HomeMy WebLinkAboutTab 22- Review Criteriaall VAU CoNSTRUO.TTON MANACIE\INT, k
1038 Country Rd 323 `'. RiRE, CO 81650
Mid-America Pipeline Company, LLC
Western Expansion Project II- Development Plan Review for
Right -of -Way Application
Submittal Item Tab 22- Response letter regarding
Development Plan Review Standards and Criteria for
Approval. Sections 9-107 and 7-815
Please find below a response to each of the checklist items that are required to be
reviewed by the Garfield County Building and Planning Department.
A. Right-of-way locations related to perimeters of surface
property ownerships. 7-815 (A)
Please see Tab 2- Vicinity Map- 9-104 (A)
B. Colorado Oil and Gas Conservation Commission Rules
and Regulations, Section 802, Noise Abatement. 7-815 (B)
Please see attached the following document:
1. Analysis of Noise from the Western Expansion Project II. This
report was prepared by Hankard Environmental Inc. and notes
that our pipeline construction activity will comply with section
802 of the COGCC rules.
C. Minimize visual impact and disturbance of the land
surface. 7-815 (C)
We have located the new pipeline in existing, disturbed right-of-
way to limit surface disturbance to previously disturbed areas.
Page 1 of 3
All above grade piping, block valves and improvements will be
painted "Juniper Green" to blend with the environment and the
existing facilities.
D. Access Points to public roads. 7-815 (D)
Please see Tab 15- Traffic Impact- 9-104 (N)
E. Impact on endangered species. 7-815 (E)
Please see Tab 11- Sensitive Area Survey- 9-104 (J)
F. Air contaminant emissions. 7-815 (F)
The Applicant agrees to meet the control provisions set forth by
the Colorado Air Quality Control Program, Title 25, Article 7,
C.R.S. Please see the Fugitive Dust Permit in Tab 7- Regulatory
Permit Requirements.
G. Compliance with Colorado State Public Health and
Environment, Water Quality Control standards. 7-815 (G)
Please see Tab 7- Regulatory Permit Requirements- 9-104 (F).
The Applicant has/or will receive the necessary CDPS permits
from the CDPHE for the project.
H. Compliance with Garfield County Individual Sewage
Disposal System regulations. 9.07.06 (8)
There will not be ISDS installed at this project. Please see Tab 21 -
Construction Management Plan- Waste Disposal and sanitation to
note the use of portable chemical toilets for human waste during
the construction of the pipeline.
I. Reclamation plan. 7-815 (I)
Please see Tab 12- Revegetation Plan- 9-104 (K)
J. Abandoned pipeline removal. 7-815 (J)
Abandoned pipeline will be abandoned as per the most current
Colorado Oil & Gas Conservation Commission regulations at the
time of abandonment.
Page 2 of 3