HomeMy WebLinkAboutApplication-PermitGarfeld County
Building & Sanitation Department
108 8" Street, Suite #201 Glenwood Springs, Co. 81601
Office- 945-8212 Inspection Line- 384-5003
NO. Ct59a.
ja
Job Address no� �_' 1 I� N((� r� l Jl r t `/
Nature of Work Building Permit 1 ( Ph C �l ,/ V (1 In
Use of Buildin • e • t l I_ / ' f"
Owner (�J [t? cQ c&112 9
Contractor Q r L I nPr
Amount of Permit $ f)8-55. P Date
S--G1-O5
1I0-1- -o4-c 7 Clerk
Permit No:
GARFIELD COUNTY BUILDING PERMIT APPLICATION
108 8'• Street, State 201, Glenwood Sprlap, CO 51601
Phone: 970-946-8212 / Pea: 970-38+3470 / InspectLon Lbw 970-3846003
Job Address: 0 21 / 1 ij (%I t✓C; (Jr
Parcel/Schedule No: 2_4-0 1 U'+0U J
ea G;klb35
1 Lot No: y Block No:"'l l 8'` (3 Subd. / Exemption:
(
v
lelVI Z Lai Ul I'ay�
2
Owner:
Otlat Ho_t1.
Address
Ph:
Wk Ph:
3
Contractor 110. -es
Unite TIO -es
Address: %bU ��
a er ✓F
Ph:
5th Saks
Lic. No
205 -&Ai �
4
Architect/Engineer:
Address: G' •.f �(S
Lic. No.
5
Sq. Ft. of Building: '' G 7
Sq. Ft. of L ot:0 / i h �y
701 .1 rL(
Height-
No. of Floors:
6
Use of Building: Ne..... f'B-iC 1t _ M
(t, Cj rr,--�J�/j/y_IsM�J}1 r`.IAQG_/�ll�/
{ re
nao--
7
Describe Work:
/VC we Home.
8
Class of Work: ii New J Alteration o Remove
❑ Addition j Move
9
10
Garage: ❑ Single
0 NO Double
Carport: 0 Single
J Double
o Dnveway Permit 0 On -Site Sewage
Disposal
J Site Plan
11
Valuation of Work: $
Adjusted Valuations:SS / 1 7/ 313
12
�y ,,/ (a
O �� s: %s;2
„ fl.XH , `� �,eA-1•�O/ er AJ[rl�Tl QNO
A
ISSUED
THIS
AUTHORIZED
CONSTRUCTION
PERIOD
I
APPLICATION
PROVISIONS
COMPLETED
GRANTING
TO
LOCAL
SEPARATE ELECTRICAL PERMIT IS REQUIRED AND MUST BE
BY THE STATE OF COLORADO.
PERMIT BECOMES NOLL AND VOID IF WORK OR CONSTRUCTION
IS NOT COMMENCED WI'M.N 180 DAYS. OR, IF
OR WORK IS SUSPENDED OR ABANDONED FOR A
OF 180 DAYS AT ANY TIME AFTER WORK IS COMMENCED.
HEREBY CERTIFY THAT I HAVE READ AND EXAM: IED THIS
AND KNOW THE SAME TO BE TRUE AND CORRECT ALL
OF LAWS GOVERNING THIS TYPE OF WORK WILL BEi?z
WITHIN WHETHER SPECIFIED HEREIN OR NOT. THE
OF A PERMIT DOES NOT PRESUME TO GIVE AUTHORITY
VIOLATE OR CANCEL THE PROVISIONS OF ANY OTHER STATE OR
LAW REGULATING CONSTRUCTION OR THE PERFORMANCE
F CON h ON. ,A
/�IB�cn} —7/1$
`+/y�)
Plan Check Fee:
_ I
7/ 1.10'141.55 .(
Permit Fee:
l �4f 55
Total Fee:
�J�
)8ct r `14413
l i
Dated Permit Issued:
= 1ii6 -3!
OCCGroup:
_FT'l J
Const. Type:
Zoning:
Setbacks:
A6,. }1
ISDS N�o�.1&/Fte�e:j�-[,,
V"� "�,
„r/1.
C%=o'a I
t,/�-r
i
1_Q
`a`I 1`
30
N �,,A9\
• ER
5 7-2$
IpATE
V'�—
BLD fel' . PLNG DEPT. V
• AL/DATE APPROVAL/DA
1 ,t
AGREEMENT
PERMISSION IS HEREBY GRANTED TO THE APPLICANT AS OWNER, CONTRACTOR AND/OR THE AGENT OF THE CONTRACTOR OR OWNER TO CONSTRUCT THE
STRUCTURE AS DETAILED ON PLANS AND SPECIFICATIONS SUBMITTED TO AND REVIEWED BY THE BUILDING DEPARTMENT
IN CONSIDERATION OF THE ISSSUANCE OF THIS PERMIT. THE SIGNER. HEREBY AGREES TO COMPLY WITH ALL BUILDING CODES AND LAND USE
REGULATIONS ADOPTED BY GARFIELD COUNTY PURSUANT TO AUTHORITY GIVEN LN 30.28.201 CRS AS AMENDED THE SIGNER FURTHER AGREES THAT IF
THE ABOVE SAID ORDINANCES ARE NOT FULLY COMPILED WITH 1N THE LCOATION, ERECTION, CONSTRUCTION, AND USE OF THE ABOVE DESCRIBED
STRUCTURE, THE PERMIT MAY BE REVOKED BY NOTICE FROM THE COUNTY AND THAT THEN AND THERE IT SHALL BECOME NULL AND VOID.
THE ISSUANCE OF A PERMT BASED UPON PIANS, SPECIFICATIONS AND OTHER DATA SHALL NOT PREVENT THE BUILDING OFFICIAL FROM THEREAFTER
REQUIRING THE CORRECTION OF ERRORS 114I SAID PLANS, SPECIFICATIONS MW OTHER DATA OR FROM PREVENTING BUILDING OPERATION BEING
CARRIED ON THEREUNDER WHEN IN VIOLATION OF THS CODE OR ANY OTHER ORDINANCE OR REGULATION OF THIS JURISDICTION.
THE REVIEW OF SUBMITTED PLANS AND SPECIFICATIONS AND INSPECTIONS CONDUCTED THEREAFTER DOES 1401 CONSTITUTE AN ACCEPTANCE OF ANY
RESPONSIBILITIES OR LJABUTIES BY GARFIELD COUNTY FOR ERRORS, OMISSIONS OR DISCREPENCIES. THE RESPONSIBILITY FOR THESE ITEMS AND
IMPLEMENTATION DURING CONSTRUCTION RESTS SPECIFICIALLY WITH THE ARTICTECT, DESIGNER, BUILDER, AND OWNER COMMENTS ARE INTENDED
TO BE CONSERVATIVE AND IN SUPPORT OF THE OWNERS LNTEREST.
Gerken 003
I HEREBY ACKNOWLEDGE THAT I HAVE READ AND UNDERSTAND THE AGREEMENT ABOVE (INITIAI4
IcAg`? Cil-' !%170Y,R
The following items are required by Garfield County for a final inspection:
1. A final Electrical Inspection from the Colorado State Electrical Inspector;
2. Permanent address assigned by Garfield County Building Department posted where readily
visible from access road;
3. A finished roof, a lockable house, complete exterior siding, exterior doors and windows
installed, a complete kitchen with cabinets, a sink with hot & cold running water, non-absorbent
kitchen floor coverings, counter tops and finished walls, ready for stove and refrigerator, all
necessary plumbing;
4. All bathrooms must be complete, with washbowl, tub or shower, toilet stool, hot and cold
running water, non-absorbent floors and walls finished and a privacy door;
5. All steps outside or inside over three (3) steps must have handrails, guard rails on balconies or
decks over 30" high constructed to all IBC and IRC requirements;
6. Outside grading done to where water will detour away from the building;
7. Exceptions to the outside steps, decks and grading may be made upon the demonstration of
extenuating circumstances, i.e. weather, but a Certificate of Occupancy will not be issued until
all the required items are completed and a final inspection made;
8. A final inspection sign off by the Garfield County Road & Bridge Department for driveway
installation, where applicable; as well as any final sign off by the Fire District, anchor State
Agencies where applicable.
A CERTIFICATE OF OCCUPANCY WILL NOT BE ISSUED UNTIL ALL THE
ABOVE ITEMS HAVE BEEN COMPLETED.
****CANNOT OCCUPY OR USE DWELLING UNTIL A CERTIFICATE OF OCCUPANCY
(C.O.) IS ISSUED. OCCUPANCY OR USE OF DWELLING WITHOUT A C.O. WILL BE
CONSIDERED AN ILLEGAL OCCUPANCY AND MAY BE GROUNDS FOR VACATING
PREMISES UNTIL ABOVE CONDITIONS ARE MET.
I understand and agree to abide by the above conditions for occupancyrkseceaaQnd the issuance of a
Certificate of Occupancy for the dwelling under building permit # lr�
t
Signature
BpcontOct2004
Date
Applicant
VALUATION/FEE DETERMINATION
Address02�
Date 7 2.005
Finished (Livable Areal:
Main 70
Upper %(Q p
Lower
Other
Total Square Feet
Valuation
Subdivision V vv P 6
Zit Lot/Block 7
Contractor 6
/467,7s).9 = 109,555s
io
Basement:
Unfinished
Conversion of Unfinished to Finished
Plan Check Fee for Conversion
Valuation
Garage:
Crawl Space:
Valuation 383 'f
Valuation
Decks/Patios:
Covered
Valuation
Open
Valuation
7Z Y1Z
Total Valuation
4894
in, 31356
GARFIELD COUNTY BUILDING AND PLANNING
970-945-8212
MINIMUM APPLICATION REQUIREMENTS
For
SINGLE FAMILY DWELLING CONSTRUCTION
Including
NEW CONSTRUCTION
ADDITIONS
ALTERATIONS
And
MOVED BUILDINGS
In order to understand the scope of the work intended under a permit application and expedite the
issuance of a permit it is important that complete information be provided. When reviewing a plan
and it's discovered that required information has not been provided by the applicant, this will result
in the delay of the permit issuance and in proceeding with building construction. The owner or
contractor shall be required to provide this information before the plan review can proceed. Other
plans that are in line for review may be given attention before the new information may be reviewed
after it has been provided to the Building Department.
Please review this document to determine if you have enough information to design your
project and provide adequate information to facilitate a plan review. Also, please consider
using a design professional for assistance in your design and a construction professional for
construction of your project. Any project with more than ten (10) occupants requires the plans
to be sealed by a Colorado Registered Design Professional.
To provide for a more understandable plan in order to determine compliance with the building,
plumbing and mechanical codes, applicants are requested to review the following checklist prior to
and during design. Applicants are required to indicate appropriately and to submit the
completed checklist at time of application for a permit.
Plans to be included for a Building Permit, must be on drafting paper at least 18"x24" and
drawn to scale.
1
Plans must include a floor plan, a concrete footing and foundation plan, elevations all sides with
decks, balcony, steps, hand rails and guard rails, windows and doors, including the finish grade line
and original grade. A section showing in detail, from the bottom of the footing to the top of the roof,
including re -bar, anchor bolts, pressure treated plates, floor joists, wall studs and spacing, insulation,
sheeting, house -rap, (which is required), siding or any approved building material. Engineered
foundations may be required.
A window schedule. A door schedule. A floor framing plan, a roof framing plan, roof must be
designed to withstand a 40 pound per square foot up to 7,000 feet in elevation, a 90 M.P.H. wind
speed, wind exposure B or C, and a 36 inch frost depth.
All sheets to be identified by number and indexed. All of the above requirements must be met or
your plans will be returned.
All plans submitted must be incompliance with the 2003 IRC.
1. Is a site plan included that identifies the location of the proposed structure or addition and
distances to the property lines from each comer of the proposed structure(s) prepared by a
licensed surveyor and has the surveyors signature and professional stamp on the drawing?
Properties with slopes of 30% or greater must be shown on the site plan. (NOTE
Section: 106.2) Any site plan for the placement of any portion of a structure within 50 ft.
of a property line and not within a previously surveyed building envelope on a
subdivision final plat shall be prepared by a licensed surveyor and have the surveyor's
signature and professional stamp on the drawing. Any structure to be built within a
building envelope of a lot shown on a recorded subdivision plat shall include a copy of
the building envelope as it is shown on the final plat with the proposed structure located
within thye envelope.
Yes
2. Does the site plan also include any other buildings on the property, setback easements and
utility easements? Please refer to Section 5.05.03 in the Garfield County Zoning Resolution
if the property you are applying for a building permit on is located on a comer lot. Special
setbacl4sslo apply.
Yes Xj
3. Does the site plan include when applicable the location of the I.S.D.S. (Individual Sewage
Disposal System) and the distances to the property lines, wells (on subject property and
adjacegt,properties), streams or water courses?
Yes r
2
4. • Does the site plan indicate the location and direction of the County or private road accessing
the pro
Yes
5. Do the plans include a foundation plan indicating the size, location and spacing of all
reinforcing steel in accordance with the IRC or per stamped engineered design?
Yes
6. Do the plans indicate the location and size of ventilation openings for under floor crawl
spaces aathe clearances required between wood and earth?
Yes
7. Do the plans indicate the size and Location of ventilation openings for the attic, roof joist
spaces "soffits?
Yes //
8. Do the plans include design loads as required by Garfield County for roof snow loads, (a
minimum of 40 pounds per square foot up to & including 7,000 feet above sea level), floor
loads and\rind loads?
Yes T
9. Does the plan include a building section drawing irk -lir -firing foundation, wall, floor, and roof
construction?
Yes
10. Does the building section drawing include size and spacing of floor joists, wall studs, ceiling
joists, rografters or joists or trusses?
Yes
11. Does the building section drawing or other detail inchide the method ofpositive connection of
all columns and beams?
Yes
12. Does the elevation plan indicate the height of the building or proposed addition from the
undisturbed grade to the midpoint between the ridge and cave of a gable or shed roof or the
top of a ft roof? (Building height measurement usually not to exceed 25 feet)
Yes
13. Does the plan include any stove or zero clearance fireplace planned for installation including
make and model and Colorado Phase II certifications or phase II EPA certification?
Yes )1 No
3
14. Does the plan include a masonry fireplace including a fireplace section indicating design to
comply with the IRC?
Yes No jv
15. Does the plan include a window schedule or other verification that egress/rescue windows
from sleeping rooms and/or basements comply with the requirements of the IRC?
Yes 'f No
16. Does the plan include a window schedule or other verification that windows provide natural
light and ventilation for all habitable rooms?
Yes �f' No
17. Do the plans indicate the location of glazing subject to human impact such as glass doors,
glazing immediately adjacent to such doors; glazing adjacent to any surface normally used as
a walking surface; sliding glass doors; fixed glass panels; shower doors and tub enclosures
and speci safety glazing for these areas?
Yes No
18. Is the location of all natural and liquid petroleum gas furnaces, boilers and water heaters
indicated on the plan?
Yes No
19. Do you understand that if you are building on a parcel of land created by the exemption
process or the subdivision process, are building plans in compliance with all plat notes and/or
covenants?
Yes c-(' No
20. Do you understand that if you belong to a homeowners association, it is your responsibility
to obtain written permission from the association, if required by that association, prior to
submitting an application for a building permit? The building permit application will not
be accepted without it.
Yes ./P No
21. Will this be the only residential structure on the parcel?
Yes -# No If no -Explain:
22. Have two (2) complete sets of construction drawings been submitted with the application?
Yes '1
23. Do you understand that the minimum dimension a home can be on a lot is 20ft.wide and 20ft.
long?
Yes Y No
4
24. Have you designed or had this plan designed while considering building and other
construction code requirements?
Yes ' No
25. Do your plans comply with all zoning rules and regulations in the County related to your
properties zone district?
Yes No
26. Does the plan accurately indicate what you intend to construct and what will receive a final
inspection by the Garfield County Building Department?
Yes 'f No
27. Do you understand that approval for design and/or construction changes are required prior to
the application of these changes?
Yes No
28. Do you understand that the Building Department will collect a "Plan Review" fee from you
at the time of application submittal and that you will be required to pay the "Permit Fee" as
well as any "Road Impact" or "Septic System" fees required, at the time you pick up your
building permit?
Yes `; No
29. Are you aware that you must call in for an inspection by 3:30 the business day before
the requested inspection in order to receive it the following business day? Inspections
will be made from 7:30 a.m. to 3:30 p.m. Monday through Friday. Inspections are to be
called in to 384-5003.
Yes Y No
30. Are you aware that requesting inspections on work that is not ready or not accessible will
result in a $50.00 re -inspection fee?
Yes No
31. Are you aware that you are required to call for all inspections required under the IRC
including approval on a final inspection prior to receiving a Certificate of Occupancy and
occupancy of the building?
Yes 7� No
32. Are you aware that the Permit Application must be signed by the Owner or a written
authority being given for an Agent and that the party responsible for the project must comply
with the IRC?
Yes •p No
5
33. Are you aware that prior to submittal of a building permit application you are required to
show proof of a driveway access permit or obtain a statement from the Garfield County Road
& Bridge Department stating one is not necessary? You can contact the Road & Bridge
Department at 625-8601.
Yes i No
34. Do you understand that you will be required to hire a State of Colorado Licensed Electrician
and Plumber to perform installations and hookups, unless you as the homeowner are
performing the work? The license number of the person performing the work will be
required at a of applicable inspection.
Yes No
35. Are you aware, that on the front of the Building Permit Application you will need to fill in
the Parcel/Schedule Number for the lot you are applying for this permit on prior to submittal
of a building,ermit application? Your attention in this is appreciated.
Yes No
36. Do you know that the local fire district may require you to submit plans for their review of
fire safety issues? Yes No (please check with the
building department about this requirement)
37. Do you understand that if you are planning on doing any excavating or grading to the
property prior to issuance of a building permit that you will be required to obtain a grading
permit?
Yes 50
I hereby acknowledge that I have read, understand and answered these questions to the
ibest y ability.
}
/17 (K
Signature of Owner Date
Phone: C 2 J s SS 5 (days);
Project Name: Ile? Lr tv VI Hui No, 3
Project Address: 02.1 g 614 v•i tv Crc Ic
(evenings)
Notes: If you have answered "No" on any of the questions, you may be required to provide this
information at the request of the Building Official prior to beginning the plan review process. Delays
in issuing the permit are to be expected. Work may not proceed without the issuance of a permit. If
it is determined by the Building Official that additional information is necessary to review the
application and plans to determine minimum compliance with the adopted codes, the application
6
may be placed behind more recent applications for building permits in the review process and not
reviewed until required information has been provided and the application rotates again to fust
position for review, delay in issuance of the permit or delay in proceeding with construction.
BpminreqFeb2005
7
Jun.27. 2005 2:32PM HIGH COUNTRY ENGINEERING
No.1644 P. 3/4
NOTE:
ALL DRAINAGE SHALL FLOW AWAY FROM THE
BUILDING WITH A GRADE DROP OF 1 VERTICAL FOOT
IN 10 HORIZONTAL FEET.
DRAINAGE A::OW
LOT 8
LOT 7
NO218 CLIFF VIEW CIRCLE
FF ELEV: 5429.25
LOT 6
FF ELEV: 5431.69
N 89'59
W
•
HIGH COUNTRY ENGINEERING, INC.
IAONERI 011MtE1R. * P.I aq U4CLSY 0Q. Co SOI 12
AIOPROWI�4I0�0Y��M PAi Ufl C
1017Ymog PWvENcv OOS 7V azsricnoOiEOf mum
wwnlawow
DARTER. LLC DRAWN er.
GARFIELD CAUN7Y. COLORADOclaclaD Br.
I AL4
VALLEY VIEW VILLAGE 1 REW
PHASE 6
1.077 SITE PLAN
SCALE
1"= 20'
GT No:
2021056.02
DATE: PA13E'
62205
Ate' .1:/202/105649H2/snrt .shat 7-5 E
Yeh and Associates, Inc.
Geotechnical Engineering Consultants
5700 E. Evans Avenue
Denver, CO 80222
Tel.: (303) 781-9590
Fax: (303)781-9583
June 1, 2005
Mr. Dan Penny
Grace Homes, Inc.
786 Valley Court
Grand Junction, CO 81505
Test Pit Observations, Lots 1 —E138 and 39, Battlement Mesa, Phase II, Garfield
County, Colorado.
Subject:
Reference:
0 2j ec C vc.
0170 Mel Ray Road
Glenwood Springs, CO 81601
Tel: (970) 384-1500
Fax: (970) 3841501
Project No. 24-116
HP Geotech, "Preliminary Geotechnical Study, Proposed Roan Cliff Village
Development, Parcels 2-5 and 2-6, Battlement Mesa, Garfield County, Colorado",
dated September 16, 2002.
Dear Mr. Penny:
As requested, a representative of Yeh and Associates, Inc. observed backhoe test pits at the
subject site to investigate near surface conditions in order to provide recommendations for
shallow foundation design and construction. The findings of our investigation and
recommendations for construction of residences on the subject Tots are presented in this letter.
A preliminary geotechnical report was conducted by HP Geotech in 2002, as referenced above.
Yeh and Associates, Inc. work was done in accordance with our agreement for geotechnical
engineering services for Grace Homes, Inc. dated November 5, 2004.
Based on conversations with the client, single-family residences are planned on these lots. We
anticipate the foundations will consist of a concrete mat with thickened edges. Basements are
not planned for these residences. The lots are rough graded and curb and gutter is installed.
Streets were not paved at the time of our investigation. Based on site observations, the lots are
near construction grade and fill placement should be negligible, if necessary.
We observed excavation of test pits located on the property line between Lots 1 and 2, 3 and 4,
5 and 6, 7 and 8, and 38 and 39 as shown on Figure 1. The soils exposed in the test pits for
Lots 1 - 6 consisted of sand and gravel to the maximum explored depth of approximately 6 feet.
The sand and gravel had 12 to 24 percent fines (passing No. 200 sieve) with liquid limits
ranging from 34 to 39 percent and plasticity indices of 13 to 18 percent. Soils encountered on
Lots 7, 38 and 39 consisted of silt and clay to the maximum explored depth of 6 feet. A grain
size analysis indicated that the silt and clay from these lots consisted of approximately 51 to 56
percent low to moderate plasticity silt and clay with liquid limits of 29 to 44 percent and plasticity
indices of 11 to 17 percent. The sand and gravel classified as SC and GP -GC or GM and the
silt and clay classified as ML and CL, respectively, based on the Unified Soil Classification
System. Laboratory test results are presented on Figures 2 through 7. Groundwater was not
encountered in the excavations and the soils were slightly moist to moist.
r
Project No. 24-116
Based on our investigation, spread footings or a mat foundation constructed on the undisturbed
natural soils can be designed for an allowable soil pressure of 1,500 psf for the above
referenced lots. Soils encountered on adjacent lots near anticipated foundation level exhibited
compression during laboratory testing. Increases in moisture content due to irrigation or other
sources could cause hydro -collapse of the subsoils resulting in foundation settlement. Care
should be taken to provide drainage away from the residences. Recommendations for surface
drainage are presented in the referenced report. Loose, disturbed soils encountered at
foundation level should be removed and replaced with compacted fill or the foundation should
be extended to undisturbed soils. Other design and construction recommendations presented in
the above referenced geotechnical report should be followed.
This study was conducted in accordance with generally accepted geotechnical engineering
practices in this area at the time the investigation was performed for use by the client for design
and construction purposes. The recommendations submitted in this letter are based on our
observations of the subsoils encountered in the test pits and laboratory test results. This study
is based on the assumption that soils at other portions of the lot are similar to the conditions
encountered in the pits to the depths excavated. The risk of foundation movement may be
greater than indicated in this report because of possible variations in the subsurface conditions.
Expansive soils may occur on this site. If expansive clays are encountered in building areas,
they may need to be removed or the footings designed with a minimum dead Toad pressure to
reduce foundation and slab -on -grade movements. If the conditions encountered in foundation
excavations vary from what is described in this report, we should be notified to re-evaluate our
recommendations. We recommend on-site observation of excavations and foundation bearing
strata by a representative of the geotechnical engineer.
Please call ii you have any questions.
YEH AND ASSOCIATES, INC
REG,
O '0S
'5.,/ay,TF
Oi vs stn
.77.07,/35832 oc
Richard D. Johnson, P.E.
Senior Geotechnical Enginee
2of2
J
J
1
1
1
1
1
r
1
S
1
m
r
1
a
+spVprai r •••/•105
1
L1 fl 11Tif=[.AI r .
M16 -11E— tEI[�C
lifl iJ.I-3.1L1.•LtiT.Jit:P
0)
r.
N
r
1'
r
0)
rn
caN
W
0)
rn
0)
o
a
(0
0
0
N
0
N0
-P
1
ME
wrMEM
NNW
MAommomI III I
II
II
LI I i
•
11111'
1
ii
•
•
•
•
0
nnunuuu•u
•
•
-- 1
1 t -rti
o a
•
1
u
j
•N
NnNu
1
n
me
•m
I'
�I
I
it- It
L
O
0
8
o o o a CO $ .- o
6uHssed alaaied
E
3/4E
N
0)
m
t
0.
C5
I� V3
0
01)
00•
i
0 0
C
e
Ts
c
.0
-F)
o
V
a
f,�F-1 I CSDI R�l�l I I FT T'
1R4
EzILV1 El yeti
6
z
a`
04
O
z
N
co
IL
0
33
0
.. m
m7,
c V
d r
000
10
CO
a
N
0
N
c
la a SAND (
0
d a
E °
C
c
L
c
i
0
1
}
2
•
1
CO
CO
0
O
ID
O)
7
(0
LO
N
0)
(W)
0)
N
N
r
iTs ico
i+)
N
(V
1"
r
a
o_
0
a
O
NO
8
8
A
0
ry
Ir
7;�-:iIji,—
I l
j 1 1f , r 1 _1
T_
ILLI ! ' I
_ �_-_TI-i 1 1 -�' Tt_ ,
TF -T._ 1
T1-_• I ,LyI I. 1
-t-1-1 l 1 I I 1 I I I
8 g 0
0
0 2 S
bussed 30e310d
en
0
O
O
0
0
0
0
8
8
NMI
E
(o
z
d
O
0-
f117 4 • ase
En1*�1 llE14v11E
6
z
44))
O
CCK
0)
6
z
m
LL
to
CO
r
J
-J
-J
0
CO)
0
r
4)
0
c
C
tO
10
co
4)
C
LL
la e GRAVEL ( P-
C
4)
d 'C
E $
0
1
c
E
c
1
1
i
0
f
j
11--W-777177 St=
c
CYC_
.G
0
W
c
44,2 t
w
a
1
0)
OD
v
n
Yr
v
M
a
r
> m
m
fA
8
8
io
N
N
r
11
11
0
a
0
•
c
•
{
8
tt
yr
L
II
• I
•
i
0 l(0 N O'
Bussed;ueaisd
O
O
0
O
ci §
C
e
�
CmC
•yCJ.a
0 0
h
bo
ca c
ova
• 0 U
03.1o
ui
E
o
z
a
J
J
CO
0
0
d
to.
E
to
J
a
0
0
c
c
m
y
Ezi I Al EWE -1R]
O
Z
1
a
00
CC re
m�
g
0 U
to
0)
r
a
0
0
c
li
v
2
Oi
IL
it 'A (c]!Il
ti
A
c
1
•
1
E.I. ritniimMGrr
1FIES7G777:1C
0
c
0
u
in
• 0
d
f'')
N
fV
1
r
CO
O
n
a
m
O
O_
co
O
a
1.0
O
NO
8
R
8
•
A
1.
1
1
1
I;
I I
f
11'
EWE
•
l •
111
• ili'
I
'1
�I
8
m
o
n
8 8
Bussed wowed
8
N
O
O
0
6
E
N
m
()
t
a
O
0
0
8
OM
•1
d
E
w
z
g
a
3
0
d
a
E
0)
1-
r
AL'
m
N
I0
0
z
d
a
0
z
rn
LL
Ce R
3
E
0 0
10
de
a$
E a
CO m
0
J
J
m
J
a
a
10
•
0
C
co
0)
10ILL
-and IL ( L
tl
P
1
y
"h:irT2772:i47771
4ieve Openin. in Inche
ID
0)
o
CO
CO
in
8
6
iv)
N
r
C
a
0
0
a
0
if
1
mu
•
-1141 !Ij----- 'ITIIj
.-4I SII
1I
T_• —}�
III
tet_ l ty !I -LH_•
1
-i-t-t • t -r_._ Y
rtt� i
O
Bussed Weaied
O
0
0
MEEi
0
s
ON
0)
04
J
J
(•)
r
9.,
C9
0
0
0
E
N
CO
04
J
a
CD
ql4TISLIZMWE:IR
4
04
6
z
m
.o
a`
CO
d
Z
7
rn
iL
0 a'
m
ma
3 U
L0
0 0
0
r
a
ID
e
N
d
C
-11 LAY ( L
0
F
dco
E
0
1
••
n
co
0)
co
W
0)
1-
n
10
<V
r
r
n
a
_o
0
8
0
0
•
•
m
0
HP'
II 4
1111■
BIY
Er
E,1
1;N...
•
1
•
■
ii
1111111111111111■11111■111
IMMOuu■u�uuuuuunuuiuuu
iuui
IHHIIP HHH IIE NNIN
111111
jL HW
MI HIMl
111111 •......nunnnuunu
II 111
11111 IIIIIININIINNUIN
NNE.INII MN
1111111111 4 111
EMI MINIM ' ■111
uuOom••n.uIu
NOMEMinnama .N
.NN N•
nn.1ENNNNN. .N::=
-! r
I iI
1
i 1 -r-i-t 111-{ 1
sous
ins
I
I JP
1' til
I%
f
I
S O m r 8 O Y
BuIssed wowed
0
0
0
0
0
8
CS a
*NI tt
0
y
•
0 0
m
O c
�
Q
0
.0 0
@ o
u
c�
isq
ON
CO
Cr)
J
-J
1D
ots 8 and 39 Phase 1
O
0
a
E
y
N
E:11 1111161
r
(0N
6
z
•O
cc cc
mcm�
c 4.90 U
10
r
r
J
a
N
a
10
e_
0
0
c
IL
6
z
rn
LL
1-I
V
Z
YEH & ASSOCIATES,
Valley View Village
Project Name:
z
a
CLASSIFICATION
CD
U
CO
D
SC
GP -GC
GM
ML
CL
CL
O1HSW
N
Q
m N
Q
n
N
Q
C
19
Q 11-
onm
Q
6
Q
R -VALUE
Unconf.
Comp.
Strength
(Psf)
% Swell (+) /
Consoli-
dation (-)
o
co co
M
a
Atterberg Limits
a0)
y- y-
J
a
N
m
()
N
a'
N
J
A
2
v
4
N
8
Grain Size Analysis
a 8N J_
# !
LL y
N
.-
.
co
10
1()
(/)
86
M
p
2
39
1�
8
v
To
e a A
2
2
m
CI
Dry Density
(Pc)
Moisture
Content
(%)
17.9
r-
6
G
14.4
18.7
ri
O)
Sample Location
m
d 0.4)
t/)
Bulk
Bulk
Bulk
Y
M
Bulk
Y
CO
C
0.d
0
aQ
a}
y
ap
1A
11
N
4•6
<
cla
07
CD
44a
1n
CO
96
N.
M
04
CO
0)
ENE -30-19?: 04:21 From:
To:9705230103
P.4,5
t.
n
yl0
1
0
r
A
35-4 0
r 1
20-0-0
�IF
15-4-0
Telephone:
Fax:
Name: 84
LUMBER
Nome:
Address:
3022 BIC
BIRO
City: GRAND
JUNCRON
Stole: ,
Phone:
Job:
GH1394—X
°16""" "
Scale: 1 Dde: 9/21 Dram
By:
t/04/2003 21:36 9702438407 SUNCANCE
C'1ZI�S CVL
COPY
PAGE 02
BATTLEMENT MESA SERVICE ASSOCIATION
ARCHITECTURAL COMMITTEE APPLICATION SUBMITTAL FORM
(For New Home Construction)
INSTRUCTIONS:
This Application & Checklist is to be used for all project submittals to the Battlement Mesa Service Association
Architectural Committee (BMSA/AC). This form is intended to assist in ensuring that the application submittal
is complete. This will help provide a quicker, more thorough review process.
It is recommended that each Applicant thoroughly review the requirements of the current Architectural
Stanj1arda, the Amended and Restated Declaration of Covenants (including Resolutions) and the recorded
Final Plat for their respective neighborhood prior to preparing a submittaL
Applicants preparing a submittal should compare the information they are about to submit with the requirements
of this form and "check off' each required item on the form If any item is not checked, the Application submittal
is not complete and should not be submitted. Incomplete Applications will not be processed and will be returned
to the Applicant.
In addition to the checklist, Applicants should fill in all of the places on the Application Form where information
is requested. The Architectural Committee will use this information inevaluating your Application. Ifinformation
is requested but is not applicable to your specific project submittal, write "N/A" in the space provided. If some
required information is yet to be determined (such as exterior paint colors you may not have yet selected) write
"TBD" inthe appropriated space provided. You will then be required to make a follow-up submittal with these
selections at a later date but before installation in the home.
DO NOT 811 in any information in the "Conditions for Approval" section of this form Ibis portion of the form
is for Architectural Committee use only.
When an Application is complete, please mail or deliver it to the following address:
Battlement Mesa Service Association
Architectural Committee Application
73-0 Sipprelle Drive
P.O. Box 6006
Battlement Mesa, Colorado 81636
The Architectural Committee meets mice monthly on the 1" and 3"Wednesday, and Applications are due
one week prior to the Scheduled Meeting Dated for prior review by Committee members. Please contact
Jane Chapman at (970) 285-9740 to confirm the next scheduled meeting date or to request further information.
We thank you in advance for your cooperation and in complying with the Architectural Standards of the
Battlement Mesa Service Association.
Page 1 of' 6
!8/04/2003 21:36 9702438407
SIFT PAGE 03
BATTLEMENT MESA SERVICE ASSOCIATION
ARC:1I11'k.CTURAL COMMITTEE APPLICATION & CHECKLIST
(for New Home Construction projects)
Homeowner: CACP --7k1
Home Mailing Address: i 0 4 OA -
Home Phone: ()Work Plume(ifdesired): SSS S
Project Address: 1321 (4 C1)4 Via- e C . in -lc Lot: 7 Block: 1116 Subdivision: a ilaaa Lab
PmductionHoroePlanName (ifapplicable):
Homebuilder:
BusinessMailingAddress: 1(n /U�C�
BusinessPhone: 6 ,QA -' SS 5 Fax desired):
SubmittalDate: 7I D Estimated Start Date: 9/44 5 Estimated CompletionDate: " /45
SUBMITTAL REQUIREMENTS: Two Copies each of items 1, 2 & 4 need to be submitted.
(Check -off items attached to the Application. Fill in spaces as indicated.)
iZ 1. Site Plan Drawing (1" = 10' or I" = 20' scale) with the following information shown:
Lot, Block & Subdivision name.
t� Street Address of Project.
!/ Building Setback Lines (also fill-in the shortest distance between property line to the
exterior wall closest to that property line). Please be aware that all Building Setback
Lines are taken from your Property Line Pins!! Your Property Line is NOT the
Curb Line!!
Front Setback:
Left Side Setback:
Right Side Setback:
Rear Setback:
Utility Enwnts.
Dwelfine Un4
1/1
2B. b7°
Go
55' Clear Site -Line at Intersection Corner Lots.
Site Grading Elevations & Drainage.
Garage
zs
First (main) Floor Height in relation to top of street curb at front -center of lot.
Driveways (including width of driveway), Walkways, Patios, etc.
Outbuildings.
Page 2 of 6
88/84/2803 21:36
9702438407
&NDAI CE PAGE 04
2. Architectural Drawings (1/4" = 1' or 1/8" = 1' scale) with the following information shown.
Floor Plan(s) with overall dimensions (fill-in the following square foot areas).
First Floor Finished Living Arca: 70 y square fret
Second Floor Finished Living Area: 7 60 square feet
Lower Floor Finished Living Area: square feet
Total Finished Living Area: (`t G 7 square feet
Total Unfinished Living Area:
Garage Arca:
square feet
square feet
Building Elevations Plans ineliratiag doors, windows, exterior materials, building height,
roof pitch, roof -mounted evaporative coolers, etc. (fill-in maximum height below).
Maximum building height to highest ridge line or building structural projection
2.3' feet above top of street curb at front -center of your lot.
✓ Engineered (stamped) Foundation Plan.
Outbuildings indicating dimensions, elevations and overall height to ridge line.
Exterior Materials (fill-in the selections below):
RoospgMiaterial: rear; SL:4e
PrimarySidingMateriai: /f4ran Dn.*
t� Accent Siding Material: 4»ri.4- Drtels,
Trim Material: /gnarca• Dna.
Masonry Material: kine Q&c
Il) , Stucco Materials: 0 l
Front Door Material: 54..1
Color.
1� GarageDoorMaterial: 64.4
COLOR SAMPLE COLOR SAMPLE
COLOR SAMPLE COLOR. SAMPLE
Page 3 of 6
vont
Color: �.,.
Color:
Color. �+'k
be,.t,.l
Color:
Color:
3f4
Color: 0,;44
Color: 14k
COLOR. SAMPLE
COLOR SAMPLE
08/04/2003 21:36 9702438407
SLNDANCE PAGE 05
4. Landscape/Irrigation Plans with the following information:
Planting Plan (indicate areas of irrigated lawn, tree placement, shrub beds, ground cover,
etc.).
Plant Material listing by species of trees, shrubs and grasses.
i� Groundcover Material with weed control barrier.
Fences.
Other Landscape Improvements (decks, site lighting, flag poles, etc.).
5. Variance Request (if applicable) Give details below:
6. Residential Construction Monetary Deposit:
1/We hereby aclmowledge and understand that our failure to complete Home Construction, Improvement
Projects or Landscaping Construction within the time constraints noted in Conditions 2. & 3. On Page
6 of this Application will result in a Notice and Opportunity for a Bearing before the BMSA Board of
Directors. If I/We are found in violation of these Conditions at the Hearing it will result in a fine to the
Owner of not less than 5500.00 per month for each full month in excess of the allotted completion time
frame.
I/We hereby acknowledge that Home Construction or Improvement Projects or Landscape Construction
features which are built in non-conformance with this full application, including the Conditions of
Approval noted on Page 6 of 6 herein, UWe will be cited by the BMSA/AC in written citation form at the
time of discovery. In extenuating circumstances a Variance may be requested from the BMSA/AC,
provided such Variance request item is within the purview and approval jurisdiction of the BMSA/AC.
If a Variance is not granted by the BMSA/AC and if the Non -Conforming Items are not corrected v►itbin
60 days after the date of written citation, I/We will be served Notice of a Hearing before the BMSA Board
of Directors, and if I/We are found in violation of these Non -Conforming Items at the Hearing X/We will
be fined a minimum of 5500.00 per Non -Conforming Item. Notwithstanding the foregoing, I/We
acknowledge that the BMSA Board of Directors and/or Architectural Committee may pursue any legal
rewedy available in the event of a non-compliance.
Page 4 of 6
08/04/2003 21:36 9702438407 SUNDANCE
PAGE 06
12. --DRAINAGE FLOW LINES THE PLOT PLAN.
13. -ROOF PITCHES. ---1.
• AS PER THE ARCHITECTURAL STANDARDS,PLEASE INDICATE THE
FOLLOWING POINTS ON THE PLOT PLAN AND BELOW:
ELEVATIONS AT EACH CORNER OF THE LOT.
LOCATION,
1.
2.
3.
4.
5.
6. --THE HIGH POINT OF TAE LOT.
7. --THE LOW POINT OF TEE LOT.
8. --HEIGHT OF GARAGE FLOOR.
9. --HEIGHT OF HOUSE MAIN FLOOR.
10. -HEIGHT OF ROOF ABOVE FOUNDATION. ---
( MAXIMUM- 35 FEET )
ELEVATION (DEET )
11. --HEIGHT OF ROOF ABOVE CENTER
OF THE MID CURB.
( MAXIMUM--- 29 FEET )
15. --SQUARE FEET OF LIVING SPACE.
/2_47 _
08/84/2063 21:36 9702438407
SINDANCE PAGE 07
Failure to pay fines levied as determined at the Hearing may also result in a Lien being placed on you
Property or litigation Process initiated by the BMSA Board of Directors to secure conformance with tbi
full Application and its respective Conditions Of Approval.
I/We understand that Architectural Committee approval does not constitute approval of the local build/Jai
department, drainage design or structural soundness, nor does it constitute assurance that the plan
comply with all applicable codes, regulations, ordinances and laws.
I/We further acknowledge that any subsequent field changes which I/We may desire to the Hem
Construction or Improvement Projects of this original Application Submittal and the original Condition:
of Approval issued by the BMSA/AC will require an additional Revised Application Submittal on ow
behalf, and that I/We will not proceed with any subsequent field changes until a Revised Conditions o$
Approval have been issued to us by the BMSA/AC.
-a/Owner's Signature(s)( C�th n
Owner' s Printed Names:
Builder's Signature:
te€ Pe it)
Date:
Date:
BuildersPrintedName:
L2c=la�h
Page 5 of 6
Date:
•
08/04/2003 21:36 9702438407
SUNEANCE PAGE 08
This portion of the Application Form is to be completed by the
Architectural Committee (not the Applicant).
CONDITIONS OF APPROVAL or DISAPPROVAL
1. No sitework or building construction may proceed on any Lot (including no preliminary site clearing,
grubbing, grade alteration, storing of material, foundation excavation, extension of underground utilities,
etc.) until the Project has received a Project approval from the Architectural Committee and has been
issued a Building Permit (as required by Garfield County for new home or Renovation projects).
2. All general building and site improvements construction for any Project chap be completed and shall have
issued a Certificate of Occupancy from the Garfield County Budding Department no later than one (1)
year after the issuance date of this Architectural Comwpittee AporovaL
3. The complete landscaping and revegetation of the improved Lot, to specifically include the front slt and
sear yard areas, chap be completed no later than six (6) months from the date of the Certificate of
Occupancy.
4. If the selection of colors and /or landscaping plans are not included with this application they must be
submitted for approval before any action is taken to install the missing items.
5.
6.
7.
Application .,�� royal (Initials pf A Comani iF embers):
Application App .7 ed for Cff}struction su
By Chan:
o the above conditions:
Application Denied (initials of Architectural Committee Members):
By:
Date:
7 -6-05"
Application Denied for reason(s) stated above:
By Chairman: Date:
Page 6 of 6
• Jun.27. 2005 2:32PM HIGH COUNTRY ENGINEERING
No.1644 P. 3/4
NOTE:
ALL DRAINAGE SHALL FLOW AWAY FROM THE
• BUILDING WITH A GRADE DROP OF 1 VERTICAL FOOT
IN 10 HORIZONTAL FEET.
DRAINAGE A::OW
..__
►iii •
.
•
iallre
.. Q u1.
Mc
-
o (n S
o 4, �s) alp,
V ya a
ON CRE TE m
DRIVE A
I;
Arn
R
44.00' A�
I 11.00'
1flC/
', .
- 24001
ii
POND
c,..,
I
RIS .
.
LOT 8
P.)
A
4'LOT 7
40218 CLIFF VIEW CIRCLE +
FF ELEV: 5429.25 5
3 ,_4,. 11
'
0
,f
FF ELEV: 5431 69
01�
1•
1 ..10X12.- .
a - .-i ..
/4
PI /
r7
CO
0%/
CV
(0
-/ G
/
O
/1
Z
O
o .
0
h I'
l
W
_
,
/
f
5430
..,,RN‘‘‘‘
/
/
o, i pc,..... ,
�A"S 0; •VG ( •� „, r�
tio
/5432 �
75.00'
•• 35617 •
.., 4 to
9 a. 42-07• / :
.
i N 89'59'15 W
.�
1 ylFf� .....• �V�Z`,
li�ONAI7 DP
0 HIGH COUNTRY ENGINEERING, INC.
IA DIVEleellanitHE CAST, STE 81E0, ENCLiWDOn, CO 50112
PROM Goat ebroe.e FAX NOM 555547
1017 MAKE AYUhL*. WTi 1 O1. CIDIWOOD11910400a1501
SMOI.S;,OYq 50Ni5 FAX S7 eilm
N1MaRNsoa.
DARTER. LLC
GARFIELD COUNTY. COLORADO
VALLEY VIEW VILLAGE
PHASE B
L077 BITE PLAN
DRAWN 9Y:
ALA
SCALE:
1^=20'
CAMPED eY:
REW
PROJECT NO
202105602
DATE:
62205
PAGE.
PILE. JJ202/1066PH2/SITEPLANS/1.0T 7 -SITE
PLAN REVIEW CHECKLIST
ApplicantGt44 4vtj4.0 Date 728) 'ES
nilding Planning/Zoning
Engineered Foundation
Dr'veway Permit s..3 -Oft Stream Setbacks
^-Strlteyed Site Plan Flood Plain
//1 ASeptic Permit and Setbacks Building Height
Grade/Topography 30% ✓ toning Sign -off
•--'Attach Residential Plan Review List ✓Riooad Impact Fees
�Minimum Application Questionnaire ✓ HOA/DRC Approval
Subdivision Plat Notes v Grade/Topography 40%
ssues
Property Line Setbacks
AlFire Department Review
valuatjon Determination/Fees
✓Red/Line Plans/Stamps/Sticker
trach Conditions
pplication Signed
Lien To Sign Application
c� Peel/Schedule No.
440# Snowload Letter- Manf. Hms.
GENERAL NOTES:
Subdivision Plat Notes
03/03/2006 FRI 15:07 PAX
FAX COVER SHEET
%race I-tow.es Real, Estate aAid Cowstru.ctiow IOZ.
786 Valley Court
Grand Junction, CO 81505
To: Tor/Clarice w/Major Mtg
Andy SchwaUer w/Garfield Co.
From: Melaine A. Mims
Subject 0218 CVC
Date: 3/3/06
Pages: (Including cover) 2
Office Location: 786 Valley Court
Grand Junction, CO 81505
Fax Number. 241-6700
1-970-384-3470
Phone Number: (970) 523-5555
Fax: (970) 245=4006
_Urgent Reply ASAP Please Comment Pleose Review x For Your Information
RECEIVED
MAR 0 3 2006
GARFIELD COUNTY
BUILDING & PLANNING
®001/002
03/03/2006 FRI 15:07 FAX
®002/002
STATO#PP SAL BOARD
INSPECTION REPO ,/,.\ CORRECTION NOTICE
*t. Ree.. /3f
PEPM T • 5:794.6.3.:
cont*actor/Home Q.ner F r Lizic C
Vies: 024 gCUFF i%itco nit=
TiTtoF i1 p*onuL
Pextial Rough in _ [h deiground
ACTION: A
.opt
Commeate or Oorrectioas:-:
Taspactor's Mame
Phone i Date 34/ 0
F00IW: a7nl9P s3TIr .DOC
RECEIVED
MAR 03 2006
GARFIELD COUNTY
BUILDING & PLANNING
a2 -z
gzQE1
0FEen-
m
E*}§
*\�
o £
%k
0 -
� • �£• ca c
�
co OD a\/
2. ® &
■E2°
&g&\
D am
6ig
3▪ -0
CD CD
k
k
9\72
[ymoa
m0•■
r=�Ert
§\(0(0-a
$kik
N m P O W
5)32
1 ■
CO
Oo-
'g2EE
-a=00m
ag■9;e
slain ma]A JJ!1J 8620
L
E
Lower ValleyEnglneering and Consulting, Inc.
625 ever Flume Delve Frulta, Colorado 81521
Ph. (970) 9592000 Fax(970) e56 -20e5
David Mead
Garfield County Building Department
Fax: 970-384-3470
10-17-05
RE: Grace Homes Valley View Battlement Mesa, Single Family Residence at 0218 Cliff
View Circle.
Building Department:
I have been retained by Grace Homes to provide engineering services for the
above referenced project. I have supervised inspection of the foundations and walls prior
to concrete placement to ensure conformance with the drawings that I prepared and were
submitted for permit.
The foundations are structurally adequate to satisfy the building codes currently
adopted by Garfield County.
Please contact me if there are any questions concerning this project.
Signed,
Darren R. Adams, P. E.
Oct 20 OS 01:48p Battlement Mesa Metro Dis 9702859631
• BATTLEMENT MESA METROPOLITAN DISTRICT
109 TAMARISK TRAIL / P.O. BOX 6116 / BATTLEMENT MESA, CO 81636
(970) 285-9050 / FAX (970) 285-9631
FACSIMILE TRANSMISSION
Date: 10/20/05
Tom(_ Andy Schwaller
COMPANY: Garfield County Building & Planning
FAX NUMBER: 384-3470
FROM: Arnie Arneson
FAX NUMBER: 970-285-9631
ci(v
MESSAGE
All tap fees have been paid and Water & Sewer Service is
approved for
218 Cliff View Circle.
Thanks, Amie
TOTAL NUMBER OF PAGES: 1
p. 1
CONFIDENTIALITY NOTICE:
This fax communication is intended only for the above-named recipient. If you have received
this transmission in error, please call (970)285-9050 as soon as possible. It is unlawful to
disclose, in any manner, such confidential information to anyone other than the peon to whom
it is directed.
OCT 2 0 DOCS
i
Buk--NG p v� TyG
COUNTY OF GARFIELD - BUILDING DEPARTMENT
CORRECTION NOTICE
108 8th St., Suite 201 Glenwood Springs, Colorado
Phone (970) 945-8212
Job located at/C)
Permit No. t692
I have this day inspected this structure and these
premises and found the following corrections needed:
bold- a6
_j_45-rec, tokk
--P
o rG(S l rh-4a
fad, � /eat �
W f �c y /N- o r
Dr sc-rea)S
AlPr ire -1415? / //pt/
Ate A re_ 16 Ak.1/ some_ (le
(C
ou are he oby notified that the above correction must be inspected
before covering.
When correction(s) have been made, call for inspection at 970-384-5003.
Date
Building Inspector
Phone (970) 945-8212
li-/Dr7a rn ro 671
No CI 7 9a
n/� IBUILDINNO P*R.
Job Adca`ssf)C8 `ri VLSI -)Ch
Owners 51/�(CSi- Address
Contractor (Dtkx1P.fr
Assessor's Parcel No
acn /S-►-UJ-�;
QR, jLDaT"te k- OJ'
.ARO y Ol`l �Jf
CA_An C�lu i� �• � V � �� OlLje-
Address -r)\-SL.-
etbaFk �Fr�_ racy_ RH LH
lam' '1(��•✓1� Rear
INSPECTIONS
Soils Test
Footing
Foundation
Grout
Underground Plumbing q- /c -05i
Rough Plumbing ittfr 05-
Framing 1- 49-195
Insulationl off? 0 art
Roofing
Drywall (-.1-y-0(P .
Gas Piping (1- 5 ���11M1
Phone #
Phone #
Zoning
Weatherproofing
Mechanical
Electr'cal Rough (State)
Electr c I Final ( tate) + Gd9 • �rvQ(j
Final /ChecklisS..ioxap(eted,
Certificate Occupancy #Sa/
Date 3-Qfe
Septic System #
Date
Final
Other
NOTES
(continue on back)
55.
INSPECTION WILL NOT BE MADE UNLESS
THIS CARD IS POSTED ON THE JOB
24 HOURS NOTICE REQUIRED FOR INSPECTIONS
BUILDING PERMIT
GARFIELD COUNTY, COLORADO
Date Issued is q14 .Zoned Area Permit No 91451P.
!P.
AGREEMENT
In consideration of the issuance of this permit, the applicant hereby agrees to comply with all
laws and regulations related to the zoning, location; construction and erection of the proposed
structure for which this permit is grant and further agrees that if the above said regulations
are not fully complied with in the zoning, location, erection and construction of the above
described structure, the permit may then be revoked by notice from the County Building
Inspector and IMMEDIATELY BECOME NULL AND VOID.
Use S/A/ off. N +apex
Address
oorLegal Desc tion t o, C1� vat
Owner ^ HIS41 S Contractor Cliana se
Sethhcks
s
Front Side _Side Rear
This Card Must Be Posted So It is Plainly Visible From The Street Until Final Inspection.
INSPECTION RECORD
Footing
Driveway
Foundation
Underground Plumbing 1(-/s_p< icAN;
Insulation i- tai- D6,QM
Rough Plumbing a_ 2$-05 ,Ott'
Drywall 1_ 3.1 _ p (o AM
Chimney & Vent (,'l -24=c-4/1,
Electric Final (by State Inspector) titibR. uG
Gas Piping /Z- _c(57,0yyu
Filial . 3.3.0(6
Electric Rough (By State Inspector)
Septic Final
Framing /-t-A 5.014._
(To include Roof in place and Windows
and Doors installed).
Notes:
ALL LISTED ITEMS MUST BE INSPECTED AND APPROVED BEFORE COVERING -
WHETHER INTERIOR OR EXTERIOR, UNDERGROUND OR ABOVE GROUND.
THIS PERMIT IS NOT TRANSFERABLE
For Inspections Call 384-5003 108 8th Street Glenwood Springs, Colorado
APPROVEDDO NOT DESTROY THIS CARD
Date ' By
IF PLACED OUTSIDE - CO R WITH CLEAR PLASTIC