Loading...
HomeMy WebLinkAboutApplication-PermitGarfield County Building & Sanitation Department 108 8`s Street, Suite #201 Glenwood Springs, Co. 81601 Office- 945-8212 Inspection Line- 384-5003 rNo. gtYO Job Address r•cr,V\, 11--i\ -iteir-- 1 l kr) -Pi' Building Permit rcf a eick\l2.s 11 p(YeSip Use of Building e,C , T b V.J t S ly_ k nu )Null", �n (t -e Q Nature of Work Owner Contractor 1. Amount of Permit $ all?- //3-01-2b91 Date Clerk Permit No' GARFIELD COUNTY BUILDING PERMIT APPLICATION 108 6" Street. Suite 201, Glenwood Spdnp, CO 81601 Phone: 970-945-8212 / Fen: 970984-3470 / Inspection Line: 970-384-3003 Parcel/Schedule No: 3177 - 113 -0I -0O cR c AGREEMENT PERMISSION 15 HEREBY GRANTED TO THE APPLICANT AS OWNER. CONTRACTOR AND/OR THE AGENT OF THE CONTRACTOR OR OWNER TO CONSTRUCT THE STRUCTURE AS DETAILED ON PLANS AND SPECIFICATIONS SUBMITTED TO AND REVIEWED BY THE BUILDING DEPARTMENT IN CONSIDERATION OF THE ISSSUANCE OF THIS PERMIT. THE SIGNER. HEREBY AGREES TO COMPLY WITH ALL BUILDING CODES AND LAND USE REGULATIONS ADOPTED BY GARFIELD COUNTY PURSUANT TO AUTHORITY GIVEN LN 30.28.201 CRS AS AMENDED THE SIGNER FURTHER AGREES THAT IF THE ABOVE SAID ORDINANCES ARE NOT FULLY COMPILED WnH IN THE LCOATION. ERECTION. CONSTRUCTION. AND USE OF THE ABOVE DESCRIBED STRUCTURE THE PERMIT MAY BE REVOKED BY NOTICE FROM THE COUNTY AND THAT THEN AND THERE R SHALL BECOME NULL AND VOID. THE ISSUANCE OF A PERMT BASED UPON PLANS. SPECIFICATIONS AND OTHER DATA SHALL NOT PREVENT THE BUILDING OFFICIAL FROM THEREAFTER REQUIRING THE CORRECTION OF ERRORS IN SAID PIANS, SPECIFICATIONS AND OTHER DATA OR FROM PREVENTING BUILDING OPERATION BEING CARRIED ON THEREUNDER WHEN IN VIOLATION OF THS CODE OR ANY OTHER ORDINANCE OR REGULATION OF THIS JURISDICTION. THE REVIEW OF SUBMITTED PIANS AND SPECIFICATIONS AND INSPECTIONS CONDUCTED THEREAFTER DOES NOT CONSIITUIE AN ACCEP'T'ANCE OF ANY RESPONSIBILITIES OR LIABLMES BY GARFIELD COUNTY FOR ERRORS. OMISSIONS OR DISCREPENCIES. THE RESPONSI BITTY FOR THESE ITEMS AND IMPLEMENTATION DURING CONSTRUCTION RESTS SPECIFICIALLY WTHi THE ARUCTECT, DESIGNER. BUILDER, AND OWNER. COMMENTS ARE INTENDED TO BE CONSERVATIVE AND IN SUPPORT OF THE OWNERS LNTEREST. Garfom.003 (� . I EREBY pN ACKNOWLEDGE THAT I HAVE READ AND UNDERSTAND THE AGREEMENT ABOVE ornA ,I' '�t , ` /7 i fes') J(R_'.c/� Job Address: Doe Pow er.1ne fwaa 1 '&46 Co $It' 5-v 1 Lot No: a Block No: Subd. / Exemption: 010�r 1 ne OI.tbd; v, S l ON t er (� ' o fl. JCott + R u-nrnQ LID Ad ss (�1p VD Do X194 Ph.(pop J5 -5J`J� 3 Con��va.tor:' I Qc NO . D Address: qseR S. llo3 Ph: /_05- Vo20g (w p 1I • 8F • . 4 Archltect/Engineer: J4 Johnson ress: r"rT /� //34,43 RA:o Ph: ' - lGv "-0580 � ^ 5 Sq. of Building:I ^ booSq o� Ft Lot.�� Height: a 3 I No. of Floors: 6 Use of Building ,.e,; ...Ansi. 7 Describe Work: -' .iiR.,, 8 Class of Work: New 4 ❑ Alteration u Remove ❑ Addition J Move 9 10 Garage: 0 Single 0 Double Carport: ❑ Single J Double u Dveway Perm t 0 On -Site Sewage Disposal J Site Plan q ]�—'�--�^-}��1}1— 11 Valuation" of �7ork:el\ 1 / 0 6 , /O 7 AdJu, , luauon OS Z •' 12 Special Conditions: NOTICE A SEPARATE ELECTRICAL PERMIT IS REQUIRED AND MUST BE ISSUED BY THE STATE OF COLORADO.,,�-Iu� THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUCTION AUTHORIZED IS NOT COMMENCED WFTHLN 180 DAYS. OR, IF CONSTRUCTION OR WORK I5 SUSPENDED OR ABANDONED FORA PERIOD OF 180 DAYS AT ANY TIME AFTER WORK l5 COMMENCED. 1 HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE AND CORRECT ALL PROVISIONS OF LAWS GOVERNING THIS TYPE OF WORK WILL BE COMPLETED WITHIN WHETHER SPECIFIED HEREIN OR NOT THE GRANTING OF A PERMIT DOES NOT PRESUME TO GIVE AUTHORITY TO VIOLATE OR CANCEL THE PROVISIONS OF ANY OTHER STATE OR LOCAL LAW REGULATING CONSTRUCTION OR THE PERFORMANCE OF; ON57R .N. • r-� J1lUl 14L1 I �' I IDS Plan Cheic A, Febermit ,3 +jil. &- Fee: ^J /1r , 9ff Total "Fee: _ 1 ✓ 41 `3 77 Dated Permit Issued: OCC Group: 3 �^ Const. Type: ry� �,(� oning: Setbacks: Manu. Home: ISDS No. & Fee: �, ��' �j �► 2-2a„f � DATE 2_D1,, APPRQ'VAL . TE APPROVAL/DATE c AGREEMENT PERMISSION 15 HEREBY GRANTED TO THE APPLICANT AS OWNER. CONTRACTOR AND/OR THE AGENT OF THE CONTRACTOR OR OWNER TO CONSTRUCT THE STRUCTURE AS DETAILED ON PLANS AND SPECIFICATIONS SUBMITTED TO AND REVIEWED BY THE BUILDING DEPARTMENT IN CONSIDERATION OF THE ISSSUANCE OF THIS PERMIT. THE SIGNER. HEREBY AGREES TO COMPLY WITH ALL BUILDING CODES AND LAND USE REGULATIONS ADOPTED BY GARFIELD COUNTY PURSUANT TO AUTHORITY GIVEN LN 30.28.201 CRS AS AMENDED THE SIGNER FURTHER AGREES THAT IF THE ABOVE SAID ORDINANCES ARE NOT FULLY COMPILED WnH IN THE LCOATION. ERECTION. CONSTRUCTION. AND USE OF THE ABOVE DESCRIBED STRUCTURE THE PERMIT MAY BE REVOKED BY NOTICE FROM THE COUNTY AND THAT THEN AND THERE R SHALL BECOME NULL AND VOID. THE ISSUANCE OF A PERMT BASED UPON PLANS. SPECIFICATIONS AND OTHER DATA SHALL NOT PREVENT THE BUILDING OFFICIAL FROM THEREAFTER REQUIRING THE CORRECTION OF ERRORS IN SAID PIANS, SPECIFICATIONS AND OTHER DATA OR FROM PREVENTING BUILDING OPERATION BEING CARRIED ON THEREUNDER WHEN IN VIOLATION OF THS CODE OR ANY OTHER ORDINANCE OR REGULATION OF THIS JURISDICTION. THE REVIEW OF SUBMITTED PIANS AND SPECIFICATIONS AND INSPECTIONS CONDUCTED THEREAFTER DOES NOT CONSIITUIE AN ACCEP'T'ANCE OF ANY RESPONSIBILITIES OR LIABLMES BY GARFIELD COUNTY FOR ERRORS. OMISSIONS OR DISCREPENCIES. THE RESPONSI BITTY FOR THESE ITEMS AND IMPLEMENTATION DURING CONSTRUCTION RESTS SPECIFICIALLY WTHi THE ARUCTECT, DESIGNER. BUILDER, AND OWNER. COMMENTS ARE INTENDED TO BE CONSERVATIVE AND IN SUPPORT OF THE OWNERS LNTEREST. Garfom.003 (� . I EREBY pN ACKNOWLEDGE THAT I HAVE READ AND UNDERSTAND THE AGREEMENT ABOVE ornA ,I' '�t , ` /7 i fes') J(R_'.c/� The following items are required by Garfield County for a final inspection: I. A final Electrical Inspection from the Colorado State Electrical Inspector; 2. Permanent address assigned by Garfield County Building Department posted where readily visible from access road; 3. A finished roof, a lockable house, complete exterior siding, exterior doors and windows installed, a complete kitchen with cabinets, a sink with hot & cold running water, non-absorbent kitchen floor coverings, counter tops and finished walls, ready for stove and refrigerator, all necessary plumbing; 4. All bathrooms must be complete, with washbowl, tub or shower, toilet stool, hot and cold running water, non-absorbent floors and walls finished and a privacy door; 5. All steps outside or inside over three (3) steps must have handrails, guard rails on balconies or decks over 30" high constructed to all IBC and IRC requirements; 6. Outside grading done to where water will detour away from the building; 7. Exceptions to the outside steps, decks and grading may be made upon the demonstration of extenuating circumstances, i.e. weather, but a Certificate of Occupancy will not be issued until all the required items are completed and a final inspection made; 8. A final inspection sign off by the Garfield County Road & Bridge Department for driveway installation, where applicable; as well as any final sign off by the Fire District, anchor State Agencies where applicable. A CERTIFICATE OF OCCUPANCY WILL NOT BE ISSUED UNTIL ALL THE ABOVE ITEMS HAVE BEEN COMPLETED. ****CANNOT OCCUPY OR USE DWELLING UNTIL A CERTIFICATE OF OCCUPANCY (C.O.) IS ISSUED. OCCUPANCY OR USE OF DWELLING WITHOUT A C.O. WILL BE CONSIDERED AN ILLEGAL OCCUPANCY AND MAY BE GROUNDS FOR VACATING PREMISES UNTIL ABOVE CONDITIONS ARE MET. I understand and agree to abide by the above conditions for occupancyyy--a,se and the issuance of a Certificate of Occupancy for the dwelling under building permit # "1 R 1 t sgiinn Signature BpcontOct2004 /02.705 Date PLAN REVIEW CHECKLIST Applicant �cc [` kuti, Date 2-2-' Ofo ding Engineered Foundation fietfDriveway Permit Surveyed Site Plan ; Permit and Setbacks 47.1- ----Cade/Topography 30% 4d4 Attach Residential Plan Review List '1Glinimum Application Questionnaire division Plat Notes Department Reviewbt{�.(,LA ✓�uation Determination/Fees� ed Line Plans/Stamps/Sticker Attach Conditions ACpplication Signed ✓Plan Reviewer To Sign Application 4Parcel/Schedule No. tw' 40# Snowload Letter- Manf. Hms. diff Soils Report GENERAL NOTES: 121°c° K 42(e = 2v, In 9 Planning/Zoning Property Line Se acks 30ft Stream S backs Flood Plai Buildin. eight Zonin Sign -off Road pact Fees HO RC Approval Gr de/Topography 40% arming Issues ubdivision Plat Notes GARFIELD COUNTY BUILDING AND PLANNING 970-945-8212 MINIMUM APPLICATION REQUIREMENTS FOR CONSTRUCTION OF COMMERCIAL OR MULTI -FAMILY RESIDENTIAL BUILDINGS Including NEW CONSTRUCTION ADDITIONS ALTERATIONS And MOVED BUILDINGS In order to understand the scope of the work intended under a permit application and expedite the issuance of a permit it is important that complete information be provided. When reviewing a plan and it's discovered that required information has not been provided by the applicant, this will result in the delay of the permit issuance and in proceeding with building construction. The owner or contractor shall be required to provide this information before the plan review can proceed. Other plans that are in line for review may be given attention before the new information may be reviewed after it has been provided to the Building Department. Please review this document to determine if you have enough information to design your project and provide adequate information to facilitate a plan review. Also, please consider using a design professional for assistance in your design and a construction professional for construction of your project. Any project with more than ten (10) occupants requires the plans to be sealed by a Colorado Registered Design Professional. To provide for a more understandable plan and in order to determine compliance with the building, plumbing and mechanical codes, applicants are requested to review the following checklist prior to and during design. Plans to be included for a Building Permit must be on draft paper at least 18"x 24"" and drawn to scale. 1 Plans must include a floor plan, a concrete footing and foundation plan, elevations all sides with decks, balcony steps, hand rails and guard rails, windows and doors, including the finish grade and original grade line. A section showing in detail, from the bottom of the footing to the top of the roof, including re -bar, anchor bolts, pressure treated plates, floor joists, wall studs and spacing, insulation, sheeting, house -rap, (which is required), siding or any approved building material. Engineered foundations may be required. Check with the Building Department. A window schedule. A door schedule. A floor framing plan, a roofing framing plan, roof must be designed to withstand a 40 pound per square foot up to 7,000 feet in elevation, a 90 M.P.H. windspeed, wind exposure B or C, and a 36 inch frost depth. All sheets need to be identified by number and indexed. All of the above requirements must be met or your plans will be retumed. All plans submitted must be incompliance with the 2003 IBC, IPC, IMC and IFGC. Applicants are required to indicate appropriately and to submit completed checklist at time of application for a permit: 1. 15 a site plan included that identifies the location of the proposed structure, additions or other buildings, setback easements, and utility easements showing distances to the property lines from each comer of the proposed structure prepared by a licensed surveyor and has the surveyors signature and professional stamp on the drawing? Slopes of 30% or more on properties must be show on site plan. (NOTE: Section 106.2) Any site plan for the placement of any portion of a structure within 50 ft. of a property line and not within a previously surveyed building envelope on a subdivision final plat shall be prepared by a licensed surveyor and have the surveyors signature and professional stamp on the drawing. Any structure to be built within a building envelope of a lot shown on a recorded subdivision plat, shall include a copy of the building envelope as it is shown on fi .1. with the proposed structure located within the envelope. 2. Does the site plan when applicable include the location of the I.S.D.S. (Individual Sewage Disposal System) and distances to the property lines, wells (on subject property and adjacent properties), streams or water courses? This information must be certified by a licensed surveyor with their signature and professional stamp on the design. Yes WM No Not necessary for this project 3. Are the plans submitted for application review construction drawings and not drawings that are stamped or marked identifying them as "Not for construction, for permit issuance on l "A; royal drawings only", "For permit issuance only" or similar language? No Not necessary for this project 2 Is the I.S.D.S. (Individual Sewage Disposal System) designed, stamped and signed by a Colorado Registered Engineer? Yes No Not necessary for this project N/A 5. Does the site plan indicate the location and direction of the State, County or private road a esgjfe property? 6. Do the plans include a foundation plan indicating the size, location and spacing of all reinforcing steel in accordance with the uniform building code or per stamped engineered d- ius", No Not necessary for this project 7. If the building is a pre-engineered structure, is there a stamped, signed engineered found, ., plan for this building? ur ► No Not necessary for this project 8. Do the plans indicate the location and size of ventilation openings for under floor crawl spaces and the clearances required between wood and earth? Yes No Not necessary for project &Y?Crek blab 9. Do the plans indicate the size and location of the ventilation openings for the attic, roof joist spaces and soffits? Yes No Not necessary for this project NM 10. Do the plans include design loads as required under the IBC or IRC for roof snowloads, (a minimum of 40 pounds per square foot in Garfield County)? � '' No Not necessary for this project J 1» 11. D th lans include design loads as required for floor loads under the IBC or IRC? No Not necessary for this project 12. Does the plan include a building section drawing indicating foundation, wall, floor, and f construction? No Not necessary for this project 13. I e wind speed and exposure design included in the plan? 0..hi/ . No Not necessary for this project 14. Does the building section drawing include size and spacing of floor joists, wall studs, c m oasts, roof rafters or joists or trusses? No Not necessary for this project 3 15. Does the building section drawing or other detail include the method of positive ion of all columns and beams? No Not necessary for this project 16. Does the elevation plan indicate the height of the building or proposed addition from the undisturbed grade to the midpoint between the ridge and eave of a gable or shed roof or the to i of a flat roof? (Check applicable zone district for building height maximum) No Not necessary for this project 17. Does the plan include any stove or zero clearance fireplace planned for installation including make and model and Colorado Phase II certifications or Phase II EPA certification? Yes No Not necessary for this project N/FI 18. Does the plan include a masonry fireplace including a fireplace section indicating design to comply with the IBC or IRC? Yes No Not necessary for this project N45 19. Does the plan include a window schedule or other verification that egress/rescue windows from sleeping rooms and/or basements comply with the requirements of the IBC or IRC? Yes No Not necessary for this project N' 9 20. Does the plan include a window schedule or other verification that windows provide 11 t and ventilation for all habitable rooms? No Not necessary for this project 21. Do the plans indicate the location of glazing subject to human impact such as glass doors, glazing immediately adjacent to such doors; glazing adjacent to any surface normally used as a walking surface; sliding glass doors; fixed glass panels; shower doors and tub enclosures and specify safety glazing for these areas? Yes No Not necessary for this project AIIA 22. Do the plans include a complete design for all mechanical systems planned for installation intmill .•? CDL%;,' 111 No Not necessary for this project 23. Have all areas in the building been accurately identified for the intended use? (Occupancy as ide t, in - . in the IBC Chapter 3) 4:12)4? No Not necessary for this project 24. Does the plan indicate the quantity, form, use and storage of any hazardous materials that may be in use in this building? Yes No Not necessary for this project N/fi ti/o h42arclOus ,na.er/als 4 ' 25. Is the location of all natural and liquid petroleum gas furnaces, boilers and water heaters indicated on the plan? es Yom" ` No Not necessary for this project 26. Do the plans indicate the location and dimension of restroom facilities and if more than four emplo ees and both sexes are employed, facilities for both sexes? No Not necessary for this project 27. Do the plans indicate that restrooms and access to the building are handicapped accessible? Yes No Not necessary for this project `'j/M 28. Have two (2) complete sets of construction drawings been submitted with the lication? No 29. Have you designed or had this plan designed while considering building and other construction code requirements? No Not necessary for this project 30. Does the plan accurately indicate what you intend to construct and what will receive a final ins section by the Garfield County Building Department? ifP No 31. Do your plans comply with all zoning rules and regulations in the County related to your zone district? For corner lots see supplemental section 5.05.03 in the Garfield County Zoni Resolution for setbacks. No 32. Do you understand that approval for design and/or construction changes are required rior to the implementation of these changes? No 33. Do you understand that the Building Department will collect a "Plan Review" fee from you at the time of application and that you will be required to pay the "Permit" fee as well as any "Septic System" or "Road Impact" fees required, at the time you pick up your building p it? •,! "ter No 34. Are you aware that you are required to call for all inspections required under the IBC including approval on a final inspection prior to receiving a Certificate of Occupancy and occ ancy of the building? es No 5 35: Are you aware that the Permit Application must be signed by the Owner or a written authority be given for an Agent and that the party responsible for the project must comply with the .'form Codes? No 36. Are you aware that you must call in for an inspection by 3:30 the business day before the requested inspection in order to receive it the following business day? Inspections will be made between 7:30 a.m. and 3:30 p.m. Monday through Friday. Inspections are to be called in to 384-5003. 37. Are you aware that requesting inspections on work that is not ready or not accessible will re t 'n a $50.00 re -inspection fee? No 38. Are you aware that prior to issuance of a building permit you are required to show proof of a driveway access permit or obtain a statement from the Garfield County Road & Bridge Department stating one is not necessary? You can contact the Road & Bridge at625-8601. Atread y done by ilcz ke / i// No 39. Do you understand that you will be required to hire a State of Colorado Licensed Electrician and Plumber to perform installations and hoolcups? The license number will be equir-' at time of inspection. C,,:4i!/. No 40. Are you aware, that on the front of the building permit application you will need to fill in the Parcel/ Schedule Number for the lot you are applying for this permit on prior to submitt.1 of the building permit application? Your attention in this is appreciated. No 41. Do you know that the local fir dis . ' t may require you to submit plans for their review of fire safety issues? ,/�'';j No (Please check with the building department about quirement) 6 42. Do you understand that if you are planning on doing any excavating or grading to the property prior to issuance of a building permit that you will be required to obtain a gradin; •e1,:•t? Yeses, t4 I hereby acknowledge that I have read, understand, and answered these questions to the best of my ability. Signature � Phone:97D-S?55-S556(dayss); ' iD-4'a?S -SS-Ste (evenings) Project Name: --31.)..)n I I les w11C Project Address: Note: Date If you answered "No" on any of these questions you may be required to provide this information at the request of the Building Official prior to beginning the plan review process. Delays in issuing the permit are to be expected. Work may not proceed without the issuance of the permit. *If you have answered "Not necessary for this project" on any of the questions and it is determined by the Building Official that the information is necessary to review the application and plans to determine minimum compliance with the adopted codes, please expect the following: A. The application may be placed behind more recent applications for building permits in the review process and not reviewed until required information has been provided and the application rotates again to first position for review. B. Delay in issuance of the permit. C. Delay in proceeding with construction. *If you answered "No" to this question the circumstances described in the question could result in a "Stop Work Order" being issued or a "Certificate of Occupancy" not being issued. Bpcomm Feb2005 7 Tally Ho Construction Inc. 145 County Road 225 Rifle, CO 81650 (970) 625-0208 Fax # (970) 625-8636 Preliminary Bid, To: Jeff Johnson Rifle, CO RE: 60'x 200'x 16' Sentinel Steel Building for Down Valley Septic. INrth: 1) 2-16'W x 14'H Overhead brand Thermacore door. (R-15) (installed)(w/ electric openers $685.00/ea) (hi -lift tracts included $ 190.00/ea.) 2) 4- 10'H x 10'W Overhead Brand Thermacore door.(R-15) (installedxw/ electric openers $685.00/ea) (hi -lift tracts included $ 190.00/ea.) 3) 8- 3,0!1,0 Walk doors. 4) 8- 5'x 4'Thermal fixed window. 5) 8" Base channel instead of base angle. 6) 4' High girt system. 7) Kynar paint instead of siliconozed poyiester. 8) 6" Fiberglass insulation in walls R-19 9) Simple Saver roof insulation R-30 10)8' Simple Sav�rinsulation in roof (R-30) 11)Anchor bolts included. 12)8- 6'x 5' Canopies over walk doors. $118,817.52 Sales tax $ 4,633.88 $123,451.40 Building Sq/Ft price of 510.29/ FT Concrete 1) 8"x 24' concrete footer with 4'x 4' Extended pads under columns 2) 8'x 36" concrete stem wall on top. $ 23,750.00 3) 60'x 200'x 6" concrete slab with fiber mesh over $ 40,000.00 8' compacted gravel sub -base of 34' gravel. Concrete Total $ 63,750.00 !!Concrete prices indude equipment time to excavate for footers and backfill for slab on level ground.!! Erection (1072 Hrs.) Sq.Ft price of $18.45/ Ft $ 34.155.00 Total building price erected $221,356.40 Options: 1) Rain gutters with down spouts $ 4,250.00 To Be paid as follows: 1) Down payment to order building. $ 30,000.00 2) Due when foundation is complete. $ 23,750.00 3) Due when concrete slab is poured. $ 40,000.00 e 4) Cashiers check 2 days prior to building delivery. $ 93,451.40 5) Due when red iron is complete. $ 12,000.00 6) Due when walls are sided. $ 12,000.00 7) Due when erection is complete. $ 10,155.00 Total: $221,356.40 0.7 I Parrington ir ally Ho Co . `I- ft -0..3 date Down Valley Septic ;Z/date RECE1VI, JUN 2 2 2006 BUILDING &'rLA' 6-20-06 WEST SLOPE TESTING & INSPECTION 3177 Glendam Dr Grand Junction, CO 81504 Phone: 970-434-6988 Cell: 970-260-2844 Page 1 of 1 Andrew Schwaller Garfield County Building Official 108 8th St., Suite 401 Glenwood Springs, CO 81601 Please find enclosed copy of special inspection report for Down Valley Septic metal building. Thank You; Doug Young West Slope Testing & Inspection 3177 Glendam Dr. Grand Junction, CO 81504 Phone: 970-434-6988 Cell: 970-260-2844 Final Inspection Report Report #1 Page 1 of 1 Date: 6-6-06 Project: Down Valley Septic Address: 0005 Powerline Rd. Rifle, CO Building Permit No: 9810 General Contractor: Tally Ho Construction Inc. Contractor that Performed Work: Tally Ho Construction Inc. Inspection of shop fabrication or field work at job site: Field Report: Tested three sample bolts in a Skidmore -Wilhelm bolt tension testing device to determine the testing torque required for the 3/4" diameter A325 bolts used in the main frame connections. Using the testing torque determined above (325 ft pounds) the A325 bolts at the main frame connections were tested for proper tightness per the AISC arbitration procedure. I also verified that the correct size & grade of bolts had been installed at these connections as shown on the building manufactures drawings. The bolting inspected/tested above appeared to be in compliance with the building manufactures drawings, 2003 IBC, and the AISC Specification for Structural Joints Using ASTM A325 or A490 Bolts. Inspector/Technician: Douglas E Young ci4t ff . 4 COUNTY OF GARFIELD - BUILDING DEPARTMENT CORRECTION NOTICE 108 8th St., Suite 201 Glenwood Springs, Colorado Phone (970) 945-8212 Job located at ,zo r I 1 ¥e Permit No. "I C I I have this day inspected this structure and these premises and found the following corrections needed: rob PAS neer o b� boner -5 -p6s-i ti-dd re s& s You are hereby notified that the above correction must be inspected before covering. When correction(s) have been made, call for inspection at 970-384-5003. Date — Building Inspector Phone (970) 9454212 No I751c) Job ress Owner Contractor Assessor's Parcel Noa/77-// 3-O/-t0a) Date r7-7-0Ca BUILDING PERMIT C RD SS t� ro Rear Soils Test Footing 77/ Foundation a '(K-O(c Grout Underground Pluming Rough Plumbing �Q ?A-06 Framing 4p • 1.q- 06 Insulation b .29-042 Roofing j/ Drywall $/!L i(ditri _ Gas Piping 69- 7yC� Address Address • __ aQ.J U hey I- Pa Rte.,. ll. %hone 44.05—<556 (�025 55t RH LH` Zoning Phone #62_4--_L_20‘c - ,�, , r n Q, ^ INSPECTIONS NOTES Weatherproofing Mechanical Electrical Rough (State) %',�L`D�, t)j Electr' ina (State) i 'J�`�/` 6'( Final ' hecklisj ptpleted? 15 Certificate Occup cy # ��%'c:a Date ' a% - (NU, Septic System # Date Final Other (continue on back) INSPECTION WILL NOT BE MADE UNLESS THIS CARD 1S POSTED ON THE JOB 24 HOURS NOTICE REQUIRED FOR INSPECTIONS BUILDING PERMIT GARFIELD COUNTY, COLORADO Date Issueda i- Dt4t...Zoned Area Permit No Crtilb AGREEMENT In consideration of the issuance of this permit, the applicant hereby agrees to comply with all laws and regulations related to the zoning, location; construction and erection of the proposed structure for which this permit is granted, and further agrees that if the above said regulations are not fully complied with in the zoning, location, erection and construction of the above described structure, the permit may then be revoked by notice from the County Building Inspector and IMMEDIATELY BECOMJ NULL AND VOID. Use Address or Legal Description eft tit Ownenilaan %k' % ContractorTallt_Li 0014 Setbacks Front �JJ! Side Side Rear This Card Must Be Posted So It is Plainly Visible From The Street Until Final Inspection. INSPECTION RECORD Footing —g._ 64_4_ Driveway Foundation (2-/3_ D (o Underground Plumbing 3_l„ Insulation -ZR- 06 iggn(—/ Rough Plumbing 0 .R9 -o6 1 Drywall g- t Q -o Chimney & Vent g_ _nco Electric Final (by State Inspector) y/z/io ` iy` Gas Piping (r - 94-04, ,Q,1trw, Final 5-'S JAL - Electric Rough (By State Inspector) k,..1 qoA Septic Final Framing /, _.31-obkm_ (To include Roof in place and Windows and Doors installed). Notes: ALL LISTED ITEMS MUST BE INSPECTED AND APPROVED BEFORE COVERING - WHETHER INTERIOR OR EXTERIOR, UNDERGROUND OR ABOVE GROUND. THIS PERMIT IS NOT TRANSFERABLE For Inspections Call 384-5003 108 8th Street Glenwood Springs, Colorado APPROVED DO NOT DESTROY THIS CARD Dater Itis By IF PLACED OUTSID - R WITH CLEAR PLASTIC