HomeMy WebLinkAboutApplication-Permit• Garfield County
Building & Sanitation Department
108 8`" Street, Suite #201 Glenwood Springs, Co. 81601
Office- 945-821
2 Inspection Line- 384-5003 J
Job Address (J 1 S3 c l , 7 P �i % Lr� RCi'12
lC�f- 3q PKT)
Nature of Work �` Building Permit 94V'fl - ISI- -b9 - t��� v !• V male.
JB
Use of Building / �J J Q•
0(1.Aa0 e:=1-V1V0
Owner C'SYaCO3 Oral eS
Contractor ntaYlar
Amount of Permit $ i$ as: S l_ Date ZS - 9" 05
NO. 593
Clerk
4-
• Permit No:
GARFIELD COUNTY BUILDING PERMIT APPLICATION
108 8-• Street, Smite 201. Glenwood spiv. CO 81601
Phone: 970.945.8212 / Fu: 970-384-3470 / Inspection Line: 9704848003
G5'g3
Job Address I S Vier Crr�I L
Parcel/Schedule No: 240 ( It, ICT 031
P6s&cjALrfe. Cog (bi,
1 Lot No: 31 Block No: I r' hk. b Subd. / gxempup� l el VIt� 111 (IQC1
Uf/�ll
2
Owner:
OVA/s 110.1S
Address
lig lo ower. G. j .00116(
p
Wk Ph: �/
3
Contractor
G�<< Hu .ea
Address: �/'
7tsG Valley
ph:
5L3 Sa�S
Lic. No.
165-(/ lin
4
Architect/Engineer
H;yyi (044-7F- m5,
A diress:Ph:
C 19.—de ,� Scr1 S
858''04;
Lic. No.
5
Sq. Ft. of Bull ng: ' 4 f
of Lot• n�t���.i
.1`'��a_.a81/---�r0/era
Height:
No. Floors:
7
�Sq..Ft.
DesoiBuiloing I�PCI �B-e. J�
Ate( r
`r- MAS^
7
Describe Work:
(j/] f
8
Class of Work: i4 New D Alteration o Remove
0 Addition ❑ Move
9
10
Garage: 0 Single
0 '0 Double
Carport: 0 Single
o Double
0 Driveway Permit 0 On -Site Sewage
Disposal
❑ Site Plan
11
Valuation of Work: $
S� 40 p��''C�� &'ij/'�
12
�pA�dju�sste�d ,V�aluationss/:1:
Special Conditions: sQ '•^"„ a `--- •'9e 1 U
1�b !T � e.o ,
(J
NOTICE ssTT""BBas
A SEPARATE ELECTRICAL PERMIT IS REQUIRED AND MU
THIS ISSUED BY THE STATE OF COLORADO.
TS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUCTION
AUTHORIZED IS NOT COMMENCED WTHUI 180 DAYS, OR, IF
CONSTRUCTION OR WORK I5 SUSPENDED OR ABANDONED FOR A
PERIOD OF 180 DAYS AT ANY TIME AFTER WORK 15 COMMENCED.
I HEREBY CERTIFY THAT I HAVE READ AND =ARMED THIS
APPLICATION AND KNOW THE SAME TO BE TRUE AND CORRECT. ALL
PROVISIONS OF LAWS GOVERNING THIS TYPE OF WORK WILL BE
COMPLETED WITHIN WHETTER SPECIFIED HEREIN OR NOT. THE
GRANTING OF A PERMIT DOES NOT PRESUME To GIVE AUTHORITY
TO VIOLATE OR CANCEL THE PROVISIONS OF ANY OTHER STATE OR
LOCAL LAW REGULATING CONSTRUCTION OR THE PERFORMANCE
F CON ON. {//,{1ft&� / r�
7 V<ISD
Plan Check Fee:
/�
700•54
/
Permit Fee:
^f
1, 077 ./
Total Fee:
h
I a27 „�, �%
7�p: I
Dated Permit Issued:
/.O �J�A
OCC Car
�'�tJl\
Const. Type:
Zoning:
Setbacks:
(JJ 7
47 0�PING.
e n
& Ft
/Tey Rl7!
`
1�'l�
DBFT.
aT•
L/DATE APPROVAL/D
AGREEMENT
PERMISSION IS HEREBY GRANTED TO THE APPLICANT AS OWNER, CONTRACTOR AND/OR THE AGENT OF THE CONTRACTOR OR OWNER It CONSTRUCT THE
STRUCTURE AS DETAILED ON PLANS AND SPECIFICATIONS SUBMITTED TO AND REVIEWED BY THE BUILDING DEPARTMENT
IN CONSIDERATION OF THE ISSSUANCE OF THIS PERMIT, THE SIGNER HEREBY AGREES TO COMPLY WITH ALL BUILDING CODES AND LAND USE
REGULATIONS ADOPTED BY GARFIELD COUNTY PURSUANT TO AUTHORITY GIVEN 124 30 28.201 CRS AS AMENDED. THE SIGNER FURTHER AGREES THAT IF
THE ABOVE SAID ORDINANCES ARE NOT FULLY COMPILED WITH IN THE LCOATION ERECTION. CONSTRUCTION, AND USE OF THE ABOVE DESCRIBED
STRUCTURE, THE PERMIT MAY BE REVOKED BY NOTICE FROM THE COUNTY AND THAT THEN AND THERE IT SHALL BECOME NULL AND VOID.
THE ISSUANCE OF A FERMI' BASED UPON PIANS, SPECIFICATIONS AND OTHER DATA SHALL NOT PREVENT THE BUILDING OFFICIAL FROM THEREAFTER
REQUIRING THE CORRECTION OF ERRORS IN SAID PLANS, SPECIFICATIONS AND OTHER DATA OR FROM PREVENTING BUILDING OPERATION BEING
CARRIED ON THEREUNDER WHEN IN VIOLATION OF THS CODE OR ANY OTHER ORDINANCE OR REGULATION OF THIS JURISDICTION.
THE REVIEW OF SUBMITTED PLANS AND SPECIFICATIONS AND INSPEC TONS CONDUCTED THEREAFTER DOES NOT CONSTITUTE AN ACCEPTANCE OF ANY
RESPONSIBILITIES OR LIABLITIES BY GARFIELD COUNTY FOR ERRORS, OMISSIONS OR DISCREPENCIES THE RESPONSIBILITY FOR THESE ITEMS AND
IMPLEMENTATION DURING CONSTRUCTION RESTS SPECIFICIALLY WITH THE ART1CTECT, DESIGNER, BUILDER. AND OWNER. COMMENTS ARE INTENDED
TO BE CONSERVATIVE AND 1N SUPPORT OF THE OWNERS LNTEREST ' n
Garfom.003
1 HEREBY ACKNOWLEDGE THAT I HAVE READ AND UNDERSTAND THE AGREEMENT ABOVE (INIT1AL1
.�(gla5 5 4 gr.sy
The following items are required by Garfield County for a final inspection:
1. A final Electrical Inspection from the Colorado State Electrical Inspector;
2. Permanent address assigned by Garfield County Building Department posted where readily
visible from access road;
3. A finished roof, a lockable house, complete exterior siding, exterior doors and windows
installed, a complete kitchen with cabinets, a sink with hot & cold running water, non-absorbent
kitchen floor coverings, counter tops and finished walls, ready for stove and refrigerator, all
necessary plumbing;
4. All bathrooms must be complete, with washbowl, tub or shower, toilet stool, hot and cold
running water, non-absorbent floors and walls finished and a privacy door;
5. All steps outside or inside over three (3) steps must have handrails, guard rails on balconies or
decks over 30" high constructed to all IBC and IRC requirements;
6. Outside grading done to where water will detour away from the building;
7. Exceptions to the outside steps, decks and grading may be made upon the demonstration of
extenuating circumstances, i.e. weather, but a Certificate of Occupancy will not be issued until
all the required items are completed and a final inspection made;
8. A final inspection sign off by the Garfield County Road & Bridge Department for driveway
installation, where applicable; as well as any final sign off by the Fire District, anchor State
Agencies where applicable.
A CERTIFICATE OF OCCUPANCY WILL NOT BE ISSUED UNTIL ALL THE
ABOVE ITEMS HAVE BEEN COMPLETED.
****CANNOT OCCUPY OR USE DWELLING UNTIL A CERTIFICATE OF OCCUPANCY
(C.O.) IS ISSUED. OCCUPANCY OR USE OF DWELLING WITHOUT A C.O. WILL BE
CONSIDERED AN ILLEGAL OCCUPANCY AND MAY BE GROUNDS FOR VACATING
PREMISES UNTIL ABOVE CONDITIONS ARE MET.
I understand and agree to abide by the above conditions for occupancy, use andthe issuance of a
Certificate of Occupancy for the dwelling under building permit # C 5.C1,3
Signature
BpcontOct2004
Date
VALUATION/FEE DETERMINATION
Applican Subdivision t/" "
Address Lot/Block 39
Date Z -D Contractor cviYksi,1/4_,
Finished (Livable Area):
Main
Upper
Lower
Other
770
447
Total Square Feet �Y / 7 `�� 6 105 Z 1
Valuation 11
Basement:
Unfinished
Conversion of Unfinished to Finished
Plan Check Fee for Conversion
Valuation
Garage:
Crawl Space:
Valuation 4 /) '1 18
Valuation
Decks/Patios:
Covered
Valuation
Open
Valuation
X4a
Total Valuation
7398
/440
`fi G59s6
GARFIELD COUNTY BUILDING AND PLANNING
970-945-8212
MINIMUM APPLICATION REQUIREMENTS
For
SINGLE FAMILY DWELLING CONSTRUCTION
Including
NEW CONSTRUCTION
ADDITIONS
ALTERATIONS
And
MOVED BUILDINGS
In order to understand the scope of the work intended under a permit application and expedite the
issuance of a permit it is important that complete information be provided. When reviewing a plan
and it's discovered that required information has not been provided by the applicant, this will result
in the delay of the permit issuance and in proceeding with building construction. The owner or
contractor shall be required to provide this information before the plan review can proceed. Other
plans that are in line for review may be given attention before the new information may be reviewed
after it has been provided to the Building Department.
Please review this document to determine if you have enough information to design your
project and provide adequate information to facilitate a plan review. Also, please consider
using a design professional for assistance in your design and a construction professional for
construction of your project. Any project with more than ten (10) occupants requires the plans
to be sealed by a Colorado Registered Design Professional.
To provide for a more understandable plan in order to determine compliance with the building,
plumbing and mechanical codes, applicants are requested to review the following checklist prior to
and during design. Applicants are required to indicate appropriately and to submit the
completed checklist at time of application for a permit.
Plans to be included for a Building Permit, must be on drafting paper at least 18"x24" and
drawn to scale.
1
i
Plans must include a floor plan, a concrete footing and foundation plan, elevations all sides with
decks, balcony, steps, hand rails and guard rails, windows and doors, including the finish grade line
and original grade. A section showing in detail, from the bottom of the footing to the top of the roof,
including re -bar, anchor bolts, pressure treated plates, floor joists, wall studs and spacing, insulation,
sheeting, house -rap, (which is required), siding or any approved building material. Engineered
foundations may be required.
A window schedule. A door schedule. A floor framing plan, a roof framing plan, roof must be
designed to withstand a 40 pound per square foot up to 7,000 feet in elevation, a 90 M.P.H. wind
speed, wind exposure 13 or C, and a 36 inch frost depth.
All sheets to be identified by number and indexed. All of the above requirements must be met or
your plans will be returned.
All plans submitted must be incompliance with the 2003 IRC.
1. Is a site plan included that identifies the location of the proposed structure or addition and
distances to the property lines from each comer of the proposed structure(s) prepared by a
licensed surveyor and has the surveyors signature and professional stamp on the drawing?
Properties with slopes of 30% or greater must be shown on the site plan. (NOTE
Section: 106.2) Any site plan for the placement of any portion of a structure within 50 ft.
of a property line and not within a previously surveyed building envelope on a
subdivision final plat shall be prepared by a licensed surveyor and have the surveyor's
signature and professional stamp on the drawing. Any structure to be built within a
building envelope of a lot shown on a recorded subdivision plat shall include a copy of
the building envelope as it is shown on the final plat with the proposed structure located
within the envelope.
2. Does the site plan also include any other buildings on the property, setback easements and
utility easements? Please refer to Section 5.05.03 in the Garfield County Zoning Resolution
if the property you are applying for a building permit on is located on a corner lot. Special
setbac do apply.
Yes
3. Does the site plan include when applicable the location of the I.S.D.S. (Individual Sewage
Disposal System) and the distances to the property lines, wells (on subject property and
adjace t properties), streams or water courses?
Yes_
9
4. Does the site plan indicate the location and direction of the County or private road accessing
the pro"?
Yes J�%
5. Do the plans include a foundation plan indicating the size, location and spacing of all
reinforcing steel in accordance with the IRC or per stamped engineered design?
Yes 1
cs
6. Do the plans indicate the location and size of ventilation openings for under floor crawl
spaces andthe clearances required between wood and earth?
Yes
7. Do the plans indicate the size and location of ventilation openings for the attic, roof joist
spaces 'soffits?
Yes �"
8. Do the plans include design loads as required by Garfield County for roof snow Loads, (a
minimum of 40 pounds per square foot up to & including 7,000 feet above sea level), floor
loads and ind loads?
Yes /�
9. Does the plan include a building section drawing indicating foundation, wall, floor, and roof
construction?
Yes
10. Does the building section drawing include size and spacing of floor joists, wall studs, ceiling
joists, roof rafters or joists or trusses?
Yes /b_
11. Does the building section drawing or other detail include the method of positive connection of
all colunms and beams?
Yes
12. Does the elevation plan indicate the height of the building or proposed addition from the
undisturbed grade to the midpoint between the ridge and eave of a gable or shed roof or the
top of a at roof? (Building height measurement usually not to exceed 25 feet)
Yes
13. Does the plan include any stove or zero clearance fireplace planned for installation including
make °del and Colorado Phase 11 certifications or phase II EPA certification?
Yes / — No
14. Does the plan include a masonry fireplace including a fireplace section indicating design to
comply with the IRC? 1
Yes No )/
15. Does the plan include a window schedule or other verification that egress/rescue windows
from sl ng rooms and/or basements comply with the requirements of the IRC?
Yes No
16. Does the plan include a window schedule or other verification that windows provide natural
light and ventilation for all habitable rooms?
Yes V2 No
17. Do the plans indicate the location of glazing subject to human impact such as glass doors,
glazing immediately adjacent to such doors; glazing adjacent to any surface normally used as
a walking surface; sliding glass doors; fixed glass panels; shower doors and tub enclosures
and speoj safety glazing for these areas?
Yes No
18. Is the location of all natural and liquid petroleum gas furnaces, boilers and water heaters
indicated on the plan?
Yes No
19. Do you understand that if you are building on a parcel of land created by the exemption
process or the subdivision process, are building plans in compliance with all plat notes and/or
covenants?
Yes % No
20. Do you understand that if you belong to a homeowners association, it is your responsibility
to obtain written permission from the association, if required by that association, prior to
submitting an application for a building permit? The building permit application will not
be accept,bvithout it.
Yes No -
21. Will this>e the only residential structure on the parcel?
Yes No If no -Explain:
22. Have twcomplete sets of construction drawings been submitted with the application?
Yes
23. Do you understand that the minimum dimension a home can be on a lot is 20ft.wide and 20ft.
long? \�
Yes T No
i
24. Have you designed or had this plan designed while considering building and other
construe on code requirements?
Yes No
25. Do your plans comply with all zoning rules and regulations in the County related to your
properties z ne district?
Yes %" No
26. Does the plan accurately indicate what you intend to construct and what will receive a final
inspectio by the Garfield County Building Department?
Yes No
27. Do you understand that approval for design and/or construction changes are required prior to
the applicSon of these changes?
Yes No
28. Do you understand that the Building Department will collect a "Plan Review" fee from you
at the time of application submittal and that you will be required to pay the "Permit Fee" as
well as any "Road Impact" or "Septic System" fees required, at the time you pick up your
buildin permit?
Yes_ No
29. Are you aware that you must call in for an inspection by 3:30 the business day before
the requested inspection in order to receive it the following business day? Inspections
will be made from 7:30 a.m. to 3:30 p.m. Monday through Friday. Inspections are to be
called intoo384-5003.
Yes ,Sc'0No
30. Are you aware that requesting inspections on work that is not ready or not accessible will
result in 0.00 re -inspection fee?
Yes No
31. Are you aware that you are required to call for all inspections required under the IRC
including approval on a final inspection prior_to receiving a Certificate of Occupancy and
occupanp of the building?
Yes / No
32. Are you aware that the Permit Application must be signed by the Owner or a written
authority being given for an Agent and that the party responsible for the project must comply
with the IRC?
Yes No
7
33. Are you aware that prior to submittal of a building permit application you are required to
show proof of a driveway arress permit or obtain a statement from the Garfield County Road
& Bridge Department stating one is not necessary? You can contact the Road & Bridge
Department at 625-8601.
Yes No
34. Do you understand that you will be required to hire a State of Colorado Licensed Electrician
and Plumber to perform installations and hookups, unless you as the homeowner are
performing the work? The license number of the person performing the work will be
required at time of applicable inspection.
Yes %c) No
35. Are you aware, that on the front of the Building Permit Application you will need to fill in
the Parcel/Schedule Number for the lot you are applying for this permit on prior to submittal
of a building rmit application? Your attention in this is appreciated.
Yes No
36. Do you know that the local fiJistrict may require you to submit plans for their review of
fire safety issues? Yes No (please check with the
building department about this requirement)
37. Do you understand that if you are planning on doing any excavating or grading to the
property prior to issuance of a building permit that you will be required to obtain a grading
permit?,
Yes
I hereby acknowledge that I have read, understand and answered these questions to the
best o+u y ability.
Signature of Own
Phone:
S73 -
Project Name:
Project Address:
S -5-575- (days);
VA? U; ew V oc,,c, Pk R.
(3153 C I fI U; t C, ric
Date
6115/05 -
(evenings)
Notes: If you have answered "No" on any of the questions, you may be required to provide this
information at the request of the Building Official prior to beginning the plan review process. Delays
in issuing the permit are to be expected. Work may not proceed without the issuance of a permit. If
it is determined by the Building Official that additional information is necessary to review the
application and plans to determine minimum compliance with the adopted codes, the application
r
may be placed behind more recent applications for building permits in the review process and not
reviewed until required information has been provided and the application rotates again to first
position for review, delay in issuance of the permit or delay in proceeding with construction.
BpminreqFeb2005
08/04/2003 21:36 9702438407
Homeowner.
SUNDANCE
COPY PAGE 03
BATTLEMENT MESA SERVICE ASSOCIATION
ARCH11 LCTYIRAL COMMITTEE APPLICATION & UtteCKLLST
(for New Home Construction projects)
14
Home Mailing Address:
Home Phone:
1 p /Lb 014 0 -.
UtTorkPhone (ifdesired): f QS - 5 6 5 5
ProjectAddress: 0153 C!'4 Vii- Ci rJe
Lot: 34 Block: (t 8 Subdivision:
ProductionHomePlanName (ifapplicable): Dr, ft w j W
Homebulder. U1))49 i '1\�p
Business Mailing �
Busnessphon: .
desired):
tataki
Submittal Date: Estimated Start Date: Estimated CompletionDate:
SUBMITTAL REQUIREMENTS: Two Copies each of items 1, 2 & 4 need to be submitted.
(Check -off items attached to the Application. Fill in spaces as indicated.)
1. Site Plan Drawing (1" = 10' or 1" = 20' scale) with the following information shown:
Lot, Block & Subdivision name
✓ Street Address of Project.
L.- Building Setback Lines (also fill-in the shortest distance between property line to the
exterior wall closest to that property line). Please be aware that all Building Setback
Lines are taken from your Property Line Pins!! Your Property Line is NOT the
Curb Linel!
Front Setback:
Left Side Setback:
Right Side Setback:
Rear Setback:
Utility Easements.
Dwelling Unit.
f 55' Clear Site -Linc at Intersection Corner Lots.
- Site Grading Elevations & Drainage.
Game
Zs
First (main) Floor Height in relation to top of street curb at front -center of lot.
f Driveways (including width of driveway), Walkways, Patios, etc.
f Outbuildings.
Page 2 of 6
.08/84/2003 21:36 9702438407 SJ4DANCE PAGE 04
(/ 2. Architectural Drawings (1/4" = 1' or 1/8" = 1' scale) with the following information shown.
Floor Plan(s) with, overall dimensions (fill-in the following square foot areas).
First Floor Finished Living Arca:
Second Floor Finished Living Area:
Lower Floor Finished Living Area:
Total Finished Living Area:
Total Unfinished Living Area:
Garage Area:
970.YY
square feet
4.44 G`6 square feet
square fret
square feet
17. i 2. square feet
410.S6 square feet
Building Elevations Plans indicating doors, windows, exterior materials, bolding height,
roof pitch, roof -mounted evaporative coolers, etc. (511 -in maximum height below).
Maximpm building height to highest ridge line or balding structural projection
/ Z A% fent above top of street curb at front -center of your lot.
Engineered (stamped) Foundation Plan.
Outbuildings indicating dimensions, elevations and overall height to ridge line.
Exterior Materials (fill-in the selections below):
i/ Roofing Material: '30yr. Artil 7I+,, 1
Primary Siding Material:
Color: W n a lire d
ACcraeSidingMaterial: 4M.er44w pre C."
TrimMarerial: D'cq,.
Masonry Material: R ve. Rode -
Color: Bebe
Color: u'l,:ti.
Color. WL,}c
Color: 14~019.6+1
Stucco Materials: y A Color. A) I A.
FrontDoorMaterial: fat Color: Milk
GarageDoorMaterial Color; L/t t
COLOR SAMPLE COLOR. SAMPLE
COLOR SAMPLE COLOR SAMPLE
Page 3 of 6
COLOR SAMPLE
COLOR SAMPLE
08/04/2003 21:36
9702438407
SlNDAta PAGE 05
4. Landscape/Irrigation Plans with the following information:
Planting Plan (indicate areas of irrigated lawn, tree placement, shrub beds, ground cover,
etc.).
Plant Material listing by species of trees, shrubs and grasses.
Groundcover Material with weed control barrier.
Fences.
Other Landscape Improvements (decks, site lighting, flag poles, etc.).
5. Variance Request (if applicable) Give details below:
6. Residential Construction Monetary Deposit:
I/We hereby acknowledge and understand that our failure to complete Home Construction, Improvement
Projects or Landscaping Construction witbln the time constraints noted in Conditions 2. & 3. On Page
6 of this Application wiq result in a Notice and Opportunity for a Hearing before the BMSA Board of
Directors. If I/We are found in violation of these Conditions at the Hearing it will result in a fine to the
Owner of not leas than 5500.00 per month for each fu i month in excess of the allotted completion time
frame.
I/We hereby acknowledge that Home Construction or Improvement Projects or Landscape Construction
features which are built in non-conformance with this Hill application, including the Conditions of
Approval noted on Page 6 of 6 herein, 1/We wilt be cited by the BMSA/AC in written citation form at the
time of discovery. In extenuating circumstances a Variance may be requested from the BMSA/AC,
provided such Variance request item is within the purview and approval jurisdiction of the BMSA/AC.
If a Variance is not granted by the BMSA/AC and if the Non -Conforming Items are not corrected within
60 days after the date of written citation, I/We will be served Notice of a Hearing before the BMSA Board
of Directors, and if I/We are found in violation of these Non -Conforming Items at the Hearing I/We will
be fined a minimum of 5500.00 per Non -Conforming Dem. Notwithstanding the foregoing, I/We
acknowledge that the BMSA Board of Directors and/or Architectural Committee may pursue any legal
remedy available in the event of a non-compliance.
Page 4 of 6
08/84/2003 21:36 9702438407
SekDANCE
AS PER THE ARCHITECTURAL STANDARDS,PLEASE INDICATE THE
FOLLOWING POINTS ON THE PLOT PLAN AND BELOW:
ELEVATIONS AT EACH CORNER OF THE LOT.
LOCATION.
1.
2.
3.
4.
5.
6. -THE HIGH POINT OF THE LOT.
7. --THE LOW POINT OF THE LOT.
8. -HEIGHT OF GARAGE FLOOR
9: -HEIGHT OF HOUSE MAIN FLOOR.
ELEVATION (BEET )
Ji
fig-d-
\51/11
10. -HEIGHT OF ROOF ABOVE FOUNDATION. ---
( MAXIMUM-- 35 FEET )
11. -HEIGHT OF ROOF ABOVE CENTER
OF THE MID CURB.
( MAXIMUM--- 29 FEET )
mamma
PACE 06
12. -DRAINAGE FLAW LINES 07N... -
N PLOT PLAN.
13. -ROOF PITCHES. ----1: 7 /L
3:-
15. --SQUARE FEET OF LIVING SPACE.
08/04/2003 21:36 9702438487
Si4DAWCE PACt 07
Failure to pay fines levied as determined at the Hearing may also result in a Lien being placed on your
Property or litigation Process initiated by the BMSA Board of Directors to secure conformance with thi:
full Application and its respective Conditions Of ApprovaL
I/We understand that Architectural Committee approval does not constitute approval of the local building
department, drainage design or structural soundness, nor does it constitute assurance that the plat
comply with all applicable codes, regulations, ordinances and laws.
I/We farther acknowledge that any subsequent field changes which I/We may desire to the Howe
Construction or Improvement Projects of this original Application Submittal and the original Condition:
of Approval issued by the BMSA/AC will require an additional Revised Application Submittal on our
behalf, and that I/We will not proceed with any subsequent field changes until a Revised Conditions of
Approval have been issued to us by the BMSA/AC.
Owner's Signature(s):
Owner's Printed Names?
Builder's Signature:
Builders Printed Name:
Page 5 of 6
Date:
08/04/2003 21:36 9702438407 SINDANCE PAGE 08
This portion of the Application Form is to be completed by the
Architectural Committee (not the Applicant).
CONDmONS OF APPROVAL or DISAPPROVAL
1. No sitework or building construction may proceed on any Lot (including no preliminary site clearing,
grubbing, grade alteration, storing ofmaterial, foundation excavation, extension of underground utilities,
etc.) until the Project has received a Project approval from the Architectural Committee and has been
issued a Building Permit (as required by Garfield County for new home or Renovation projects).
2. All general building and site improvements construction for any Project shall be completed and shall have
issued a Certificate of Occupancy from the Garfield County Bolding Department no later than one (1)
vear after the issuance date of this Architectural Cou mi`ttee Approval
3. The complete la a (keying and revegetation ofthe improved Lot, to specifically include the from, side and
r yard areas, shall be completed no later than six (6) months from the date of the Certificate of
Occupancy.
4. If the selection of colors and /or landscaping plans are not included with this application they must be
submitted for approval before any action is taken to install the missing items.
5.
6.
7.
Applicatioty,+Igprove] (Initis of Architectural Committee Members):
By:
Application App ed for onon jest to the above conditions: /C. v
lay Chairman:c! L Date: strnctrtQ'
Application Denied (initials of Architectural Committee Members):
By:
Application Denied for reason(s) stated above:
By Chairman: Date:
Page 6 of 6
Jun. 2. 2005 3:48PM HIGH COUNTRY ENGINEERING
No.0759 P. 3/4
DR,y ;,;'OW
NOTE:
ALL DRAINAGE SHALL FLOW AWAY FROM THE
BUILDING WITH A GRADE DROP OF 1 VERTICAL FOOT
IN 10 HORIZONTAL FEET.
4
i
&DR4FTWOOD i1
LOT 39
0153 CLIFF VIEW °'
CIRCLE q
FF ELEV: 5418.12
21.001
__ .J
I �
LOT 40
110 HIGH COUNTRY ENGINEERING, INC
to IRVEpNEy ppryE
A4W1E flSP-tlfT,DnN2ODO1flEWSgO%O4CDl 13
5517 ELAfl Ayp01E. ITE tot, q,WW000 Y1101, tb• loo'
VMaeolitey
DARTER. U.0
• 6ARFIELD COUNTY. COLORADO
VALLEY VIEW VILLAGE
PHASE B
LOT 39 WE PLAN
oRAWnlm
ALA
1^=20•
cllocaro et
REW
PIOJECr Na.
2021056.02
DATE
6-1.05
PAGE'
nu..1 /202/1056#P1t2/CrrrPl &men..r�n.
JUN 13 2005 10:41 FR
Box -11-19/ : 14:53 Fram:
viao
"7",11% l
R ^ r
w r.
tivi
Up n
1
G
a7Icr 'RTI
_ (.fCiQIdO 9SZ;
N
9
0
m
0
0
N
0
0
G2
S1
31,
S, ..
S3 CO
1N
N.-
513 D.: _it,
OK) CVC-
0N-1
VC-
TO 5230103 P.05
10: G41 do.)
27-10-0
N
Ow
00
m
41 .: N
I S,. CC
• 41 0 0
G3; I • CD CD
t1 -;.D1
. ....E13- ..... ; . . .D?.m- ---
3._,!
T1 :.. "7 ma ) 19-0-0 1p rat.
OG Till ' v_) SD -
1 -114-. —
T 1 �A8! �, .1
ro m.00
r1/1 Ani . _.D2 O_.,.,_
r1Afir O�m A
71A l�� s 22-0-,....� 1 0
�
T;A . Dec 1971 m
01 f{0 .
Velm
y
J
as -s -o
10
0
r.,- .
1
G4
64
S4
54
544,1
-�
s4
S4
S4
54
S4
G4
J
m'
6153cvc
l'A
Yeh and Associates, Inc.
Geotechnical Engineering Consultants
5700 E. Evans Avenue
Denver, CO 80222
Tela (303)781-9590
Fax: (303) 781-9583
0170 Mel Ray Road
Glenwood Springs, CO 81601
Tel: (970) 3841500
Fax: (970) 3841501
June 1, 2005 Project No. 24-116
Mr. Dan Penny
Grace Homes, Inc.
786 Valley Court
Grand Junction, CO 81505
Subject: Test Pit Observations, Lots 1 — 7, 38 and 39, Battlement Mesa, Phase II, Garfield
County, Colorado.
Reference: HP Geotech, "Preliminary Geotechnical Study, Proposed Roan Cliff Village
Development, Parcels 2-5 and 2-6, Battlement Mesa, Garfield County, Colorado",
dated September 16, 2002.
Dear Mr. Penny:
As requested, a representative of Yeti and Associates, Inc. observed backhoe test pits at the
subject site to investigate near surface conditions in order to provide recommendations for
shallow foundation design and construction. The findings of our investigation and
recommendations for construction of residences on the subject lots are presented in this letter.
A preliminary geotechnical report was conducted by HP Geotech in 2002, as referenced above.
Yeh and Associates, Inc. work was done in accordance with our agreement for geotechnical
engineering services for Grace Homes, Inc. dated November 5, 2004.
Based on conversations with the client, single-family residences are planned on these lots. We
anticipate the foundations will consist of a concrete mat with thickened edges. Basements are
not planned for these residences. The lots are rough graded and curb and gutter is installed.
Streets were not paved at the time of our investigation. Based on site observations, the lots are
near construction grade and fill placement should be negligible, if necessary.
We observed excavation of test pits located on the property line between Lots 1 and 2, 3 and 4,
5 and 6, 7 and 8, and 38 and 39 as shown on Figure 1. The soils exposed in the test pits for
Lots 1 - 6 consisted of sand and gravel to the maximum explored depth of approximately 6 feet.
The sand and gravel had 12 to 24 percent fines (passing No. 200 sieve) with liquid limits
ranging from 34 to 39 percent and plasticity indices of 13 to 18 percent. Soils encountered on
Lots 7, 38 and 39 consisted of silt and clay to the maximum explored depth of 6 feet. A grain
size analysis indicated that the silt and clay from these lots consisted of approximately 51 to 56
percent low to moderate plasticity silt and clay with liquid limits of 29 to 44 percent and plasticity
indices of 11 to 17 percent. The sand and gravel classified as SC and GP -GC or GM and the
silt and clay classified as ML and CL, respectively, based on the Unified Soil Classification
System. Laboratory test results are presented on Figures 2 through 7. Groundwater was not
encountered in the excavations and the soils were slightly moist to moist.
Project No. 24-116
Based oh our investigation, spread footings or a mat foundation constructed on the undisturbed
natural soils can be designed for an allowable soil pressure of 1,500 psf for the above
referenced Tots. Soils encountered on adjacent lots near anticipated foundation level exhibited
compression during laboratory testing. Increases in moisture content due to irrigation or other
sources could cause hydro -collapse of the subsoils resulting in foundation settlement. Care
should be taken to provide drainage away from the residences. Recommendations for surface
drainage are presented in the referenced report. Loose, disturbed soils encountered at
foundation level should be removed and replaced with compacted fill or the foundation should
be extended to undisturbed soils. Other design and construction recommendations presented in
the above referenced geotechnical report should be followed.
This study was conducted in accordance with generally accepted geotechnical engineering
practices in this area at the time the investigation was performed for use by the client for design
and construction purposes. The recommendations submitted in this letter are based on our
observations of the subsoils encountered in the test pits and laboratory test results. This study
is based on the assumption that soils at other portions of the lot are similar to the conditions
encountered in the pits to the depths excavated. The risk of foundation movement may be
greater than indicated in this report because of possible variations in the subsurface conditions.
Expansive soils may occur on this site. If expansive clays are encountered in building areas,
they may need to be removed or the footings designed with a minimum dead load pressure to
reduce foundation and slab -on -grade movements. If the conditions encountered in foundation
excavations vary from what is described in this report, we should be notified to re-evaluate our
recommendations. We recommend on-site observation of excavations and foundation bearing
strata by a representative of the geotechnical engineer.
Please call if you have any questions.
YEH AND ASSOCIATES, INC.
%PALO D. %
yy,�
a 35832 0.
Richard D. Johnson, P.E.
Senior Geotechnical Engineer 7/'"'^'
2 of 2
•
U
•
•
9
J
9
9
0
J
J
J
J
0
J
1
7
A
1
1
1
7
A
1
A
..41g0..nW miA i1
NP4Vlag^V
ROWS
Hydrometer Analysis
Size of Particles in mm
•
c
y
U.S. Standard Sieves
Sieve Opening in Inches
.c
u a)
a
i
i
i
a,
00i
97
CO
cc)N
39
m
In to
En
N
2"
\
.-
\
W
-
t\
a
#
N
%
8
R
0
R
0
111
01
10
II'1II
1it
II
II
1,;
Ill
1
4 I
- I -t
'
Y
rt
11
11
1
•
•
;
—
IIH
II
I
•I
•
Al
I
;
-f.j-y
.ai.
I i
1
I
s
• II
II
1
.
L
1
-.
+-
T1
Ln
+
NI
1■nf
1_
• T
4-t-
._.
■in
Li
Mn
T
-T
I a-11
I
I
t ' 4 -
-4 —_
+,1
—' r
J"_ 1■=■
■■
•
.
1
I
4
o rn m n m a
6u1ssed 41.103J0d
0
0
0
0
6
E
N
m
0
0
i'
I0
0
0
8
in
N
0
V
00
0
d
c
00
c
It
0
0
0
0
0
irq
SIEVE ANALYSIS
CD
N
N
0
Z
a)
d
6
Z
Ol
li
Valley View Village
Lots 1 and 2, Phase II
0
d
0.
E
a7
0
art
N
J
-J
J
0
a
1
O
CD
N
>
C9
a
c
N
N
4)
c
it
clayey SAND (SC)
c
0
ma
0. -c
EN
co 0
Hydrometer Analysis
Size of Particles in mm
Sieve Analysis
U.S. Standard Sieves
Sieve Opening in Inches
%
Passing
(0
51
I 1
I
50
49
46
45
42
39
29
CVrim
Sieve
Size
� i
2"
N
8
2
0
8
A coOr m N O
Bussed Pu03104
M
N
0
0
0
C
O
E
E
co
CO
0
V
A
a
O
O
s
SIEVE ANALYSIS
isq
co
N
0
z
U
d
O
a`
itre
a
Tm
CD -c)
30
f0
0 0
Valley View Village
Lots 3 and 4, Phase II
p
N
Q
E
CO
E
E
m y 0
co
w
N
CO
J
-J
J
a
a
CO
Y1
O
M
N
r
2
0
V
C
0
C
clayey GRAVEL (GP -GC)
O
a .
G'C
E
co 2co 0
1.0
3
K
1
I 1
I
1
1 1
1
� i
sili
10
I1
mu
mm
n�i
nn.nnn.
11111
NI
■
IANIIIIIIIIIIII■IIf,I1
...no.
inn
•..Asan.
1
;'
-
J
1
•
i
1
I
I ,
J
•
jr
1 4,—;I
1
L
i
-
•
T
Lir
,
+ iT
1
?
_Nom
-
en:
In:
tel'
'-
1_ 1 i
1i
II
•I
•
I
iJ-1-
rt
i --"
•
'
-4
,,
'
I,l
I
T
_. .. -I :+.1-1
. - - -- _+._y-*-
11
I
_I 1-+t1
J--.
ili 'ti
1
.T_I--T4-f--'rt_-__-__
._ -' ___1_Y i--
111
4
Y
I I
II
1;1''
y_ _
' -
-T
lL
_ - _ j
II
I I
1-
.T
ti
—L
1
+--T
-tit.,.
I-ir
;111'
-r-i-
'_
[
�: I
-t-f 7 . l t I �
I L I I
I
8
A coOr m N O
Bussed Pu03104
M
N
0
0
0
C
O
E
E
co
CO
0
V
A
a
O
O
s
SIEVE ANALYSIS
isq
co
N
0
z
U
d
O
a`
itre
a
Tm
CD -c)
30
f0
0 0
Valley View Village
Lots 3 and 4, Phase II
p
N
Q
E
CO
E
E
m y 0
co
w
N
CO
J
-J
J
a
a
CO
Y1
O
M
N
r
2
0
V
C
0
C
clayey GRAVEL (GP -GC)
O
a .
G'C
E
co 2co 0
1.0
3
K
.0)
oco
H
N
Q
uY
1
1
1
49
a
47
45
•cr
41
30
14
N W
0)N
M
IV
N
N
N
\
1-
0I
e"
it
O_
It
O
g
00Z#
Size of Particles in mm
U.S. Standard Sieves
Sieve Opening in Inches
8
a
m
0
e
CO
iii
"
I(
I
1
k
1-1
-y
1
!
i
1
T
I
I
I
I
I
I
I
I
I'
Ii
_
- 11��
1
H •
-'
-1-11-7i
4•
r
B
■
-r-
1 •
-i
;
1 ,•
7 1
1 1
1
8
m
m
m
N
BUMS Ed )ueosad
1+01
N
O
O
0
O
SIEVE ANALYSIS
N
0
2
U
d
0
O 0
et it
M
00 v
• U
N
e
O 0
Valley View Village
E
co
2
0
Lots 5 and 6, Phase II
0
d
0.
E
1)
u,
rn
M
N
J
J
J
0
o
0
CD
10
0
0
V
COC
CO
r
N
0
C
LL
silty GRAVEL (GM)
e
O
N d
E c°
E t0
loo 0
0
1'
c`
a
0
Hydrometer Analysis
Size of Particles in mm
r
c
Qo
U.S. Standard Sieves
Sieve Opening in Inches
a
• c
•
,
94
88
76
56
0 N
I
1
1
1
CO
M
1
111111
O.
I
Sieve
Size
i
a
0
a7
a
III
II
I
I
87
75
51
Sieve
Size
III;II
CN
N
N
\
r
1-
11881
1111111
Vn■
.4°
a
#
a
OOb#
Hydrometer Analysis
Size of Particles in mm
U.S. Standard Sieves
Sieve Opening in Inches
8
2
9
0
N
e
O O m t-
0
O 0
Bulssed wowed
cn
O
n
O
0
0
0
E
N
m
t
a
0
0
C
0
U
00
0
0
ELI
0
0
0
0
0
SIEVE ANALYSIS
CD
O
6
2
0
N
O
a`
6
2
rn
IL
0 0
m
c
00
Valley View Village
E
m
2
d
a
Lots 38 and 39, Phase II
0
W
a
E
m
co
0)
N
-J
J
CO
N r
N ••--
a a
r
2
C7
o_
CO
C
silty CLAY (CL
C
c
E�
0:1 CD
0
III
II
I
I
I I 1
11
III;II
11881
1111111
Vn■
nnUNUUUUmminnol
1
'
I :
NOMANISSAIIIIIIM
InIn1111III
1181111111
1111111
t
I
.
11
nn!:iiiiiiill
I I
11•
•
,
; I
111
111
----
- 7
•
1
I 1
'
111
'
•••
ME;
siN�
.ter
EN
N���
o�
r
I
iui
1UI
111
I 1
HHHIIIl
•
IEI
H•
;
1111
I
Id
a.
. , -
Ella
-r-
INN
ONE
y;__-ri--
----
�r :
..—n...
•
I
I 1
I
1
,
+
a
______,T
�rt
�-!IIS
• '', Y
T I 1-r
' 1
••
-rfrt'T:
TILL
t,
Ttt
+
t1+t
-F-.----F
-fes
T
Ii i
+--•
..._+a+;
•'k
4T
I
,
T+tt-
4±t—
r�
- rt l
H-
7
i
1
l
II
iri—
I
I
1
11
O O m t-
0
O 0
Bulssed wowed
cn
O
n
O
0
0
0
E
N
m
t
a
0
0
C
0
U
00
0
0
ELI
0
0
0
0
0
SIEVE ANALYSIS
CD
O
6
2
0
N
O
a`
6
2
rn
IL
0 0
m
c
00
Valley View Village
E
m
2
d
a
Lots 38 and 39, Phase II
0
W
a
E
m
co
0)
N
-J
J
CO
N r
N ••--
a a
r
2
C7
o_
CO
C
silty CLAY (CL
C
c
E�
0:1 CD
0
Hydrometer Analysis
Size of Particles in mm
U.S. Standard Sieves
Sieve Opening in Inches
• 0)
Caa
II
III dill
97
I1
77
d
N
-
2"
a
:pi\
Q
0
0
00.1
8
8
co
•
N
w
8
rn co t- b N e
Bussed WeaJed
0,
C.
0
0
0
0
0
0
8
0
SIEVE ANALYSIS
a
4
6
z
0
d
0
z
rn
LL
00
aCC
Valley View Village
Lots 38 and 39, Phase II
a
w
a
E
to
10
0
at
0
c0
CO
0,
J
J
N
J
o_ a
- ID
0
N
2
c
V
0
0
m u
silty CLAY (CL)
0
N
0_
Eto
10
0
II
III dill
I1
1
I
r -!r I -I
i_ 1_1_1
III,
I-
,, +
L
,
I
pp
rT;,
IA
;,
III
111
NI
NIN11.111111
II
11.1�
N
11111.111111111
•
NN■unNuunuu
airs
1
IN
imillsoll
• -
•U
UYENNENNE
N�■■M■m=1
i
III
Iunn
•
4Ill
11111111111
+
Ili.
IIINIIIN
1111
Ir.
II
III■■1■u■1i■■
Ii
iiiIIIIIIiiIIIgUI
'
INI
11
IliI
ri
i
iuIlliiii
9w
•N
••=••••••••'
T
uiu
•1u■1111.1.u■■o■
■
1111
EMEM
MMMMM
Man.
Lt
•
M
1
Li
�-L
'- -- -,-
MINIM
~ .
---- ---- - -
Yuuumu
1 i
f-
Nn
m.
-
■■■■■■m■■Es■■■■
T
I
•
I
-ai.1
11
rr
I+, 11
1-
1-
-1-
,}
;i+i
I ' r li
' I
Ti-Ir.T;,
i'1 r 1 t
li
i,_ hot
8
rn co t- b N e
Bussed WeaJed
0,
C.
0
0
0
0
0
0
8
0
SIEVE ANALYSIS
a
4
6
z
0
d
0
z
rn
LL
00
aCC
Valley View Village
Lots 38 and 39, Phase II
a
w
a
E
to
10
0
at
0
c0
CO
0,
J
J
N
J
o_ a
- ID
0
N
2
c
V
0
0
m u
silty CLAY (CL)
0
N
0_
Eto
10
0
Summary of Laboratory Test Results
•
Valley View Village
E
z
a)
v
0
1
v
z
a
CLASSIFICATION
USCS
SC
GP -GC
GM
J
2
J
0
J
0
OLHSW
N
<
N
Q
N
Q
9
Q
9
<
(p
Q
W
J
Q
CC
Unconf.
Comp.
Strength
(psf)
% Swell (+) /
Consoli-
dation (-)
_o y
d W
0 ? -� 0
cn n
r
n
Atterberg Limits
E
9-
9-
9-
N-
�
9-
d
Z;0)
MIN
0
r
J
0)
11)i
a
Y
N
M
Grain Size Analysis
in O
a t e
LL y
N
-
I.
N
N
110
�"
m�
0
0)
10
et
d
Dry Density
(Po)
Moisture
Content
(%)
rn
r
10.7
14.4
n
(d
7.1
9.8
Sample Location
w
n a
E H m
co
Y
Bulk
Bulk
Bulk
Y
m
Bulk
Depth (ft)
-.J
N
.0
r
'Cr
.8
C7
(O
GO
1n
788
38 8 39
0
m
a
a
PLAN REVIEW CHEECKLIST
Applicant al -et 43 Date 8-2705-
OA-
Z"cc
GA- 39
Building
t/Engineered Foundation
4344Driveway Permit
-/hro'seyed Site Plan
A 4Septic Permit and Setbacks
, ,,6 ade/Topography 30%
Attach Residential Plan Review List
inimum Application Questionnaire
�Subdivision Plat Notes
kitire Department Review
V Valuation Determination/Fees
—RLine Plans/Stamps/Sticker
2ed
-� Attach Conditions
Application Signed
`-Plan eviewer To Sign Application
ParceUSchedule No.
ALA
GENERAL NOTES:
Letter- Manf. Hms.
Planning/Zoning
£/ Property Line Setbacks
30ft Stream Setbacks
a•Trood Plain
Building Height
�ning Sign -off
woad Impact Fees
k41OA/DRC Approval
✓�Grade/Topography 40%
// Planning Issues
Subdivision Plat Notes
JAN -23-2005 10:04 From:
Division of Registrations
To:3843470
P.2'3
Pagel of 1
.lrnn• r ss.., ..af.yY.-_a, Sala. 6Y',IYtlVISC.iYSIabW.iY'•Mil&P -!•.+-rte 1
Electrical and Plumbing Permits Online
41004/. Lestr.tr.:r-asY'.iw'YiY1'YY.U.T.rL' ._ —_.w... .. •••aIYmL\- 1.12•S‘0f1et.aa LN.M•r, r -.._l'.
view Inspection for Permit 574393
indicates Ranked Reid
Inspection
Parrott 0:572392
bepacwd Data:12/5012005
Permit Natali .E C ELECTRIC
Site AOdM06'0153 Cliff View Cir !r
Cay:9ewemerd Masa
Stats:CO
Tap:81086
1 Type:Rot
slActionAoospead
Rainepet1imn Fos Pete 3:
Comment&
Corrections:
Inspectors Plane:elft Owens
Phonc:870-625-6065
Print for Display OK
• Quintans? Check out the DeOnftlons Pan or Fr n'r ev Askgd Oueseone TAW.
experience take ow Survey b mil us about your ertsnce with the online permit, site.
:oras......—¢�s.J.._.:rs:.a-_...a. Jmuaun:u ..., . ...... _sas'>rrrat a.:'.: !awrras:'-ta_mora arrnesa.'
Grlerand: 01lr V1Oos 07!79 sin
Pnv_saymsr31 Dladrimsr
TalallEMAitaltimmc
{nu Inenmalaa Tedewlnw Swam
WMINOrne 11 Bispllamsaga II Seffela Pag•
Toff no
faNeil the Cn' lridn Oenartmant of Rajutaaory Agencies
1590 Broadway, Sults 1850
Denver, CO 00202
1703) awns*
(pox 6ee-7683 • Fax
IMMISSMIM
(The (English a Spanish), Voce ll, a (S Awlaaner HNmomc)
hUps://www.dote.state.co.usfpis/rpsl/EP_WEB_Inepeclion_GU1.$bow Pagc7P_seesion id... 1/19/2006
1n'.l II:II[ WV. RT UYf
Tfig.-Ir7.-016:X9.1 "7VT '712113313 7 3
JR1-23-2005 10:04 From:
Jan 23 2000 3:30AM HP LRSERJET 3330
To:3843470 P.3/3
p. 1
powarrdappletwibmanWeaseCtsweiSaliserww
CI Sew PIaw.DMS.. 6.w..aasaps
A0.1) San sliptimiggpolig
David Mead
Garfield County Building Department
Pax: 9'70-384-3470
1-23-06
RE: Grace Homes Valley View Battlement Mesa, Single Family Residence at 0153 Cliff
View Circle.
Building Department
t have been retained by Grace Homes to provide engineering services for the
above referenced project. I have supervised inspection of the foundations and walla poor
to concrete placement to ensure conformance with the drawings that I prepared and were
submitted for permit
The foundations in structurally adequate to satisfy the bui (ding codes currently
adopted by Garfield County.
Please contact me if there are any questions concerning this project.
Signed,
Darren R. Adams, P. E.
Oct 20 05 01:52p
Battlement Mesa Metro Dis 9702059631 p.1
BATTLEMENT MESA METROPOLITAN DISTRICT
, 109 TAMARISK TRAIL / P.O. BOX 6116 / BATTLEMENT MESA, CO 81636
(970) 285-9050 / FAX (970) 285-9631
FACSIMILE TRANSMISSION
Date: 10/20/05
TO: Andy Schwaller
COMPANY: Garfield County Building & Planning
FAX NUMBER:"384-3470
FROM: Amie Arneson
FAX NUMBER: 970-285-9631
MESSAGE
All tap fees have been paid and Water & Sewer Service is
approved for
153 Cliff View Circle.
Thanks, Amie
TOTAL NUMBER OF PAGES: 1
CONFIDENTIALITY NOTICE:
This fax communication is intended only for the above-named recipient. If you have received
this transmission in error, please call (970)285-9050 as soon as possible. It is unlawful to
disclose, in any manner, such confidential information to anyone other than the person to whom
it is directed.
No GC* 3 Assessor's Parcel No 4C- «1 -c'4 -C)
-R-Gs-
B ILDINQ PERMIT D ate Il ��
s®i SB C << PP P etr C /� c tt v.vT.'JI'�►a
AddressiJ Phone #
Address' iv. s Phone #
Job Add
Owner
Contractor t x Y' 2 -Pr-
/,$etbpc�Cs:_ , flronnj Q Rear (gyp RH
( t 1/ Q 7Ct �� INSPECTIONS
Soils Test
Footing
Foundation
Grout
Underground Plumbing /o -7'o, -
Rough Plumbing //-/3'-r"j
Framing //-28--D5- t- Af'/44,a®i.4fief-
Insulation /2^/2 "DS
Roofing
Drywall /2-/9'OS
Gas Piping 11- I S' oS
LH Zoning
Weatherproofing
Mechanical
Electrical Rough (State)
Electric inal (State) /_2-30-os€4o
Final Checklist om Meted?
Certificate Occupar cy
Date //
Septic System #
Date
Final
Other
NOTES
(continue on back)
INSPECTION WILL NOT BE MADE UNLESS
THIS CARD IS POSTED ON THE JOB
24 HOURS NOTICE REQUIRED FOR INSPECr1ONS
BUILDING PERMIT
GARFIELD COUNTY, COLORADO
Date Issued.f • 7 - 4t Zoned Area Permit No 91113
AGREEMENT
In consideration of the issuance of this permit, the applicant hereby agrees to comply with all
laws and regulations related to the zoning, location; construction and erection of the proposed
structure for which this permit is granted, and further agrees that if the above said regulations
are not fully complied with in the zoning, location, erection and construction of the above
described structure, the permit may then be revoked by notice from the County Building
Inspector and IMMEDIATELY BECOME NULL AND VOID.
Use
Address or Legal Descnption
Owner&rat. t 1-kgraeS
Setbacks Front Side
Contractor
Side
Rear
This Card Must Be Posted So It is Plainly Visible From The Street Until Final Inspection.
INSPECTION RECORD
Footing
Driveway
Foundation
Underground Plumbing ; 7-e i7J
Insulation 17-- is -OS ow,
Rough Plumbing t _ r5..
Drywall )2- i l-(4'QM-
Chimney & Vent
Electric Final (by State Inspector) /JJ-l25-Cf4
Gas Piping i /_ it -CS' —
Final / ..p(0 ,4&
Electric Rough (By State lospectoekras
Septic Final
Framing II-n.05-gyit,.
(To include Roof m place and Windows
and Doors installed).
Notes:
ALL LISTED ITEMS MUST BE INSPECTED AND APPROVED BEFORE COVERING -
WHETHER INTERIOR OR EXTERIOR, UNDERGROUND OR ABOVE GROUND.
THIS PERMIT IS NOT TRANSFERABLE
For Inspections Call 384-5003 108 8th Street Glenwood Springs, Colorado
DO NOT DESTROY THIS CARD
APPROVED
Date Plats By f /erg
IF PLACED OUTSIDE - COVER WITH CLEAR PLASTIC