Loading...
HomeMy WebLinkAboutPermit for Utilities Installation.pdf(--1 • Garfield Couni Construction Permit for llttstallatiotn of s Applicant Name: Red Rock Gathering Company, LLC Address: 2128 Railroad Ave., Ste. 106 Type of Installation: Road Bore Purpose: Natural Gas Pipeline & Produced \Vater Line Length of Installation: 100' County Road: 200 Nearest Intersection nr Address: CR 45 Distance from Intersection or Address: .63 Miles •I -/- Direction from Intersection or Address: West Side of Road: Full Road Width Estimated Construction Schedule: Start: 8/25/2014 Permit Number: GRI114-U-39 Finish: 9/24/2014 Request for permission to make the above installation at the location specified is hereby granted, subject to the following terms, conditions and special provisions: 1. It is understood that the Applicant will cause the installation to be made at no expense whatsoever to Garfield County and that the Applicant will own and maintain the installation upon completion of work 2. The Applicant shall maintain the installation at all times and agrees to hold harmless the County of Garfield and its representatives, agents or employees from any and all liability, loss and damage which may arise out of or be connected with the installation, maintenance, alteration, removal or presence of the installation above described or any work or facility connected therewith, within the area covered by this permit. 3. The entire installation repairs and clean up shall be completed prior to: 9/24/2014. 4. The traveling public shall be protected during the installation with proper warning signs or signals both day and night, and warning signs and signals shall be installed by and at the expense of the Applicant and in accordance with directions given by the Board of County Commissioners or their representative. No open wench shall be permitted in the traveled roadway after dark, unless otherwise specified in the Special Provisions below. 5. lithe Board of County Commissioners so requires, Applicant shall mark the installation at the designated locations in manner acceptable to the Board of County Commissioners or their Representative. 6. In the event any changes are made to this county road in the future that would necessitate removal for relocation of this installation, Applicant will do so promptly at its own expense upon written request from the Board of County Commissioners, The County will not be responsible for any damage that may result in the maintenance of the county road to installation placed inside Public Right -of -Ways Limits. 7. Applicant will be required to shut off lines and remove all combustible materials from the right-of-way when requested to do so by The Board of County Commissioners because of necessary road construction or maintenance operations. 8. Where the installation crosses the roadway, it shall be encased in pipe of larger diameter and the crossing shall be as nearly perpendicular to the roadway as physically possible. This installation shall be installed by the method of boring or jacking through beneath the road surface: however, open cut shall be allowed up to the edge of the surfaced portion of the county road. No water shall be used in the boring, and no tunneling shalt be permitted. if boring is not successful then arrangements should be established with the County for possible excavation methods. 9. Where the installation crosses any ditches, canals or water carrying structures, wherever possible it shall be pushed through and beneath a pipe of larger diameter thereby eliminating the necessity of trenching with a minimum bury of4 foot. In no case shall the flow of water ever be impaired or interrupted, without arrangements having been made with the effected water company or ditch association, 10. The installation tnust be accomplished in accordance with accepted good practices and conform to the recommendations of the National Electric Safety Code and to such Colorado statues as are applicable. The nbove-described Rond Bore shall be installed beneath the surface of the right-of-way at a minimum depth 8ft, and the disturbed portion of the right-of-way will be restored to its original condition. Any backfilling in the roadway shall he made in six-inch lifts and mechanically tamped and packed and the last twelve inches of backfill shall be of stable granular material such as crushed rock or gravel. 11. Applicant shall be responsible for any repairs to roadway or right-of-way necessitated by the installation. 12. Applicant's installation shall be made at a location tnutually agreed upon by Applicant and the Board of Comtnissioners or their representative, and in accordance with details and specifications shown on the construction plans, a copy of which shall be furnished to Garfield County. 13, Applicant shall inform the Board of County Commissioners of construction methods, equipment and operational procedures that will be utilized and shall obtain the occurrence of the Board of County Commissioners. 14. Applicant shall advise the Board of County Commissioners or their representatives at least 48 hours in advance of the time at which work on the installation will commence, 15. Any materials from excavation as the result of the installation will be removed from the road way surface each day. 16. Under no condition is an asphalt surface to be cut unless otherwise specified in the attached Special Provisions 17. Where reference is made herein to the representative of the Board of County Commissioners, such representative shall be the District Rond Supervisor, unless otherwise specified in writing by the Board of County Commissioners. 18. This permit shall be valid daring the estimated construction schedule set forth above. Neither the Owner, nor the Applicant shall conduct any work pursuant to this permit at anytime other than that set forth in the estimated construction schedule, IN THE ROADWAY BETWEEN THE DITCHES 95% COMPACTION, BETWEEN DITCH AND FENCE LINE 85% COMPACTION. TRENCIILINE INSIDE ROADWAY, LAST LIFT NEEDS TO BE 2 Fi'. OF CLASS 6 ROADBASE. APPLICANT WILL BE (REQUIRED 1'O MAINTAIN THE AREA %VHEREIN UTILITY INSTALLATION IS MADE DURING CONSTRUCTION AND TWO YEARS AFTER COMPLETION DATE. IT WILL BE THE APPLICANT'S RESPONSIBILITY, WHEN REQUESTED, TO SUPPLY AT THE APPLICANT'S EXPENSE, COMPACTION TESTS AND RESUL'I'S OF TESTS FORM A LICENSED PROFESSIONAL ENGINEER. Special Provisions: 1. For road bore, road bore will be attempted 3 times before and open road cut will he permitted or boring tool is stuck. Permit holder will contact person issuing permit prior to cutting road surface. 2. Installations within In the County Right -of -Way over 1000ft in length require a survey and BOCC Approval and ns -built upon completion. 3. Type of Backfill: Excavated Material. If back fill is road base or excavated material, backfill will be compacted to 95% with water to include shoulders, drainage ditches and pits used for road bore. All rocks 10 inches or larger will be removed from site. No wet material removed front excavation will be used for backfill. 4. Asphalt Replacement: False. If true, asphalt will be 4 inches of hot compacted asphalt. Asphalt will be saw -cut 2 feet larger than excavation area. Replacement of asphalt will be 1 lace minimum width the size of the cut or full rood width if the cut crosses the centerlhre of road. 5. Replacement of Magnesium Chloride Surface: False. If true, person issuing permit will give specification on replacement. The length of the road surface damaged by utility installation will require replacement. Tfiis will include the hauling of equipment and materials. 6. Certified Traffic Required? False gg7. Work Zone Signs Required? True Representative of the Board o C u mty Comtnissione1swo .Garfield County, Colorado In accepting this permit, the undersigned, representing the Applicant, verifies that lie has read and understands all of the foregoing provisions: that he has the authority to sign for and bid the Applicant: and that by virtue of his signature, the Applicant, is bound by all the conditions set forth herein. THE COUNTY DOES NOT VERIFY THAT THERE IS AN EXISTING COUNTY OR PUBLIC RIGHT- OF-WAY WITHIN TO PLACE PROPOSED UTILITY. THE APPLICANT IS RESPONSIBLE FOR VERIFYING THE EXITENCE OF CESSARY RIGHT-OF-WAY FOR THE PLACEMENT OF THE UTILITY. Utility Permit Applicant Red Rock GatlVtg Company, LLC