HomeMy WebLinkAbout03-HDD CrossingsTOTAL HORRONTAL DISTANCE = 72B9FT
TOTAL PPE LENGTH • 3384.7 FT
61=Ptql
NOTES
1. ELEVAT AE BASHED oARE TO OGRACPHo�IN 100 MMT DATUM.
2. STATIONING IS BASED ON HORIIOt(AL DISTANCES.
B. OR LOCATIOWY N OAF FOORR�IIGN MIMAND ES ENTERPRISE
IN PPLOT�PLANNOOR PRROFlNOT ILE�hE�
INFORMATION SHOWN HEREON IS O E NTE WRHO S, G FOR ANY DAMAGES
R�ESFUCf ��TpLLTIJNG ENGINEERING_
ROM ERERPoOR INC.
R OMISSIONS THERENRPRISE P..
CO MOT ONE
ALL COLORADO AT 31L , 3DAYS PIEOORR TTOO DIGGING.
4.GRESPONSELE_FOTING
MATER[AL SUMMARY
REFERENCE DRAWINGS
ITEM
DESCRIPTION
QTY.
DWG
DESCRIPTION
CROSSRMIEGEtilD
NOTES
ENGNEERING RECO
0
DRAWN
B
ISSUED PCE BD
Re
1.20.12
ZEI
A
FOR FEVER RIRPOSEB OFl.Y
TL
11-0&11
YY
REV
DESCRPRON
5Y
DATE
APP.
13C
EFnlcrr'ri4.•Pi Iia=1h
73307E Road SuNs C40
�drf�ldiratk. osisnaligf7 80777
ENTERPRISE PRODUCTS PARTNERS, L.P.
PROPOSED FUD PULLBACK
OOLUMBNE SPISNGS LOCATION
OPTION
WESTERN EIIPASSION PROJECT PHASE 1
GARFIELD COINTY, COLORADO
SCALE: NOSCALE DRAWS@: 02757PI42092A i""