Loading...
HomeMy WebLinkAboutConditions of Permit.pdfCONDITIONS OF PERMIT BLM F-7-14-3312 Araujo Residence 3911 CR 100 Carbondale, Colorado 1) SEE PLAN ATTACHMENTS FOR BUILDING REQUIREMENTS. 2) REFER TO ENGINEERED FOUNDATION AND ROOF ALTERATION PLANS. 3) OPEN -HOLE SOILS REPORT REQUIRED AT FOOTING INSPECTION, 2000 PSF. 4) PROVIDE ENGINEERED TRUSS SHOP DRAWINGS AT FRAME INSPECTION, 50 PSF. 5) MAINTAIN ROOF VENTING AND PENETRATION LOCATION, SIZE, AND HEIGHTS. 6) SEPTIC TANK PUMPING IS REQUIRED TO VERIFY CAPACITY FOR THREE (3) BEDROOMS. 7) PLUMBING/GAS PIPING MUST BE PERFORMED BY A COLORADO LICENSED PLUMBER. 8) ELECTRICAL WORK MUST BE PERFORMED BY A COLORADO LICENSED ELECTRICIAN. 9) ELECTRICAL FINAL APPROVAL IS REQUIRED FOR CO/FINAL INSPECTION. 10) C.D.O.H. INSTALLATION INSIGNIA MUST BE AFFIXED PRIOR TO CO/FINAL INSPECTION. 11) EXISTING SINGLE WIDE HOME MUST BE REMOVED PRIOR TO CO/FINAL INSPECTION.