Loading...
HomeMy WebLinkAbout4.0 Permit'ij{.,$jJrT+ruH+H',Ht[1|I+'.,+r' I1,. ,,'{ II II I 'i-oi + pec Fee:g0.00 Doc Fee:O.00 GARFIELD cOuNTY c01 of 4 Rec Fee AMENDMENT LAND USE CHANGE PERMIT - SPECIAL USE APROVAL to Public Service Company of Colorado - Xcel Energy for the Rifle Substation (Parcel No. 2177 -1 44-00-126) ln accordance with and pursuant to Section 4-107 (Amendments to an Approved Land Use Change Permit) of the Garfield County Unified Land Use Resolution of 2008, as amended, the Director of the Building and Planning Department has determined thatthe proposal is a non-substantialamendmentto an existing Special Use Approval, and hereby authorizes, by this Amended Land Use Change Permit, the following activity: Construction of an additional3,000 sq.ft. storage building and related site improvements accessory to the existing Rfle Substation Facilities on that property described in Exhibit "A", Legal Desciption and in Exhibit "8" Site Plan Excerpt and generally located on Lots 1, and 2, Secfion 14, TOS, R93W, also known as 620 County Road 319, Ritle, Colorado, 81650. (County File No. SUAA-6958) This Administrative Permit is hereby issued subject to the conditions set forth in Exhibit "C" (attached hereto) and amends approvals granted by Resolution No. 80- 243, for a 345 l(V Transmission Line which included additional terminal and substation facilities at the Rifle Substation. This permit shall be valid only during compliance with applicable provisions of the Garfield County Unified Land Use Resolution of 2008, as amended, Building Code, and other regulations of the Board of County Commissioners of Garfield County, Colorado. BUILDING AND PLANNING DEPARTMENT, GARFIELD COUNTY, COLORADO Fred A. Jarman, AIC t[l$t IIJIIIIIF lt{rll rlf H[i l]til !!ur, l{l "i I I ll I tAtZqtZO'11 @4:@2:51 Pl'l Jean nlberico i-oi +-Rec Fee,$0.0@ Doc Fee:0.@@ GARFIELD couNTY co Exhibit A Legal Description EXEMPTION SURVEY,LEGAL DESCR|pTION: ; A PORTION OF LEND LOCATED IN THE SOUTH HAIf OF SECT]ON 14, TOI,\'}$STIIP 6 SOUTH, RANGE 93 WEST OF THE SDCIH PRINCIPAI- MERIDIAN. COt NTy OF RlFl-E, SIATE OF COLORADO, lr{CtRE PARTICUI"ARLY DESCRBEDASFOLLOES: , I COMMENCING ATTHE CENTER QUARIER CORNER OF SAID SEGTION 14; THENCE SOUT}I00.581,4. W&STN DI$TANCE OF ES6.OO FEET TO T}IE POINT ff BEGINNING; THEIICE SOUTH O1"(B'50" WEST A DISTAI'EE.OF 280.14 FEET; fiEItlCE SOUTH 0O"5llB4" WEST A DlgTAt{CE OF 3Sr-85 FEET; THENCE SOUTI{ 68?15-1" EASTA DISTANCEoFI3IS.0TFEEITOTHESOUTHEASTSXTEENTHCORNEROFSAIDSEgflON14: THEICEdCIUTH OOE56{I7' WEI}T A EISTANCE OF 1313,57 FEET TO THE EAST SDfiEENTH CORNER OF SAID SECTION 14;; THENCE NORTH 88'g!STWEST,ALONGTHESOUTH TINEOFIHE SOTJTHWESTAUARTEROFTHE SOI,IfTIWESI AUARTER OF THE SUTHEAST QUARTER OF SAID SEGTION 14, A DISTANCE OF 13.16.44 FEET TO THE SOUTH QUARTER CORI.IER OF SAID SE TloN 14; THE}.ICE NORTH 00.58O8. EAST. trEFARNNG SAID SOWH UilIE, A DISTAI{CE OF 655.15 FEET; THENCE }.IOFITH 881C?te WEST A DISTAI.ICE OF 668.8{, FEET; THENbE Nohfl{ 00"6651'EASTA DISTANGE OF 664.07 FEET: THENCE TIORTH 0f4$4e EAIITA DISTANCE OF 3,f5.01 FEEj TIIENCE NORm{ fiTEUI'EF€TA DISTANCE OF 308.SG FEEr; rHEs,lCE SOUTH 8E"4628" e,ESra orsra*Ce or 659.2 FEET TO T}IE PONNT OF BEGINNING. CONTAINING 59.4C} ACRES OR 85fl,507 SQT'ARE FEET, MORE OR LESS. Exhibit B Site Plan Excerpt *.rrqdlwrw *-------PAdE 131 l'*fr' lil't Iilll r-l!"Ht l"{1l+$,Ui[Iffi !l+! UlrJ H tll u{d' I +l' ll{' I I I I I I '[d Pll'g* P3"93r'3r'8."' E3!, B I EE'^ aEEF r ELD couNTy co a. b. Exhibit C Conditions of Approval All prior approvals including but not Iimited to Resolution No.80-243 and conditions of approval for the Public Service Company of Colorado - Xcel Energy Rifle Substation shall remain in effect. The storage structure sha!! be limited to a maximum of 3,000 sq.ft. and shall complywith allzoning and building code requirements including grading and drainage for the proposed improvements. The building permit submittal shall contain storm water management plans and best management practices prepared by a licensed professional engineer for the relocated drainage swale adjacent to the building and any other related storm water impacts.