COVER REQUIREMENTS. SHALL BESPED FtED BY THE ALIGNMENT DRAWINGS. FREE STRESS BENDING SHALL BE ASSUMED AT CROSSINGS WHERE NO BENDS ARE SPECIFIED. 4. AT OPEN CUT CROSSINGS, APPROVED RIP•RAP OR SAND CEMENT BAGS SHALL 8E DRY SED LEVEL FORA LENGTH OF AT LEAST TWENTY 12O) FEET ALONG EACH BINK PROVIDED AND INSTALLED FROM THE HIGH BANK DWON TO THE WW WATER LINE OR 5. CONCRETE WEIGHTS AND ROCK SHIELD FURNISHED AND INSTALLED BY CONTRACTOR AS SHOWN ON CONSTRUCTION DRAWINGS. 6. SUBMIT CONCRETE WE?GHT DRAWINGS TO ENGINEER FOR REVIEW. 7. SEE TOPOGRAPHIC MAP ED -3 FOR CROSSING LOCATION. THIS DRAWING HAS NOT BEEN PUBLISHED KIT RATTIER HAS BEEN PREPARED 8Y WAGON WHEa CONSULTING, INC FOR ZY THE CLIENT NAMED IN TLE BLOCK SOLELY IN :CT OF THE CONSTRUCTION, v AT€0N AND MAINTENANCE OF THE FACILITY NAMED IN THE TITLE BLOCK AND SHALL NOT BE USED FOR ANY OTHER PURPOSE OR FURNISHED TO ANY OTHER PARTY WITHOUT THE EXPRESSED WRITTEN CONSENT OF WAGON WHEEL CONSULTNG, INC REFERENCE DRAWIG6 REVISIONS BY CHKDA PPD DATE BY DATE ED -1 TOPOGRAPHIC MAP DRAWN TSG 11/01/05 4700 PIPELINE PLANE & PROFILE CHECKED IS 11/01/05 ISSUED FOR PERMITTING 1S JS 15 11/01/05 ENC ANA �u TITLE HIGH MESA PiPEL€NE EXTENSION DRAINAGE CROSSING 1 Located In the SE 1/4 SW 1/4 of Section 30, T75, R95W, 6U P.M. Garf€etd County, Colorado WAGON WHEEL CONSULTING, INC 111E 3RD. ST. SUITE 213 RIFLE CO 81650 970-625-8433 WW0 Project N;rm bar W VC Drawing Number 5c AL.E 05059 D5-0806-05059 node 132ellia ExlstMqipelJlte Exlsf4,g P0ellee NI r54.191 387+27' Centerline of Proposed Pipeline,. Right—of—Way Plan View ,, EXISTING GROUND CHANNEL E �L�EVATp€EO NggSgqSRHA�L�Ly N� rOT 6 E PIPELINE Corts1 TUC'RuN (TYPICAL) No6*2-7" 292.32' FREE SUSS SEND SEE NOTE: 5 & 6 FREE STESS BEND REFER TO ALIGNMEN i SHEETS FOR PIPE SIZE AND COATING Creek Crossing Detail -ALg: NONE 39AgS OF BEARINGS NOTE' Basis of Bearings is the East line of the Are 1/4 of Section 30. 175. R95W, 6fh P.M. which is Token from global positioning satellite observations to bear NOO192'121- a measured distance of 2574.97: CORNER TTE NOTE 13.1. 92+5016 bears N43112'587 111748' from the West 1/4 Comer of Section 29 BASIS OF ELEVA77ONS E7elvtions are based on the NG5 Benchmark KOEPSELL Located at Lot. 3925'42.65" North and Lang. 108134'27.77" West (NA❑ 8.V. The MAW 88 elevation of this Benchmark is 5123.0: 6000' 5975' 5950' Preconstruct►on Grade At Proposed Pipeline 6000' 5975' 5950' uz 0 90+50 91+00 91+50 Pipeline Centerline Profile PRE-CJIST BOLTED CONCRETE WEIGHT "MINIMUM WEIGHT •6000 POUNDS *CONCRETE SHALL SE NORMAL WEIGHT 1150 LBS./CU. FT.(M:N.)I AND UTIL€ZE ASTM C160 TYPE!' IR 11A CEMENT "SUBMIT CONCRETE WEIGHT DRAWINGS 10 ENGINEER FOR REVIEW ROCK SHIELD FAB MCREQ IJ RED BETWEEN PIPE AND CONCRETE WEIGHTS SECTION r� 141 tlYA 92+00 92+50 Latitude & Longitude Datum. Horizontal: NAD 27 Vertical: NAVD 88 U.S. Survey Feet UTM Coordinate Datum: Ho lzontal: NAD 85 UTM Zone 13, U.S. Survey Peet Vertical NAVD 88 U.S. Survey Feet DRAINAGE CROSSING COORDIK&TF5 GR.AINAGE' NUii7H I AiT]'L M WEST LONGITUDE UTM NORTH 11.1TM EAST STA. 91+56 39° 24' 37.89' 108° OF 36.99' F1,328,437.4 785,2R1 NOTES: 1. SURVEY AND SLIG NMENT BY 'TRI STATE SURVEYING, INC' 2. PIPELINE INSTALLATION UNDER THE WATER CROSSING SHALL BE HORIZONTAL 3. THE USE OF FABRICATED BENDS. PROVIDED BY COMPANY, TO ASSET COVER REQUIREMENTS. SHALL BE SPEOIFTED BY THE AIJGNmENT DRAWINGS. FREE STRESS BENDING SHALL BE ASSUMED AT CROSSINGS WHERE NO BENEIS ARE SPECIFIED. 4. AT OPEN CUT CROSSINGS, APPROVED RIP -RAP OR SAND CEMENT BAGS SHALL BE DRY BED LEVEL EOR A LENGTH OF AT LEAST TWENTY (20) FEET ALONG EACH BANK PROVIDED AND INSTALLED FROM THE HIGH BANK DWON TO THE LOW WATER UNE OR 5 CONCRETE WEIGHTS AND ROCK SHIELD FURNISHED AND INSTALLED SY CONTRACTOR AS SHOWN ON CONSTRUCTION DRAWINGS. 8. SUBMITCONCRETEWEIGHT DRAW NGS TO ENGINEER FOR REVIEW. 7. SEE TOPOGRAPHIC MAP ED -1 FOR CROSSING LOCATION. HIS DRAWING HAS NOT BEEN PUBLISHED BUT RAT LER HAS SEEN PREPARED BY WAGON WHEEL.. CO NSU LTINGr INC R)R 'Y THE CLIENT NAMED EN TLE BLOCK SOLELY IN :CT OF THE CONSTRUCTION, L ATION AND MAINTENANCE OF THE FACILITY NAMED IN THE TITLE BLOCK AND SHALL NOT BE USED FOR ANY OTHER PURPOSE OR FURNISHED TO ANY OTHER PARTY WITHOUT THE EXPRESSED WRITTEN CONSENT CF WAGON WHEEL CQ.N$ULTING, INC REFERENCE DRAW1GS REVISIONS BY CHKD APPD DATE BY DATE ED -1 TOPOGRAPHIC MAP DRAWN TSG 11/01/05 4700 PIPELINE PLANE & PROFILE CHECKED JS 11/01/05 ISSUED FOR PERMITTING JS J$ J$ 11/01/05 h� C ANA E� TITLE HIGH MESA PIPETINE E%TENS€ON DRAINAGE CROSSING 2 LoadintheSW14NW14 of Section 29, TIS, R95W, 6th P.M. Garfield County, Colorado WAGON WHEEL CONSULTING, INC 111 E. BRD. ST. SUITE 213 RIFLE, CO 81650 970-625-8433 WWC Project Number 05059 WWC DravwIng Number 05.0293.05059 SCALE none Centerline of -- -- _Proposed _Proposed Pipeline — — — — Right—of Way Ex/rfhg PpNha Exhthg Pirxtb e N1513'1$'E 6.62' tel E M,g P�aAha FREE STESS BEND 1 1 f/ r , Plan View EXISTING GROUND/CHANNEL E�L�EVATI O NS AS AAS Fp- AAELL NOT BE ALTERED CCONSTRSIJCT0N (TYPICAL) SEE NOTE: 5 & 6 FREE STESS BEND 135SJs OF BEARING_ NOTE: Bas Is at bearings s the North Line of the NE 1/401 Section 31 T75, Re T W, 6th P.M Which is taken from the Global Position in 5otettta Observations to bear N89 '55'03'W a Measured dlsanceai 2642.33`. CORNER TIE NOTE' p.1,60+ 7 /.12 hears S16' 52'56'E 2226.58' from the Nath 1/4 Garner at Section 30. BASIS OF ELEVATIONS Elevations are based err the Eblor Triangulation Swoon. 39.44' 35.84'N Lat& 108'3.7.43.55'N' Long (NAD 83). EL 7,615' 1NAV088). REFER TO ALIGNMENT SHEETS FOR PIPE SIZE AND COATING Creek Crossing Detail SCALE: NONE 5800' 5775' 5750' Preconstruction Grade At Proposed Pipeline 5800' 5775' 5750' 1) oS 0 03 c0 Irr 0 m r - in 03 108+00 108+50 109+00 109+50 PRE -CAST BOLTED CONCRETE WEIGHT •MENEMUM WEIGHT -600DpOUNN65 "CONCRETE SHALL BE NORM Al WEIGHT (150LB3./CU. FT.(k1:N.)J AND UTILIZE ASTM 0150 TYPE!! IR ILA CEMENT "SU BMET CONCRETE WEIGHT DRAWINGS. TO ENG INSER FOR REVIEW ROD( SHE EL0 FAB HECRE U[RED BETWEEN PEPE AND CONCRETE WEI3HTS SECTION t-r�---Q Pipeline Centerline Profile 110+00 Latitude & Longitude Datum Horizontal: NAD 27 Vertical: NAVD 88 U.5. Suivey Feet TIM Coordinate Datura Harizontat NAD 83 UTM Ione 13, U.S. Survey Feat_ VerBral NAVD 88 U.S. Survey Feat DRAINAGE CROSSING {:DORDDLITES DRAINAGE NORTH LATITUDE WEST LONGUIDE UTM NORT}T LITM EAST STA 108+8I 39° 24' 54.75 108' 01' 3635' 14,328,140.9 785 326.4 NOTES: 1. SURVEY AND SU6 LAMENT BY "TRI STATE SURVEYING. INC' 2, PIPEUNE INSTALLATION UNDER THE WATER CROSSING SHALL BE HORIZONTAL 3. THE USE OF FABRICATED BENDS, PROVIDED 8Y COMPANY, TO MEET COVER REQUIREMENTS, SHALL BE SPECIFIED BY THE Alla NMENT DRAWINGS. FREE STRESS BENDING SFEALLBE ASSUMED AT CROSSINGS WHERE NO BENDS ARE SPECIFIED. 4, AT OPEN CUT CROSSINGS. APPROVED RIP -RAP OR SAND CEMENT BAGS SHALL. BE DRY BED LEVEL FOR A LENGTH OF AT LEAST TWENTY (20) FEET ALONG EACH BANK PROVIDED AND INSTALLED FROM THE HIGH BANK DL4ON TO THE LOW WATER LINE OR 5. CONCRETE WEIGHTS AND ROCK SHIELD FURNISHED AND INSTALLED BY CONTRACTOR AS SHOWN ON CONSTRUCTION DRAWINGS. 6. SUBMIT CONCRETE WEIGHT DRAWINGS TO ENGINEER FOR REVIEW. 7. SEE TOPOGRAPHIC MAP ED -1 FOR CROSSING LOCATION. THIS DRAWING HAS NOT BEEN PUBLISHED BUT RATHER HAS BEEN PREPARED BY WAGON WHEEL CONSULTING, INC FOR YTHECLIENT NAMED IN TLE BLOCK SOLELY IN CT OF THE CONSTRUCTION. L ATION AND MAINTENANCE OF THE FACILITY NAMED IN THE TITLE BLOCH AND SHALL. 1107 BE USED FOR ANY OTHER PURPOSE OR FURNISHED TO ANY OTHER PRIM WITHOUT THE EXPRESSED WRITTEN CONSENT OF WAGON WHEEL CONSULTING, INC REFERENCEDRAWIGS REVISIONS BY APPD DATE 9Y DATE ED -1 TOPOGRAPHIC MAP DRAWN TSG 11/01/05 4700 PIPFT.INEPLANE & PROFILE CHECKED JS 11/01/05 ISSUED FOR PERMrTTING IS I5 IS 11/01/05 ENC AIAr TITLE HIGH MESA PIPELINE EXTENSION DRAINAGE CROSSING 3 Located in the NW 1/4 NW 1/4 of SeotJon 29, T7S. P095W. 6th P.ht. Garfield County, Colorado WAGON WHEEL CONSULTING, INC 111 E- 3RD. ST, SUITE 213 RIFLE, GO 81650 970-€325.8433 WWC Project Number 05059 WWC Drawing Number 05-0294-05059 SCALE none Centerline of Proposed Pipeline Right—of—Way Route B FREE STESS BEND I, 1 J6' Culvert ►l ► 52015'52'E 133.87' . E /Sec. ,28 / B. L. M. (U.S. A.) NW 1/4 SE 1/4 Plan View EXISTING GROUND/CHANNEL. ELEVATIONS SNNOT BE gqPFRRhlitigqYiUE(TYPICAL) 1 a SEE NOTE: 5 & FREE STESS BEND REFER TO ALIGNMENT SHEETS FOR PIPE SITE AND COATING J Creek Crossing UetaiI SCALE: NONE 7175' 7150' Preconstruction Grade At Proposed Pipeline Note: e3' s oftom Devotion of the Culvert Was Interpolated Using Elevations at Both Ends of the Culvert. qm 7175' 3s' LLlvert 0 MAO' 77 , 7150' BASIS OF 8EARINCS NOTE: Basis of Bearings is the East line of the NE 1/4 of Section 30, 77S, R95W 61h P.M. which Is taken from global positioning satellite observations to bear N000272 E a measured distance of 2574.97: CORNER AE NOTE P.I. 186#68.38 bears N48 335'14 "W 3349.70' from the Southeast Comer of Section 28 BASIS Or ELEVAT10N5' Elevations are based on the NOS Benchmark KOEPSELL Located at Lot. .392542,65" North and Long. 708V4'27.77" West ('NAD 83). The NAVO 88 elevation of this Benchmark is 5123.0: SECTION of urs co n co ua 165+50 PRE -CAST BOLTED CONCRETE WEIGHT *MINIMUM WEIGHT -5000 POUNDS *CONCRETE SHALL BE NORMAL WEIGHT 1150 L8$ JcIi. Fr Am AND UT IL/7E ASTM C150 T YPE II IR € A CE M ENT *SUBMIT CO NCRETEWEIGHT DRAWINGS TO ENGINEER FOR REVIEW ROOK SHIELO FABRIC REQUIRED BETWEEN PIPE AND CO ETE WEIGHTS 166+ 00 166+50 Pipeline Centerline Profile Latitude & Lon$Rude Dutorn: Horizontal; NAO 27 VerScal- NAVD 138 U.S. Survey Feet UTM Coordinate Daturrr. Horizontal- NAD 83 LITM Zone 13, U.S. Survey Feet Vertical NAVD 88 U.5. Survey Feet DRAINAGE CROSSING COORDINATES DRAINAGE NORTH -1 LA717UDE WEST LONGH1IDE [ITEM NORTH L17M EAS' STA. 165+87 39° 24' 26.46' 108' 00' 04.13' 14,325,037.0 792,468.2 NOTES: 1. SURVEY AND S LLG NM EN T $Y "TRI STATE SURVEYING, INC' 2. PIPELINE INSTALLATION UNDER THE WATER CROSSING SHALL 8E HORI7ONTAL 3. THE USE OF FABRICATED BENDS, PROVIDED BY COMPANY, TO MEET COVER REQUIREMENTS, SHALL, BE SPECI F ED 8Y THE ALIGNMENT DRAWINGS. FREE STRESS BENDING SHALL BE ASSUMED AT CROSSINGS WHERE NO BENDS ARE SPECIFIED 4. AT OPEN CUT CROSSINGS, APPROVED RIP -RAP OR SAND CEMENT BAGS SHALL BE DRY BED LEVEL FOR A LENGTH OF AT LEAST TWENTY {20) FEET ALONG EACH BANK PROVIDED AND INSTALLED FROM THE HIGH BANK DWON TO THE LOW WATER UNE OR 5, CONCRETE WEIGHTS AND ROCK SHIELD FURNISHED AND INSTALLED BY CONTRACTOR AS SHOWN ON CONSTRUCTION DRAWINGS. 6. SL SHIT CONCRETE WEIGHT DRAW NGS TO ENGINEER FOR REVIEW. 7. SEE TOPOGRAPHIC MAP 80.1 FOR CROSSING LOCATION. THIS DRAWING HAS NOT BEEN PUBLISHED BUT RATHER HAS BEEN PREPAREDEiYWAGON WHEEL CONSULTING, INC FOR 'Y THE CLIENT NAMED IN TLE SLOGS SOLELY U CT OF THE CONSTRUCTION. L .ATION AND MAINTENANCE OF THE FACILITY NAMED IN THE TIME BLOCK AND SHALL NOT BEUU OSEORFURNANY � DTOANY OTHER PARTY WITHOUT THE DSPRESSED WRITTEN CONSENT OF WAGON WHE>LCONSULT!NG INC REFERENCE DRAWIGS REVISIONS BY 2TIKDAPPD DATE BY DATE TITLE HIGH MESA PIPELINE Ex€EHS€ON DRAINAGE CROSSING 3B Located In the NW 1/4 SE 1/4 of SeLRlon 28, ITS, 5W, 8 VI P.M. Fig Garfield County, Colorado EE 1 TOPOGRAPHIC MAP 4. DRAWN TSG 11/01/05 l 4 (y ANA T, 4700 PIPEL€NE PLANE & PROFILE CHECKED Is 11/01/05 WAGON WHEEL CONSULTING, INC 111E SRO. ST, SUITE 213 RIFLE, 00 8165 970.625.8433 OW 059 Pro'EctNumber - Number WWC Drawing 05-0291-05059 S CALE none ISSUED FOR PERMITTING JS J$ IS 11/01/05 ▪ N \ ` N3ebf. \\I. 4Il, , o Qt. , Sn1t 1 .`�, C4 ..N14.1 N38104'24" 85.50' Centerline of $s Proposed Pipeline Right—of—Way 8 yY FREE STESS SENO 8 Ex1s[h9 P Alma Sec. 20 Payton & Williams NE 1/4 SW 1/4 Plan View EXISTING GROUND/CHANNEL ELEVATIONS SNOT BE PL7ERE AS gqRSC€PELiNCONSTRUCTION (TYPICAL) SEE NOTE; 5 & 6 FREE STESS BEND REFER TO ALIGNMENT SHEETS FOR PIPE SIZE AND COATING Creek Crossing Detail CALE' NONE 5525' 5500' 5475' 5450' •o Preconstructian Grade cu At Proposed Pipeline CZ) 5525' 5500' 5475' 5450' SASS OF BEARINGS NOTE &Osis of Bearings 1-s the East /Me of the NE 1/4 of Section 30 T7S, R95W, 611, P.M. which is token from global positioning sateillte observations to bear N00 U212 E o measured distance of 2574.97: CORNER 77E NOTE P.1. 1491-68.01 bears 584'45'11T 1416.82' from the West 1/4 Corner of Section 20. BASIS OF ELEVATIONS Elevations are based on the NGS Benchmark KOEPSELL Located at Lot. 3925'42.65' North and Long. 108'04 27.77" West (NAD 83). The NAVE) 88 elevation of this Benchmark is MOP 4- 0 L co 0 6 a un 149+50 150+00 150+50 Pipeline Centerline Pro, Ile PRE -CAST BOLTED CONCRETE WEIGHT "MINIMUM WEIGHT•6000POUNDS 'CONCREE SHALL BE NORMAL WEIGHT 1150 LBS./CU. FT.(M'N.)( AND UTILIZE ASTM C150 TYPE II IR IIA CEMENT *SUBMIT CONCRETE WEIGHT DRAWINGS TO ENGINEER FOR REM/ ROCK SHIELD FABRIC REQUI E0 BETWEEN PIPE AND CONCRETE WEIGHTS SECTION re, 1 i.E Kit iJ 151+00 Latitude & Longtude Datum Horizontal: NM) 27 Vertical: NAND 88 U.S. Survey Feet UTNI Coordinate Datum: Horizonte. NAD 83 UTM Zone 13. U.S, Survey Feet Vertical NOD 88 U.S. Sur ew Feat DRAINAGE CROSSING COORDINATES DRAINAGE NORTH LATITUDE WEST LONGUUDE UTM NORTH L17M BAST STA 150+30 e9° 25' 22/5' 108° 01' 28.03' 14,330,951.6 786,074.5 NOTES: 1, SURVEY AND SUGNMENT BY 'TRI STATE SURVEYING, INC" 2 PIPELINE INSTALLATION UNDER THE WATER CROSSING SHALL 8E HORIZONTAL 3 THE USE OF FABRICATED BENDS, PROVIDED BY COMPANY, TO MEET COVER REQUIREMENTS, SHALL 6E SPEC ED BY THE AIJGNMENT DRAWINGS. FREE STRESS BENDING' SHALL BE ASSUMED AT CROSSINGS WHERE NO BENDS ARE SPECIFIED. 4. AT OPEN CUT CRO3SINGs, APPROVED RIP -RAP OR SAND CEMENT BAGS SHALL BE DRY BED LEVEL FOA A LENGTH OF AT LEAST TWENTY (20) FEET ALONG EACH BANK PROVIDED AND INSTALLED FROM NE HIGH BANK MONT() THE LOW WATER UNE OR 5. CONCRETE WEIGHTS AND ROCK SHIELD FURNISHED AND INSTALLED BY CONTRACTOR AS SHOWN ON CONSTRUCTION DRAWINGS. 6. SUBMIT CONCRETE WEIGHT DRAWINGS TO ENGINEER FOR REVIEW, 7. SEE TOPOGRAPHIC MAP ED -1 FOR CROSSING LOCATION. THIS DRAWING HAS NOT BEEN PUBLISHED BUT RATHER HAS BEEN PREPARED BY WAGON CONSULTING, INC FOR TY THE CLIENT NAMED IN ITLE BLOCK SOLELY IN ;CT OF THE CONSTRUCTION, L ,ATION AND MAINTENANCE OF THE FACILITY NAMED IN THE TITLE BLOCK AND SHALL NOT BE USED FOR ANY OTHER PURPOSE OR FURNISHED TO ANY OTHER PARTY WITHOUT THE laPRESSEO WRITTEN CONSENT OF WAGON WHEEL CONSULTING, INC REFERENCE DRAWIGS REVISIONS BY CHILD APPD DATE 8Y DATE ED -1 TOPOGRAPHIC MAP DRAWN TSG 11/03/05 4700 PIPELINE PLANE & PROFILE CHECKED JS 11/03/05 ISSUED FOR PERMITTING JS IS JS 51/03/05 ENCANA WAGON WHEEL CONSULTING, INC 111 E. 3RD. ST. SUITE 213 RIFLE, CO B5650 970.625.8433 TITLE HIGH MESA PIPELINE laTENSIDN DRAINAGE CROSSING 4 Located in the NE 1/4 SW 1/4 of Section 20,111S, R95W, 6th P_M. Garfield County, Colorado iM WC Project Number 05059 WWC Drawing Number 05-0309.03059 SCALE none J r — to -- Sec. 20 Payton SE 1/4 NE 1/4 FREE STESS BEND REFER TOAUG WEN; SHEETSFOR PIPESIZEAND COAIRTG THIS DRAWING HAS NOT BEN PUBLISHED BUT RATHER HAS BEEN PREPARED BY WAGON U=cIrL CONSULTING, INC FOR Y THE CLIENT NAMED IN TLE BLOCK SOLELY IN 'CT OF THE CONSTRUCTION, .ATION AND MAINTENANOE OF THE FACILITY NAMED IN THE TITLE BLOCK AND SHALL NOT SE USED FUR ANY OTHER PURPOSE OR FURNISHED TO ANY OTHER PARTY WITHOUT TI -E ECPRESSED WRITTEN CONSENT OF WAGON WHEEL CONSULT€NGJNC Creek Crossing Detail 8CA1.E: NONE Plan View EXISTING TTIONSpOUHAAEL�LNOr[[[ EA PLPELI E CONSTRIICTON (TYPICAL) C'en terlin e of Proposed Pipeline .N.‘4s Right—of—Way SEE NOTE 5 &8 FREE STESS BEND BASIS Or BEARINGS NOTE. }iasis of Bearings is the East line of the NE 1/4 of Section 30, R95W, 6th P.M. which Is token from global positioning sateiilte osseruotions to bear NOO192'1? E a measured distance of 2574.97: CORNER TIf NOTE: P.1. 1871-12.15 becrs N47'07'18"W 87537' from the East 1/4 Corner of Section 20, BASIS OF ELEVATIONS Elevations are hosed on the NGS Benchmark KOEPSELL Located at Lot. .5925'42.65" North and Long. 108V4 27.77" West (NAD B3). The NAYfD 88 elevation of this Benchmark is 51210: 5800' 5750' 5700' tri C1 Precanstruction Grade 'At Proposed Ppeline 5800' 5750' 5700' eD to I• 0 r 04 n 187+50 PRECAST BOLTED CONCRETE WEIGHT *MINIMUM WEIQHT•6000POUNDS *C0NCRETESHALL BE NORMAL WEIGHT (150 L35JCU. FE.(MIN.)j AND UTILIZE ASTM C150 TYPE II IR 54 CEMENT *SUBMIT CONCRETE WEIGHT DRAWINGS TO ENGINEER FOR REVIEW ROCK SHIELD FABRIC REQUIRED BETWEEN PIPE AND CONCRETE WEIGHTS SECTION S. .E els.kej 188+00 188+50 Pipeline Centerline 189+00 189+50 Pro file LatItude & Longitude Datum: Horizontal: NAD 27 Vertical: NAVD 88 U.S. Survey Feet UTM Coo;dlnate Datum Horizontal: HAD 83 UTM Zone 13, U.S. SurveyFest Vertical NAVE) 88 U.S. Survey Foot DRAINAGE CROSSING COORDINATES DRAINAGE NORTH LATITUDE WEST LONGITUDE LITHO NORTH LITr4i EAST STA. 188+21 39° 29 29.48' 108° 00' 4514' 14,331,519.6 789,4624 NOTES: 1 SURVEY AND SIJGNMENT BY "TRI STATE SURVEYING, INC' 2. PIPELINE INSTALLATION UNDER THE WATER CROSSING SHALL BE HORIZONTAL 3. THE USE OF FABRICATED SENDS, PROVIDED BY COMPANY, TO MEET COVER REQUIREMENTS, SHALL BE SPECT F1 ED BY THE ALIGNMENT DRAWINGS. FREE STRESS BENDING SHALL BE ASSUMED AT CROSSINGS WHERE NO BENDS ARE SPECIFIED. 4. AT OPEN CUT CROSSINGS, APPROVED RIP•RAP OR SAND CEMENT BAGSSHALL BE DRY BED LEVEL FOR A LENGTH OF AT LEAST TWENTY (20) FEET ALONG EACH BANK PROVIDED AND INSTALLED FROM THE HIGH BANK DWON TO THE LOW WATER LINE OR 5. CONCRETE WEIGHTS AND ROCK SHIELD FURNISHED AND INSTALLED BY CONTRACTOR AS SHOWN ON CONSTRUCTION DRAWINGS. 6. SUBMIT CONCRETE WEIGHT DRAWNGS TO ENGINEER FOR REVIEW. 7. SEE TOPOGRAPHIC MAP E0-1 FOR CROSSING LOCATION. REFERENCE DRANGS REVISIONS BY CHND APPD DATE BY DATE ED -1 TOPOGRAPHIC MAP DRAWN TSG 11/01/05 4700 PIPELINE PLANE& PROFILE CHECKED I5 1/01/05 ISSUED FCR PERMITTING IS 15 J5 1/01/05 HNC: ANA 'u TITLE HIGH MESA PIPELINE EXTENSION DRAINAGE CROSSING 5 Located in the SE 1/4 NE 1/4 of Section 20• T7S, R95W, 6th P.M. Garfield County, Colorado WAGON WHEEL CONSULTING, INC 111 E. SRD. ST. SUITE 213 RIFLE, CO 81650 970.625.8433 WWC Project NO' her 'WWC Drawing Number 05059 05.0298.05059 SWkLE none Centerline of Proposed Pipeline 1?igh t --of Way rt-‘ 14 CQ te Edge P,lne N10.27'53"E 452.42' �I Pi. 210+3644 FREE STESS BEND Plan View EXISTING GROUND/CHANNEL ELEVATIONS pS SHALL NOT BE PIPELINE CONSTRUCTION ITYP€CAL} CORNER TIE NOTE: • P.I. 2104-36.44 bears 525'45'5.31Y 188.58' from the Northeast Corner of Section 20. BASIS OF BEARINGS NOM: Basis of Bearings 7s the Cost Ilse of the NE (/4 of Section 30 T75. 8950: 6th P.M. which is token from global positioning satellite observations to bear A/0OV2'12 E a measured distance of 2574,97: BASIS OF ELEVATIONS Elevations are based on the NGS Benchmark KG(PSELL Located at Lot. J925'42.65" North and Long. 10817.4'27.77" West (NAB 83). The NAVD B8 elevation of this Benchmark is 5123.0: SEE NOTE; 5 & 6 FREE STESS BEND REFER TO AUGNMEN T SHEETS FOR PIPE SIZE AND COATING THIS DRAWING HAS NOT BEEN PUBLISHED BLT RATHER HAS BEEN PREPARED BY WAGON w'T EL CONSULTING, INC FOR '-Y THE CLIENT NAMED IN IT LE BLOCK SOLELY IN ICT OF THE CONSTRUCTION, a. LAT1ON AND MAINTENANCE OF THE FACILITY NAMED IN THE TITLE BLOCK AND SHALL NOT BE USED FOR ANY OTHER PURPOSE OR FURNISHED 70 ANY OTHER PARTY WITHOUT THE EXPRESSED WRITTEN CONSENT OF 0► HE 'NS i I Creek Crossing Detail SCALE: NONE REFERENCE DRAMS ED -1 4700 TOPOGRAPHIC MAP PIPELINE PLANE& PROFILE REVISIONS ISSUED FOR PERMITTING 5800' 5750' tl 5700' Precansfrucfion Grade Af Proposed Pipeline 5800' 5750' 5700' co N n 0 Lei r7 N 207+50 208+00 208+50 209+00 PRECAST BOLTED CONCRETE WEIGHT `MINIMUM WEiGHT"5000 POUNDS *CONCRETE SHALL BE NORMAL WEIGHT [150 LBS./CU. Fr.{MIN.yj AND UT €LIZ E ASTM C150 TYPE A di S4 CEMENT 'SUBMIT CONCRETE WEIGHT DRAWINGS TO ENGINEER FOR REVIEW ROCK SHIELD FABRIC RE IiIREi] BETWEEN PIPE AND CO E WHO IDT& SECTION ;-etch s. Pipeline Centerline Profile 209+50 Latitude & Loi gstude Datum: Horizontal: NAD 27 Vertical: NAVD 88 U.S. Sunray Feet UTM Coordinate Datum: Hof Izontal: NAD 83 UTM Zone 13, US. Surrey Feet Vertical NAVD 88 U.S. Survey Feet DRAINAGE CROSSING COORDINATES DRAINAGE NORTL 1 LATITUDE WEST LONCJTLJDE L117a4 NORTH UTM EAST STA. 208+46 39' 25' 463? 108°00' 40.94' 14,333,217,2 789,848.8 NOTES: 1. SURVEY AND SLIRNMENT BY 'TM STATE SURVEYING. INC 2. PIPELINE INSTALLATION UNDER THE WATER CROSSING SHALL BE HORIZONTAL 3. THE USE OF FABRICATED BENDS, PROVIDED SY COMPANY, TO MEET COVER REQUIREMENTS, SHALL SE SPECIFIED BY THE ALIGNMENT DRAWINGS. FREE STRESS BENDING SHALL BE ASSUMED AT CROSSINGS WHERE NO BENDS ARE SPECIFIED. 4. AT OPEN CUT CROSSINGS. APPROVED RIP -RAP OR SAND CEMENT BAGS SHALL SE DRY BED LEVEL FOR A LENGTH OF AT LEAST TWENTY (20) FEET ALONG EACII BANK PROVIDED AND INSTALLED FROM THE H€GH BANK DWON TO THE LOW WATER LINE OR 5. CONCRETE WEIGHTS AHD ROCK SHIELD FURNISHED AND INSTALLED BY CONTRACTOR AS SHOWN ON CONSTRUCTION DRAWINGS. 6. SUBMIT CONCRETE WEIGHT DRAW NOS TO ENGINEER FOR REVIEW. 7. SEE TOPOGRAPHIC MAP EDI FOR CROSSING LOCATION. E .L A[ ANA iu WAGON WHEEL CONSULTING, INC 111 E 3RD. ST. SUITE 213 RIFLE, CO 81650 970-625-8433 TITLE HIGH MESA PIPELINE EXTENSION DRAINAGE CROSSING 6 Located In the NE 1/4 NE 1/41 al Section 20, 775, R85W. 6th P.M. Garfield County+. Colorado MVO • roject umber WWO Drawing Number 050SB 05-0299.05059 NI 2'29'41-E 282,15' Centerline of Proposed Pipeline Right—of—Way 8 Nel. rl — r r �xtsTltr4 • Pihefine _ J r wa. a 33,0.52' 0 P.O.P.E» 212+ J J Plan View advert EXISTING GROUND/CHANNEL ELEVATIONS AS pSHALL NOT 85 ALTERED CONS] RESULT (TYPICAL) section Line Culvert FREE STESS BEND SEE NOTE: 5 & 6 FREE STEW BEND 5825' Preconstruction Grode i Proposed Pipeline Cs , 5775' 5725' BASIS' GF BEARINGS NOTE' Basis of Bearings Is the East line of the NE 1/4 of Section 30. r7S, R95W, 6th P. M, which is taken from global positioning satellite observations to bear NOG02'12 E a measured distance of 2574.97: CORNER 71E NOTE.' P.I. 213+18.59 bears N1 f '12'1 r W 70769' from the Southeast Corner of Section 17. BASIS OF ELEVATIONS Elevations ore based on the NGS Benchmark KOEPSEU Located at Lot. 39254265" North and Long. 108'04'2777' West (NAD 83). The NA4'D 88 elevation of this Benchmark Is 5123.0'. REFER TO ALIGNMENT SHEETS FOR PIPE SIZE AND COATING THIS DRAWING HAS NOT BEEN PUSUSHED BUT RATHER HAS BEEN PREPARED BY WAGON W'}SEL CONSULTING. INC FOR Y THE CLIENT NAMED IN TLE BLOCH SOLELY EN =CT DF THE CONSTRUCTION, ,AT10N AND MAINTENANCE OF THE FACILETY NAMED IN THE TITLE BLOCK AND SHALL NOT BE USED FOR ANY OTHER PURPOSE OR FURNISHED TO ANY OTHER PARTY WITHOUT THE EXPRESSED WRITTEN CONSENT OF AGtNN WHEEL ONS LTENG INC Creek Crossi ng Detail ALE: NONE REFERENCE CRAWEGS ED -1 4700 TOPOGRAPHIC MAP P€PEI€NE PLANE & PROFILE REVISIONS ISSUED FOR PERMITTING ono u d!I 00 r•i n 212+00 212+50 213+00 11s Pipeline Centerline Profile PRE -CST BOLTED CONCRETE WEIGHT "MINIMUM WEIG?1T•6000 POUNDS 'CONCRETE SHALL BE NORMAL WEIGHT 1150 LBS./CU. ELWIN)] AND UTIU £ ASTM C150TYPE IE!RBA CEMENT *SUBMIT CONCRETE WE S1iT DRAWINGS TO ENGINEER FOR REVIEW ROCK SHIELD FABRIC REQUIRED BETWEEN PIPE ANDCONCRETE WEIGHTS SECTION 3, A_E rut �1 BY CHKDAPPD DATE BY DATE JS 1S DRAWN TSG 1?/03/05 CHECKED JS 11/03/05 15 11/03/05 213+50 5825' 5775' 5725' Latitude & Longitude Datum: Horizontal: NAD 27 Vertical: MAYO 88 U.5. Survey Feet UTMMM Coordinate Datum. Horizontal: HAD 83 VIM zone 13, U.S. Survey Feet Vertical NAVD 88 U.S. Survey Feet DRAINAGE C1tOS'S!NG COORDINATES DRAINAGE NORTH LATITUDE WEST LONGWUDE LIFM NORTE LTTM EAST STA. 212+84 39° 25 501.51' 108° 00' 3981" 14333,643.4 789,95t9 NOTES: 1. SURVEY AND SLIG LAMENT BY "TRI STATE SURVEYING, INC' 2. PIPELINE INSTALEATIOH UNDER THE WATER CROSSING SHALL BE HORIZONTAL 3. THE USE OF FABRICATED BENDS, PROVIDED BY COMPANY, `0 MEET COVER REQUIREMENTS, SHALL BE SPECIWEO BY THE ALIGNMENT DRAWINGS. FREE STRESS BENDING SI -TALL SE ASSUMED AT CROSSINGS WHERE NO BENDS ARE SPECIFIED. 4. AT OPEN CUT CROSSINGS. APPROVED RIP -RAP OR SAND CEMENT BAGS SHALL 8E DRY 8E0 LEVEL FORA LENGTH OF AT LEAST TWENTY 120) FEET ALONG EACH BANK PROVIDED AND ENSTALLE0 FROM THE HIGH BANK DWON TO THE LOW WATER LINE OR 5. CONCRETE WEIGHTS AND ROCKSHEELD FURNISHED AND INSTALLED BY CONTRACTOR AS SHOWN ON CONSTRUCTION 0RAV4NGS. 6. SUBMIT CONCRETE WEIGHT DRAVA NGS TO ENGINEER FOR REVIEW. 7. SEE TOPOGRAPHIC MAP ED -1 FOR CROSSING LOCATION. E N CAN _A ,, tea. WAGON WHEEL CONSULTING, INC 211 E. 3RD. ST. SUITE 213 RIFLE CO 81650 970-625-8433 TITLE NIGH MESA P€PELIN E EUTETVS€0N DRAINAGE CROSSING 7 Located in the SE 1/4 SE 1/4 of Sefton 17.775, R95W, 6th P.M. Garfield County, Colorado WWC Project N Jrrber WWO Drawing Number 05059 06.0302-05059 57738E 254,?]' 1 Sec. 16 B.L.M. (U.S.A.) S771g3.7 z Centerline of Proposed Pipeline +s,ar Right—of—Way SW 1/4 SE 1/4 1 Plan View EXISTING GROUND/CHANNEL ELEVRATIONS SHALLNOTBE PIPgPIPELINE A$ CONREF CTIOpN (TYPICAL) ti FREE FESS BEND REFER TO AUG NM EN T SHEETS FOR PI't: SI zE AND COATING -� Creek Crossing Clete if SCALE: NONE SEE NOTE: 5 & 8 FREE STESS BEND BASIS OF BEARINGS NOTE Basis of Bearings Is the East line of the NE 1/4 of Section ata 77.X R95W, 6th P.M. which Is taken from global positianlnq satellite abservatlons to bear NOOi72'12 E a measured distance of 2574.971 CORNER 17E NOT: Ai, 162#01.16 bears 54571'10"W 2041.22' from the East 1/4 Comer of Section la. BASIS OF ELEVATIONS Elevations ore based on the NCS Benchmark KOEPSELL Located at Lot. 39254255" North and Long, 108'04'27.77" West (NAG 83) The NANO 88 elevation of this Benchmark Is 5123,0: 6050' 6000' 5950' 0 259 4-50 Preconstruction Grade At Proposed Pipeline 6050' 6000' 5950' 0 m d 0 CO (41 0 m 0 0 co 0 0 0 in 260+00 2604-50 265+00 Pipe/ine Centerline Profile PRE -CAST BOLTED CONCRETE WEIGHT *MINIMUM WEIGHT -woo POUNDS `CONCRETE SHALL BE NORMAI, WEIGHT (150 LBS./CU. FT.tMIN.jj AND UTILIZE ASTM C150 TOE II IR PA CE MENT *SUBM}T CONCRETE WEIGHT DRAWINGS TO ENGINEER FOR REVIEW ROCK SHIELD FABRIC REQUIRED BETWEEN PIPE AND CONCRETE WEIGHTS SECTION 0 Ti.Ls. 261+50 Latitude & Lcngitude Datum: Horizontal: NAD 27 Vertical: NAVD 88 U.S. Survey Feet UTNI Coordinate Datum: Horizontal: NAD 83 UTM Zone 13. U.S. Surrey Feet Vertical NAVE 88 U S Stavey Feet DRAINAGE CROSSING COORDINATES DRAINAGE NORTH LATITUDE WEST LONGITUDE Uil14 NOR.TH IXIM EAST STA. 260+51 39° 26' 0156' 107' 59' 53.70' 14,334,630.7 793,606.3 NOTES: 1. SURVEY AND SUGNMENT BY "TRI STATE SURVEYING. INC' 2. PIPELINE INSTAUAT1CN UNDER THE WATER CROSSING SHALL 8E HORIZONTAL 3. THE USE OF FABRICATED BENDS, PROVIDED BY COMPANY, TO MEET COVER REQUIREMENTS, SHALL SESPEgR.D BY THE ALIGNMENT DRAWINGS, FREE STRESS BENDING SHALLBE ASSUMED AT CROSSINGS WHERE NO BENDS ARE SPECIFTED. 4 AT OPEN Cur CROSSINGS. APPROVED RIP -RAP OR SAND CEMENTBAGS SHALL BE DRY BED LEVEL FOR A LENGTH OF AT LEAST TWENTY 120) FEET ALONG EACH BANK PROVIDED AND INSTALLED FROM THE I•€€GH BANK DWON TO THE LOW WATER LINE OR 5. CONCRETE WEIGHTS AND ROCK SHIELD FURNISHED AND INSTALLED BY CONTRACTOR AS SHOWN ON CONSTRUCTION DRAWINGS. 6. SUBMIT CONCRETE WEIGHT DRAW NGS TO ENGINEER FOR REVIEW. 7. SEE TOPOGRAPHIC MP EDI. FOR CROSSING LOCATION. T DRAWING HAS N T :EEN PUBLISHED BUT RATHER HAS BEEN PREPARED BY WAGON W'+r.EL CONSULTING. INC FOR -Y THE CLIENT NAMED IN LE BLOCK SOLELY IN 'CT OF THE CONSTRUCTION. L ,ATION AND MANNTENANOE OF THE FACT LI TY NAMED IN THE TITLE BLOCK AND SHALL NOT BE USED FOR ANY OTHER PURPOSE OR FURNISHED TO ANY OTHER PARTY WITHOUT THE EXPRESSED WRITTEN CONSENT OF WAGON WHEEL CONSULTING, INC REFERENCE DRAWIGS REVISIONS SY CH4D APPD DATE E0.1 TOPOGRAPHIC MAP DRAWN I BY TSG DATE 11/01/05 4700 PIPELINE PLANE & PROFILE CHECKED JS 11/01/05 ISSUED FOR PERMITTING JS IS JS 11/01/05 C .ANA �u TITLE HIGH MESA PIPELINE EXTENSION DRAINAGE CROSSING 8 Located In the SW i14 NE 1/4 of Section 30, T7S, R97W, th P.M. Garflald County, Colorado WAGON WHEEL CONSULTING, INC 111 E 3RD. ST. SUITE 213 RIFLE, CO 81650 870-625.8433 WWC Project Number 05059 WWC Drawing Number' 05-0303-05059 none 6 • sr 326,8 0 0 w Centerline of Proposed Pipeline Right ---of— Way .Pan View EXISTING GROUND/CHANNEL ELEVATIONS AS gqSHALL �N0T 8E ALTERED CCONSTfWCTITO (TYPICAL) FREE STESS BENO SEE NOTE: 5 & FREE STESS BEND REFER TO ALIGNMENT SHEETS FOR PIPE SIZE AND COATING — Creek Crossing Detail SCALE: NONE 0 7000' 6050' 6000' a m .C� Preconstruction Grade c$1 h At Proposed Pipeline N 7000' 6050' 6000' BASIS Of BEARINGS NOTE Basis of Bearings is (he East line of the NE 1/4 of Section 30,, T7S, R95W, 6(h P.M. which Is token from global positioning satellite observations to bear NOOV2'12 "E o measured distance of 257497'. CORNER 77E NOT: P1. 264#8Z47 bears 5424.3'18 "W 1766.51' from the East 1/4 Corner of Section 16. BASIS OF ELEVATIONS Elevations ore based on the NGS Benchmark KOEPSELL Located at Lat. .39'25'42.65" North and Long. 108114'27.7r West (NAD 8J). The NAVD 88 elevation of this Benchmark Ts 512J.0'. 5ECT1�- 6 40 , m 0 w rn 00 0 c0 0 ti D 0 0 CO 0 co 00 rn 264+00 264+50 265+00 265+50 266+00 Pipetine Centerline Profile PRECAST BOLTED CONCRETE WEIGHT *MINIMUM WEIGHT -6000 POUNDS .CONCRETE SHALL SE NORMAL WEIGHT (150 LBS./CU. FI (MIN.)) AND UTILIZE ASTM 0150 TYPE 11 €R IIA CEMENT *SUBMIT CONCRETE WEIGHT DRAWINGS TO ENGINEER FOR REVIEW ROCK SHIELD FABRIC REQU BRED BETWEEN PIPE AND coN ETE WEIGHTS 266+50 1a'iiude & Longitude Datum: HarizontaE: NAD 27 Vertical: NAVD 88 U.S. Survey Feet UTM Caordknate Datum: Horizontal: NAD 83 UThI Zone 13, L.S. Survey Feet Vertical NAVD 88 U.S. Survey Feet DRAINAGE CROSSING COORDINATES DRAINAGE NORTH LATITUDE WEST LONGTIME trim NORTH UTh1 EAST STA 265+35 39° 26' 0294' 107° 59'48.20' ' 14,334,755.8 794,0426 NO'ES: 1. SURVEY AND SUGEcMENT BY"TRISTATE SURVEYING, INC' 2. PIPELINE INSTALLATION UNDER THE WATER CROSSING SHALL BE HORIZONTAL 3. THE USE OF FABRICATED BENDS, PROVIDED BY COMPANY, TO MEET COVER REQUIREMENTS, SHALL BE SPECiRED BY THE ALIGNMENT DRAWINGS. FREE STRESS BENDING SHALL BE ASSUMED AT CROSSINGS WHERE NC BENDS ARE SPECIFIED. 4 AT OPEN CUT CROSSINGS, APPROVED RIP/RAP 0R SAND CEMENT BAGS SHALL SE DRY BED LEVEL FORA LENGTH OF AT LEAST TWENTY (20) FEET ALONG EACH BANK PROVIDED AND INSTALLED FROM THE H:GH BANK DWON TC THE LOW WATER UNE OR 5 CONCRETE WEIGHTS AND ROCKSHIELU7 FURNISHED AND INSTALLED BY CONTRACTOR AS SHOWN DN CONSTRUCTION DRAWINGS. 6. SUBMIT CONCRETE WEIGHT DRAWINGS TO ENGINEER FOR REVIEW. 7. SEE TOPOGRAPHIC MAP ED•1 FOR CROSSING LOCATION. THIS DRAWING HAS NOT BEEN PUBLISHED BUT RATHER HAS BEEN PREPARED BY WAGON WHEEL CONSULTING, INC FOR 'Y THE CLIENT NAMED IN TLE BLOCK SOLELY IN =CT OF THE CONSTRUCTION, .ATION AND MAINTENANCE: OF THE FACELETY NAMED IN THE TITLE BLOCK AND SHALL NOT BE USED FOR ANY OTHER PURPOSE OR FURNISHED TO ANY OTHER PARTY WITHOUT THE EXPRESSED WRITTEN CONSENT OF WAGON WHEEL CONSULTING. INC REFERENCE DRAWIGS REVISIONS BY CHKD APPD DATE BY DATE ED1 TOPOGRAPHIC MAP DRAWN TSG 11/03/05 4700 PIPE LINE PLANE & PROFILE CHECKED 1S 11/03/05 ISSUED FOR PERMITTING is l5 JS 11/03/05 ENC ANA iu TITLE HIGH MESA PIPELINE EXTENSION DRAINAGE CROSSING 9 Located En the NE 1I4 5E 1/4 o1Section 1B, T7S, R95W. 8ih P.M. Gar1ia€d County, Ccierado WAGON WHEEL CONSULTING, INC 111 E 3RD. ST. SUITE 213 RIFE, OO 31650 9WO-825.8453 WW0 Project Nurotier 05059 WNC Drawing Number 05-0304-05059 SCALE none ex1sty Pgpslha FREE STESS BEND r Plan View EXISTING GROUND/CHANNEL ELTIONS SHALL NOT BE ALTERED AS cO NSTRUUCLITOF TON {TYPICAL) Centerline of Proposed Pipeline Right—of—Way BASIS OF BEARINGS NOTE. Basis of Beorings is the Fast line of the NE 1/4 of Section 3D, T7S, R9514; 6th P.M. which is token from global positioning satellite observations to bear N00D2'1r E o measured distance of 2574.97: CORNER TIE NOTE: P.I. 27Q#93.10 bears 543'22'11V 1165,55' from the East 1/4 Comer of Section 16. BAS15 OF ELEVATIONS Elevations are based on the NGS Benchmark KQEPSELL Located at Lot. ,925 4255" North and Long, 108124'2Z 77" West (NAD 83). The NAVD 88 elevation of this Benchmark is 51230'. SEE NOTE: 5 846 FREE STESS BEND REFER TO ALIGNMENT SHEETS FOR PIPE SIZE AND COATING Creek Crassinj Detail SCALE: NONE 6150' Precon s true tion Grade At Proposed Pipeline 6100' 6050' 6150' 6100' 6050' a No - 0 o3 0 ❑ 0 0 to 0 0i 0 t0 271+50 272+00 272+50 Pipeline Centerline PRE -CAST BOLTED CONCRETE WEIGHT "MIN -MUM WEIGHT.6000 POUNDS "CONCREft SHALL BE NORMAL WEIGHT [256 L85./CU. FT.[MIN.)) AND U T I Lit E ASTM C180 TYPE Ii IR IIA CEMENT .61/EMIT CONCRETE W EI D HT DRAWINGS TO ENGINEER FOR REVIEW ROCK SHIELD FABRIC REQUIRED BETWEEN PIPE AND coN ETE wen His SECTION JJr, 273+00 Profile 2734-50 Latitude & Longitude Datum: Horizontal: NAD 27 Vertical; NAVD 88 U.S. Survey Feet UTM Coo{dinate Datum: Harizontal: NAD 83 UTM Tone 13, U.S. Survey Feet Verical NAVD 83 U.S. Survey Feet DRAINAGE CROSSING C ORDINATES DRAINAGE NORTH LA• T UDE rWESi LONGfl1JDE UT t NORTH UT71,4EAST S1,1. 272+64 39° 26' 08.62' 107° 59' 42.67' 14,335,316.4 79} 4961 NOTES: 1. SURVEY AND SUGNMENT BY 'FRI STATE SURVEYING, INC' 2. PtPEL€NE INSTALLATION UNDER THE WATER CROSSING SHALL BE HORIZONTAL 3. THE USE OF FABRICATED BENDS, PROVIDED V COMPANY. TO MEET COVER REQUIREMENTS, SHALL BE SPECIFIED BY THE AIJGNMENT DRAWINGS. FREE STRESS BENDING SHALL BE ASSUMED AT CROSSINGS WHERE NO SENDS ARE SPECIFIED. 4. AT OPEN CUT CROSSINGS, APPROVED RIP -RAP OR SAND CEMENT BAGS SHALL BE DRY BED LEVEL FORA LENGTH OF AT LEAST TWENTY =20) FEET ALONG EACH BANK PROVIDED AND INSTALLED FROM THE HIGH BANK DWON TO THE LOWWATER UNE OR 5. CONCRETE WEIGHTS AND ROCK SHIELD FURNISHED AND INSTALLED 8Y CONTRACTOR AS SHOWN ON CONSTRUCTION DRAWINGS. 6. SUBMIT CONCRETE WEIGHT DRAWINGS TO ENGINEER FOR REVIEW. 7. SEE TOPOGRAPHIC MAP ED -1 FOR CROSSING LOCATION. THIS DRAWING I-1AS NOT BJH PUBLISHED BUT RATHER HASB BEEN WAGON Wu+=ELCDN5ULT€NG, INC FOR Y THE CLIENT NAMED IN TLE BLOCK SOLELY INin :OT OF THE CONSTRUCTION, .ATICN AND MAINTENANCE OF THE FACILITY NAMED IN THE TITLE BLOCK AND SHALL NOT BE POSE ORAVYOTHER PURPOSE OR FURN€5HEDT7 ANY OTHER PARTY WITHOUT THE EXPRESSED WRITTEN CONSENT OF WAGON WHEEL CONSULTING, INC REFERENCE DRAVdIGS REVISIONS v . CHKD APPD DATE BY DATE 4 �E :� TITLE HIGH MESA PIPELINE EXTENSION DRAINAGE CROSSING 10 the NEI 4 SE 1/4 of Section 16, TTS, R95W, BEh P.M. Gar) I4 County, Colorado ED -1 TUPOGRAPHICMAP DRAWN TSG 21/03/05ENC 4700 PIPELINE PLANE & PROFILE CHECKED IS 11/03/054..0.412°'31:111121:::,-'‘ WAGON WHEEL CONSULTING, INC L LI E. 3RD. ST, STATE 213 RIFLE, CO 81850 970-628-8433 D p59ralectNUlnber 05-0305-05059M�1nber SCALE none ISSUED FOR PERMITTING j5 JS 15 11/03/05 N84 -05,21.E. 369.54' '°h'2 C'le )'5 Jr. NE 1!¢�t Centerline of Proposed Pipeline Right ---0f Way a FREE STESS BEND Plan. View N7517'38"E 335,58' EYJ8T1NG GROUND CHANNEL ELEVATIONS ppSp�g�NOT �BE NEMP E CONSTRUCON (TYPICAL) SEE NOTE: 5 & 8 existkv2ipelNra FREE MESS BEND 1 REFER TOALIGNMENT SHEETS FOR PPE SiZEAND COATING - Creek Crossing Detail 6625' 6575' 6525' Preconstruction Grode At Proposed Pipeline 6825' 6575' 6525' BASIS OF BEARINGS NOM: Basis of Bearings Is the East line of the NE 1/4 of Section 30, 77.S R95W, 6th P.M. which Is taken from global positioning satellite observations to boar N00V212 E a measured distance of 2574.97: CORNER 77E NOT: P 1. 317#50,38 bears N8775 06"E 3437.26' from the West 1/4 Corner of Section 15. BASIS OF ELEVA 77ONS Elevations are based on the NGS Benchmark KOEPSELL Located at Lat. 39'54265" North and Long. 108V427.77" West (NAD 83). The NA I4 88 elevation of this Benchmark is 51230'. inn orio 0 40 to 40 to V) 0 8 CNS 46 m 317+00 317+50 318+00 318+50 319+00 Pipeline Centerline Profile PPE -CAST BOLTED CONCRETE WEIGHT 'WlNIMUM WEIGHT -6000 POUNDS .CONCRETE SHALL BE NORMAL WEIGHT [150LB5./CU. Ff.(MIN.)1 AND UTILIZE ASTM C150 TYPE I€ €R IIACEMENT "SUBMIT CONCRETE WEIGHT DRAWINGS TO ENGINEER FOR REVIEW ROCK SHIELD FABRIC RU€RED BETWEEN PIPE AND CCN E WEIGHTS SECTION O 3:A.i wt. A Latitude & Lengtuds Datum: Horizontal: NA027 Vertical_ NAVD 88 U.S. Survey=eet UTM Coordinate Datum: Horizontal: NAD 83 UTM Zone 13, U.5. Survey Feat Vertical NAVD 98 U.S. Suiv yFe t DRAINAGE CROSSING COORDINATES DRAINAGE NORTH LATITUDE WEST LONGITUDE LIMA NORTH IJrM EAST STA 317+85 39° 26'17.08' 107° 58' 49.13' 14,336033.0 798,7242 NOTES: 1. SURVEY ANDSLIGNMENT BY `TRI STATE SURVEYING. INC 2. PIPELNE INSTALLAT1ON UNDER THE WATER CROSSING SHALL BE HORIZONTAL 3. THE USE OF FABRICATED BENDS, PROVIDED BY COMPANY, TO MEET COVER REQUIREMENTS, SHALL BE SPECIFIED SY THE ALIGNMENT DRAWINGS. FREE STRESS BENDING SHALL BE ASSUMED AT CROSSINGS WHERE NO BENDS ARE SPECIFIED. 4. AT OPEN CUT CROSSINGS, APPROVED RIP -RAP OR SAND CEMENT BAGS SHALL BE DRY BEC LEVEL FORA LENGTH OF AT LEAST TWENTY (20) FEET ALONG EACH SANK PROVIDED AND INSTALLED FROM THE HIGH BANK DWON 70 THE LOW WATER UNE CR 5. CONCRETE WEIGHTS AND ROCK SHIELD FURNISHED ANO INSTALLED BY CONTRACTOR AS SHOWN ON CONSTRUCTION DRAWINGS. 6. SLLBMIT CONCRETE WEIGHT DRAWINGS 70 ENGINEER FOR REVIEW 7. SEE TOPOGRAPHIC MAP ED -1 FOR CROSSING LOCATION. THIS DRAWING HAS NOT BEEN PUBLISHED BUT RATHER HAS BEEN PREPARED BY WAGON WL4 }1CONSULT€NG, INC FOR THE CLIENT NAMED IN iTLE BLOCK SOLELY IN ECT OF THE CONSTRUCTION, .3A110N AND MAINTENANCE OF THE FADLITY NAMED IN THE TITLE BLOCK AND SHALL NOT 6E USED FOR ANY OTHER PURPOSE OR FURNISHED TO ANY OTHER PARTY WITHOUT THE EXPRESSED WRITTEN CONSENT OF WAGON WHEEL CONSULTING INC REFERENCE ORAWIGS REVISIONS BY CHKOA PPD, DATE BY DATE ED- . TOPOGRAPHIC MAP DRAWN TSG 11/03/05 4 700 PIPELINE PLANE & PROFILE CHECKED J5 11/03/05 ISSUED FOR PERMITTING JS J5 .15 11/03/05 ENCAN TITLE HIGH MESA PIPELINE EXTENSION DRAINAGE CROSSING 11 Located in the SW 1/4 NE 1/4 ofSaetiun 15, T75, R95W, 631' P.M. Garfield County, Colorado WAGON WHEEL CONSULTING, INC 111E 3RD. ST. SUITE 213 RIFLE. CO 81650 910-625-8433 WWC Nolo Number 05059 WWC Drawing Number 05-0308-05059 LLE Done Centerline of Proposed Pipeline Righ t— o f— Way N7517'38"E 335.58' Existing Pipeline (17 Plan View FREE STESS a&NO EXISTING GROUND/CHANNEL ELEVATIONS SHALL NOT BE PIEECON��CLTNPLIINCONSTRUCTION (TYPICAL) 7/i 146816'09"E 261'9' BASIS OF BEARINGS NOTE,. Basis of Bearings 1s the East line of the NE 1/4 of Section 30, 77% R95Ft 6th P.M. which Is token from global positioning satellite observations to beat- NO0172'12 E a measured distance of 2514.97'. CORNER 77E NOTE P.I. 320+696 beers N6672 J3E 3766.12' from the West 1/4 Comer of Section 15 BASS OF Ea -VA TONS Elevations are basad an the NGS Benchmark KOEPSELL Located of Lot. J.9'25'42.65' North and Long. 706'74'2177" West (NAO 93). The NAVD 86 elevation of this Benchmark is 5123.0'. SEE NOTE: S & 8 FREE STESS BEND REFER TO ALIGNMENT SHEETS FOR PIPE SIZE AND C0A11NG THIS DRAINING HAS NO` BEEN PUBLISHED BUT RATHER HAS BEEN PREPARED BY WAGON EL CONSULTING, INC FOR Y THE CLIENT NAMED IN iTLE BLOCK SOLELY IN EOT OF THE CONSTRUCTION, .CATION AND MAINTENANCE OF THE FACILITY NAMED IN THE TITLE BLOCK AND SHALL NOT BE USED FOR ANY OTHER PURPOSE OR FIJRNISHED TO ANY OTHER PARTY WITHOUT THE EXPRESSED WRITTEN CONSENT OF AGON W CONSULTING INC Creek Crossing_Detai4 SCALE: NONK REFERENCE DRAWIGS E 4700 TOPOGRAPHIC MAP PIPELINE PLANE & PROFILE REVISIONS ISSUED FOR PERMITTING 6650' ti 66130' 6550' Prcconstruction Grade At Proposed Pipeline 6650' 6600' 6550' 319+50 PRE -CAST BOLTED CONCRETE WEIGHT •MINIMUM WEIGHT•6000POUNDS •CONCRETE SHALL BE NORMAL WEIGHT ILSO LBS./CU. FT. (MIN.}] AND UTILIZE ASTM C150TYPE II IRIIA CEEMENT .SUBMIT CONCRETE WEIGHT DRAWINGS TO ENGINEER FOR REVIEW ROCK SHIELD FABRIC REQUIRED BETWEEN PIPE AND CONCRETE WEIGHTS SECTION n� BY CHK7APPD DATE J5 1S JS 11/03/05 320+00 320+50 321+00 Pipeline Centerline Profile Latitude & Longitude Datum: Horizontal- NAD 27 Vertical: NAVD 88 U.S. Survey Feet UTM Coordinate Daturre Horizontal: NAD 83 UTM Zone 13, U. 3. Survey Feet Vertical NAVD 88 U.S. Survey Fcet DRAINAGE CROSSING COORDINATES DRAINAGE NORTH LATITUDE WEST L.ONCIfUDE 1f M NORTH UTM EA51" STA 320+28 39° 26'17.69' I07 58' 46,15' 14,336,0865 798 960.6 NOTES: 1. SURVEY AND SIJGNMENT SY'TR1 STATESURVEYING, INC 2. PIPELINE INSTALLATION UNDER THE WATER CROSSING SHALL SE HORIZONTAL 3. THE USE OF FABRICATED BENDS, PROVIDED BY COMPANY, TO MEET COVER REQUIREMENTS, SHALL BE SPECIFIED BY THE ALIGNMENT DRAWINGS. FREE STRESS BENDING SHAU.LBE As$UMED AT CROSSINGS WHERE NO BENDS ARE SPECIFIED. 4- AT OPEN CUT CROSSINGS, APPROVED RIP -PAP OR SAND CEMENT BAGS SHALL BE DRY BED LEVEL FOR A LENGTH DF AT LEAST TWENTY (20) FEET ALONG EACH BANK PROVIDED AND INSTALLED FROM THE H Ghi BANKDWON T6 THE LOW WATERLINE OR 5. CONCRETE WEIGHTS AND ROCKSHIELD FURNISHED ANO INSTALLED BY CONTRACTOR AS SHOWN ON CONSTRUCTION DRAWINGS. 6. SUBMIT CONCRETE WEIGHT DRAWINGS TO ENGINEER FOR REVIEW. 7_ SEE TOPOGRAPHIC MAP E0-1 FOR CROSSING LOCATION. _EN CAN_A lu WAGON WHEEL CONSULTING, INC 111 E. 3RD. ST. SUITE 213 RIFLE„ CO 81650 970-625.8433 TITLE HIGH MESA PIPELINE E1tTEJ'ISION DRAINAGE CROSSING 12 Located in the SW 1/4 NE 1/4 of Section 15, 17S, R95W, 6th P.M. Garfield Cc unty, Colorado WO Project Number 05059 MVO Drawing Number 05-0307-05059