Loading...
HomeMy WebLinkAbout3.1 Amended PermitHILIA5:144; NII! 1 Reception#: 767258 04/30/2009 02:45:47 PM Jean Alberico 1 of 3 Rec Fee:$0.00 Doc Fee:0.00 GARFIELD COUNTY CO FIRST AMENDED ADMINISTRATIVE PERMIT for EnCana Oil and Gas (USA) Inc. [The 24 -inch Collbran Pipeline] In accordance with and pursuant to Article IX of the County Unified land Use Resolution of 2008and Resolution No. 2005 - 53 of the Board of County Commissioners of Garfield County, State of Colorado, the Director of the Building and Planning Department hereby authorizes, by this First Amended Administrative Permit, the following activity: 3.61 mile pipeline to transport natural gas from the Collbran/Plateau Valley area of western Colorado to the Meeker Gas Plant in Rio Blanco County. The proposed pipeline will be up to 24 -inches diameter. The project also includes a staging area and contractor 's office facility to be located on private property (Specialty & Stockton Restaurant) The purpose of this First Amended Administrative Permit is to correct the original Administrative Permit recorded at reception # 753473 such that the pipeline shall be sized up to 24 -inches rather than 20 -inches and continues to be subject to the conditions set forth in Exhibit A (attached hereto), and shall be valid only during compliance with such conditions and other applicable provisions of the Garfield County Zoning Resolution of 1978, Article IX of the County Unified land Use Resolution of 2008and Resolution, the Subdivision Regulations, Building Code, and other regulations of the Board of County Commissioners of Garfield County, Colorado. BUILDING AND PLANNING DEPARTMENT, GARFIELD COUNTY, COLORADO W. 1111 h'ii°1N:1,1111;1U;.$1,tHll11111 Reception#: 767258 04/30/2009 02:45:47 PSI Jean glberico 2 of 3 Rec Fee:$0.00 Doc Fee:0.00 GARFiELD COUNTY CO Exhibit A Page 1 of 2 1) Any equipment used in construction or operation of a pipeline must comply with the Colorado Oil and Gas Conservation Commission Rules and Regulations, Section 802, Noise Abatement. Additionally, all power sources used in pipeline operations shall have electric motors or muffled internal combustion engines; 2) Pipeline operations shall be located in a manner to minimize their visual impact and disturbance of the land surface. Facilities shall be painted in a uniform, non - contrasting, non -reflective color, to blend with the adjacent landscape. Right-of- way shall be located in existing disturbed areas unless safety or visual concerns or other adverse surface impacts clearly dictate otherwise; 3) All access and oversize or overweight vehicle permits shall be obtained from the County Road & Bridge Department prior to beginning operation. Any new roads or intensified driveway accesses created as a result of the pipeline construction, intended to be permanent for maintenance and repair operations shall be placed behind a locked gate or other barriers preventing use by recreational vehicles. Any gates or barriers need to be consistent with the surface owner's preferences; 4) All vehicles working within Garfield County Right of Ways will be licensed and registered in the State of Colorado. All vehicles hauling equipment and materials for the pipeline construction will abide by Garfield County Road & Bridge Departments oversize%overweight regulations. All vehicles requiring an oversize/overweight permit will send a letter showing proof that they can operate under a known bond holder on file with Garfield County Road & Bridge Department before a permit will be issued; 5) The Applicant shall provide the County with a digital alignment of the pipeline once constructed in a format readable to the County Geographic Information System (GIS) analyst; 6) In no case shall an operator engage in activities which impact Federal or State threatened and endangered species; 7) Air contaminant emissions shall be in compliance with the applicable permit and control provisions of the Colorado Air Quality Control Program, Title 25, Resolution 7, C. R. S; 8) All operations shall comply with all applicable Federal and State Public Health and Environment, Noise, and Air and Water Quality Control standards; 9) Any proposed waste disposal or treatment facilities shall comply with all requirements of the County Individual Sewage Disposal System Regulations; 10) Should any abandoned pipeline be removed, it will be subject to the original revegetation and weed management requirements in the original application; 11) The Applicant shall provide revegetation security in the amount of $154,250 prior to the issuance of the Administrative Pipeline Permit; 12) The Applicant shall provide a copy of the Stormwater Management Plan for Garfield County Records; 13) Construction of Phase II (as represented in the application) shall not begin until a copy of the Bureau of Land Management Right -of -Way agreement is submitted to the Building and Planning Department for review; 14) The Applicant shall provide Garfield County Vegetation Management seed tags upon completion of the revegetation process; 15) The Applicant shall submit project -specific Biological Resources Protection Plan prior to construction of the project Phase II; 1 1111 N:MIPIViiikVii, Heil.1011'«1..11 rMilraii, ii 11111 Reception#: 767258 04/30/2009 02:45:47 PM Jean Rlberico 3 of 3 Rec Fee:$0.00 Doc Fee 0.00 GARFIELD COUNTY CO Exhibit A Page 2 of 2 16) Once the construction contractor selection is finalized, EnCana shall provide a detailed, project -specific Emergency Response plan to the County and the construction contractor representatives will meet with representatives from the Sheriffs department and Grand Valley Fire District prior to any construction of the proposed pipeline; 17) The Applicant shall comply with the conditions of utility permit number is GBRB08-U-68 regarding crossing County Right-of-way (County Road 300) and any future conditions deemed necessary by Garfield County Road and Bridge Department regarding the health, safety and welfare of the citizens of Garfield County during construction within County Right-of-way; 18) Signage shall be in place no less than five (5) days prior to the actual work being done to let users of Cr. 300 be aware of the road closure for the installation of the road crossing showing the detour route to Battlement Mesa via Cr. 300; 19) The proposed contractor's office and storage areas shall only be utilized in conjunction with the construction of the proposed Collbran pipeline. Immediately following the completion of the Collbran pipeline project the proposed storage area and office shall be reclaimed and reseeded; 2