Loading...
HomeMy WebLinkAbout2.0 BOCC Staff Report 11.12.1985REQUEST: BOCC 11/12/85 PROJECT INFORMATION AND STAFF COMMENTS Public Hearing request for a Special Use permit for a natural gas pipeline and compressor station. APPLICANT: Barrett Energy Company ENGINEER: Burkhalter Engineering, Inc. LOCATION: Beginning in the SW 1/4 Section 33, T6S, R95W, thence easterly along north side I-70 to Rulison Overpass, thence southerly under I-70 to south side I-70 thence easterly along south side I-70 to Anvil Points Overpass, thence northerly under I-70 to north side 1-70 thence easterly over Webster Hill to Mountain Fuel Meter in NE 1/4 NE 1/4 Sec. 13, T6S, R94W, Garfield County, Colorado. Gathering system to hook up 9 Wasatch Wells in T6S, R95W: SE 1/4 Sec. 32; NE 1/4, SE 1/4, SW 1/4, Sec. 33; SW 1/4, SE 1/4, NW 1/4, Sec. 34; T7S, R95W: NW 1/4 NE 1/4 Sec. 4 with 2", 3", 4", 6" steel pipe. Hook up two Mesa Verde Wells in T7S, R96W: SE 1/4 Sec. 3; NW 1/4 Sec. 10; with 3" gathering line from NW 1/4 Sec. 10 to SE 1/4 Sec. 3, thence 8" line from SE 1/4 Sec. 3 easterly to county road, thence southeasterly along county road to outskirts of Parachute, thence easterly along north side I-70 to SW 1/4 Sec. 33, T6S, R95W for tie-in to compressor. Compressor station and yard in SW 1/4 Sec. 33, T6S, R95 W, of Garfield County. Generally located between Parachute and Rifle in the vicinity of County Rd. 215, I-70, I-70 Frontage Road and the Colorado River. SITE DATA: The site consists of 23 1/2 miles of right-of-ways or easements. WATER: N/A SEWER: N/A ACCESS: Proposed private access, County Road and State Highway right-of-way, and proposed BLM access. EXISTING ZONING: 0/S, Open Space, R/L, Resource Lands, A/R/RD, R/G/UD. I. RELATIONSHIP TO THE COMPREHENSIVE PLAN The proposed pipeline will pass through the following districts as designated on the Garfield County Comprehensive Plans Management Districts Map: Public Lands, District C, D, & F, Rural Areas with Minor through Severe Environmental Constraints, Parachute Urban Area of Influence, and Subdivisions and Rural Serviceable Areas. II. DESCRIPTION OF THE PROPOSAL A. Site Description: The pipeline is proposed in rural areas characterized by ranching and open space, along County Road and State Highway right-of-ways, and in the vicinity of Parachute with more residential and industrial types of land use. B. Project Description: The applicant proposes to construct approximately 23 1/2 miles of transmission and gathering pipeline between 8" and 2" in size with operating pressures of up to 1000 PSIG. Construction is proposed to begin in November, 1985, continuing through January, 1986, employing a maximum of 50. Restoration is proposed to begin immediately following construction in accordance with individual landowners specifications. III.MAJOR ISSUES AND CONCERNS 1. The applicant is required to construct and operate the pipeline in accordance with Federal Department of Transportation Pipeline Safety Regulations. 2. The applicant must submit documentation of agreements with all property owners authorizing the construction of the pipeline. The authorization may take the form of lease agreements, right-of-ways, or easements, and should formally address restoration plans. These agreements must be completed prior to any Resolution of Approval. 3. The proposed pipeline is not authorized by the P.U.C., (Public Utilities Commission) and therefore has no rights of condemnation. 4. The applicant must submit all approvals and permits from the Army Corps of Engineers authorizing the proposed river crossing by the gathering line in Section 4, T7S, R95 and Section 33, T6S, R95W. 5. The applicant must apply for all required road cut permits from the Garfield County Road and Bridge Department and building and septic permits from the Garfield County Building and Sanitation Department. 6. The proposed pipeline route passes through the Town limits of Parachute briefly on the north side of town. Parachute has been notified of this application and is unable to comment beyond registering general safety concerns at this time due to the scheduling of their next Town Council Meeting. Any County action should be conditional on the applicant receiving all appropriate approvals from the town. IV. SUGGESTED FINDINGS 1. That proper publication and public notice was provided as required for the hearing before the Board of County Commissioners. 2. That the hearing before the Board of County Commissioners was extensive and complete, that all pertinent facts, matters and issues were submitted and that all interested parties were heard at that hearing. 3. That for the above stated and other reasons, the proposed use is in the best interest of the health, safety, morals, convenience, order, prosperity and welfare of the citizens of Garfield County. V. RECOMMENDATION APPROVAL, with the following conditions: 1. All proposals of the applicant shall be considered conditions of approval unless stated otherwise by the Board. 2. The applicant and r shall notify the County Clerk's office and the Assessor's office to ensure proper licensing and assessment of equipment and vehicles based in the operation, prior to final approval. 3. The applicants shall comply with all regulations of Garfield County relating to industrial operations in the zone districts in which the properties are located, and shall construct and operate the pipeline in accordance with all applicable State and Federal Regulation, including but limited to the Department of Transportation Safety Regulations. 4. The applicant shall apply for and receive any road cut permits, access permits, building permits and septic permits, as required by the County Road and Bridge Supervisor & Chief Building Official. 5. The applicant shall submit agreements with all property owners including the BLM authorizing the construction of the pipeline and addressing restoration of the site. All agreements shall be submitted prior to any Resolution of Conditional Approval. 6. The applicant shall submit documentation of approval from the Army Corps of Engineers authorizing the proposed Colorado River crossing by the pipeline in Section 4, T7S, R95W and Section 33, T6S, R95W. 7. The applicant shall submit proof of compliance with all applicable regulations of the Town of Parachute. 8. A single mobile home, for use as office space, shall be allowed on the site adjacent to tne Compressor site. The lease agreement for the mobile home site shall authorize the placement of the mobile home or written confirmation from the property owner must be submitted. 9. The applicants shall have 120 days from the date of the Resolution of Conditional Approval to meet all conditions set forth in tne Resolution. The Special Use permit shall be issued when all conditions are met and shall be valid for a period of 120 days from the date of issuance, and shall expire, unless construction or use has commenced witnin tnis period. i Ii11 L/ � -S = PUBLIC NOTICE Take Notice that Barred Ede gy Company Hos ap- plied to the: Bodrd of Courny,Comm fsioners. Garfield` County. State of C Iepado, _to grant Special Use. Permit 1 con Oiwith thq loll wing delc bell property siteated n th 'couniq f daheid:ilara of Colorado; towt , Legal Descriphion1 Beginning lqS 70 Sec £- 9g 11'65,: R9SW, ih nce'eosterly along oorlh dd 70 to Rullso`n Overpass: thence southerly end '670 to south; side h. 70 Memel easterly glogg caulk aids l'7616 AnvitPoint,,. pons; lhep d ortherly uncle 170 tomorth side -70. thence easterly eYer Webiter'hill to Mountain fuel' Meter In NE 114 NE 1/4 Se617 T65, 1294W, Gerl eld' County, Catorado _ Gathering sy tem to hook upe Wasatch Wells in T65, R95Wt S835/48sa MRS Ifo; 551r/4. SW I/45 Sec33,SW I/4 SE lfS,.fjW V'yetUl T7S R95W NW 17d NE. 1/45ec4 With] 3 4',6'steel pip • MOOR up twoMina, Verde Wells in T75, R96W. SE 1/a Sec 3; NW 1/4 Sc 10: with p, gal6enn9,ine fr9n'SlW v4$ec I0 to sE1 5 3inane 6 kne'f SE8/4 5 da. egsterly t9 k upty r ody; rh ce symlte4�ierly. Imlg kapnty ro§d-(a a t k u'- 1 P9roalt to ,Hence aiferly Ao�sgynqq 1�f�s,4d8 1 70 io YW 114 Beet$ {T65, R98w, fyf» ntWc6h5pre3 ac t =% 6iffe0 al 9h 9Psd yard In Sh }fg149 33, T65, R9$W ti tleld urtly ' .} 42c1t �= Practic;s4 De's Ipli Locor'ed bath' £h,Porgchute nd RifI4' fs f na4 vlSlnity of county Rd U5,1,40, 1-70 F ant g Rg9Aan�slll C I redoAAR r''YY Sold SpacedU:parfaitikideg9wniae PBtittaaglato cpnarutt end •, pe al - natural gas -pipeline and comp r stotgnon the Ii Y,9.dpstib dproprly All Persons, of,�e t d by Ihe'p,4g ed 5pdi