HomeMy WebLinkAboutApplication - PermitGarfield County
Building & Sanitation Department
108 8th Street, Suite #201 Glenwood Springs, Co. 81601
Office- 945-8212 Inspection Line- 384-5003
Job AddressS-12,6%&_3(0
NO. gc)`)
Nature of Work Building Permit
Use of Building ol-k>"e-A., 33)A -P C24aVA,
b(VUA/Lc,(0-4
(USA) .
c1'0?- 36a—bo P- O 5
Owner
Contractor 5\43)/0*.,
Amount of Permit
/06›07.#1
Date
Clerk
Permit No:
Job Address:
GARFIELD COUNTY BUILDING PERMIT APPLICATION
108 8'' Street, Suite 201, Glenwood Springs, CO 81601
Phone: 970-945-8212 / Fax: 970-384-3470 / Inspection Line: 970-384-5003
Parcel/Schedule No: 2409-361-00-048
N1/2 Section 36; Township 7 South; Range 96 West; 6th P.M
1 Lot No: Block No: Subd / Exemption:
048 00 N/A
_
Owner:
EnCana Oil & Gas (USA), Inc
Address 2717 CR 215
Parachute, ('0
Ph:
970-2'5-2600
Wk Ph:
970-2R5-2600
Contractor:
Unknowng..,,5-
Address:
Ph:tic.
-1(t$!pti,....-7
No.
45-.
I
Architect/En eer:
Atkinsonlndustries, Inc
Address:
Pittsburg, KS
Ph:
Lic. No
Sq. Ft. of Building: 600
Sq. Ft. of Lot: 3 Acres
Height: 12' 2.59,
No. of Floors: 1
6
Use of Building: Power Control Center
7
Describe Work
Installation of Pre -Fab Building
8
Class of Work: A New ❑ Alteration CI Remove
D Addition ❑ Move
9
10
Garage: 0 Single
N/A 0 Double
Carport: 0 Single
N/A 0 Double
Driveway Permit: 0 On -Site Sewage
N/A Disposal
o Site Plan
11
Valuation of Work: $
Adjusted Valuations: S 50,000
12
Special Conditions:
Building Pre -Fabricated Off -Site
SEPARATE ELECTRICAL
ISSUED BY THE
THIS PERMIT BECOMES
AUTHORIZED IS
CONSTRUCTION
PERIOD OF 180
HEREBY CERTIFY
APPLICATION AND
PROVISIONS OF
COMPLETED WITHIN
GRANTING OF A
TO VIOLATE OR
LOCAL LAW REGULATING
OF CONS ' UCTION.
}
NOTICE
PERMIT IS REQUIRED AND MUST BE
STATE OF COLORADO.
NULL AND VOID IF WORK OR CONSTRUCTION
NOT COMMENCED WITHLN 180 DAYS, OR, IF
OR WORK IS SUSPENDED OR ABANDONED FOR A
DAYS AT ANY TIME AFTER WORK 15 COMMENCED.
THAT I HAVE READ AND EXAMINED THIS
KNOW THE SAME TO BE TRUE AND CORRECT. ALL
LAWS GOVERNING TI -IIS TYPE OF WORK WILL BE
WHETHER SPECIFIED HEREIN OR NOT. THE
PERMIT DOES NOT PRESUME TO GIVE AUTHORITY
CANCEL THE PROVISIONS OF ANY OTHER STATE OR
CONSTRUCTION OR THE PERFORMANCE
_
Plan Check Fee:
il g r 44
Permit Fee:
J /� .
_
"7
Total Fee:
/ r OV E- 11 J`IIam,
Dated Permit Issued:
O up:
'
Co Type:
Zoning:
g
Setbacks:
Manu. Horne:
2e4
ISDS No. $6 Fee:
/-3t- t-%-
BLDG . PLNG. DEFT.
APPROVAL DATE APPROVAL/DATE
AGREEMENT
PERMISSION IS HEREBY GRANTED TO THE APPLICANT AS OWNER, CONTRACTOR AND/OR THE AGENT OF THE CONTRACTOR OR OWNER TO CONSTRUCT THE
STRUCTURE AS DETAILED ON PLANS AND SPECIFICATIONS SUBMITTED TO AND REVIEWED BY THE BUILDING DEPARTMENT.
IN CONSIDERATION OF THE ISSSUANCE OF THIS PERMIT, THE SIGNER. HEREBY AGREES TO COMPLY WITH ALL BUILDING CODES AND LAND USI
REGULATIONS ADOPTED BY GARFIELD COUNTY PURSUANT TO AUTHORITY GIVEN LN 30.28.201 CRS AS AMENDED. THE SIGNER FURTHER AGREES THAT I:
THE ABOVE SAID ORDINANCES ARE NOT FULLY COMPILED WITH IN THE LCOATION, ERECTION, CONSTRUCTION, AND USE OF THE ABOVE DESCRIBE'
STRUCTURE, THE PERMIT MAY BE REVOKED BY NOTICE FROM THE COUNTY AND THAT THEN AND THERE IT SHALL BECOME NULL AND VOID.
THE ISSUANCE OF A PERMT BASED UPON PLANS, SPECIFICATIONS AND OTHER DATA SHALL NOT PREVENT THE BUILDING OFFICIAL FROM THEREAFTEI
REQUIRING THE CORRECTION OF ERRORS IN SAID PLANS, SPECIFICATIONS AND OTHER DATA OR FROM PREVENTING BUILDING OPERATION REIN(
CARRIED ON THEREUNDER WHEN IN VIOLATION OF THS CODE OR ANY OTHER ORDINANCE OR REGULATION OF THIS JURISDICTION.
THE REVIEW OF SUBMITTED PLANS AND SPECIFICATIONS AND INSPECTIONS CONDUCTED THEREAFTER DOES NOT CONSTITUTE AN ACCEPTANCE OF AN
RESPONSIBILITIES OR LIABLITIES BY GARFIELD COUNTY FOR ERRORS, OMISSIONS OR DISCREPENCIES. THE RESPONSIBILITY FOR THESE ITEMS ANI
IMPLEMENTATION DURING CONSTRUCTION RESTS SPECIFICIALLY WITH THE ARTICTECT, DESIGNER, BUILDER, AND OWNER, COMMENTS ARE INTENDEI
TO BE CONSERVATIVE AND IN SUPPORT OF THE OWNERS LNTEREST.
Garfom.003
I HE Y ACKNOWLEDGE THAT I HAVE READ AND UNDERSTAND THE AGREEMENT ABOVE (INITIAL):
Cfr___ 61ii 41G.yy (1,\1010,
The following items are required by Garfield County for a final inspection:
1. A final Electrical Inspection from the Colorado State Electrical Inspector;
2. Permanent address assigned by Garfield County Building Department posted where readily
visible from access road;
3. A finished roof, a lockable house, complete exterior siding, exterior doors and windows
installed, a complete kitchen with cabinets, a sink with hot & cold running water, non-absorbent
kitchen floor coverings, counter tops and finished walls, ready for stove and refrigerator, all
necessary plumbing;
4. All bathrooms must be complete, with washbowl, tub or shower, toilet stool, hot and cold
running water, non-absorbent floors and walls finished and a privacy door;
5. All steps outside or inside over three (3) steps must have handrails, guard rails on balconies or
decks over 30" high constructed to all IBC and IRC requirements;
6. Outside grading done to where water will detour away from the building;
7. Exceptions to the outside steps, decks and grading may be made upon the demonstration of
extenuating circumstances, i.e. weather, but a Certificate of Occupancy will not be issued until
all the required items are completed and a final inspection made;
8. A final inspection sign off by the Garfield County Road & Bridge Department for driveway
installation, where applicable; as well as any final sign off by the Fire District, anchor State
Agencies where applicable.
A CERTIFICATE OF OCCUPANCY WILL NOT BE ISSUED UNTIL ALL THE
ABOVE ITEMS HAVE BEEN COMPLETED.
****CANNOT OCCUPY OR USE DWELLING UNTIL A CERTIFICATE OF OCCUPANCY
(C.O.) IS ISSUED. OCCUPANCY OR USE OF DWELLING WITHOUT A C.O. WILL BE
CONSIDERED AN ILLEGAL OCCUPANCY AND MAY BE GROUNDS FOR VACATING
PREMISES UNTIL ABOVE CONDITIONS ARE MET.
I understand and agree to abide by the above conditions for occupancy.,tuse
and
d the issuance of a
Certificate of Occupancy for the dwelling under building permit # "180 7
trl.57.,,i4of
Signatefire
BpcontOct2004
Date
/ DG
PLAN REVIEW CIECKLIST
Applicanti�-� it,44144 Date .31. O''
Building
Engineered Foundation
Driveway Permit
urveyed Site Plan
Septic Permit and Setbacks
ade/Topography 30%
iltiAttach Residential Plan Review List
✓linimum Application Questionnaire
j` ASubdivision Plat Notes
4 Fire Department Review
' Valuation Determination/Fees
---"‘ed Line Plans/Stamps/Sticker
Attach. Conditions
Application Signed
P1ag Reviewer To Sign Application
Parcel/Schedule No.
�1 40# Snowload Letter- Manf. Hms.
d. Soils Report
GENERAL NOTES:
Planning/Zoning
Property Line Setba s
30ft Stream S
Flood P1
Build' • g Height
Zo ing Sign -off
acks
oad Impact Fees
HOA/DRC Approval
Grade/Topography 40%
Planning Issues
Subdivision Plat Notes
GARFIELD COUNTY BUILDING AND PLANNING
970-945-8212
MINIMUM APPLICATION REQUIREMENTS
FOR
CONSTRUCTION OF
COMMERCIAL OR MULTI -FAMILY RESIDENTIAL BUILDINGS
Including
NEW CONSTRUCTION
ADDITIONS
AL'T'ERATIONS
And
MOVED BUILDINGS
In order to understand the scope of the work intended under a permit application and expedite
the issuance of a permit it is important that complete information be provided. When reviewing
a plan and it's discovered that required information has not been provided by the applicant, this
will result in the delay of the permit issuance and in proceeding with building construction. The
owner or contractor shall be required to provide this information before the plan review can
proceed. Other plans that are in line for review may be given attention before the new
information may be reviewed after it has been provided to the Building Department.
Please review this document to determine if you have enough information to design your
project and provide adequate information to facilitate a plan review. Also, please consider
using a design professional for assistance in your design and a construction professional for
construction of your project. Any project with more than ten (10) occupants requires the
plans to be sealed by a Colorado Registered Design Professional.
To provide for a more understandable plan and in order to determine compliance with the
building, plumbing and mechanical codes, applicants are requested to review the following
checklist prior to and during design.
Plans to be included for a Building Permit must be on draft paper at least 18"x 24"" and
drawn to scale.
1
Plans must include a floor plan, a concrete footing and foundation plan, elevations all sides with
decks, balcony steps, hand rails and guard rails, windows and doors, including the fmish grade
and original grade line. A section showing in detail, from the bottom of the footing to the top of
the roof, including re -bar, anchor bolts, pressure treated plates, floor joists, wall studs and
spacing, insulation, sheeting, house -rap, (which is required), siding or any approved building
material. Engineered foundations may be required. Check with the Building Depattixient.
A window schedule. A door schedule. A floor framing plan, a roofing framing plan, roof must
be designed to withstand a 40 pound per square foot up to 7,000 feet in elevation, a 90 M.P.H.
windspeed, wind exposure B or C, and a 36 inch frost depth.
All sheets need to be identified by number and indexed. All of the above requirements must be
met or your plans will be returned.
All plans submitted must be incompliance with the 2003 IBC, IPC, IMC and IFGC.
Applicants are required to indicate appropriately and to submit completed checklist at
time of application for a permit:
Is a site plan included that identifies the location of the proposed structure, additions or
other buildings, setback easements, and utility easements showing distances to the
property lines from each corner of the proposed structure prepared by a licensed surveyor
and has the surveyors signature and professional stamp on the drawing? Slopes of 30%
or more on properties must be show on site plan. (NOTE: Section 106.2) Any site plan
for the placement of any portion of a structure within 50 ft. of a property line and not
within a previously surveyed building envelope on a subdivision final plat shall be
prepared by a licensed surveyor and have the surveyors signature and professional stamp
on the drawing. Any structure to be built within a building envelope of a lot shown on a
recorded subdivision plat, shall include a copy of the building envelope as it is shown on
the final plat with the proposed structure located within the envelope.
Yes V
2. Does the site plan when applicable include the location of the I.S.D.S. (Individual Sewage
Disposal System) and distances to the property lines, wells (on subject property and
adjacent properties), streams or water courses? This information must be certified by a
licensed surveyor with their signature and professional stamp on the design.
Yes No Not necessary for this project .,..-
3. Are the plans submitted for application review construction drawings and not drawings
that are stamped or marked identifying them as "Not for construction, for permit issuance
only", "Approval drawings only", "For permit issuance only" or similar language?
Yes No Not necessary for this project
2
4. Is the I.S.D.S. (Individual Sewage Disposal System) designed, stamped and signed by a
Colorado Registered Engineer?
Yes No Not necessary for this project
5. Does the site plan indicate the location and direction of the State, County or private road
accessing the property?
Yes E.
6. Do the plans include a foundation plan indicating the size, location and spacing of all
reinforcing steel in accordance with the uniform building code or per stamped engineered
design?
Yes V No Not necessary for this project
7. If the building is a pre-engineered structure, is there a stamped, signed engineered
foundation plan for this building?
Yes V No Not necessary for this project
8. Do the plans indicate the location and size of ventilation openings for under floor crawl
spaces and the clearances required between wood and earth?
Yes No Not necessary for project t.
9. Do the plans indicate the size and location of the ventilation openings for the attic, roof
joist spaces and soffits?
Yes No Not necessary for this project
10. Do the plans include design loads as required under the IBC or IRC for roof
snowloads, (a minimum of 40 pounds per square foot in Garfield County)?
Yes 17 No Not necessary for this project
11. Do the plans include design loads as required for floor loads under the IBC or IRC?
Yes / No Not necessary for this project
12. Does the plan include a building section drawing indicating foundation, wall, floor, and
roof construction?
Yes No Not necessary for this project
13. Is the wind speed and exposure design included in the plan?
Yes No Not necessary for this project
14. Does the building section drawing include size and spacing of floor joists, wall studs,
ceiling joists, roof rafters or joists or trusses?
Yes V No Not necessary for this project
3
15. Does the building section drawing or other detail include the method of positive
connection of all columns and beams?
Yes No Not necessary for this project
16. Does the elevation plan indicate the height of the building or proposed addition from the
undisturbed grade to the midpoint between the ridge and eave of a gable or shed roof or
the top of a flat roof? (Check applicable zone district for building height maximum)
Yes No Not necessary for this project
17. Does the plan include any stove or zero clearance fireplace planned for installation
including make and model and Colorado Phase II certifications or Phase II EPA
certification?
Yes No Not necessary for this project
18. Does the plan include a masonry fireplace including a fireplace section indicating design
to comply with the IBC or IRC?
Yes No Not necessary for this project V
19. Does the plan include a window schedule or other verification that egress/rescue windows
from sleeping rooms and/or basements comply with the requirements of the IBC or IRC?
Yes No Not necessary for this project L/
20. Does the plan include a window schedule or other verification that windows provide
natural light and ventilation for all habitable rooms?
Yes No Not necessary for this project V
21. Do the plans indicate the location of glazing subject to human impact such as glass doors,
glazing immediately adjacent to such doors; glazing adjacent to any surface normally
used as a walking surface; sliding glass doors; fixed glass panels; shower doors and tub
enclosures and specify safety glazing for these areas?
Yes No Not necessary for this project
22. Do the plans include a complete design for all mechanical systems planned for
installation in this building?
Yes 1, ' No Not necessary for this project
23. Have all areas in the building been accurately identified for the intended use?
(Occupancy as identified in the IBC Chapter 3)
Yes V No Not necessary for this project
24. Does the plan indicate the quantity, form, use and storage of any hazardous materials that
may be in use in this building?
Yes No Not necessary for this project ;'
4
25. Is the location of all natural and liquid petroleum gas furnaces, boilers and water heaters
indicated on the plan?
Yes No Not necessary for this project
26. Do the plans indicate the location and dimension of restroom facilities and if more than
four employees and both sexes are employed, facilities for both sexes?
Yes No Not necessary for this project'
27. Do the plans indicate that restrooms and access to the building are handicapped
accessible?
Yes No Not necessary for this project
28. Have two (2) complete sets of construction drawings been submitted with the
application?
Yes No
29. Have you designed or had this plan designed while considering building and other
construction code requirements?
Yeses No Not necessary for this project
30. Does the plan accurately indicate what you intend to construct and what will receive a
final inspection by the Garfield County Building Department?
Yes No
31. Do your plans comply with all zoning rules and regulations in the County related to your
zone district? For corner lots see supplemental section 5.05.03 in the Garfield County
Zoning Resolution for setbacks.
Yes No i/
32. Do you understand that approval for design and/or construction changes are required
prior to the implementation of these changes?
Yes 1/ No
33. Do you understand that the Building Department will collect a "Plan Review" fee from
you at the time of application and that you will be required to pay the "Permit" fee as well
as any "Septic System" or "Road Impact" fees required, at the time you pick up your
building permit?
Yes No
34. Are you aware that you are required to call for all inspections required under the IBC
including approval on a final inspection prior to receiving a Certificate of Occupancy
and occupancy of the building?
5
Yes No
35. Are you aware that the Permit Application must be signed by the Owner or a written
authority be given for an Agent and that the party responsible for the project must comply
with the Uniform Codes?
Yes V No
36. Are you aware that you must call in for an inspection by 3:30 the business day
before the requested inspection in order to receive it the following business day?
Inspections will be made between 7:30 a.m. and 3:30 p.m. Monday through Friday.
Inspections are to be called in to 384-5003.
37. Are you aware that requesting inspections on work that is not ready or not accessible
will result in a $50.00 re -inspection fee?
Yes L./ No
38. Are you aware that prior to issuance of a building permit you are required to show proof
of a driveway access permit or obtain a statement from the Garfield County Road &
Bridge Department stating one is not necessary? You can contact the Road & Bridge
Department at 625-8601.
Yes V No
39. Do you understand that you will be required to hire a State of Colorado Licensed
Electrician and Plumber to perform installations and hookups? The license number will
be required at time of inspection.
Yes V No
40. Are you aware, that on the front of the building permit application you will need to fill in
the Parcell Schedule Number for the lot you are applying for this permit on prior to
submittal of the building permit application? Your attention in this is appreciated.
Yes No
41. Do you know that the local fire district may require you to submit plans for their review
of fire safety issues? Yes � No (Please check with the
building department about this requirement)
6
42. Do you understand that if you are planning on doing any excavating or grading to the
property prior to issuance of a building permit that you will be required to obtain a
grading permit?
Yes
gna
Phone:
I hereby acknowledge that I have read, understand, and answered these questions to
the best of my ability.
f7D -4A5 -8/3. (days), 3D3 -7,24-. 4'4 AI (evenings)
Project Name:/i/ilesc:. Wale& 57%igze /c2c,, /y
Project Address: ,lam 4/ y Sec. 36 T 7) R 9441
Note:
/-/D •4w
Date
If you answered "No" on any of these questions you may be required to provide this information
at the request of the Building Official prior to beginning the plan review process. Delays in
issuing the permit are to be expected. Work may not proceed without the issuance of the permit.
*If you have answered "Not necessary for this project" on any of the questions and it is
determined by the Building Official that the information is necessary to review the application
and plans to determine minimum compliance with the adopted codes, please expect the
following:
A. The application may be placed behind more recent applications for building permits in the
review process and not reviewed until required information has been provided and the
application rotates again to first position for review.
B. Delay in issuance of the permit.
C. Delay in proceeding with construction.
*If you answered "No" to this question the circumstances described in the question could result
in a "Stop Work Order" being issued or a "Certificate of Occupancy" not being issued.
Bpcomm
Feb2005
7
No.
Assessor's Parc& No `o F -'36 (- c o((g
Date Gro
BUILDING PERMIT CARD
Job Address . 3(,/ -/-(7.1;
') i � ,qc)C
Owner rOt6.14) . Address Miq Ce I5 Ao_
# r'-‘b13e
Contractor 63-1/Q)&0J. Address e LQ ad -4-t- Phone #6a\-5'67'
Setbacks: Front Rear RH LH Zoning S
INSPECTIONS
Soils Test Weatherproofing
Footing Mechanical
Foundation r t Electrical Rough (State)
Underground Plumbing i Electrical I State) /6` of ?�S
Grout
Mfyj Final2..,.... !Checklist Completed?
Rough Plum 'ng rb Certificate Occupancy # cocosa.
Framing Date --
Insulation Septic System # M.
Roofing Date
Drywall Final
Gas Piping Other
NOTES
(continue on back)
ZIZ8-9P6 (OM) euogci
Jo;3edsui 6umllne
Garfield County
Building & Sanitation Department
108 8th Street, Suite #201 Glenwood Springs, Co. 81601
Office- 945-8212 Inspection Line- 384-5003
Jog Address •
Nature of Work
NO. "r' r'4,1
r9
�G'(o w
Builcli�2�,
Permir LiC)qf- to -
}
Use of Building
Owner
Contractor 6-V3
Amot"/it of Permt r 0 % Date.
When correction(s) have been nia1;_:
1
w
3
0,
z
-n
O
toCD
O
0
0
0,
rp
'oN pulled
pe e3oI qo
oo
co
Cn
1.
0
CD
CD
CO
/
C (ry
C A
O
O
0
0
wati
z
z
0
Edso
Inspection Report
Page 1 of 1
o,. -(ARD Gam itleerf
COLORADO STATE ELECTRICAL BOARD
INSPECTION REPORT / CORRECTION NOTICE
Date Received: 07 -FEB -08 Permit Number: 624021
Contractor/HomeOwner:
Address:
Type of Inspection:
Action:
BRAD HASLEM, INC.
S34T7s.R96w.
Final
Accepted
Comments or Corrections:
1) Corrections all addressed and repairs made 2) Electrical Final OK
Inspectors Name: Cyrus Tuchscher
Phone Number: 970-625-5085 Date: 07 -FEB -08
COLORADO STATE ELECTRICAL BOARD
DEPARTMENT OF REGULATORY AGENCIES
1580 Logan St. Suite 550
Denver, Colorado 80203-1941
Phone: (303) 894-2985
httnc•//Annarur drn-a ct1tP PSI iC/nlc/rPcd U!Yk incnrartinn 'C.1 If Prr cc P•arrr3 O./1 Ah)(1(1`,
Ander Schwaller
From: Eckman, Jason [Jason. Eckman@encana.comj
Sent: Monday, February 14, 2011 3:05 PM
To: Andy Schwaller; Don Howanick
Subject: RE: High Mesa PDC Building
The bolts are 12 inches long and the used Red Headed expansion bolts that lock into the concrete.
Please let me know if you need anything else.
Thank you.
Jason Eckman
Permit & ROW Coordinator
North Piceance Basin
Encana Oil & Gas (USA) Inc.
2717 County Rd. 215, Suite 100
Parachute, CO 81635
office: 970.285.2656
cell: 970.261.7762
fax: 970.285.2691
email: jason.eckman@encana.com
Please note Encana's Offices are closed the 1st and 3rd Friday of the month.
www.encana.com
From: Andy Schwaller f mailto:aschwaller@garfield-county.coml
Sent: Monday, February 14, 2011 8:24 AM
To: Eckman, Jason; Don Howanick
Subject: RE: High Mesa PDC Building
Jason,
Looks good. How long are the bolts and how are they anchored into the concrete.
Thanks,
Andy
From: Eckman, Jasonfmailto:Jason.Eckman@encana.coml
Sent: Monday, February 14, 2011 8:19 AM
To: Andy Schwaller; Don Howanick
Subject: High Mesa PDC Building
Good morning Andy and Don,
Attached are three pictures of the anchors for the PDC building that were installed last week. They were installed
per the drawings that Don provided us. 1 have photos of all 12 that were installed if you would like to see them. Or,
let me know if you would like to go back up there and take a look.
1
Thank you.
Jason Eckman
Permit & ROW Coordinator
North Piceance Basin
Encana Oil & Gas (USA) Inc.
2717 County Rd. 215, Suite 100
Parachute, CO 81635
office: 970.285,2656
cell: 970.261.7762
fax: 970.285.2691
email: iason.eckman@encana,com
Please note Encana's Offices are closed the lst and 3rd Friday of the month.
www.encana.com
This email communication and any files transmitted with it may contain confidential and or proprietary information and is provided for the use
of the intended recipient only. Any review, retransmission or dissemination of this information by anyone other than the intended recipient is
prohibited. If you receive this email in error, please contact the sender and delete this communication and any copies immediately. Thank you.
http://www.encana.com
2
m
CONSUL11NG ENGIN
Mechanical &
Structural Engineering
Design & Project Management
File: G1 1011-5-2001-0
February 1, 2011
Mr. Andy Schwaller, Chief Building Official
Garfield County Building Department
108 8th Street, Suite 401
Glenwood Springs, CO 81601
Dear Mr. Schwaller,
MPA Consulting Engineers, Inc.
802 Grand Avenue, Suite #302
P.O.Box 854
Glenwood Springs Colorado 81602
Tel (970) 928-8536
Fax (970) 945-8073
Email don.howanick@mpa-glenwood.com
Re: Inspection of EnCana High Mesa Water Treatment Facility Electric PDC Building Foundation
As requested by Mr. Jason Eckman, Permit & ROW Coordinator for EnCana Oil & Gas (USA), MPA
Consulting Engineers conducted a site inspection of the EnCana High Mesa Water Treatment Facility
electrical power distribution center (PDC) building foundation on Tuesday, January 25, 2011. The purpose of
the site inspection was to determine if the foundations were built in accordance with the engineered foundation
plans.
The High Mesa Water Treatment Facility electrical building was installed in 2006. This building houses the
main breaker panels that distribute power from the primary electric supply lines to the High Mesa area gas
drilling operations, south west of Parachute, Colorado.
The electrical building is a 50 foot long by 12 foot wide single story modular unit that is designed to be lifted
with a crane and placed on top of 12 concrete piers that form the foundation. There are 6 piers, equally spaced
at 10 feet apart, on each side of the building. The piers consist of 18 inch diameter reinforced concrete
cylinders that are placed at a depth of approximately 6 feet below grade, and rise about 6 inches above grade.
The lower structural frame of the modular unit is built from structural steel channels that are welded together.
These channels are placed on top of the concrete piers, and are to be fastened to the tops of the piers with 3/4
inch diameter anchor bolts that are 12 inches long, embedded into the concrete. The bolts are to be placed
through steel clips that engage the lower flanges of the channels and secure the channels to the concrete
foundation piers. Inspection of the building structure is not in the scope of MPA's inspection.
Because the concrete for the foundations had already been placed when MPA conducted the foundation
inspection, it was not possible to verify rebar size and placement, or depth of piers below grade. Our
inspection was limited to a visual assessment of the installed foundations above grade and building attachment.
The inspection included review (without validation) of the foundation design drawings, field measurements to
verify pier location dimensions, examination of the piers and building frames to check for signs of settlement
or other indications of structural failure, building attachment to the piers, and the overall performance of the
foundations. The foundation drawings for this project are listed in Appendix "A".
During our inspection, the following observations were made:
Page 1 of 4
1.) The anchor bolts and steel clips required for attaching the channel frame to the concrete piers were not
in place at the time of inspection (see photos in Appendix "B"). These anchor bolts are shown on
foundation drawing 420I, detail 1.
2.) The piers were located correctly per the dimensions on the foundation design drawings.
3.) The size and orientation of the piers were correct as per the foundation design drawings.
4.) There were no indications of excessive settlement visible in the foundations or the lower building
frames.
5.) There were no indications of excessive settlement in the interiors of the buildings such as diagonal
cracks in the building walls, doors that were difficult to open, or any other visual signs.
To correct the discrepancies found the following corrective actions need to be performed:
1.) The %," x 12" anchor bolts and clips need to be installed in accordance with the foundation design
drawings.
Overall, the foundations appeared to be structurally sound, and built in accordance with the design drawings,
to the extent that could be visually verified. These building foundations have been in place for several years
and do not appear to have any indication of structural failures.
Sincerely,
MPA Consulting Engineers, Inc.
Don Howanick; M.S., P.E.
Principal Structural Engineer
cc: EnCana Oil and Gas (USA), attn. Mr. Jason Eckman
Page 2 of 4
APPENDIX A
FOUNDATION DRAWING LIST
Dwg No. Description Engineer
4102 Foundation Location Plan Peregrine Group
4201 Pipe Rack, Lamp, & T Support Peregrine Group
Foundations Location and Details
D-10482-00 Atkinson Control Center Atkinson Industries, Inc.
Foundation Plan View
D-10482-01 Atkinson Control Center Atkinson Industries, Inc.
Outline Plan
D-10482-02 Atkinson Control Center Atkinson Industries, Inc.
Outline Elevation W1 & W2
D-10482-03 Atkinson Control Center Atkinson Industries, Inc.
Outline Elevation W3 & W4
Page3of4
APPENDIX B
FOUNDATION PHOTOS SHOWI NG NIISSING ANCHOR BOLTS
Page 4 of 4
EXTERIOR WALL
-
ANGLE CUP
SEE DETAIL
THIS DWG.
LG
EXPANSION ANCHOR ----
CONCRETE
FOUNDATION
INTERIOR WALL
--PERIMETER MEM5ER
ELECTRICAL BUILDING
ANCHORING DETAIL
DETAIL
SCALE: NONE THIS DWG
111
Account Page 1 of 1
Account: R270014
Location
Parcel Number 2409-361-00-048
Situs Address
City Parachute
ZipCode 81635
Tax Area 047 - 16-DHFZ - 047
Legal Summary Section: 25
Township: 7 Range: 96 SURFACE
& 3/4 MIN/RTS SESW, SEC. 36
S2NE, E2NW NESW, N2SE
Transfers
Sale Price
Lax History._
Tax Year Taxes
*2011 $4,438.16
2010 $5,762.20
* Estimated
Owner Information
Owner Name ENCANA OIL &
GAS (USA) INC
In Care Of Name K E ANDREWS
& COMPANY
Owner Address 3615 S HURON
STREET, SUITE 200
ENGLEWOOD, CO 80110
Sale Date
12/16/2008
02/10/2009
10/16/2008
07/16/2007
Images
......................................
• GIS
Assessment History
Actual (2011)
Primary Taxable
Tax Area: 047
$419,000
$121,510
Mill Levy: 36.5250
Type Actual Assessed Acres SOFT Units
Land $419,000 $121,510 320.000 0.000 0.000
Doc Type
701
701
ROW
EAS
Book Page
https://act.garfieid-cou nty.com/assessor/taxweb/accou nt. jsp?accou ntN um=R270... 6/21/2011