Loading...
HomeMy WebLinkAboutTab 22- Review Criteriaall VAU CoNSTRUO.TTON MANACIE\INT, k 1038 Country Rd 323 `'. RiRE, CO 81650 Mid-America Pipeline Company, LLC Western Expansion Project II- Development Plan Review for Right -of -Way Application Submittal Item Tab 22- Response letter regarding Development Plan Review Standards and Criteria for Approval. Sections 9-107 and 7-815 Please find below a response to each of the checklist items that are required to be reviewed by the Garfield County Building and Planning Department. A. Right-of-way locations related to perimeters of surface property ownerships. 7-815 (A) Please see Tab 2- Vicinity Map- 9-104 (A) B. Colorado Oil and Gas Conservation Commission Rules and Regulations, Section 802, Noise Abatement. 7-815 (B) Please see attached the following document: 1. Analysis of Noise from the Western Expansion Project II. This report was prepared by Hankard Environmental Inc. and notes that our pipeline construction activity will comply with section 802 of the COGCC rules. C. Minimize visual impact and disturbance of the land surface. 7-815 (C) We have located the new pipeline in existing, disturbed right-of- way to limit surface disturbance to previously disturbed areas. Page 1 of 3 All above grade piping, block valves and improvements will be painted "Juniper Green" to blend with the environment and the existing facilities. D. Access Points to public roads. 7-815 (D) Please see Tab 15- Traffic Impact- 9-104 (N) E. Impact on endangered species. 7-815 (E) Please see Tab 11- Sensitive Area Survey- 9-104 (J) F. Air contaminant emissions. 7-815 (F) The Applicant agrees to meet the control provisions set forth by the Colorado Air Quality Control Program, Title 25, Article 7, C.R.S. Please see the Fugitive Dust Permit in Tab 7- Regulatory Permit Requirements. G. Compliance with Colorado State Public Health and Environment, Water Quality Control standards. 7-815 (G) Please see Tab 7- Regulatory Permit Requirements- 9-104 (F). The Applicant has/or will receive the necessary CDPS permits from the CDPHE for the project. H. Compliance with Garfield County Individual Sewage Disposal System regulations. 9.07.06 (8) There will not be ISDS installed at this project. Please see Tab 21 - Construction Management Plan- Waste Disposal and sanitation to note the use of portable chemical toilets for human waste during the construction of the pipeline. I. Reclamation plan. 7-815 (I) Please see Tab 12- Revegetation Plan- 9-104 (K) J. Abandoned pipeline removal. 7-815 (J) Abandoned pipeline will be abandoned as per the most current Colorado Oil & Gas Conservation Commission regulations at the time of abandonment. Page 2 of 3