Loading...
HomeMy WebLinkAbout2.0 BOCC Staff Report 08.11.1986REQUEST: APPLICANT: LOCATION: SITE DATA: BOCC 8/11/86 PROJECT INFORMATION AND STAFF COMMENTS Special Use Permit for Natural Gas Pipeline American Matrix Reserves, Inc. A parcel of land located in the NW 1/4 Section 28, SW 1/4 SW 1/4 Section 21, and E 1/2 Section 20, Township 7 South, Range 90 West; located approximately 12 miles south of New Castle, off of County Roads 312 and 328. The site consists of an 8,200 ft. pipeline right-of-way. ACCESS: Existing private access roads. EXISTING ZONING: A/R/RD ADJACENT ZONING: A/R/RD I. RELATIONSHIP TO THE COMPREHENSIVE PLAN The site is located in District D, Rural Areas with Moderate Environmental Constraints, as designated on the Comprehensive Plan Management Districts Map. II. DESCRIPTION OF THE PROPOSAL A. Site Description: The site is located in a rural portion of the County with land uses primarily open space, ranching, and natural resource extraction. B. Project Description: The applicant proposes to construct an 8, 200 ft. 2° pipeline, to be -buried a minimum of 3' deep on right-of-way acquired from the State Department of Wildlife, and MING Properties, Inc. Construction will take 3-4 weeks and will be in accordance with DOT Pipeline Safety Regulations, Natural Gas Parts 191 and 192. Construction is proposed to begin as soon as possible, and will connect with Northwest Pipeline at its northern end. C. History: The proposed pipeline is being developed to serve the Baldy Creek 3-28 well, approved by Special Use permit in 1980. III.MAJOR ISSUES AND CONCERNS 1. The applicant has represented that agreements with landowners have been obtained, however, documentation of these agreements should be submitted prior to any final approval. IV. SUGGESTED FINDINGS 1. That proper publication and__ prtbli'c—a t� ce _a'a9_ provided as required for the hearing before the Board of County Commissioners. 2. That the hearing before the Board of County Commissioners was extensive and complete, that all pertinent facts, matters and issues were submitted and that all interested parties were heard at that hearing. 3. That for the above stated and other reasons, the proposed use is in the best interest of the health, safety, morals, convenience, order, prosperity and welfare of the citizens of Garfield County. V. RECOMMENDATION APPROVAL, with the following conditions: 1. All proposals of the applicant shall be considered conditions of approval unless stated otherwise by the Board. 2. The applicant, contractor and/or subcontractors shall notify the County Clerk's office and the Assessor's office to ensure proper licensing and assessment of equipment and vehicles based in the operation, prior to final approval. 3. The applicant shall comply with all regulations of Garfield County relating to industrial operations in the zone districts in which the properties are located, and shall construct and operate the pipeline in accordance with all applicable State and Federal Regulations, including but not limited to the Department of Transportation Pipeline Safety Regulations. 4. The applicant shall apply for and receive any over weight vehicle permits, as required by the County Road and Bridge Supervisor. 5. The applicant shall submit agreements with all property owners including the State Department of Wildlife authorizing the construction of the pipeline and addressing restoration of the site. All agreements shall be submitted prior to any Resolution of Conditional Approval. 6. The applicant shall have 120 days from the date of the Resolution of Approval to meet all conditions set forth in the Resolution. The Special Use permit shall be issued when all conditions are met and shall expire 120 days after issuance unless construction or use has commenced. 0,1 STATE OF COLORADO Richard D. Lamm, Governor DEPARTMENT OF NATURAL RESOURCES DIVISION OF WILDLIFE 0 • James B. Ruch, Director 6060 Broadway Denver, Colorado 80216 Telephone: (303) 297-1192 August 8, 1986 !1} AUG 13 1986 LL_ GARFIELD COUNTY Garfield County Commissioners Garfield County Courthouse Glenwood Springs, CO 81601 RE: Garfield Creek - American Matrix Reserves - Right -Of -Way Commissioners: The Division of Wildlife and Wildlife Commission at its July 17 meeting approved the application of American Matrix Reserves (A.M.R.) for the construction and maintenance of a 2 inch diameter natural gas pipeline as it crosses portions of Sections 21 and 28, T. 7 S., R 90 W. The Right -of -Way agreement has been drafted by the Division, signed by A.M.R. and the consideration paid. The document is being processed for State Officials signatures. This letter shall therefore serve as the Divisions official notice to the County Commissioners that A.M.R. is authorized to apply to the County for a Special Use Permit for the proposed construction of the subject pipeline. Also this letter shall further authorize A.M.R. to enter upon wildlife lands and begin the construction of the pipeline with the understanding that all activity will be in accordance with the Right -of -Way agreement and that the Divisions Glenwood Springs Office be advised prior to the beginning of construction. Sincerely, Pete Barrows State Wildlife Manager PB/,JCC/SES cc: Olson Norman RECEIVED AUG 111986 cum DEPARTMENT OF NATURAL RESOURCES, David H. Getches, Executive Director• WILDLIFE COMMISSION, Timothy W. Schultz, Chairman Rebecca L. Frank, Vice Chairman • George VanDenBerg, Secretary • Richard Divelbiss, Member • Donald A. Fernandez, Member Robert L. Freidenberger, Member • John Lay, Member • James T. Smith, Member AGREEMENT This stipulation between American Matrix Reserves, Inc. and Garfield County, Colorado is entered into on this day, the llth of August, 1986. It is the intent of the parties that by entering into this agreement, they acknowledge certain conditions of approval concerning the Special Use permit for natural gas pipeline system, (hereinafter referred to as pipeline), conditionally approved on August 11, 1986. Specifically, the parties acknowledge that the Final Resolution of Approval and the Special Use permit for the pipeline shall not be issued until the following conditions have been met to the satisfaction of the Garfield County Board of Commissioners. Conditions: 1. All proposal of the applicant shall be considered conditions of approval unless stated otherwise by the Board. 2. The applicant, contractor and/or subcontractors shall notify the County Clerk's office and the Assessor's office to ensure proper licensing and assessment of equipment and vehicles based in the operation, prior to final approval. 3. The applicant shall comply with all regulations of Garfield County relating to industrial operations in the zone districts in -Which the properties are located, and shall construct and operate the pipeline in accordance with all applicable State and Federal Regulations, including but not limited to the Department of Transportation Pipeline Safety Regulations. 4. The applicant shall apply for and receive any overweight vehicle permits, as required by the County Road and Bridge Supervisor. 5. The applicant shall submit agreements with all property owners including the State Department of Wildlife authorizing the construction of the pipeline and addressing restoration of the site. All agreements shall be submitted prior to any Resolution of Conditional Approval. 6. The applicant shall have 120 days from the date of the Resolution of Approval to meet all conditions set forth in the Resolution. The Special Use permit shall be issued when all conditions are met and shall expire 120 days after issuance unless construction or use has commenced. American Matrix Reserves, Inc. is hereby authorized to immediately commence construction of said pipeline on lands described in Exhibit A in Garfield County, State of Colorado. American Matrix Reserves, Inc. expressly agrees and admits that all construction and related activities are done without any assurance, agreement or stipulation on behalf of the Garfield County Commissioners that final approval of the project will be granted in the future. American Matrix Reserves, Inc. hereby acknowledges that all construction and related activities are done at its own risk, without liability of Garfield County, specifically acknowledging the necessity of the satisfaction of the above noted conditions of approval before final authorization is granted. American Matrix Reserves, Inc. shall satisfy the above noted conditions on or before October 1, 1986, at which time authorization for construction and related activities based upon this agreement shI expire. ?A?72A,?i'ze American Metrix Reserves, inc. Schmueser, Chairman Garfield County Commissioners