Loading...
HomeMy WebLinkAbout1.0 ApplicationSpecial Use Permit Application for AM Radio Antenna Prepared for: Antenna Owner: Marantha Broadcasting Jim TerLouw, General Manager 1360 E. Sherwood Drive Grand, Junction, Colorado 81501 Property Owners: Stephen and Susanne Self 1098County Road 214 Silt, Colorado 81652 Prepared by: Gamba & Associates, Inc. 113 9th Street, Suite 214 Glenwood Springs, Colorado 81601 July 14, 2008 Table of Contents 1. Narrative 3 2. Water/Waste Water 3 3. Site Plan 4 4. Vicinity Map 4 5. Property Owners 4 6. Deed and Legal Description 5 7. Agent for Property Owner 5 8. Zoning Response 5 9. Additional Review Standards 6 10. Base Fee 6 11. Submittal 6 Special Use Permit Application 7 Site Map 8 Vicinity Map 9 Assessor's Map 10 Warranty Deed 11 Agent Letter 12 Will Serve Letters 13 FCC Construction Permit 14 Antenna Details 15 2 1. Narrative Proposal for MBC Grand Broadcasting, Inc. to erect a seventy eight -foot broadcasting antenna. MBC Grand Broadcasting Inc. requests a special use permit for the erection of a seventy eight - foot broadcasting antenna on an 8.9 acre parcel of land owned by Stephen and Susanne Self, described as tract 13 in Section 3, Township 6 South, Range 92 West of the 6th P.M. as shown by Plat #1 of Antlers Orchard Development Co., filed for record with the Clerk and Recorder of Garfield County; except that portion conveyed by instrument recorded in Book 429 at Page 258 of said Garfield County Clerk and Recorder's Records. The purpose of the proposed antenna is the broadcast of a 1490 AM frequency to the Town of Silt and outlying areas from an undetermined location within the immediate area. A 2.7' tall valcosphere, a 72.3' foot fiberglass antenna and a 3' base to which the antenna mounts will comprise the total height of seventy eight -feet. The antenna is freestanding with no guy wires and will be painted a color, which minimizes a visual impact. The proposed operation will use a buried radial ground system with 120 copper radials 160.75' in length around the base of the antenna. The radials are #10 gauge in diameter and will be buried 2-4' underground, Antenna specifications are included in the appendix. The antenna height is less than the two hundred -foot height restriction of the Federal Aviation Administration therefore will not be lighted or marked. A wood or plastic fence six-foot in height will surround the antenna a minimum of 10 feet from the base protecting it from wildlife, livestock and human intrusion. Plastic or wood is recommended over a steel wire fence to avoid antenna system de -tuning effects. Additionally, wooden or plastic fences avoid the possibility of RF energy induction into the fence itself, which may create an electrical hazard. An underground electric line serviced by Excel Energy will provide electricity and a phone line will be provided by Qwest Communications to the facility. The site will be used only as an unmanned communications facility, visited approximately once a month by passenger vehicle. An FAA Notice of Proposed Construction or Alteration (Form 7460-01) was submitted electronically to the Federal Aviation Administration on June 26, 2008 and will be provided before time of construction. 2. Water/Waste Water The site does not require water or generate wastewater and there are not plans to provide water or sanitary sewer services to the site. 3 3. Site Plan Attached is a site plan, drawn to scale, depicting the property boundaries, the proposed location for the antenna, the existing structures, and all roads within one -mile of the site. 4. Vicinity Map A vicinity map based on a U.S.G.S. quadrangle map, at a scale of 1:24,000, is attached to this submittal package and shows topography. 5. Property Owners A copy of the appropriate portion of a Garfield County Assessor's Map is attached to this submittal. Adjoining property owners and mineral rights owners are listed below. Adjoining Property Owners: Tony Zarlingo 970 County Road 231 Silt, CO 81652 2179-032-01-001 James Craig and Doris Bair & James Craig Bair Ranch Co 66418 Hwy 6 & 24 Glenwood Springs, CO 81601 2179-032-00-002 Kathleen & Jerome Rusch 353 E. Vista Dr. Silt, CO 81652-9699 2179-031-00-017 Perry Gene Connolly PO Box 298 Silt, CO 81652-0298 2179-031-00-018 Paul & Connie Ritter PO Box 423 Silt, CO 81652-0423 2179-031-00-007 Jerry & Sharon Fazzi 1090 County Road 214 Silt, CO 81652-9701 4 Perry Gene & Imogene Connolly PO Box 298 Silt, CO 81652-0298 2179-032-00-001 Marsha MaCallister & Lynn Owen Dunson PO Box 404 Silt, CO 81652 2179-032-01-002 Claire B Norris & The Trust of Anne 5 101 Kualapa Place Lahina, HI 96761 2179-031-00-013 Mineral Rights Owners: '/2 Interest Stephen & Susanne W. Self 1098 County Road 214 Silt, CO 81652 '/x Interest Richard Fazzi and or his heirs, successor's & assigns 6. Deed and Legal Description A warranty deed for the property, including a legal description is attached to this submittal. 7. Agent for Property Owner Gamba & Associates, Inc. (G&A) is submitting this special use application package on behalf of the antenna owners, MBC Grand Broadcasting, Inc., and the real property owners, Stephen and Susanne Self. A letter acknowledging this is attached to this submittal. 8. Zoning Response (1) The utilities required for the operation of the antenna is electric power and a phone service line. Excel Energy and Qwest Communications have agreed to provide services to the project upon completion of appropriate contractual agreements. "Will serve" letters are attached to this submittal. 5 (2) Street improvements will not be required as the site will be infrequently visited and the resultant vehicle trips will have a negligible impact on existing roadways. (3) The antenna is inherently small of profile and will be painted a neutral gray color to blend in with the nature landscape. The Federal Aviation Administration does not require the antenna to be lighted eliminating visual impact in low light periods. 9. Additional Review Standards A review of county zoning regulations indicates that Section 5.03.13 Broadcasting Studio and/or Communication Facility: is an applicable additional review standard. 1. The facility shall comply with the radio frequency emission requirements of the Federal Communications Commission as demonstrated by Facility Id: 160492 and Permit File Number BNP-20070926A0N. 2. The physics of AM frequency radio waves makes co -location unfeasible. 3. The facility includes a freestanding antenna tower. (a) To make the antenna less visible it will be painted to blend with the surrounding landscape. (b) The antenna tapers from 17.5" at the base to 3.75" at the tip and is capped with a 2.7' high by 3.75' wide valcoshere (see attached tower information). (c) There are no existing communication facilities on the site. 10. Base Fee A check in the amount of $400.00 is included with this application submittal. A signed "Agreement for Payment" is attached to this submittal. 11. Submittal Two copies of this submittal, including the completed application, are to be submitted to the Building and Planning Department. 6 GARFIELD COUNTY Building & Planning Department 108 8th Street, Suite 401 Glenwood Springs, Colorado 81601 Telephone: 970.945.8212 Facsimile: 970.384. www.garfield-county.com RECEIVED JUL 1 L.; 33 3CiHKf`t i.;� 6vLiNTY BUILDING & PLANNING Special Use Permit GENERAL INFORMATION > Street Address / General Location of Property: 107-3 C -94f `% O°AD /`.( 5(rr eco 11(,6. > Legal Description: .1P c T 13 i) 56: ro,o 13 / .0t.,/,,brofiE 5,•c-ri/ fre '1? 0 0.- t7ie Gilt tJ' • /6 S rIou) 0/ PLAT -11 6,c-/eri-hec d ctlib2D //-4- ➢ Existing Use & Size of Property in acres: Payr A11-, // ',' 6viz-Pti. • 14'4 Description of Special Use Requested: '7116 �26�'T,:".j c /1 .5Z v6- c (6it7' - Foe'r 0Ro. c45r„4- ,h✓ retd, fl > Zone District: A gR'D > Name of Property Owner: 7 i°µO45 Ste`-( .Vl ti/i-v ///i 4041), > Address: I 0 `tS C�,rtJTt (2014-Z ai`i Telephone: . > City: 11.--- i' State: Co Zip Code: ‘-‘3 I 5d FAX: > Name of Owner's Representative, if any (Attorney, Planner, etc): 64/40A A-(.3.0 C- / iri > Address: Po g,"/ 1416 8 Telephone: q 70 - 9y. -.35, 6 N0.;7 5P,2/A) frs '31 6°4-) > City: �iJState: CO Zip Code: FAX: - > ?11s— Iyto Doc. No.: STAFF USE ONLY Date Submitted: > Planner: Hearing Date: TC Date: APPLICATION SUBMITTAL REQUIREMENTS As a minimum, specifically respond to all the following items below and attach any additional information to be submitted with this application: 1. Please submit, in narrative form, the nature and character of the Special Use requested. Submit plans and supporting information (i.e. letters from responsible agencies). Include specifications for the proposed use including, but not limited to, the hours of operation, the number and type of vehicles accessing the site on a daily, weekly and/or monthly basis, and the size and location of any existing and/or proposed structures that will be used in conjunction with the proposed use, and provisions for electric power service and any other proposed utility improvements. Be specific. 2. If you will be using water or will be treating wastewater in conjunction with the proposed use, please detail the amount of water that would be used and the type of wastewater treatment. If you will be utilizing well water, please attach a copy of the appropriate well permit and any other legal water supply information, including a water allotment contract or an approved water augmentation plan to demonstrate that you have legal and adequate water for the proposed use. 3. Submit a site plan /map drawn to scale that portrays the boundaries of the subject property, all existing and proposed structures on the property, and the County or State roadways within one (1) mile of your property. If you are proposing a new or expanded access onto a County or State roadway, submit a driveway or highway access permit. 4. Submit a vicinity map showing slope / topography of your property, for which a U.S.G.S. 1:24,000 scale quadrangle map will suffice. 5. Submit a copy of the appropriate portion of a Garfield County Assessor's Map showing the subject property and all public and private landowners adjacent to your property (which should be delineated). In addition, submit a list of all property owners, private and public, and their addresses adjacent to or within 200 ft. of the site. This information can be obtained from the County Assessor's Office. You will also need the names (if applicable) of all mineral interest owners of the subject property, identified in the County Clerk and Recorder's records in accordance with §24-65.5-101, et seq. (That information may be found in your title policy under Exceptions to Title). 6. Submit a copy of the deed and a legal description of the subject property. 7. If you are acting as an agent for the property owner, you must attach an acknowledgement from the property owner that you may act in his/her behalf. 8. Submit a statement that specifically responds to each of the following criteria from Section 5.03 of the Zoning Regulations: (1) Utilities adequate to provide water and sanitation service based on accepted engineering standards and approved by the Board of County Commissioners shall either be in place or shall be constructed in conjunction with the proposed use. (2) Street improvements adequate to accommodate traffic volume generated by the proposed use and to provide safe, convenient access to the use shall either be in place or shall be constructed in conjunction with the proposed use; (3) Design of the proposed use is organized to minimize impact on and from adjacent uses of land through installation of screen fences or landscape materials on the periphery of the lot and by location of intensively utilized areas, access points, lighting and signs in such a manner as to protect established neighborhood character; 9. Depending on the type of Special Use Permit requested, you may need to respond to additional review standards in the Garfield County Zoning Resolution Section 5.00 [Supplementary Regulations]. This may include uses such industrial uses [section 5.03.07 & 5.03.08], Accessory Dwelling Units [section 5.03.21], Utility line/Utility Substations, etc. Specific sections of the Zoning Resolution which can be located on the Garfield County web site at http://www.garfield-countv.com/building and planning/index.htm, or information can be obtained from this office 10. A $400.00 Base Fee: Applicant shall sign the "Agreement for Payment" form and provide the fee with the application. 11. Submit 2 copies of this completed application form and all the required submittal materials to the Building and Planning Department. Staff will request additional copies once the Special Use Permit application has been deemed technically complete. II. PROCEDURAL REQUIREMENTS (The following steps outline how the Special Use Permit Application review process works in Garfield County.) 1. Submit this completed application form, base fee, and all supplemental information to the Garfield County Planning Department. It will be received and given to a Staff Planner who will review the application for technical completeness. 2. Once the application is deemed technically complete, the Staff Planner will send you a letter indicating the application is complete. In addition, Staff will also send you a "Public Notice Form(s)" indicating the time and date of your hearing before the Board of County Commissioners. Prior to the public hearing, Staff will provide you with a Staff Memorandum regarding your requested Special Use. (If Staff determines you application to be deficient, a letter will be sent to you indicating that additional information is needed to deem your application complete.) 3. It is solely the Applicant's responsibility to ensure proper noticing occurs regarding the requested Special Use and the public hearing. If proper notice has not occurred, the public hearing will not occur. Notice requirements are as follows: a. Notice by publication, including the name of the applicant, description of the subject lot, a description of the proposed special use and nature of the hearing, and the date, time and place for the hearing shall be given once in a newspaper of general circulation in that portion of the County in which the subject property is located at least thirty (30) but not more than sixty (60) days prior to the date of such hearing, and proof of publication shall be presented at hearing by the applicant. b. Notice by mail, containing information as described in the paragraph above, shall be mailed to all owners of record as shown in the County Assessor's Office of lots within two hundred feet (200') of the subject lot and to all owners of mineral interest in the subject property at least thirty (30) but not more than sixty (60) days prior to FROM :SILVEP.TON CHAMBER OF COMMERrE FAX NO. :9703870282 Jul ib ell U. 41,F111 -RSERJET FAN J'•` 16 2008 09:56AM P4 p, 5 such hearing time by certified return receipt mail, and receipts small be presented at the hearing by the applicant c. The site shell be posted such (het the notce is dearly end conspicuously visible from a public right-of-way, wits notice signs provided by the Planning Department. The posting must take place at !east thirty (30) but rot mere p: an sixty (E0) days prior to the hearing date and Is the sole responsibility or the applicant :e post the notice, and ensure that it remains posies until and during the date of the hearing. 4. The Applicant is required to appear before the Board of County Commissioners at the time and date :f the public hearing et which time the Beard will consider the request In addition,. the Applicant shall provide proof, at the hearing: that proper nctioe was provided. 5. Once the Beard makes a decision regarding the Special Use request, Staff will rcvice the Applicant with a signet roeoluticn memorializing the action taken by the Board. For owing the Board's approval, this office wilt issce the Special Vee Permit to ;he applicant. If the • Board's approval Includes specific coneitbns of approval to be .met, this office will not Issue the Official Special Use Perrnit certificate until the applicant has satlsred all conditions of approval, The Special 'Liss Permit approval is not finalized until chi, office has issued the Official Special Use Perrnit certificate signed by the Chairman of the Board or County Commissioners. f have read the statements above and have provided the required attached information which is correct and accurate.to t ie best of my knowledge. (Signature ofProperty Owner) �J Last Raised: 07i2007 GARFIELD COUNTY BUILDING AND PLANNING DEPARTMENT FEE SCHEDULE Garfield County, pursuant to Board of County Commissioners ("Board") Resolution No. 98-09, has established a fee structure ("Base Fee") for the processing of each type of subdivision and land use applications. The Base Fee is an estimate of the average number of hours of staff time devoted to an application, multiplied by an hourly rate for the personnel involved. The Board recognized that the subdivision and land use application processing time will vary and that an applicant should pay for the total cost of the review which may require additional billing. Hourly rates based on the hourly salary, and fringe benefits costs of the respective positions combined with an hourly overhead cost for the office will be used to establish the actual cost of County staff time devoted to the review of a particular project. Actual staff time spent will be charged against the Base Fee. After the Base Fee has been expended, the applicant will be billed based on actual staff hours accrued. Any billing shall be paid in full prior to final consideration of any land use permit, zoning amendment or subdivision plan. If an applicant has previously failed to pay application fees as required, no new or additional applications will be accepted for processing until the outstanding fees are paid. Checks, including the appropriate Base Fee set forth below, must be submitted with each land use application, and made payable to the Garfield County Treasurer. Applications will not be accepted without the required application fee. Base Fees are non-refundable in full, unless a written request for withdraw from the applicant is submitted prior the initial review of the application materials. Applications must include an Agreement for Payment Form ("Agreement") set forth below. The Agreement establishes the applicant as being responsible for payment of all costs associated with processing the application. The Agreement must be signed by the party responsible for payment and submitted with the application in order for it to be accepted. The complete fee schedule for subdivision and land use applications is attached. GARFIED COUNTY BUILDING AND PLANNING DEPARTMENT BASE FEES The following Base Fees shall be received by the County at the time of submittal of any procedural application to which such fees relate. Such Base Fees shall be in addition to and exclusive of any cost for publication or cost of consulting service determined necessary by the Board for the consideration of any application or additional County staff time or expense not covered by the Base Fee, which have not otherwise been paid by the applicant to the County prior to final action upon the application tendered to the County. TYPE OF PROCEDURE BASE FEE Vacating Public Roads & Rights -of -Way $400 Sketch Plan $325 Preliminary Plan $675 + application agency review fees and outside consultant review fees, as authorized pursuant to the Regulations, such as the Colorado Geologic Survey Final Plat $200 Amended Plat $100 Exemption from the Definition of Subdivision (SB -35) $300 Land Use Permits (Special Use/Conditional Use Permits) • Administrative/no public hearing $250 • Board Public Hearing only $400 ▪ Planning Commission and Board review & hearing $525 Zoning Amendments • Zone District map amendment $450 • Zone District text amendment $300 • Zone District map & text amendment $500 • PUD Zone District & Text Amendment $500 • PUD Zone District Text Amendment $500 Comprehensive Plan Amendment $450 Board of Adjustment • Variance $250 • Interpretation $250 Administrative Permits • Floodplain Development $400 • Pipeline Development $400 Planning Staff Hourly Rate • Planning Director $50.50 • Senior Planner $40.50 • Planning Technician $33.75 • Secretary $30 County Surveyor Review Fee (includes review of Amended Determined by Surveyor$ Plats, Final Plats, Exemption Plats) Mylar Recording Fee $11 — 1st page $10 each additional page Page 2 The following guidelines shall be used for the administration of the fee structure set forth above: 1. All applications shall be submitted with a signed Agreement for Payment form set forth below. 2. County staff shall keep accurate record of actual time required for the processing of each land use application, zoning amendment, or subdivision application. Any additional billing will occur commensurate with the additional costs incurred by the County as a result of having to take more time that that covered by the base fee. 3. Any billings shall be paid prior to final consideration of any land use permit, zoning amendment, or subdivision plan. All additional costs shall be paid to the execution of the written resolution confirming action on the application. 4. Final Plats, Amended or Corrected Plats, Exemption Plats or Permits will not be recorded or issued until all fees have been paid. 5. In the event that the Board determines that special expertise is needed to assist them in the review of a land use permit, zoning amendment, or subdivision application, such costs will be borne by the applicant and paid prior to the final consideration of the application. All additional costs shall be paid prior to the execution of the written resolution confirming action on the application. 6. If an application involves multiple reviews, the Applicant shall be charged the highest Base Fee listed above. 7. Types of "Procedures" not listed in the above chart will be charged at an hourly rate based on the pertinent planning staff rate listed above. 8. The Planning Director shall establish appropriate guidelines for the collection of Additional Billings as required. 9. This fee structure shall be revised annually as part of the County budget hearing process. Page 3 GARFIELD COUNTY BUILDING AND PLANNING DEPARTMENT AGREEMENT FOR PAYMENT FORM (Shall be submitted with application) GAP\DA I ���Jvc:,H fES GARFIELD COUNTY (hereinafter COUNTY) and (hereinafter APPLICANT) agree as follows: 1. APPLICANT has submitted to COUNTY an application for SPEC/Yte us& M t* %u .fita r. A 7$ +k A1/1»»+ -rilt Skr-F pRokary (hereinafter, THE PROJECT). 2. APPLICANT understands and agrees that Garfield County Resolution No. 98-09, as amended, establishes a fee schedule for each type of subdivision or land use review applications, and the guidelines for the administration of the fee structure. 3. APPLICANT and COUNTY agree that because of the size, nature or scope of the proposed project, it is not possible at this time to ascertain the full extent of the costs involved in processing the application. APPLICANT agrees to make payment of the Base Fee, established for the PROJECT, and to thereafter permit additional costs to be billed to APPLICANT. APPLICANT agrees to make additional payments upon notification by the COUNTY when they are necessary as costs are incurred. 4. The Base Fee shall be in addition to and exclusive of any cost for publication or cost of consulting service determined necessary by the Board of County Commissioners for the consideration of an application or additional COUNTY staff time or expense not covered by the Base Fee. If actual recorded costs exceed the initial Base Fee, APPLICANT shall pay additional billings to COUNTY to reimburse the COUNTY for the processing of the PROJECT mentioned above. APPLICANT acknowledges that all billing shall be paid prior to the final consideration by the COUNTY of any land use permit, zoning amendment, or subdivision plan. APPLICANT Signature Date: o7 -i5 vy rv`"IPrint Name 6 l A5Soco<125 Mailing Address: Po bey L.l53 &L.&Wo>:) S/ rn 4-S CO c/6oa 10/2004 Page 4 MBC Grand Broadcasting, Inc.AM Antenna SCALE:1 SHEET: I ol1 DRAWING: Site Plan 1008052341q DIRECTORY: X:108695\Mg Vicinity Map DATE: MAY 18, 9008 PROJECT: 08695 DRAWN BY: BK CHKD BY: MJG GAMBA s OCIATC• GAMBA & ASSOCIATES, INC. CONSULTING ENGINEERS B LAND SURVEYORS 970/9411-28110 WWW.GAMBAENGINEERING.COM NRH rt.. STE. aI4 P.O. PDX ,y, GLENW000•PNINOS, CO ,lana BG LL 6wuPc -z- Ie E� I T. 6 S. -R. 92 W. SEC. 3 N.E. 1/4 *Cana. Garfield STEPHEN SELF and SUSANNE W of de Coen td. WIT\655. dau dr graesWfst form the nw,Ft and SidErSeY et td*h is du Rraat, LVrpm 5e91 �a uP*SA t.iaecyallthe sralpt., tyt. 9fGarfield add sbip 6 South RaDge ers Orchard Dene Sfer of said Gerf .l r(ment recorded in Ee$ der's records. Garfield anI fool CoWado. gra . a -MSdnanoo' otm snn.it TYB3 Doi dill of}� y?od and Stpineble r sid! .ioa beM lave s+ . bnipiuM. sola COO and 61 these Pte'- ms yraad+.aeSraatgadte,>iiplttees the¢hens aadatsegns finer eo[a lnaucY ill coal fiat tia a,e: rytng and 048 1n d e Col fr{e ofCSaada-deser$ad ai fdiowc Tract NQ 13 #p -Section 3, t o'f tAe 6 P if.- as shorn by Plat er one of pay fob record with the CBGouty Clack and 4Siunt'g 'KXPT that. portion ionveyed by [c k29 at age $ of said Garfield eeety Clerk and.. to the Grentore, epsjppjrai . S, Section 3, Trolls p 6 ,Sova$ .,ad 214, 25 feet iii wtd h, hjw cov,tructed and iti place aero, eg, t u1 egress to that portion of 92 Desi 6th F 2i., lying East of line of whieb is the center of a .ite preaises. TOGETHER wide all rod sagalarthe lkabiumann.rod agdrpresinces _thcretad<- Magnin' or is awns a aniaag: dr.. =wsliurtnd ener ithn. remand:* 414 0,..14100M. aeus: issunandp.olihl ner. 4nd al dx esimc ripv:Utk. irdoresa. chomma:; eiminl whatsoner of rhe gr*nton.r. cithcr in Jaw OFianifr&. ht an to*Fox b,'&ai'!c4 Hentres• wish die henadinnbag aifd> plaule^uvs. 'ID HAVE 411010NO1»de,edWrath aOmk hagtunedtaa-dj Mend. with arc wr s, na' aedrgancerz • td mssp s dram And the graantsk far theaselya , t'sejr ant. InnshnaI t2ptoseshts 4u 3 twpio sod ate to ad ad, ]hr } tin ai vd,Iij udr dapo ti% „dead ilei . 1 sxiws trey are IWple. t 'Wka dt ym.l to .. •*- . F6 inkminkeitmple C:wnty s( Garfield .Slaw 85 5.. Thomas W. Staler and Jia .19%b ; 111lnsspy.Mad sad dread scat mbc grand b r o a d c a s t i n g. i n c. KJYE 92.3 1' KMGJ 93.1 KSTR 96. I tjgA �va4 KKNOZ 100.7 t KTMM 1340 KNEEZ NEWSRA010 1100 KNIZZ 1100 MBC Grand Broadcasting, Inc. 1360 5. Sherwood Dnve Grand Jurc6on, CO 81501 970.251.2100 Man Office 970.245.7551 Facsimile May 22, 2008 Chris Furman Gamba and Associates Box 1458 Glenwood Springs, CO 81602-1458 Dear Chris, This letter provides acknowledgement to the Garfield County Planning Department that Gamba and Associates are acting on behalf of Stephen and Suzanne Self, 1098 County Road 214, Silt, Colorado 81652 and MBC Grand Broadcasting, Inc., 1360 E. Sherwood Drive, Grand Junction, Colorado 81501, for the purpose of applying for a Special Use Permit. We ask that Gamba and Associates represent both parties in this process. MBC Grand proposes to build a 75 -foot tower on the Selfs' property at 1098 Road 214, Silt, CO for the purpose of broadcasting AM radio signals. MBC Grand agrees to pay all charges for work done by Gamba, and for all fees assessed by the County for this tower project. Thank you. James F. TerLouw, General Manager rand By oadcasting, Inc. Stephen Self utanne Self 516 4 0 Xcel Energy® 2538 Blichmann Avenue Grand Junction, Colorado 81505 June 2, 2008 Britt Kelly Gamba & Associates, Inc. PO Box 1458 Glenwood Springs, CO 81602 Dear Mr. Kelly, The address at 1098 County Road 214, Silt is in Public Service Co of Colorado's service territory and will be served by Public Service Co in accordance with the Rules and Regulations on file with the Colorado Public Utilities Commission at the time of application. I have enclosed an application for electric service. If I can be of further assistance, please contact me at 970-244-2695 or 970-244-2661 FAX. Sinter- Tillmon-1l>IcSchooler Planner, Western Division -D JO FRJN O.naest EnJ/Glenwood <TUE)JUN 17 2000 0:FA/ST. E:s4/00.7soo000333 P 1 Q QWEST 06/17/2008 Gamba & Assoicates 113 Ninth St, Suite 214 P.O. Box 1458 Glenwood Springs, Co 81601 RE: Spent Property Tract 13 in Section 3, Township 6 South, Range 92 West. Qwest Communications will provide telephone service, to the above mentioned project, as required by tariff, filed through the Colorado Public Utility Commission. If you have any questions please call 970-384-0255 Sincerely, Gary Gibson Senior Design Engineer United States of America FEDERAL COMMUNICATIONS COMMISSION AM BROADCAST STATION CONSTRUCTION PERMIT Official Mailing Address: MBC GRAND BROADCASTING, INC. 1360 E. SHERWOOD DRIVE GRAND JUNCTION C081501 Facility Id:160492 Call Sign:NEW Permit File Number: BNP-20070926A0N Authorizing Official: Son Nguyen Supervisory Engineer Audio Division Media Bureau Grant Date: APR 15 2008 This permit expires 3:00 a.m. local time, 36 months after the grant date specified above. Subject to the provisions of the Communications Act of 1934, as amended, subsequent acts and treaties, and all regulations heretofore or hereafter made by this Commission, and further subject to the conditions set forth in this permit, the permittee is hereby authorized to construct the radio transmitting apparatus herein described. Installation and adjustment of equipment not specifically set forth herein shall be in accordance with representations contained in the permittee's application for construction permit except for such modifications as are presently permitted, without application, by the Commission's Rules. Commission rules which became effective on February 16, 1999, have a bearing on this construction permit. See Report & Order, Streamlining of Mass Media Applications, MM Docket No. 98-43, 13 FCC RCD 23056, Para. 77-90 (November 25, 1998); 63 Fed. Reg. 70039 (December 18, 1998). Pursuant to these rules, this construction permit will be subject to automatic forfeiture unless construction is complete and an application for license to cover is filed prior to expiration. See Section 73.3598. Equipment and program tests shall be conducted only pursuant to Sections 73.1610 and 73.1620 of the Commission's Ryles. Hours of Operation: Unlimited Average hours of sunrise and sunset: Local Standard Time (Non -Advanced) Jan. 7:30 AM Feb. 7:00 AM Mar. 6:30 AM Apr. 5:30 AM May 5:00 AM Jun. 4:45 AM 5:15 PM 5:45 PM 6:15 PM 6:45 PM 7:15 PM 7:45 PM Jul. 5:00 AM Aug. 5:15 AM Sep. 5:45 AM Oct. 6:15 AM Nov. 7:00 AM Dec. 7:30 AM 7:30 PM 7:15 PM 6:15 PM 5:30 PM 5:00 PM 4:45 PM FCC Form 351 August, 1997 Page 1 of 4 Callsign: NEW Permit No.; 3NP-20070926AON Name of Permittee: MBC GRAND BROADCASTING, INC. Station Location: SILT, CO Frequency (kHz): 1490 Station Class: C Antenna Coordinates: Latitude: Longitude: Day N 39 Deg 33 Min 37 Sec W 107 Deg 39 Min 05 Sec Night Latitude: N 39 Deg 33 Min 37 Sec Longitude: W 107 Deg 39 Min 05 Sec Transmitter(s): Type Accepted. See Sections 73.1660, 73.1665 and 73.1670 of the Commission's Rules. Nominal Power (kW): Day: 1.0 Night: 1.0 Day: ND Night: ND (DA=Directional Antenna, ND=Non-directional Antenna; CH=Critical Hours) Antenna Mode: Antenna Registration Number(s): Day: Tower No. ASRN 1 None Night: Tower No. ASRN 1 None 15.2 15.2 Non -Directional Antenna: Day Radiator Height: 14.6 meters; 26.1 deg Theoretical Efficiency: 247.04 mV/m/kw at lkm Non -Directional Antenna: Night Radiator Height: 14.6 meters; 26.1 deg Theoretical Efficiency: 247.04 mV/m/kw at lkm FCC Form 351 August, 1997 Page 2 of 4 Callsign:NEW Permit No.. 3NP-20070926A0N Special operating conditions or restrictions: 1 The permittee/licensee must reduce power or cease operation as necessary to protect persons having access to the site, tower or antenna from radiofrequency electromagnetic fields in excess of FCC guidelines. 2 Permittee shall install a type accepted transmitter, or submit application (FCC Form 301) along with data prescribed in Section 73.1660(b) should non -type accepted transmitter be proposed. 3 Permittee/Licensee shall accept such interference as may be imposed by other existing 250 watt Class C stations in the event that they are subsequently authorized to increase power to 1000 watts. 4 A license application (FCC Form 302) to cover this construction permit must be filed with the Commission pursuant to Section 73.3536 of the Rules before the permit expires. 5 Before program test authority is authorized by the Commission: sufficient radiofrequency (RF) electromagnetic field measurements taken at the tower fence shall be submitted to show that the new power level RF radiation is in compliance with the American National Standards Institute Guidelines (OET Bulletin No. 65. August 1997); or a fence must be erected at such distances and in such a manner as to prevent the exposure human exposure to radiofrequency electromagnetic fields in excess of the FCC Guidelines (OET Bulletin No. 65. Edition 97-01, August 1997). The fence must be of a type which will preclude casual or inadvertent access, and must include warning signs at appropriate intervals which describe the nature of the hazard. Permittee shall submit documentation of compliance with this special operating condition along with the Form 302, application for license and the request for program test authority. 6 Licensee shall be responsible for satisfying all reasonable complaints of blanketing interference within the 1 V/m contour as required by Section 73.88 of the Commission's rules. FCC Form 351 August, 1997 Page 3 of 4 Callsign: NEW Permit No.: NP-20070926A0N Special operating conditions or restrictions: 7 Ground system consists of 120 equally spaced, buried, copper radials about the base of each tower, each 49 meters in length. *** END OF AUTHORIZATION *** FCC Form 351 August, 1997 Page 4 of 4 Figure I1 V33075AM-CL2 QUICK REFERENCE DATA VALCOSPHERE ELECTRICAL CHARACTERISTICS RESONANT FREQUENCY (f4) 540 - 1700 KHZ (SPECIFIED BY CUST) POWER RATING 2 KW FOR FRED OF 540- 1000 KHZ 5 KW FOR FRED OF 1000. 1700 KHZ DRY WITHSTANDING VOLTAGE 30 KV ELECTRICAL LENGTH DEPENDANT ON fc POSITION OF LOADING COIL 2ND SECTION INPUT IMPEDANCE AT to DEPENDANT ON fr O AT SELF -RESONANCE DEPENDANT ON fr. MECHANICAL CHARACTERISTICS MECHANICAL LENGTFI 75 FT (23 M) TOP TERMINATION VALCOSPHERE VALCOSPHERE 32 IN (81 CM) DIA ANTENNA MATERIAL FILAMENT WOUND EPDXY/FIBREGLASS JOINTS BRONZE FERRULE C/W LOCKING PIN AND BANANA PLUG FINISH EPDXY POLYAMIDE PAINT WIND LOADING TEST 150 MPH (241 KPH) TEMPERATURE -60"F TO 150°F (-50°C TO 65"C) WEIGFIT 800 LBS (362 KG) MAX NOTES: 1. THE ADVANTAGE OF TIIE CENTRE I OADING COII. IN SECTION TWO IS TO PROVIDE REDUCED RESONANCE OVER A SIRNGHT VERTICAL V/IIIP, IIIEREFORE REDUCING BASE FEED VOLTAGE AND PROVIDING A GREATER POWER I IANDLING CAPABILITY. 2. DO NOT USE LEAD EASE PAINT TO TOUCH-UP OR REPAINT ANTENNA. 12 x .718 IN (1.79CM) DIA EQUASPACED ON A 14.625 IN (36,56CM) DIA. BOLT CIRCLE SIDE FEED POINT Z �._ l.. N GFP GP IP GP WV SIDE VIEW O 0 O FO V1 —a— 17,50 IN -~ (43.75 CM) BOTTOM VIEW P.O. BOX 603 GUELPH, ONTARIO, CANADA, N1H 6L3 TEL 519-824-3220 FAX 519-824-3411 INTERNET: www,valcom-guelph.com EMAIL: enquiries@valcom-guelph.com VGS-120120AM GROUND SCREEN QUICK REFERENCE DATA (6,?„,,T) Figure 12 (114 FT) (12 FT 5(2) (240 FT) (114 FT) P.O. BOX 603 GUELPH, ONTARIO, CANADA, N1H 6L3 TEL 519-824-3220 FAX 519-824-3411 INTERNET: www.valcom—guelph.com EMAIL: enquiries@valcom—guelph.com !9 PUBLIC NOTICE Federal Communications Commission 445 12th St., S.W. Washington, D.C. 20554 News Media Information 202 / 418-0500 Internet: http://www.fcc.gov TTY: 1-888-835-5322 DA 08-448 February 22, 2008 MEDIA BUREAU ADOPTS SIMPLIFIED APPLICATION PROCEDURES FOR AM NONDIRECTIONAL VALCOM ANTENNAS By this Public Notice, the Media Bureau ("Bureau") announces simplified procedures for AM station construction permit applications which specify Valcom antennas, Based on its review of the Valcom field tests and intemal reports submitted to the Commission for evaluation, the Bureau announces that it will not routinely require the submission of a proof of performance, current distribution measurements, or a formula for the vertical plane radiation characteristic for nondirectional AM facilities which utilize these antennas. The Valcom antenna, manufactured by Valcom Manufacturing Group Inc., is a self-supporting whip antenna which is shorter and more streamlined than the one-quarter wavelength lattice tower typically used by AM stations. The Valcom antenna includes a "Valcosphere," or a wire -framed sphere, mounted at the top of the whip antenna. A top -loading coil is mounted approximately one-third of the total height above the antenna base. The Valcom antenna requires use of a 120 -radial buried ground system. Attachment A to this Public Notice is a January 2007 report submitted by Valcom describing the construction, modeling, and field testing of the Valcom antenna. Based on field tests submitted by the manufacturer, two models of the Valcom antenna are approved for routine use at higher AM frequencies. The 85 -foot Valcom antenna may be used at frequencies ranging from 1200 to 1700 kHz; the 75 -foot Valcom antenna may be used at frequencies from 1390 to 1700 kHz. The low -profile Valcom antenna affords AM licensees the flexibility to place antennas in areas where taller towers may be unacceptable, and niay be more economical to build and maintain than a standard antenna. Applicants may only specify the Valcdin antenna for nondirectional use. The Bureau will consider authorizing the use of directional Valcom arrays when more information is available. The January 2007 field test report included in Attachment A establishes radiation efficiency values for the 75- and 85 -foot Valcom antennas within specified frequency ranges. Figure 9 in Attachment A shows the calculated efficiencies, all of which meet or exceed the minimum efficiency for Class B, C, and D AM stations.: The Figure 9 efficiency values are reproduced in Attachment B for ease of reference. The field tests on which the calculated efficiency figures are based were performed with the Valcom antenna mounted above a ground system consisting of 120 buried radials, each 120 feet in length. Applicants specifying a Valcom antenna shall use the antenna efficiency values set forth in Attachment B, provided that both the antenna and the ground system are the same as those described in Attachment A.2 Use of I See 47 C.F.R. § 73.189(b)(2)(ii). 2 We note that it is permissible to use the 85 -foot Valcom antenna on any frequency from 1200 kHz through 1700 kHz. Applicants who wish to use the 85 -foot antenna at frequencies above 1390 kHz, i.e., on frequencies not included in the January 2007 field test report, must establish antenna efficiency by performing measurements taken in accordance with 47 C.F.R. § 73.186. any ground system other than one consisting of 120 radials, each 120 feet long with the Valcom antenna requires submission of a proof of performance as set forth in Section 73.186. Previous studies on the Valcom antennas demonstrated that the antenna elevation pattern for each can be represented by the formula for a simple vertical radiator in Section 73.160(b)(1) of the Commission's rules. A 2003 memo from the Office of Engineering and Technology concluded, based on antenna modeling studies, that the elevation pattern for a short vertical monopole such as the Valcom antenna is virtually independent of the current distribution along the radiating element.3 Consequently, the staff has eliminated the requirement for current distribution measurements that is normally applied to non-standard antennas. Applicants proposing to use Valcom antennas shall use the formula in Section 73.160(b)(1), based on the physical height of the radiator, in computing the vertical form factor commonly referred to as f(0). For additional information, contact Son Nguyen, Ann Gallagher, Charles Miller, or Susan Crawford of the Audio Division at (202) 418-2700. By: Chief, Media Bureau This Public Notice includes the following attachment: Attachment A: Request for Approval of Specified Radiation Efficiencies for Valcom 85 Foot Pole with Valcosphere Over the Range of 1200 kHz to 1390 kHz and Valcom 75 Foot Pole with Valcosphere Over the Range of 1390 kHz to 1700 kHz. Attaclunent B: Figure 9 — Tabulation of Radiation Efficiency of Valcom AM Broadcast Antennas. 3 The May 1, 2003, OET memorandum is included in Attachment A. TOWAIR Search Results FCC Federal 1Communications - Commission Page 1 of 2 FCC Home 1 Search 1 Updates 1 E -Filing 1 Initiatives 1 For Consumers 1 Find People Antenna Structure Registration FCC > WTB > ASR > Online Systems > TOWAIR TOWAIR Determination Results Ck New Search U Printable Page ❑7 HELP A routine check of the coordinates, heights, and structure type you provided indicates that this structure does not require registration. *** NOTICE *** TOWAIR's findings are not definitive or binding, and we cannot guarantee that the data in TOWAIR are fully current and accurate. In some instances, TOWAIR may yield results that differ from application of the criteria set out in 47 C.F.R. Section 17.7 and 14 C.F.R. Section 77.13. A positive finding by TOWAIR recommending notification should be given considerable weight. On the other hand, a finding by TOWAIR recommending either for or against notification is not conclusive. It is the responsibility of each ASR participant to exercise due diligence to determine if it must coordinate its structure with the FAA. TOWAIR is only one tool designed to assist ASR participants in exercising this due diligence, and further investigation may be necessary to determine if FAA coordination is appropriate. DETERMINATION Results PASS SLOPE(100:1): NO FAA REQ-RWY MORE THAN 10499 MTRS & 6529.73 MTRS (6.52970 KM) AWAY Lowest Elevation Runway Length Type C/R Latitude Longitude Name Address (m) (m) AIRP R 39-31- 107-42- GARFIELD GARFIELD 1664.5 2136.9000000000001 33,00N 52.00W COUNTY RGNL RIFLE, CO Your Specifications NAD83 Coordinates Latitude 39-33-35.4 north Longitude 107-39-08.8 west Measurements (Meters) Overall Structure Height (AGL) 23.8 Support Structure Height (AGL) 22.9 Site Elevation (AMSL) 1725.2 Structure Type TOWER - Free standing or Guyed Structure used for Communications Purposes Tower Construction Notification Notify Tribes and Historic Preservation Officers of your plans to build a tower. Note: Notification does NOT replace Section 106 Consultation. FCC Site Map http://wireless2.fcc.gov/U1sApp/AsrSearch/towairResult.jsp 6/17/2008 TOWAIR Search Results Page 2 of 2 ASR Help ASR License Glossary - FAQ - Online Help - Documentation - Technical Support ASR Online TOWAIR- CORES - ASR Online Filing - Application Search - Registration Search Systems About ASR Privacy Statement - About ASR - ASR Home FCC 1 Wireless 1 ULS 1 CORES Help 1 Tech Support Federal Communications Commission 445 12th Street SW Washington, DC 20554 Phone: 1-877-480-3201 TTY: 1-717-338-2824 Submit Help Request http://wireless2.fcc.gov/U1sApp/AsrSearch/towairRcsult.jsp 6/17/2008 1 4 • Federal Aviation Administration Air Traffic Airspace Branch, ASW -520 2601 Meacham Blvd. Fort Worth, TX 76137-0520 Issued Date: 07/10/2008 Britt Kelly Gamba & Associates, Inc. 113 Ninth Street, Suite 214 PO Box 1458 Glenwood Springs, CO 81602 REC tl`aIV ED DEC 0 2, 2008 GARHELU 1 `t BUILDING & PLANNING Aeronautical Study No. 2008-ANM-2217-OE ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Location: Latitude: Longitude: Heights: Antenna Tower Valcom AM Broadcasting Antenna Silt, CO 39-33-35.85N NAD 83 107-39-06.21W 78 feet above ground level (AGL) 5749 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a hazard to air navigation provided the following condition(s), if any, is(are) met: Based on this evaluation, marking and lighting are not necessary for aviation safety. However, if marking and/or lighting are accomplished on a voluntary basis, we recommend it be installed and maintained in accordance with FAA Advisory circular 70/7460-1 K Change 2. This determination is based, in part, on the foregoing description which includes specific coordinates, heights, frequency(ies) and power. Any changes in coordinates, heights, and frequencies or use of greater power will void this determination. Any future construction or alteration, including increase to heights, power, or the addition of other transmitters, requires separate notice to the FAA. This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. A copy of this determination will be forwarded to the Federal Communications Commission if the structure is subject to their licensing authority. Page 1 of 3 If we can be of further assistance, please contact our office at (817) 838-1995. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2008-ANM-2217-0E. Signature Control No: 583259-102312363 Alice Yett Technician Attachment(s) Frequency Data Page 2 of 3 (DNE) Frequency Data for ASN 2008-ANM-2217-OE LOW HIGH FREQUENCY ERP FREQUENCY FREQUENCY UNIT ERP UNIT 1.48 1.5 MHz 1 KW Page 3 of 3