Loading...
HomeMy WebLinkAboutEngineer Field Report #1, #2 & Finalcoif. SE,' (i J 201? ' 1; JLr'PLANNING COUNTY ENGINEERING, INC. b N& FIELD REPORT #1 To: Bill Barnes From: Paul Stoffel E.I.T., Oddo Engineering, I c Job: Barnes Cabin, 1100-20(c2 Date: July 7, 2011 71 r Present: Paul Stoffel, Oddo Engineering Alfonso, S2M Concrete oddo engineering In accordance to your request, on July 7, 2011 Oddo Engineering's personnel observed the placement of the footing reinforcement at the Barnes Cabin site. Oddo Engineering's scope of service was to verify the correct size of rebar, rebar placement, and footing size only; overall building dimensions and material testing were not verified. Our observation waslimited to areas with easy access and not all wall areas were verified. Please see below for field observation notes: 1. Rebar appears to be clean with minimal rust. 2. Oddo Engineering stated to S2M that verification of the #5 vertical dowels prior to concrete placement shall be centered in the footing and no stabbing or moving of the dowels/bars is permitted once the concrete has been consolidated. 3. The exterior spread footing dimensions appeared to 24" wide as required along with the additional 4'-0" square footing at grid "3 & A.5" was installed per the plans. 4. #5, #6, #7 bars were used for footing reinforcement and appeared to have the required minimum clearances by the way of concrete block risers. 5. #5, #6, #7 dowels were used and appeared to have the required minimum lap splice of 40 bar diameters. 6. Proper concrete consolidation with a vibrator appeared to be used by S2M. 7. Oddo Engineering was not present for the full duration of concrete placement. In general, the rebar placement in the footing was satisfactory and appears to be per Oddo Engineering's drawings dated "Construction 7-7-11." Let me know if you have any questions or comments. �1��11111111ihlUlr4�q��� Beat Regards, `�oe A osTF,Q�;� 1 Paul Stoffel, Oddo Engineering ! 28 5 H:\Paul\Pau120081Barnes Cabin 7-7-11 memo#1.�o'',Q se- 11��` IMM 713 Cooper Avenue • Suite 200 • Glenwood Springs, CO 81601 (970) 945-1006 4, Fax (970) 945-2966 s E -Mail info@oddogws.com ODDO ENGINEERING, INC. FIELD REPORT #2 To: Bill Barnes From: Job: Barnes Cabin, 1100-20 Date: July 14, 2011 Present: Paul Stoffel, Oddo Engineering Bill Barnes Paul Stoffel E.I.T., Oddo Engineering, Inc. �r oddo engineering In accordance to your request, on July 14, 2011 Oddo Engineering's personnel observed the placement of the exterior wall reinforcement and interior pad footing reinforcement at the Barnes Cabin site. Oddo Engineering's scope of service was to verify the correct size of rebar, rebar placement, wall thickness and footing size only; overall building dimensions, pad locations, and material testing were not verified. Our observation was limited to areas with easy access and not all wall areas were verified. Please see below for field observation notes: 1. S2M Concrete was not present at time of inspection. 2. Rebar appears to be clean with minimal rust. 3. Appears that #5 & #6 bars were used for the interior pad footing reinforcement and appeared to have the required noted spacing and the minimum clearances. 4. Appears that #5 & #6 vertical bars (mixed together) appeared to be used and appeared to have the required minimum lap splice of 40 bar diameters with the dowels. 5. The corner bar lap appeared to be 24". 6. Verification of the wall reinforcement and pad footing reinforcement shall be performed by S2M. prior to concrete placement 7. The vertical bars appeared to be centered in the wall with the required 4" clearance as stated on Oddo Engineering's drawings. 8. The wall dimension appeared to 8" wide as required. 9. A 4'-0" square prefabricated steel window frame was installed along grid "A" and appeared to have #5 reinforcement each side and top and bottom which is acceptable. 10. The interior pad footings appeared to be sized according to the latest Oddo Engineering's drawings. 11. It is assumed that proper concrete consolidation with a vibrator will used by S2M. 12.Oddo Engineering was not present at time of concrete placement. 713 Cooper Avenue • Suite 200 s Glenwood Springs, CO 81601 (970) 945-1006 + Fax (970) 945-2966 s E -Mail info@aoddogws.com In general, the rebar placement in the wall and the interior pad footings was satisfactory and appears to be per Oddo Engineering's drawings dated "Construction 7-7-11." Let me know if you have any questions or comments. Best Regards, Paul Stoffel, Oddo Engineering H:1Paul\Pau120081Barnes Cabin 7-7-11 memo#1.dot 000iUll lif11111/• // 28 '41111111falliitO 713 Cooper Avenue ♦ Suite 200 ® Glenwood Springs, CO 81601 (970) 945-1006 ♦ Fax (970) 945-2966 • E -Mail info@oddogws.com September 27, 2013 Bill and Barbara Barnes 924 Clubhouse Drive New Castle, CO 81647 RE: Final Structural Approval of Barnes Cabin, Garfield County, Colorado Dear Bill and Barbara: oddo engineering We understand that Garfield County requested a structural observation of the final existing framing per the Oddo Engineering drawings dated 7-18-11. Glenwood Structural and Civil Inc. performed an onsite observation on August 22, 2013 and verified compliance with the construction documents with some deviation. The deviations were described in an email to you from Adolfo Gora P.E. dated August 23, 2013. Oddo Engineering responded to that email on September 11, 2013 with red mark comments to each of the five deviations. A final field report was submitted by Adolfo Gora on September 11, 2013. Since then we have been in contact with Adolfo Gora, Mark Stoelzel and you on acceptable fixes for the deviations which are consistent with our email dated September 11, 2013. To date we understand that all fixes to the deviations have been completed. In summary, the existing framing has been verified and complies with the Oddo Engineering construction documents dated 7-18-11 and the deviations discovered on August 22, 2013. The construction of the building is acceptable from the general observation as describe above. Sincerely, ENGINEERIN .r�p4 8EG/is, ti G I obert A. Oddo, P.E. 28085 Bob2013/Barnes Final Approval �Y;•@14600�� 713 Cooper Ave • Suite 200 s Glenwood Springs, CO 81601 (970) 945-1006 ® Fax (970) 945-2966 s E -Mail bob@oddogws.com