Loading...
HomeMy WebLinkAbout047ACi,Aa!grtp C DEPAR?M 1F 08 S 1VIRONHIiNTAL NOALTH 2014 Blake Avenue enwood Springe Colorado 81601 water K 47 stem Iocatton L cs r. i;cmtractor Construction approval: Flans aid location are hereby approved. sere. ate inches in 4U minutes* ?7C - sq. ft. (.f _ ao area pr:r bedroom, ....r. Xc 75 9 . foot feet minimum re- quirement. I surest irate 4s Ine.peotor 0 9 `N, 2. Final approval of systems No system shall be deemed to Ix in compliance with the Sewage Disposal Laws until the s e ed system is approved prior to covering any part.9 7r, 8" se >tic tank alearout with seal . roper materials and assembly Adequate absorption area Po Adequate concrete cover (dry wells only)4n.000, I /I Covennants signed p bate inspector ke*,ain with permit records at construction site. c COLORADO nEPARTM NT OF HEALTH later Pollution Control Division 4210 East 11th. Avenue Denver, Colorado 80220 AiPLICATION FOR ArPROiAL OF LOCATION FOR SEtTIC TANK SYSTEMS THIS I8 NO? A PERMIT Applicant (Owner): AIr// lIAF Lll oo,g1) Mail Address: , ] 5/0 City: ArLE Mons t keJ A. INFORMATION REGARDING PROJECT SUBMITTED FOR REVIEW: Attach separate sheets or report showing entire area with zespect to surround- ing areas, topography of area, habitable buildings, location of potable water wells, soil percolation test holes, soil profiles in test holes. 64/4100/) 1. Location of Facility: County 64/4100/) /^ J City or Town: SI /T Legal Description Lot Sizes 75 &AM> Type of area and facility - Number of persona served: ..2. Subdivieion Motel Restaurant Trailer Court Other: JAI M4 47 3. Source l/ of domestic water: Public (name): GJ ,7i`.V f//`i/,/ Private: Well /.7 Depth JOOCOtbar Depth to first ground water tablef 4. Is facility within boundaries of City Sanitation District: 74%' If so name: 5. Distance to nearest sewer systems J4474 ?jJ^,*4r7 - Have negotiations been attempted with owner to connect: If rejected, give reason: 6. Rate of absorption in teat holes in minutes per inch of drop in water level after holes have been soaked for 24 hours: 7. Name, address and telephone of person who made soil absorption tests: 8. Name, address and telephone of person responsible for design of the system: 9. Est. bid opening date:1st. Completion,Date: 4 Est. Project Cost: Date: ( ?14 4 y 2, 23 tatAtreff (/ f o ner