Loading...
HomeMy WebLinkAboutBattlement Mesa Architectual Committee Application08,494/2003 21:35 9762438407 Pct. -es% : aoiDf 00/2/ a S { PAGE 02 <y� Oa /if) •hal te BATTLEMENT MESA SERVICE ASSOCIATION ARCHITECTURAL COMMITTEE APPLICATION SUBMITTAL FORM (For New Rome Construction) INSTRUCTIONS: This Application & Checklist is to be used for all project submittals to the Battlement Mesa Service Associati Architectural Committee (BMSAIAC). This form is intended to assist in ensuring that the application submit - is complete. This will help provide.a quicker, more thorough review process. It is recommended that each Applicant thoroughly review the regt,ents of the current Axclutectuw Stap4ards, theemdcd and Restated Declaration of Covenantsjinciudiva R soli hors) and the mord Final Plat for their respective neighborhood prior to preparing a submittal. Applicants preparing a submittal should compare the information they are about to submit with the requiremei of this form and "check off' each required item on the form. If any item is not checked, the Application submit is not complete and should not be submitted. Incomplete Applications will not be processed and will be return to the Appiicaut. In addition to the checklist, Applicants should fill in all of the places on the Application Form where i forrnail is requested. The Architectural Committee will use this infoz ionevaluating your Application. Iflufonnati is requested but is not applicable to your specific project submittal, write "N/A" in the space provided. If sol required information is yet to be determined (such as exterior paint colors you may not have yet selected) wr "TBD" bathe appropriated space provided. You will then be required to make a follow-up submittal with the selections at a later date but before installation in the home. DO NOT fill in any information in the "Conditions for Approval" section of this form: This portion of the for is for Architectural Committee use only. When an Application is complete, please road or deliver it to the following address: Battlement Mesa Service Association Architectural Committee Application 73-0 Sippreile Drive P.O. Box 6006 Battlement Mesa, Colorado 81636 The Ar. chitectaraI Committee meets twicemont ly on the i!t and 3rd Wednesday, and Applications are du one week prior to the Scheduled Meeting Dates for prior review by Committee members. Please coma Jane Chapman at (970) 285-9740 to confirm the next scheduled meeting date or to request further itifvrmatioo We thank you illi advance for your cooperation and in complying with the A I 5,,tm6,,,th of th Battlement Mesa Service Association Page 1 of 6 • 08/04/2003 21:36 9702439407 DANCE BATTLEMENT MESA SERVICE ASSOCIATION ARLUA I ECTUR-AL COMMITTEE APPLICATION & CRECIMIST (for New 1Torne Construction projects) � r Homeowner: r . i ° 4 HomeMai1ingA : 1 cl.p. 4 i 11 J 0A-, Home Phone: 1 ' orkPhone (ifdesired): 3 - ��s _6.5 00/0/ oof -/ cie/5< /�• Project Address- /i 3&St'Cfl Lot4 e,. 7` rlock Subdivision: Productionflonoe PlanName (ifapplicable) ' 1/r ;rtic) ; / u y p, 1/ PAGE 03 Submittal Date: Estimated Start Date: meted CompietionDate: SUBMITTAL REQUIREMENTS: Two Copies each of items I, 2 & 4 need to be submitted. (Check -off items attached to the Application. FM in spaces as indicated.) 1.- Site Pmt Drawing (1" 10' or 1" = 20' scale) with the following information shown: Lot, Block & Subdivision name. Street Address of Project. !� Building Setback Lines (also fill-in the sb.ortest distance between property line to fib exterior wall closest to that property line)_ Please be aware that an Building Setbac Lines are taken from your Property Lime Pinsl! Your Property Line is NOT tb Curb Lbel! Front Setback: Left Side Setback: Right Side Setback: Rear Setback: Dwaine Quit. (iarrag Utility Easements. 55' Clear Site -Line at Intersection Corner Lots: Site Grading Elevations & Drainage. r r'y First (main) Floor Height in relation to top of street curb at font --center of lot. Driveways (including width of driveway), Walkways, Patios, etc. Outbuildings. Page 2 of 6 08/04/2003 21:36 9702438407 SuNDANCE PAGE 04 t..77--2. Architectural Drawings (114" –1' or 118" 1' scale) with, the following information shown Floor Plan(s) with, overall dimensions (fill-in the following square foot areas). First Floor Finished Living Area: Second Floor Finished Living Area: Lower Floor Finished Living Area: Total Finished Living Area; Total Unfinished Living Area: Garage Area: 3343square feet 5 / square fleet Square feet V37 -1—g--0 a square feet • square feet 23 square feet Building Elevations Plans indicating doors, windows, exterior mater, building Neigh roof pitch, roof -mounted evaporative coolers, etc. (11 -in maximum height below). 11fa imum balding height to highest ridge line or building structural projectia feet above top of street curb at front -center of you- lot. Engineered (stamped) Foundation Plan. � �Otrtbuildinpls indicating dunensions, elevations and overall height to ridge fine. �3. Exterior Materials (fill-in the selections below): RoO Material: 3OreAr a+ri IC Color• w�af�^� (,4J Color: Do.e LL�� i� Color:. _T _ r. TrimMate l: 4"0-tutei I rel v. Tra.tt Color: (Ark 11�Iason}yMater l: I11�/er 1(ptk Color: itie W tr4 I 1U • Stucco Materials: 0,1A Color: k ) - - c,----- Front DoorMatexial: Efeci Color: liAl ill GarageDoorMatetial: Stec Accent S3diogMate ial: 41,4,; ffit7Preaw. COLOR SAMPLE COLOR SAMPLE . COLOR SAMPLE COLOR SAMPLE Page 3 of 6 Color: 1,4;41. COLOR SAMPLE COLOR SAMPLE 08/04/2003 21:38 9702438407 SUNDANCE PAGE 05 Z--- 4. Landscape/Irrigation Plans with the following information: Planting Plan (indicate areas of irrigated lawn, tree placement, shrub beds, ground oovf etc.). . Plant Material listing by species of trees, shrubs and grasses. //----- . Groundcover Material with weed control barrier. t.-.'-..------- FeDCOS. . 1.,-•-•'.------. Other Landscape Improvements (decks, site Jigkihg, flag poles, etc.). L,-.'-.---- 5. Variance Request (if applicable) Give de/449 below: .1i1.1•1=1•••••••• 6. Residential Construction. Monetary Deposit: r I/We hereby acknowledge and understand that our failure to complete Home COILItrUCti011y Improvetnen Projects or Landscaping Construction within the time constraints noted in Conditions 2. & 3. On Par 6 of this Application will result in a Notice and Opportunity for a Hearing before the MASA Board Directors. If I/We are found in violation of these Conditions at the Rearing it will result in a line to thi Owner of not less than S500.00 per month for each full month in excess of the allotted completion tinti frame. I/We hereby acknowledge that Rome Construction or Improvement Projects orLandscape Constructier features whieh are built in non-conformance with this full application, Including the Conditions oJ Approval noted on Page 6 of 6 herein, IfiVe will be cited by the BNISMAC in written citation form at tilt thne of discovery. In extenuating circumstances a Variance may .be requested from the EMSA/AC, provided such Variance request item is within the purview and approval Jurisdiction of the 'MBA/AC. If a• Variance is not granted by the BlitIBA/AC and if the Non-ConformingItems. are not •corrected -within 60 days after the date of written citationyI/We will be served Notice ofa Rearing before the BMA Board of Directors, and if lriVe are found in -violation of these Non -Conforming Items at the nearing X/Wo wiIJ be fined a minimum of S500.00 per Non.Conforming Item, Notwithstanding the foregoing, 1/We acknowledge that the BMSA Board of Directors and/or Architectural Committee may pursue any legal remedy available in the event ofa non-compliance, • Page 4 of 6 08/04/2003 21:36 9702438407 SUNbANCE . a• AS PER Lab ARCHITECTURAL STANDARDS,PLEASE INDICATE TIM FOLLOWING POINTS ON TUE PLOT PLAN AND BELOW: ELEVATIONS AT EACH CORNER OF THE LOT, LOCATION. 1. 2. 3. 4. 5. 6. --THE Hili POINT OF THE LOT. 7.- fl B LOW POINT OF TIM LOT. 8. --HEIGHT OF GARAGE FLOOR. 9.- SIGHT OF HOUSE MAIN FLOOR. 10.-1-1EIGHT OF ROOF ABOVE FOUNDATION: (MAXIMUM— 35FEET ) 1 1.--IGHT OF ROOF ABOVE CENTER OF nm MIDCURB. • MAXIMUM— 29.F E ELEVATION (FEET ) PAGE 66 12. -DRAINAGE FLOW LINES ON TIM PLOT PLAN. 13.--ROOF-.�-- 08/04/2883 21.:36 9702438497 SUNDANCE PAGE 1 a Failure to pay tines levied as determined at the ;Clearing may also result in a Lien being placed ou Property or litigation Process initiated by the BMSA Board of X}irectars to secure conformance wit hill Application and its respective Conditions Of Approval - We a understand that Architectural Committee approval does not constitute approval oftbelocal bu department, drainage design or structural soundness, nor does it constitute assurance that the comply with all applicable Bodes, regulations, urdb antes and laws 1/We farther acknowledge that any subsequent field changes which Me may des6 to tie 3 Construction or improvement Projects of this original Application Submittal and the original Conti of Approval issued by the BMSAFAC will require an additional Revised Applidtiou Submittal t behalf,and that Me e will not prod with any subsequent field changes until a Devised. Condltk Approvalhave been issued to us by the BMSA/AC, lJ w►ier's 7 f(: r '+ ! Prf'h#a ititi^es �rzy =A,.+ RI/4y Date 1 08/04/2003 21:36 9702438407 SUNDANCE This portion of the Application Foram is to be completed by the • Architectural Committee (not the Applicant). PAGE 88 CONDITIONS QF APPR OOAL or DISAPPROVAL 1. No siteworlc or building construction May proceed on any Lot (including no prelirrivary site cieariit grubbing, grade alteration, storing ofmaterial, foundation excavation, extension ofunderground etc) until the Project bas received a Project approval from the Architectural Committee and bas be issued a Budding Pert (as required by Garfield County for new home or Renovation projects). 2. AR general building and site improvements consauction for any Project shall be coxapleted hnd shall ha issued a Certificate of Occupancy from the Garfield County Btililk4h g Dint no later than one ; year after the ISSUatICe date of this Avbitectplal Committee Approval. 3. The complete landscaping and revegetation ofthe improved Lot, to ecif celiy include the front. side at yard areas, shall be completed no later than six (6) months from the date of the Cie Occupancy. 4. if the selection of colors and /or landscaping plans are not included with this application they must 1 submitted for approval before any action is taken to install the missing its. 6. 7. Required By Architectural Committee pr�.r DIO Appiiieatio val •ti fArch! • lural Co ttl e Members): Application App —Bye: ed for Co ction sub e; to the above conditions: tee: . 7,,- '6- . Application Denied (Initials ofArchitectural Cottee Members): Application Denied for reason® stated above: By Ca Page 6 of 6 tate: Lower Volley Engineerino and Consulting. Inv. eas Sliver Plume Drive FrUlia, Colorado Bulls Ph, (970) b5$ Z000 F07407*) Bga• idaq David Mead Garfield County Building Department Fax: 970-384-3470 5-30-06 RE: Grace Homes Valley View Battlement Mesa, 4-Plex at 0010 Jessica Lane. Building Department: T have been retained by Grace Homes to provide engineering services . r the above referenced project. T have supervised inspection of the foundations and alts prior to concrete placement to ensure conformance with the drawings that I prepareand were submitted for permit. The foundations are structurally adequate to satisfy the building codes •urrently adopted by Garfield County. Please contact me if there are any questions concerning this project. Signed, Darren R. Adams, P. E. 2/2'd 0112217820L61:°1 ;wo,ad ti0:9Z 9082-I2-AUJW