Loading...
HomeMy WebLinkAboutApplication-PermitGarfield County Building & Sanitation Department 108 8th Street, Suite #201 Glenwood Springs, Co. 81601 Office- 945-8212 Inspection Line- 384-5003 NO. q 2(43,, Job Address 30 �5 S R.°? j W 7(3 Nature of Work Building Permit Use of Building_ Owner r) �.Gt Contractor WIDT7 Amount of Permit $hefl � , Date 3 r3 T (c) Clerk Permit No: GARFIELD COUNTY BUILDING PERMIT APPLICATION 108 8" Street, Suite 201, Glenwood Springs, CO 81601 Phone: 970-945-8212 / Fax: 970-384-3470 / Inspection Line: 970-384-5003 Parcel/Schedule No: „wej=-ege '" ig Job Address: SW 1/4 SW 1/4 of Section 30 TSS, R95W Garfield County 2/ 31-- 273 ® /5 - I Lot No: 006 Block No: UO Subd. / Exemption: Lot 2 Owner: EnCana Oil & Gas Address 2171 CR 215, Ste 100 Parachute, CO 81535 Address: 111 East 3itl Ste 216 Rifle, CO 81650 Ph: 970-285-2600 Ph: 970-625-8433 Wk Ph: Lic. No. 3 Contractor: Wagon Wheel Consulting 4 Architect/Engin ej Engineering Inc. SamuelVi Address: 8450 Crescent Greenwood Pkwy .age. CO f � Ph: 303-714-4840 Height: 15' 9 I cc Lie. No. No. of Floors: 5 Sq. Ft. of Building: 1273 Sq. Ft,Q1 Lot: e'`+lo 'i fi Use of Building: Protect, conceal, and dampen noise from water pump and electrical equipment 7 Describe work: Install New Building 28'6" x 44'8" e Class of Work: 0 New 0 Alteration r0 Remove 0 Addition 0 Move 8 9 10 Garage: 0 Single 0 Double Carport: 0 Single 0 Double o Driveway Permit 0 On -Site Sewage Disposal 0 Site Plan 11 Valuation of Work: $ 116,899.00 Adjusted Valuations: S /1/r 15 12 Special Conditions: A SEPARATE ISSUED THIS AUTHORIZED CONSTRUCTION PERIOD I HEREBY APPLICATION PROVISIONS COMPLETED GRANTING TO VIOIATE LOCAL OF CON %"" • I'i !':1.,,.1.1 NOTICE ELECTRICAL PERMIT IS REQUIRED AND MUST 13E BY THE STATE OF COLORADO. PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUCTION IS NOT COMMENCED WITHLN 180 DAYS, OR, IF OR WORN IS SUSPENDED OR ABANDONED FOR A OF 180 DAYS AT ANY TIME AFTER WORK IS COMMENCED. CERTIFY THAT I HAVE READ AND EXAMINED THIS AND KNOW THE SAME TO BE TRUE AND CORRECT. ALL OF LAWS GOVERNING THIS TYPE OF WORK WILL BE WITHIN WHETHER SPECIFIED HEREIN OR NOT. THE OF A PERMIT DOES NOT PRESUME TO GIVE AUTHORITY OR CANCEL THE PROVISIONS OF ANY OTHER STATE OR LAW REGULATING CONSTRUCTION OR THE PERFORMANCE TRUCTION. /� / �` :/ r �., 1`�' 1 •� .2-4�-D6 PIan Check !`1 Total ee: / 7 ` Fee: Permit Fee: om"' JG�g , ?'5.' L ✓ 77 Dated Permit Issued: OCC Group: Corl t. m..pe: k1,-J,ti Zoning: Setbacks: Manu. Home: P1 ISDS No. & Fee: r E� 3 1 • n-`• DATE Ale. . 3-1 •14,, .�. . 0, BLDG DEPT. PLNG. APPROVA.. E APPRQ3AJ.JJATE DEFT. AGREEMENT PERMISSION 1S HEREBY GRANTED TO THE APPLICANT AS OWNER, CONTRACTOR AND/OR THE AGENT OF THE CONTRACTOR OR OWNER TO CONSTRUCT THE STRUCTURE AS DETAILED ON PLANS AND SPECIFICATIONS SUBMITTED TO AND REVIEWED BY THE BUILDING DEPARTMENT. IN CONSIDERATION OF THE ISSSUANCE OF THIS PERMIT, THE SIGNER. HEREBY AGREES TO COMPLY WITH ALL BUILDING CODES AND LAND UE REGULATIONS ADOPTED BY GARFIELD COUNTY PURSUANT TO AUTHORITY GIVEN LN 30.28.201 CRS AS AMENDED. THE SIGNER FURTHER AGREES THAT THE ABOVE SAID ORDINANCES ARE NOT FULLY COMPILED WITH IN THE LCOATION, ERECTION, CONSTRUCTION, AND USE OF THE ABOVE DESCRIBE STRUCTURE, THE PERMIT MAY BE REVOKED BY NOTICE FROM THE COUNTY AND THAT THEN AND THERE IT SHALL BECOME NULL AND VOID, THE ISSUANCE OF A PERMT BASED UPON PLANS, SPECIFICATIONS AND OTHER DATA SI-IALL NOT PREVENT THE BUILDING OFFICIAL FROM THEREAFTE REQUIRING THE CORRECTION OF ERRORS IN SAID PLANS, SPECIFICATIONS AND OTHER DATA OR FROM PREVENTING BUILDING OPERATION BEIN CARRIED ON THEREUNDER WHEN IN VIOLATION OF THS CODE OR ANY OTHER ORDINANCE OR REGULATION OF THIS JURISDICTION. THE REVIEW OF SUBMITTED PLANS AND SPECIFICATIONS AND INSPECTIONS CONDUCTED THEREAFTER DOES NOT CONSTITUTE AN ACCEPTANCE OF AA RESPONSIBILITIES OR LIABLITIES BY GARFIELD COUNTY FOR ERRORS, OMISSIONS OR DISCREPENCIES. THE RESPONSIBILITY FOR THESE ITEMS AN IMPLEMENTATION DURING CONSTRUCTION RESTS SPECIFICIALLY WITH THE ARTICTECT, DESIGNER, BUILDER, AND OWNER. COMMENTS ARE INTENDS TO BE CONSERVATIVE AND IN SUPPORT OF THE OWNERS LNTEREST. Garfom.003 I HEREBY ACKNOWLEDGE THAT I HAVE READ AND UNDERSTAND THE AGREEMENT ABOVE (INITIAL): Z. --/S_ ‘246- The following items are required by Garfield County for a final inspection: . A final Electrical Inspection from the Colorado State Electrical Inspector; 2. Permanent address assigned by Garfield County Building Department posted where readily visible from access road; 3. A finished roof, a lockable house, complete exterior siding, exterior doors and windows installed, a complete kitchen with cabinets, a sink with hot & cold running water, non-absorbent kitchen floor coverings, counter tops and finished walls, ready for stove and refrigerator, all necessary plumbing; 4. All bathrooms must be complete, with washbowl, tub or shower, toilet stool, hot and cold running water, non-absorbent floors and walls finished and a privacy door; 5. All steps outside or inside over three (3) steps must have handrails, guard rails on balconies or decks over 30" high constructed to all IBC and IRC requirements; 6. Outside grading done to where water will detour away from the building; 7. Exceptions to the outside steps, decks and grading may be made upon the demonstration of extenuating circumstances, i.e. weather, but a Certificate of Occupancy will not be issued until all the required items are completed and a final inspection made; 8. A final inspection sign off by the Garfield County Road & Bridge Department for driveway installation, where applicable; as well as any final sign off by the Fire District, anchor State Agencies where applicable. A CERTIFICATE OF OCCUPANCY WILL NOT BE ISSUED UNTIL ALL THE ABOVE ITEMS FIAVE BEEN COMPLETED. ****CANNOT OCCUPY OR USE DWELLING UNTIL A CERTIFICATE OF OCCUPANCY (C.O.) IS ISSUED. OCCUPANCY OR USE OF DWELLING WITHOUT A C.O. WILL BE CONSIDERED AN ILLEGAL OCCUPANCY AND MAY BE GROUNDS FOR VACATING PREMISES UNTIL ABOVE CONDITIONS ARE MET. I understand and agree to abide by the above conditions for occupancy use and the issuance of a Certificate of Occupancy for the dwelling under building permit # Signate BpcontOct2004 Date GARFIELD COUNTY BUILDING AND PLANNING 970-945-8212 MMEMUM APPLICATION REQUIREMENTS FOR CONSTRUCTION OF COMMERCIAL OR MULTI -FAMILY RESIDENTIAL BUILDINGS Including NEW CONSTRUCTION ADDITIONS AL'T'ERATIONS And MOVED BUILDINGS In order to understand the scope of the work intended undera permit application and expedite the issuance of a permit it is important that complete information be provided. When reviewing a plan and it's discovered that required information has not been provided by the applicant, this will result in the delay of the permit issuance and in proceeding with building construction. The owner or contractor shall be required to provide this information before the plan review can proceed. Other plans that are in line for review may be given attention before the new information may be reviewed after it has been provided to the Building Department. Please review this document to determine if you have enough information to design your project and provide adequate information to facilitate a plan review. Also, please consider using a design professional for assistance in your design and a construction professional for construction of your project. Any project with more than ten (10) occupants requires the plans to be sealed by a Colorado Registered Design Professional. To provide for a more understandable plan and in order to determine compliance with the building, plumbing and mechanical codes, applicants are requested to review the following checklist prior to and during design. Plans to be included for a Building Permit must be on draft paper at least 18"x 24"" and drawn to scale. 1 Plans must include a floor plan, a concrete footing and foundation plan, elevations all sides with decks, balcony steps, hand rails and guard rails, windows and doors, including the finish grade and original grade line. A section showing in detail, from the bottom of the footing to the top of the roof, including re -bar, anchor bolts, pressure treated plates, floor joists, wall studs and spacing, insulation, sheeting, house -rap, (which is required), siding or any approved building material. Engineered foundations may be required. Check with the Building Department. A window schedule. A door schedule. A floor framing plan, a roofing framing plan, roof must be designed to withstand a 40 pound per sgnnre foot up to 7,000 feet in elevation, a 90 M.P.H. windspeed, wind exposure B or C, and a 36 inch frost depth. All sheets need to be identified by number and indexed. All of the above requirements must be met or your plans will be returned. All plans submitted must be incompliance with the 2003 IBC, IPC, IMC and IFGC. Applicants are required to indicate appropriately and to submit completed checklist at time of application for a permit: l . Is a site plan included that identifies the location of the proposed structure, additions or other buildings, setback easements, and utility easements showing distances to the property lines from each corner of the proposed structure prepared by a licensed surveyor and has the surveyors signature and professional stamp on the drawing? Slopes of 30% or more on properties must be show on site plan. (NOTE: Section 106.2) Any site plan for the placement of any portion of a structure within 50 ft. of a property line and not within a previously surveyed building envelope on a subdivision final plat shall be prepared by a licensed surveyor and have the surveyors signature and professional stamp on the drawing. Any structure to be built within a building envelope of a lot shown on a recorded subdivision plat, shall include a copy of the building envelope as it is shown on the final plat with the proposed structure located within the envelope. Yes 2. Does the site plan when applicable include the location of the I.S.D.S. (Individual Sewage Disposal System) and distances to the property lines, wells (on subject property and adjacent properties), streams or water courses? This information must be certified by a licensed surveyor with their signature and professional stamp on the design. Yes No Not necessary for this project 3. Are the plans submitted for application review construction drawings and not drawings that are stamped or marked identifying them as "Not for construction, for permit issuance only", "Approval drawings only", "For permit issuance only" or similar language? Yes No ) Not necessary for this project 2 4. Is the I.S.D.S. (Individual Sewage Disposal System) designed, stamped and signed by a Colorado Registered Engineer? Yes No Not necessary for this project 5. Does the site plan indicate the location and direction of the State, County or private road accessing the property? Yes )C 6. Do the plans include a foundation plan indicating the size, location and spacing of all reinforcing steel in accordance with the uniform building code or per stamped engineered design? Yes No Not necessary for this project 7. If the building is a pre-engineered structure, is there a stamped, signed engineered foundation plan for this building? Yes % No Not necessary for this project 8. Do the plans indicate the location and size of ventilation openings for under floor crawl spaces and the clearances required between wood and earth? Yes X No Not necessary for project 9. Do the plans indicate the size and location of the ventilation openings for the attic, roof joist s aces and soffits? Yes X No Not necessary for this project 10. Do the plans include design loads as required under the IBC or IRC for roof snowloads, (a minimum of 40 pounds per square foot in Garfield County)? Yes No Not necessary for this project 11. Do the lans include design loads as required for floor loads under the IBC or IRC? Yes No Not necessary for this project 12. Does the plan include a building section drawing indicating foundation, wall, floor, and roof construction? Yes No Not necessary for this project 13. Is the wind speed and exposure design included in the plan? Yes_ No Not necessary for this project 14. Does the building section drawing include size and spacing of floor joists, wall studs, ceiling joists, roof rafters or joists or trusses? Yes No Not necessary for this project X 3 15. Does the building section drawing or other detail include the method of positive connection of all columns and beams? Yes X No Not necessary for this project 16. Does the elevation plan indicate the height of the building or proposed addition from the undisturbed grade to the midpoint between the ridge and eave of a gable or shed roof or the to of a flat roof? (Check applicable zone district for building height maximum) Yes No Not necessary for this project 17. Does the plan include any stove or zero clearance fireplace planned for installation including make and model and Colorado Phase II certifications or Phase II EPA certification? Yes No Not necessary for this project X 18. Does the plan include a masonry fireplace including a fireplace section indicating design to comply with the 1BC or IRC? Yes No Not necessary for this project X 19. Does the plan include a window schedule or other verification that egress/rescue windows from sleeping rooms and/or basements comply with the requirements of the IBC or IRC? Yes No Not necessary for this project 20. Does the planincludea window schedule or other verification that windows provide natural light and ventilation for all habitable rooms? Yes No Not necessary for this project X 21. Do the plans indicate the location of glazing subject to human impact such as glass doors, glazing immediately adjacent to such doors; glazing adjacent to any surface normally used as a walking surface; sliding glass doors; fixed glass panels; shower doors and tub enclosures and specify safety glazing for these areas? Yes No Not necessary for this project X 22. Do the plans include a complete design for all mechanical systems planned for installation in this building? Yes X No Not necessary for this project 23. Have all areas in the building been accurately identified for the intended use? (Occupancy as identified in the IBC Chapter 3) Yes No Not necessary for this project 7( 24. Does the plan indicate the quantity, form, use and storage of any hazardous materials that may be in use in this building? Yes No Not necessary for this project X 4 25. Is the location of all natural and liquid petroleum gas furnaces, boilers and water heaters indicated on the plan? Yes No Not necessary for this project X 26. Do the plans indicate the location and dimension of restroom facilities and if more than four employees and both sexes are employed, facilities for both sexes? Yes No Not necessary for this project 27. Do the plans indicate that restrooms and access to the building are handicapped accessible? Yes No Not necessary for this project X 28. Have two (2) complete sets of construction drawings been submitted with the application? Yes X No 29. Have you designed or had this plan designed while considering building and other construction code requirements? Yes X No Not necessary for this project 30. Does the plan accurately indicate what you intend to construct and what will receive a final inspection by the Garfield County Building Department? Yes .k No 31. Do your plans comply with all zoning rules and regulations in the County related to your zone district? For corner lots see supplemental section 5.05.03 in the Garfield County Zoning Resolution for setbacks. Yes_ No 32. Do you understand that approval for design and/or construction changes are required prior to the implementation of these changes? Yes X('` No 33. Do you understand that the Building Department will collect a "Plan Review" fee from you at the time of application and that you will be required to pay the "Permit" fee as well as any "Septic System" or "Road Impact" fees required, at the time you pick up your building permit? Yes A No 34. Are you aware that you are required to call for all inspections required under the IBC including approval on a final inspection prior to receiving a Certificate of Occupancy and occupancy of the building? 5 Yes X No 35. Are you aware that the Permit Application must be signed by the Owner or a written authority be given for an Agent and that the party responsible for the project must comply with the Uniform Codes? Yes X No 36. Are you aware that you must call in for an inspection by 3:30 the business day before the requested inspection in order to receive it the following business day? Inspections will be made between 7:30 a.m. and 3:30 p.m. Monday through Friday. Inspections are to be called in to 384-5003, 37. Are you aware that requesting inspections on work that is not ready or not accessible will result in a $50.00 re -inspection fee? Yes X . No 38. Are you aware that prior to issuance of a building permit you are required to show proof of a driveway access permit or obtain a statement from the Garfield County Road & Bridge Department stating one is not necessary? You can contact the Road & Bridge Department at 625-8601. Yes X No 39. Do you understand that you will be required to hire a State of Colorado Licensed Electrician and Plumber to perform installations and hookups? The license number will be required at time of inspection. Yes x No 40. Are you aware, that on the front of the building permit application you will need to fill in the Parcel/ Schedule Number for the lot you are applying for this permit on prior to submittal of the building permit application? Your attention in this is appreciated. Yes X No 41. Do you know that the local fire district may require you to submit plans for their review x of fire safety issues? Yes No (Please check with the building department about this requirement) 6 42. Do you understand that if you are planning on doing any excavating or grading to the property prior to issuance of a building permit that you will be required to obtain a grading permit? Yes a I hereby acknowledge that I have read, understand, and answered these questions to the best of my ability. Date Phone:?2 - 6,25- (days); (evenings) Project Name:4 0e rth as„,kare4 WSe14 par,D /rause Project Address: 6 U.24i $w> Sec 5c '7 6 S', a 95k) Note: If you answered "No" on any of these questions you may be required to provide this information at the request of the Building Official prior to beginning the plan review process. Delays in issuing the permit are to be expected. Work may not proceed without the issuance of the permit. *If you have answered "Not necessary for this project" on any of the questions and it is determined by the Building Official that the information is necessary to review the application and plans to determine minimum compliance with the adopted codes, please expect the following: A. The application may be placed behind more recent applications for building permits in the review process and not reviewed until required information has been provided and the application rotates again to first position for review. B. Delay in issuance of the permit. C. Delay in proceeding with construction. *If you answered "No" to this question the circumstances described in the question could result in a "Stop Work Order" being issued or a "Certificate of Occupancy" not being issued. Bpcomm Feb2005 7 Applican PLAN REVIEW CHECKLIST tergic ilding Engineered Foundation it, if Driveway Permit Sxi bite Plan /Septic Pe 't and Setbacks rade/Topography 30%0 Attac Residential Plan Review List ' Minimum Application Questionnaire Subdivision Plat Notes la. Fire Department Review aluation Determination/Fees ed Line Plans/Stamps/Sticker ttach Co itions pplication Signed man Reviewer To Sign Application arcel/Schedule No. gift 40# Snowload Letter- Manf. Hms. Soils Report GENERAL NOTES: Date Planning/lo ing Property ine Setbacks 30ft S earn Setbacks Flo.d Plain B - ilding Height oning Sign -off Road Impact Fees HOA/DRC Approval Grade/Topography 40% Planning Issues Subdivision Plat Notes No. Job Add Owner //��� Contractor GC Setbacks: Assessor's Parcel No C213 S- 3 -o Date3/e22- cl/Q BUILDING PERMIT CARD oils Test Footing - 1 "O -• Foundation Grout Underground Plumbing Rough Plumbing Framing Insulation Roofing Drywall Gas Piping Front taca4 /� Com- fOO C f c Addres Phone #),,S Address /)1(.. 3 570 0r T`hone # 6 Y13 Rear RH LH Zoning f°G4,7 417)A4,_ INSPECTIONS NOTES Weatherproofing Mechanical Electrical Rough (State) Electrical Final (State) Final 2_-4-10 /Checklist Completed? Alf) Certificate Occupancy # ��2- : ti Date 0 Septic System # Date Final Other (continue on back) INSPECTION WILL NOT BE MADE UNLESS THIS CAD IS POSTE PJ ON THE JOB 24 HOURS NOTICE REQUI'," ED FOR INSPECTIONS BUILDING PERMIT GARFIELD COUNTY, COLORADO Date Issued. !.q ° a .Zoned Area Permit No 1. fit .*. AGREEMENT In consideration of the issuance of this permit, the applicant hereby agrees to comply with all laws and regulations related to the zoning, location; construction and erection of the proposed structure for which this permit is granted, and further agrees that if the above said regulations are not fully complied with in the zoning, location, erection and construction of the above described structure, the permit may then be revoked by notice from the County Building Inspector and IMMEDIATELY BECOME NULL AND VOID. Use Address or egal Description Owner Setbacks Front Side icodic Contractor k40 s 4L4 f Si�slQ Rear This Card Must Be Posted So It is Plainly Visible From The Street Until Final InspePtion. INSPECTION RECORD Footing --/S -W— 004 Foundation _/! Da Underground Plumbing Rough Plumbing Chimney & Vent Gas Piping Electric Ronsgb (By State Iaaspector) Framing (To include Roof in place and Windows and Doors installed). Driveway Insulation Drywall Electric Final (by State Impeder) Septic Final Notes: ALL LISTED ITEMS MUST BE INSPECTED AND APPROVED BEFORE COVERING - WHETHER INTERIOR OR EXTERIOR, UNDERGROUND OR ABOVE GROUND. THIS PERMIT IS NOT TRANSFERABLE For Inspections Call 384-5003 108 8th Street Glenwood Springs, Colorado 0 r T IESTR YTHIS C• • APPROVED Date '4 By IF PLACED OUTSIDE - COVER WITH CLEAR PLASTIC COUNTY OF GARFIELD m BUILDING DEPARTMENT C FiRECTIO N •TCE 108 8th St., Suite 201 Glenwood Springs, Colorado Phone (970) 9458212 Job located at /6' 6S—a 6e Permit No. I have this day inspected this structure and these premises and found the following corrections needed: -71:-r7a1 You are hereby notified that the above correction must be inspected before covering. When correction(s) have been made, call for inspection at 970-384-5003. Date 20 Building Inspector ki91/1-€4tiee- Phone (970) 945-8212 COLORADO STATE ELECTRICAL BOARD 1580 Logan Street, Suite 550 Denver, CO 80203-1941 cijaa Inspection Report Date Inspected: 06/26/2008 PERMIT #: 637969 Permit BRAD HASLEM, INC. Holder: P 0 BOX 1848 VERNAL 84078 Phone: (435) 789-5252 Fax: (435) 789-7782 Email: branden@bhi-ut.com Site Middle Fork Water Pump Building Parachute, Garfield County, Owner: Encana Oil and gas Phone: Status: Accepted Inspection type: Final NEW COMMERCIAL COMMERCIAL NEW Partial Inspection:N Trim Permit:N Inspector: Cyrus Tuchscher 970-625-5085 Corrections: all reports on file in Rifle office of inspector Comments: 11/16/2009 Page 1 COLORADO STATE ELECTRICAL BOARD 1580 Logan Street, Suite 550 Denver, CO 80203-1941 Inspection Report Date Inspected: 03/1812008 PERMIT #: 637969 Permit BRAD HASLEM, INC. Holder: P 0 BOX 1848 VERNAL 84078 Phone: (435) 789-5252 Fax: (435) 789-7782 ErnaL. branden@bhi-ut.com Site Middle Fork Water Pump Building Parachute, Garfield County, Owner: Encana Oil and gas Phone: Status : Accepted Inspection type: Final Partial Inspection:Y NEW COMMERCIAL Trim Permit:N COMMERCIAL NEW Inspector: Cyrus Tuchscher 970-625-5085 Corrections: 1) Corrections all addressed and repairs made 2) Electrical Final OK pending receipt of verification of ESD, or Documented Safe Switching Procedures Comments: ************* This is only a partial final inspection. Will close permit upon completion of item 2 above *********************************************************************************************k********************k ************* • 4/2/2008 Page