HomeMy WebLinkAboutInstallation Observation 08.24.14
August 24, 2014 Project No. C1081
Tamar Mattorano
pmattorano@hotmail.com
Onsite Wastewater Treatment System (OWTS) Installation Observations
1164 CR 106
Garfield County, Colorado
Garfield County Permit No. SEPT-6-14-3273
Tamar,
ALL SERVICE septic, LLC observed the installation of the onsite wastewater treatment system
(OWTS) on July 31, 2014 for the subject property. Aspen Digger installed the system.
The installation included a new 1000-gallon, two-compartment concrete septic tank with an H-20
rated lid and an effluent filter on the outlet tee. This filter must be cleaned annually, or as
needed.
Effluent gravity flows to a gravelless chamber bed, with 4 rows of 10 ‘Quick 4’ Infiltrator® chambers
for a total of 40 chambers and 395 square feet of infiltrative area.
The existing OWTS was properly abandoned. The existing well on the property was also
abandoned due to the encroachment on the required 100-foot setback from the absorption area.
The OWTS was generally installed according to specifications. This observation is not a guarantee
of workmanship and/or parts and materials. ALL SERVICE septic, LLC should be notified if changes
are made to the OW TS in the future. Any additional OWTS construction must be according to the
county regulations.
LIMITS:
Observations are limited to components that are visible at the time of the inspection. The installer
must have documented and demonstrated knowledge of the requirements and regulations of the
county in which they are working. The quality of the installation is dependent of the expertise of the
installer, soil type, and weather conditions.
Please call with questions.
Sincerely,
ALL SERVICE septic, LLC Reviewed By:
Carla Ostberg, MPH, REHS Richard H. Petz, P.E.
Tapping into existing line from house
Hole prep for septic tank Septic tank installation
1000-gallon, two compartment tank with an H-20 rated lid
Prep for chamber bed
Chamber bed being installed
Final grading of field – protected from traffic
832‐R‐13‐002