HomeMy WebLinkAboutConditions of Permit.pdfCONDITIONS OF PERMIT
BLC0-10 -14-3421
EnCana/Solvay Chemicals, Inc
Pump house Roof Replacement
Parachute, Colorado
1) ALL WORK MUST COMPLY WITH THE 2009 IBC AND MANUFACTURERS SPECIFICATIONS .
2) IF APPLICABLE , ECTRICAL FINAL APPROVAL IS REQUIRED FOR COMPLETION INSPECTION .
3) LIGHT AND VENTILATION PER 2009 IBC, CHAPTER 12 .
4) CONCRETE REINFORCEMENT INSPECTION REQUIRED .
5) FINAL/COMPLETION INSPECTION REQUIRED .