HomeMy WebLinkAbout3.0 PC Staff Report 04.23.2008PC Exhibits (4/23/2008) — 319 Water Company— Camper Park
Exhibit
Letter
(A to Z)
Exhibit
A
Proof of Mail Receipts
B
Proof of Publication
C
Garfield County Zoning Regulations of 1978, as amended (the Zoning Code)
D
Staff Memorandum
E
Application
F
Memo from Steve Anthony of the Garfield County Vegetation Management
Department dated April 15, 2008
G
Memo from Jake Mall of the Garfield County Road and Bridge Department dated
March 27, 2008
H
Memo from Will Spence of the Colorado Division of Wildlife dated April 15, 2008
I
Memo from Matt Sturgeon of the City of Rifle dated April 14, 2008
J
Memo from Jim Rada of the Garfield County Public Health Department dated
April 14, 2008
K
Email from Mark Kadnuck of the Colorado Department of Public Health and
Environment (CDPHE) dated April 10, 2008
L
Memo from Michael Erion of Resource Engineering dated April 15, 2008
M
Email from Kevin Whelan of the Rifle Fire Protection District dated April 16, 2008
N
Email from Jimmy Sills of 319 Water Company dated February 25, 2008
O rA i T rOAI �l� � fAno• y S , US a 9 L✓a, 1f✓ (04
/—eek
-Crow? l',(44,1 ' l(f
42f 1 Z3, Z°c4-
to / cc/I s 114
RE'"? e, `f0 vele& > &&•/ of 6,0
-> Pa .4,Fki ,/� > Prov <<a<es .c 3
i. _,
tea 6o ver c '{:S /-/etof
-� .sPP4(c r Rtooluc&
-5'46 ri,
ticArct --o
u4, kr
ae-,e - ("f
PC 4/23/2008
DP
PROJECT INFORMATION AND STAFF COMMENTS
TYPE OF REVIEW: Special Use Permit: (SUP)
SUMMARY OF REQUEST:
The Applicant requests a SUP for a
"Camper Park" in the ARRD zone
district
PROPERTY OWNER: 319 Water Company (Jimmy Sills)
LOCATION:
Approximately 1 rnile south of the
Garfield County Airport on County
Road 319.
SITE INFORMATION: 35.75 acres
ACCESS: CR 319
EXISTING ZONING: ARRD (Agricultural/Residential/Rural
Density)
ADJACENT ZONING: ARRD (Agricultural/Residential/Rural
Density)
I. BACKGROUND
The Applicant is proposing to build and operate a 100 space Camper Park on a 35.75 acre
property just south of the Garfield County Airport on County Road 319. No tent spaces are
proposed. Each space is to be provided both wastewater and potable water hookups.
Wastewater is to be accommodated by three Individual Sewage Disposal Systems (ISDS)
while potable water is to be supplied by a central water system. The Applicant has
represented the following:
11. DESCRIPTION OF THE PROPOSAL
The applicant proposes to build and operate a Camper / RV Park on the 35.7.5 acre parcel.
Currently Garfield County lacks adequate facilities for this type of temporary, housing. As
a part of this request the applicant has addressed drinking water, sanitation, sewage
disposal, emergency access and other issues identified in an article published in the
Grand Junction Sentinel. These issues were brought forth by the Ger;lield County
Planning Department as not being addressed with the man -camp type operations
currently being utilized at well drilling sites throughout Garfield County.
The hours of operations are proposed to be 24 hours, 7 days a week, however, limits on
activities which may cause excessive noise will be posted and enforced to reasonable
hours for the benefit of the tenants in the park.
City of Rifle
Legend
-C.,, :
rJ�
C
Zonnp
ZOXE i
N<�b. r.aara
QeE 0.
APRO RW/we Re%Verai R.2`iku[f
Oxelkeomix vewr
�a xnr.7.1/ w
&mote ism"
ATUW 4Y Deretrne,
NG. NM/Mkt awfos.:Dders, Asns,
rsD�JD .r., 3... Mal Mnsy
RI.:,J�
Petah...1,.e� n
- ,
Cfl-TO OP. A
319 Water Company -
Camper Park
0 700 1,400
2,800 Feet
t i I
Note: Dots Represent Gas Wells
2 319 Water Company — Camper Park
Special Use Permit
PC 4/23/2008
II. DESCRIPTION OF THE PROPOSAL
The Applicant is proposing to construct a "Camper Park" to accommodate 100 self-
contained Recreational Vehicle (camper) spaces. Each space within the park is to be served
by central water and wastewater hook-ups. Water is to be supplied by a shared well which
has been demonstrated to produce up to 35 gallons of water per minute while wastewater is
to be accommodated by three onsite Individual Sewage Disposal Systems (ISDS).
The Applicant has represented that the intent of the Camper Park is to fill a niche for
Recreational Vehicle spaces to accommodate temporary workers and their families needed
within the gas industry. As this type of use is not consistent with the intent of the Camper
Park regulations (geared toward tourism) within the Garfield County Zoning Resolution
(Section 5.02), the Applicant is requesting a waiver from Section 5.02.20. Section 5.02.20
requires that "Occupancy in camper parks by any individual shall be limited to no more than
one hundred twenty (120) days per year in any one (1) or combination of camper parks in
the County." This request is discussed later in the Staff Report.
The Applicant has represented that the hours of operation are to be 24 hours a day, 7 days
per week. The traffic study indicates that trip generation from the site is to be approximately
177 ADT. The report goes on to state that this translates in to 32 trips during the AM peak
and 48 trips during the PM peak. Overall, the Camper Park is to increase the traffic on CR
319 by 13% while the AM and PM peak hours will be an increase of 20% and 34%
respectively.
Please see the definitions below from Section 2.00 of the Zoning Resolution which are
relevant to this application:
2.02.11 Camper Park: Any lot which has been designed, improved or used for the parking of
two (2) or more camper vehicles and/or tent campers for human habitation.
2.02.12 Camper Space: A plot of ground within a camper park designed for accommodation
of one (1) camper vehicle or tent.
2.02.13 Camper Vehicle or Trailer: Any vehicle or portable structure designed to be
transported on, or towed behind, a vehicle and designed to permit temporary
occupancy as living quarters; it shall be considered self-contained if it includes a toilet
and a bath or shower.
2.02.37
2.02.38
2.02.39
Mobile Home: A building manufactured partially or entirely in a factory and at a
minimum, meeting the "National Manufactured Housing Construction and Safety
Standards Act of 1974", 42 U.S.C. 5401, et seq., as amended and has a dimension of
less than twenty (20) feet wide and/or twenty (20) feet long. (A. 95-043)
Mobile Home Park: Any lot used for location of two (2) or more mobile home
buildings for human habitation.
Mobile Home Space: A plot of ground within a mobile home park designed for
accommodation of one (1) mobile home.
3 319 Water Company — Camper Park
Special Use Permit
PC 4/23/2008
III. SITE DESCRIPTION
The 35.75 -acre property is located approximately 1 miles south of the Garfield County
Airport and the City of Rifle limits. Access is provided via County Road 319.
Physically, the property is undulating and generally rises upward away from County Road
319. The property is covered mostly by sage brush, pinion juniper and dry grasses. (See
street and topographical map on following page)
The Property is also adjacent to the Rifle Airpark Annexation. As a result of this annexation,
which is expected to take place in the summer of 2008, the City of Rifle limits will be directly
abutting the subject property on two sides. As a result of the Rifle Airpark Annexation, the
subject property is expected to be able to achieve the 1/6 contiguity requirement for
annexation with the City of Rifle within the next several months (as early as June 2008). As
is noted in Exhibit I from Matt Sturgeon, Assistant City Manager, with the City of Rifle, "the
City will not consider annexation when the property becomes eligible for annexation — this
could be as soon as June 2008 — unless the RV Park is built to City specifications. See Sec.
16-10-50 R.M.C. www.rifleco.orq." Although Garfield County cannot require the Camper Park
to develop to City of Rifle development standards or require annexation, the Applicant
should take this into account when designing this development in order to permit future
annexation of this property and service by municipal water and sewer services.
Rifle Airpark Annexation
Sheet 1 of 7
A throe of L I,J Sita*miinrcnz:xnt Lw s *S.., 3E Tows., t Soak, Rangz S: Wee* of Sid
liaaeaml?benlua. Skid ?un¢;Mx* Si are mroeatr Ste., II. la the to Sf.ar.? S9);SEIa N Sm..
If, In aCSaerin 23, ?a mil lc4i Ses,noo ii Towweh E63nah. Ran,. W. of
the Sixth P ,azpx, Mrr. u:. il: w the Cog.," of iariirut Stam, o} Coleus.,
Subject
Property
•
RVS
r iv
4
•n•. �':. (le fumed. X Iaa3a344*, !'!of
Rifle Airpark Annexation Map
11w p*,p.4* <448 enaeaaUmx
i s t1SAan-
..dpo.pns.3%8.838* wahrfs
!rc riS Airpi*k f1snr„:y{ Anm
sole C113 .3RM. 413.rarex..
nmsh 8**. sna3,4i-a.
3f,,,,36x1.8*ihati1;..a. Terni
.r rllat t;aolea-uk no, O .dw4q.
n7 vFurtra:!,.xxlaa: ma4 sem:,
mghn Mui Cit ;d Mk, add to
u'::l.. :!r.• Cif'1 Au,ar1: 1:wanrg
! i1 ti..3enit
is
( 1 :c_f}kuete
31.:81 .d 4,1 2nd vxw.
err,
4 319 Water Company — Camper Park
Special Use Permit
PC 4/23/2008
.49.-skawat-•'734"
, (he) XVI ,CO
8-$29 a) 3,1004
/17.074,44.44.1005,1,..11O,J2IPS
0$$1$ 0119,10:! '4"1.40i 'XIMAY VIOV, nit
STILS ANNE('
'DM piTiNvaN :4,kag1in8
ariVill1533011d
LIOAV1 ((VON
OP7110101ALN.103 (172114.1013
N1R'd .11V,J IcKVK
to
•
k.
/ '....i
,., /
• ., ,
,'----. • „.. -„, -
5 319 Water Company — Camper Park
Special Use Permit
PC 4/23/2008
Mamm Camp RV Park — Site Plan (Road Layout)
Legend
- Highways
- Traits
- Cit Streets
CountyRaads
water
Sections
City
Parcels
Q C42MileBu$er
319 Water Company
Camper Park
Aerial Photo
0 55 110 220 Feet
I l i i I t i t
6 319 Water Company — Camper Park
Special Use Permit
PC 4/23/2008
IV. REFERRALS
Staff referred the application out to the following review agencies and or County
Departments:
a. City of Rifle: See Exhibit I
The City of Rifle appreciates the opportunity to comment on the Special
Use Permit application made for a 100 space camper/trailer park on CR
319. The City does not wish to pose a direct objection to the request as
such a facility is needed in west Garfield County; however, we do wish to
point out some concerns the City has relative to this specific request.
We hope county staff and the applicant will consider these concerns
moving forward with this application.
1. Was the Rifle Fire Protection notified of this request and asked to
review the details of the camper park plan. There is significant wild land
fire danger at this location, and the applicant should demonstrate: 1)
campfire mitigation; 2) vegetation clearance to campsites; 3) fire vehicle
access; etc.
2. The park will be immediately adjacent to industrial activities that
may include night time yard activities. This interface should be
understood going forward.
3. The applicant should be required to tie to municipal services,
wastewater in particular, as it becomes available.
4. The applicant mentions making this park available to families.
There are many social implications associated to introducing families to
this type of living environment. It is understood this will facilitate long-
term stay needs, but family living should not be promoted or encouraged.
5. This permit should have a five year life with an option for the
county to review and terminate if the park is a nuisance or has no market
need, and the county should have the ability to terminate long-term stay
allowances to transition the park into a "conventional" RV park facility.
This should not become a perpetual living option for residents of Garfield
County. It should be viewed as a solution to an immediate residential
need associated with regional energy development and rental housing
shortages.
6. The park will have an impact on City street infrastructure. If this
were occurring in the City we would charge an off-site street impact fee
that would go to City wide transportation needs (1-70 Roundabouts,
Airport Road improvements, etc). Permitting this use will influence
negotiations regarding annexation of CR 319 road in the future.
7. The use is required to obtain a City of Rifle Watershed Permit
before any ground is disturbed.
7 319 Water Company — Camper Park
Special Use Permit
PC 4/23/2008
8. Park management should be a major concern to the county. The
applicant should demonstrate an ability to operate this facility like a
conventional RV Park facility.
9. The City will not consider annexation when the property becomes
eligible for annexation—this could be as early as June 2008—unless the
RV Park is built to City specifications. See Sec. 16-10- 50 R.M.C.
www. rifleco. orq
b. Rifle Fire Protection District: See Exhibit M
The IFC references NFPA 1194 – Recreational Parks and
Campgrounds, 2005 for design and was used in my review process
The following are my comments for the proposed Mamm Camp RV
Park up CR 319- Jimmy Sills , developer.
1. Fire Protection Water supply -
a. My understanding is that the water supply will connect of
an existing system in the area. Maintenance records of this
existing system, per NFPA 25, is needed to verify that this
system is operational.
b. Exhibit B indicates that the fire district will conduct flow
tests. The fire district would prefer an approved third party
conduct this tests and that they are witnessed by the fire
district. NFPA 25 does require this to be done on a yearly
basis by the owner of the water system
c. Plans indicate that a new hydrant would be required. A
further review of hydrant spacing is required.
d. All hydrants and piping shall be installed per city of Rifle
standards
2. If the dead end road in the NW corner of the park is greater tan
100 ` in length, an approved turnaround shall be provided.
3. Posting of addresses: Addresses are to be posted where the
driveway intersects with the County Road as well as on the
individual sites and / or where single roads intersect. Letters are to
be a minimum of 4 inches in height, '/ inch in width and be in
contrast to background colors.
4. If used, individual propane tanks are to be placed in a location
where they are not subject to damage and combustible materials
are to be kept a minimum of 10 feet away from tanks.
5. Vegetation should be removed from near any structures to provide
a safe area in the event of a wild land fire. Information is available
at the district office.
6. Roadways /Driveways: Consideration should be given to the heavy
weights of emergency apparatus when constructing roadways and
roads are to be of an all weather -driving surface.
7. NFPA 1194 indicates that fire extinguishers (minimum 2A 20BC)
should be spaced at 100' travel distance in the event of a fire.
Approval of the water supply system would likely eliminate this
requirement but it should be discussed with the developer.
8. Campfire locations and design should also be approved by the fire
district
8 319 Water Company – Camper Park
Special Use Permit
PC 4/23/2008
9. NFPA 1194 requires the following:
a. Employee training in the event of an emergency
b. A posted evacuation plan
c. Posted fire regulations that should include:
i. Telephone information for contacting fire , police
and medical help (911)
ii. Address and Telephone number of the Park
iii. Location of nearest public telephone
c. Colorado Division of Wildlife: See Exhibit H
The referral form for the Camper Park includes an extensive wildlife
section by Kirk Beattie who did a good job of identifying the species that
may be impacted by this development. It appears the study was
intended for a subdivision rather than a camper park. Most values will
stay the same except for the fact that the density of traffic and number of
people will be higher in a camper park. A camper park will also be
inhabited by people who may not care as much about the long term
effects of their actions. I will not reiterate his study but will instead focus
on a few primary concerns.
The location of the proposed Camper Park is heavily used by mule deer
and elk during the late fall, winter, and early spring. There were days that
several hundred elk could be counted on and around the property this
past winter. Winter range in the Colorado River Valley is being
developed at an alarming rate. This development results in more
human/wildlife conflicts and in the loss of habitat that is crucial to deer,
elk, and other species that are sometimes hard pressed to survive the
winter. It is important to consider these developments with regard to the
fact that the surrounding areas are currently disturbed by energy
development or are slated for large proposed developments. I feel it is
important to remind the County Planning Department to keep the need
for winter range in mind when considering development.
The Camper Park will without doubt attract dog owners. The owner of
the park should take care to follow Beattie's suggestions of requiring
dogs to be either confined on a lot or on a leash; never allowed to run
around on the surrounding property. There will be large numbers of deer
and elk that persist in wintering nearby that will be a temptation for dogs
running loose.
The Camper Park should be aware that there will be nuisance wildlife
and have plans to mitigate that problem. There should be bear proof
trash containers to preclude bears, skunks, and raccoons from making a
habit of finding their food in the park. All trash must be properly
disposed of. Barbeque equipment will draw those animals and should
be kept clean and put away. Deer and elk will feed on any young trees
or shrubs planted for shade and landscaping. Those plants should be
protected by plastic fencing or other exclusionary devices.
9 319 Water Company — Camper Park
Special Use Permit
PC 4/23/2008
d. Colorado Department of Public Health and Env.: See Exhibit K
The water system will be a public water system and need to go through
CDPHE-WQCD review as proposed. The wastewater system
is proposed as an ISDS(s?). The total volume of sewage will be greater
than 2000 gal/day, thus a single ISDS will need to go through CDPHE-
WQCD site application and design review process or multiple ISDSs will
be required to meet WQCD Policy 6 requirements (multiple ISDSs on a
single property).
e. Colorado Division of Water Resources: No Comments Received
f. Garfield County Road and Bridge Department: See Exhibit G
g.
Garfield County Road & Bridge Department has no objection to this
application with the following comments. A driveway access permit has
been issued for this project and will be signed off on when completed.
The conditions for the driveway access include a paved apron and a
stop sign located at the entrance to Cr. 319. Cr. 319 has been improved
from this driveway access going north has been reconstructed and will
handle the increased traffic volume for this application. This project will
help alleviate some of the temporary housing shortage for industry
workers who are not on long term status in the local area.
Garfield County Vegetation Management Department: See Exhibit F
Noxious Weeds
The applicant needs to provide a current weed inventory and map.
Please provide a weed management plan that reflects the inventory.
Revegetation
The applicant has provided the plant material list and revegetation plan
for the Mamm Creek Commons project, we assume that they want to
utilize that plan for this project. Please quantify the area, in terms of
acres, to be disturbed and subsequently reseeded on road cut and utility
disturbances. This information will help determine the amount of
security that will held for revegetation.
Staff recommends a revegetation security once this information is
provided.
Soil Plan
It is requested that the applicant provide a Soil Management Plan that
includes:
Provisions for salvaging on-site topsoil.
A timetable for eliminating topsoil and/or aggregate piles.
10 319 Water Company — Camper Park
Special Use Permit
PC 4/23/2008
A plan that provides for soil cover if any disturbances or stockpiles will sit
exposed for a period of 90 days or more.
h. Garfield County Sheriffs Office: No Comments Received
i. Garfield County Public Health Department: See Exhibit J
1. The design requirements notes for ISDS 2 & 3 indicate that the slow
perc rate in one test hole was discarded due to the bottom of the test
hole being in a dense clay lens. This is inappropriate as we want to
include soils that are representative of all soil types in the leach field
area. There are no provisions for discarding percolation data in the
ISDS Regulations. If the design engineer feels that this is an
anomaly, then additional perc tests should be run and all test results
averaged. This said, the average percolation rate for site 2 is 53
minutes per inch and will require a leach field of 2031 square feet.
Using this figure, they should still be able to fit the system in the
designated area. The same note on system 3 appears to be
inaccurate as the perc rates for all three test holes is 27 minutes per
inch.
2. ISDS Plan No. 2 indicates that the leach field will lie perpendicular to
the slope. From the topography on the site plan, this will put one end
of the leach roughly 7-10 feet deep. This puts the deep end of the
leach field approximately 3.5 — 6.5 feet deeper than the perc test
was run. As indicated in the perc test reports, variable soils exist in
the area which could result in this system being in soils that are
substantially different than identified in the perc test. In addition, at
this depth, the system will be partially installed at a depth greater
than the manufacturer's recommendation. I recommend that the
engineer be required to retest the soils for this system at the
appropriate depth to assure an accurate percolation rate and provide
information from the manufacturer indicating whether this system
can be installed at the designed depth. It appears that they might
also be able to relocate this leach field across the road and better be
able to maintain the leach field orientation along the surface
contour. Of course, a new perc test would be required for this area.
3. Parts of leach fields 2 and 3 appear to be encroaching on the
mandatory 25 foot leach field to potable water supply line setback.
Per the ISDS regs encroachment may be allowed if the water line is
encased according to footnote 2 of the ISDS Setback table (Page
24-25 of ISDS Regs).
4. There are many locations on this plan where sewer lines will cross
over the water lines or lie within the 10 foot mandatory setback. Per
the ISDS regs crossing or encroachment may be allowed if the water
line is encased according to footnote 2 of the ISDS Setback table
(Page 24-25 of ISDS Regs).
5. Effective distribution of effluent in these leach field will be difficult
with gravity flow and varying lengths of chamber rows. For most
effective, equal distribution of effluent in all of these systems, the
engineer should consider pressure distribution rather than gravity
distribution.
11 319 Water Company — Camper Park
Special Use Permit
PC 4/23/2008
6. No ISDS management plan is specified. As a commercial operation,
greater attention must be paid to these systems to assure that they
operate at their optimum level at all times. I recommend that the
applicant be required to submit an inspection and maintenance plan
as a condition of approval.
7. The GC Development code apparently requires a water supply
capable of providing 100 gpd to each space where individual water
connections are required. This does not match the 50 gallons per
day ISDS sizing factor from the ISDS Regulations used for the ISDS
design. I am unable to find any additional requirements to increase
sewage flows to match water flows, but as this facility will likely
house multiple people per unit, the county may want to consider
larger flow figures.
8. The August 2004 Amended Water Contract from the West Divide
Water Conservancy District approved 16.23 acre feet for 25
residential and 46 commercial units and 284,000 square feet of
lawn/garden irrigation. This is confirmed by the Sill #2 well permit.
The Well sharing agreement also states that the water use from this
well must conform to the terms and conditions set forth in the well
permit and the West Divide contract. I did not read anywhere in the
document submitted about use of this water for a 100 unit camper
park. I recommend that the County require the applicant to
document that this development falls into the scope of the original
well permit and West Divide contract. If it does not then I
recommend that a condition of approval be to have the applicant
align the proposed uses with revised documents from both West
Divide and the Division of Water Resources.
9. Due to the changes in Public Water System classification and water
quality issues, I also recommend that a CDPHE approval of the
water system be a condition of BOCC approval of the SUP.
10. No mention is made of solid waste storage and management in the
submittal. In line with the wildlife consultant's recommendations, the
applicant should provide information and specifications as to how
they will manage solid waste generated on site. Consideration
should be given not only to wildlife issues but also nuisance issues
associated with solid waste (i.e. litter control).
j. Resource Engineering: See Exhibit L
Section 5.02.08 Water Supply
(1)There is no evidence to support that the water supply is in compliance
with the CDPHE drinking water standards. Such evidence must be
presented prior to any issuance of a Special Use Permit.
(4)There is no evidence that the proposed water distribution system is in
compliance with CDPHE drinking water regulations and GARCO
criteria. Evidence of such must be submitted including typical design
details.
Section 5.02.10 Water Supply
12 319 Water Company — Camper Park
Special Use Permit
PC 4/23/2008
(1)WeII permit No. 61926-F does not allow for a camper park. A valid well
permit allowing the proposed uses must be obtained and provided
prior to issuance of any Special Use Permit.
(2)Typical space layout and details must be provided to demonstrate
compliance with regulations and provide a guideline for a contractor
to construct a compliant system.
(3)Typical space layout and details must be provided to demonstrate
compliance with regulations and provide a guideline for a contractor
to construct a compliant system.
Section 5.02.11 Fire Protection
(1)There is no evidence to support that the Fire Protection criteria are met.
Section 5.02.13 Sewage Disposal
(1) Typical site layout of sewage disposal facilities should be provided.
(2)The proposed sewage disposal includes four ISDS systems designed
for 50 gpd per unit. The water requirement is 100 gpd per unit for
individual water and sewer service. The ISDs systems should be
designed for at least 100 gpd per unit. Four additional ISDS systems
are required.
5.02015 Sewage Disposal
(1)Typical layout and design details for the individual sewer connections
should be provided to ensure compliance with GARCO standards.
Section 5.02.20 Miscellaneous Regulations
(1)Applicant has requested a variance from the 120 day maximum
occupancy time limit. Such variance would create a "temporary
housing project." This may impact the water and sewer usage as
well as traffic estimates. It is recommended that the water use (and
resulting sewer use) be monitored through flow meter readings to
ensure compliance with ISDS design parameters.
Section 5.03 Special Use Permit General Requirements
(1) Utilities
Comments on water and sewer are provided above under the specific
camper regulations.
(2) Traffic/Roads
The traffic report assumes 2 average daily trips (ADT) per unit. Given the
13 319 Water Company — Camper Park
Special Use Permit
PC 4/23/2008
nature of the proposed project and no on-site commercial facilities for
basic necessities, a trip generation of 4 ADT per unit is more
reasonable. The traffic report should address the adequacy of the
existing CR 319 and the proposed internal roads to accommodate
the traffic volumes generated by the proposed project. The report
only states that the impact to existing traffic volumes (15% to 30%) is
minor.
OTHER
The proposed project is located within the City of Rifle Watershed
District. A Watershed District Permit should be obtained prior to any
issuance of a Special Use Permit.
V. COMPREHENSIVE PLAN
The property lies within Study Area 2 and is designated on the proposed land use map as
Outlying Residential. The Applicant has proposed a use that is industrial in nature which
conflicts with the present designation. Consider the following Goals, Objectives, and policies
that apply to the proposal:
a. Goals
Tourism is an integral component of the economy of Garfield County. Therefore, it is
essential that the planning process respect the natural environment that brings
residents and visitors to the County.
Garfield County will encourage the development of a diversified industrial base for the
County which recognizes the human resources, natural resources, and physical
location -to -market capabilities of the community, and which further recognizes and
addresses the social and environmental impacts of industrial uses.
While the proposed project is intended to serve the gas industry's immediate need for
temporary housing for gas workers, the regulations written for this kind of development
(Section 5.02) were intended for recreational and tourism purposes. To this extent, while the
Camper Park is immediately and into the near future (next 5-10 years) for commercial and
industrial support purposes, the long term use of the Park is contemplated to be tourism and
recreation. As such, this proposal fits both immediate housing concerns related to local gas
development as well as long term recreational uses once the gas industry is no longer as
strong of an economic force within the County as it is today.
b. Objectives
2.1 To encourage adequate, integrated housing at a reasonable cost to residents
throughout Garfield County.
14 319 Water Company — Camper Park
Special Use Permit
PC 4/23/2008
4.5 Ensure that the type, size and scope of industrial and commercial development
are consistent with the long-term land use objectives of the County.
The proposed development is intended to fit a niche market to supply housing in the form of
Recreational Vehicle spaces for temporary workers within the gas industry. As the gas
industry is arguably at its peak within Garfield County, this kind of housing accommodation is
currently in very high demand. As is the current situation throughout the County, many
existing Camper Parks are fully occupied year-round with gas industry workers despite a
requirement that they not be at the site for over 120 days within each calendar year.
As such, this application and the current situation with housing for temporary workers within
the gas industry has pitted several goals within the County against each other. On the one
hand, the County has goals and objectives within the Plan to encourage a diverse range of
housing options and types to support various commercial and industrial activities within the
County. On the other hand, this proposal is to utilize expressed temporary structures
(Recreational Vehicles) as more or Tess permanent living quarters (over 120 days). In
addition, the proposal is submitted under regulations which were intended to accommodate
the tourism industry within Garfield County, not the gas industry. To this end, although such
a Camper Park will provide immediate housing accommodations to gas industry workers it
could also serve as an accommodation for the tourism industry following its useful life as a
Camper Park for gas industry workers.
Further, as expressed within Exhibit I from the City of Rifle, since this facility is to
accommodate families (by contrast, family members are not permitted to stay at a
Temporary Employee Housing Facility per Section 5.02.21), there are significant social
implications (such as school impacts, secondary employment impacts, etc.) from this kind of
development which would not be expected from a traditional Camper Park used for
recreational purposes or a Temporary Employee Housing Facility.
c. Policies
4.3 The project review process will include the identification and mitigation of
transportation impacts related to commercial and industrial development.
The Applicant has submitted a traffic study related to the expected impacts from the
proposed development. However, this study is based on a Camper Park used for
recreational purposes, not as housing for gas industry workers. As such, the numbers within
the study are expected to not be completely accurate for the immediate use of the property.
However, the Garfield County Road and Bridge Department (Exhibit G) has indicated that a
driveway permit has been issued and did not foresee any problems with the traffic study as
submitted. Meanwhile, Michael Erion P.E. of Resource Engineering has expressed concern
regarding the traffic impact study.
4.1 Commercial development will be encouraged in areas where existing
infrastructure (water and wastewater facilities) are currently available.
Since this development is anticipated to be located adjacent to the City of Rifle limits within
the next several months (Exhibit I, City of Rifle states as soon as June 2008), in respect to
116th contiguity, this property will be eligible for annexation to the City of Rifle very shortly.
Such an annexation will presumably enable the Applicant to connect to City of Rifle water
15 319 Water Company — Camper Park
Special Use Permit
PC 4/23/2008
and wastewater facilities. Considering the constraints in terms of water quality (radioactivity)
and expressed issues with the proposed ISDSs (See Exhibits J, K, and L) it may be
financially beneficial to the Applicant, promote health and wellbeing among the inhabitants
and help protect ground water and soil quality by hooking this development to City services.
The Applicant acknowledges within Section 4 of the application that the proposed well is to
serve three entities (developments) "until the properties are adjacent to the City of Rifle at
which time annexation into the city is anticipated."
VI. REVIEW STANDARDS
Special Uses for Camper Parks are subject to the standards in Section 5.02 and
Section 5.03 of the Zoning Resolution. These review standards are presented below
followed by a response by Staff.
A. Section 5.03 Review Standards
1) Utilities adequate to provide water and sanitation service based on accepted
engineering standards and approved by the Board of County Commissioners
shall either be in place or shall be constructed in conjunction with the proposed
use;
Staff Finding
1) Water:
- Quantity:
The Applicant has represented that the well with permit number 61926 can pump up to
35 gallons per minute or 30,000 gallons per day to serve three entities (319 Water
Company, Mamm Creek Commons, LLC and 319 Properties, LLC). The current status
of the well is as a Transient, Non -Community Water System. The proposed Camper
Park requires that the system be reestablished with CDPHE as a Community Water
System. Comments from the CDPHE (Exhibit K) confirm that the water system as
proposed will need to be permitted by CDPHE-WQCD. A pump test conducted in 2003
indicated that "this well will not provide reliable long term yield of 35 gpm. However, the
well can be pumped at 35 gpm for short periods of time (24 hours or less) followed by
periods of equal or greater recovery. We recommend an average yield of 30,000
gallons per day be used for planning purposes." A well sharing agreement has been
submitted which legally distributes and maintains the water to the three entities. With a
planned yield of 30,000 gpd, and a distribution of 1/3rd interest in Sills Well no.2, it can
be deducted that each use is permitted 10,000 gpd. As the Camper Park regulations
require 100 gallons of water per day for all self-contained units, a total supply of 10,000
gpd is required (100 self-contained Camper Units X 100 gpd demand). To this end, it is
Staffs opinion that adequate physical water is available for the proposed use.
- Quality:
Since the water system will need to be reestablished as a Community Water System
and permitted through CDPHE, Colorado River Engineers on behalf of the Applicant
has prepared sampling studies. The sampling study conducted in February 2007
concluded that "the water samples exceeded the Radiological Maximum Contaminant
Levels (MCL) for Uranium and Gross Alpha Particles... Without additional treatment,
the water is not suitable for use in the CWS, where recurring exposure to the water is
16 319 Water Company — Camper Park
Special Use Permit
PC 4/23/2008
expected... Radiation pulls electrons off atoms in the cells (ionizes them) and may
prevent the cell from functioning properly. It may lead to the cell's death, to the cell's
inability to repair itself, or to the cell's uncontrolled growth (cancer)." The tests showed
that all other Volatile Organic Contaminants (VOC) and Synthetic Organic
Contaminants (SOC) at Below Detectible Levels while all inorganic contaminants were
either Below Detectible Levels or below the Maximum Contaminant Levels. The study
also indicates that this well had had problems with high Nitrate levels in the past.
In regards to Uranium removal, the Applicant has been working with Colorado River
Engineers and Water Remediation Technology, LLC (WRT) to find a method to remove
the radioactivity from the well water in order to meet the requirements of CDPHE for a
Community Water System. This system will need to be approved and permitted by
CDPHE prior to issuance of the permit for a Community Water System.
Considering these challenges, Staff recommends that the project be connected to the
City of Rifle water system as soon as the property is eligible for annexation. This
opportunity could present itself as soon as June of 2008. If the Applicant chooses to
continue land use permitting with Garfield County, a Community Water System permit
must be obtained from CDPHE prior to issuance of the Special Use Permit.
- Legal Availability:
The Applicant has provided an executed West Divide Water Conservancy District
Water Allotment Contract (#040219WC(a)) for 16.23 acre feet per year. This water
allotment contract, however, does not specify that a 100 space Camper Park for
Recreational Vehicles is a permitted user of the water (the contract specifies 46
commercial units comprising 207,000 square feet and 184,000 square feet of lawn and
gardens). A valid water allotment contract must be supplied prior to issuance of the
Special Use Permit.
In addition, well permit number 61926 has been supplied which allows for 35 gpm from
Sills Well no. 2. The well permit specifies that the following uses are permitted: fire
protection, ordinary household purposes inside not more than 25 single family dwelling
units, the irrigation of not more then 4,000 square feet of home gardens and lawns per
residential site, drinking and sanitation facilities inside not more than 46 commercial
business units and 4,000 square feet of landscaping for each commercial unit. To this
extent, a 100 space Camper Park for Recreation Vehicles is not permitted as a part of
this well permit. A valid well permit must be supplied for Staff to support this application.
Further, the water system must be approved by the CDPHE as a Community Water
System prior to the issuance of a Special Use Permit.
Further, the well sharing agreement requires that water use from the Sills Well no. 2 be
consistent with the West Divide Contract and Well Permit 61926. As such, it is Staffs
opinion that water is not legally available for the proposed use.
2) Sanitation and Wastewater:
- Sewage Disposal:
The Applicant is proposing to service the facility with three engineered septic systems.
The engineered septic systems as designed by Bullseye Engineering, is to handle
17 319 Water Company — Camper Park
Special Use Permit
PC 4/23/2008
50,000 gallons of wastewater per day. Unlike the Garfield County requirements for
minimum water supply per Camper Space (100 gpd), the Garfield County Zoning
Resolution does not specify a minimum amount of wastewater disposal capacity. As
indicated in both the Garfield County Public Health Department (Jim Rada) and Michael
Erion, P.E. reviews (Exhibits J and L respectively), there is a discrepancy between the
100 gpd required for water to each Camper Space versus the proposed 50 gpd
wastewater disposal capacity. Although there is no requirement for the Applicant to
increase wastewater disposal capacity within the Zoning Resolution, it is generally not
an appropriate practice to provide more water to a facility then can be handled by the
wastewater disposal system. Michael Erion, P.E. of Resource Engineering (Exhibit L)
has recommended that the amount of wastewater capacity equal that of the supplied
water (100 gpd). This would presumably require a doubling of the number of ISDSs
within the proposed development from three to six. As this Camper Park is to be used
at least initially for full-time residents, Staff recommends that the wastewater disposal
capacity equal the supplied water per Camper Space. Upon review of the plans, it is
unclear as to whether this property can adequately accommodate 100,000 gpd of
wastewater without obtaining a State CDPHE-WQCD permit.
In addition, Per comments by the Garfield County Public Health Department (Exhibit J,
the engineering of the system contained percolation tests for ISDS numbers 2 and 3
which were slow due to the bottom of the hole being in a dense clay lens. These test
holes where discarded as an anomaly. However, as Jim Rada explains in Exhibit J,
"There are no provisions for discarding percolation data in the ISDS regulations."
Further, Jim Rada explains that "ISDS Plan No. 2 indicates that the leach field will lie
perpendicular to the slope. From the topography on the site plan, this will put one end
of the leach roughly 7-10 feet deep. This puts the deep end of the leach field
approximately 3.5 — 6.5 feet deeper than the perc test was run. As indicated in the perc
test reports, variable soils exist in the area which could result in this system being in
soils that are substantially different than identified in the perc test. In addition, at this
depth, the system will be partially installed at a depth greater than the manufacturer's
recommendation." To this end, it is Staffs opinion that the requirements for wastewater
disposal are not based on "acceptable engineering standards" and hence this
requirement is not met.
Further, it may be financially beneficial to the Applicant and would certainly be promote
both public health and environmental quality if the development were annexed and
connected to the City of Rifle wastewater services. As mentioned previously, this
property could be eligible for annexation as early as June of 2008 (Exhibit I).
Prior to issuance of the Special Use Permit that Applicant shall verify that all concerns
expressed within Exhibit J have been rectified to the satisfaction of the Garfield County
Public Health Department.
- Solid Waste Disposal:
The Applicant has not represented how solid waste will be handled within the
development. Section 5.02.19(5) requires that " the storage, collection and disposal of
refuse in mobile home parks and camper parks shall be so arranged as to create no
health hazards, rodent harborage, insect breeding areas, accident or fire hazards, or air
pollution. All refuse shall be disposed of at either a municipal or county designated
landfill site. Staff recommends that a solid waste disposal plan be submitted and
18 319 Water Company — Camper Park
Special Use Permit
PC 4/23/2008
approved by the Garfield County Public Health Department per Exhibit J prior to
issuance of the Special Use Permit.
- Fire Protection:
The Applicant is proposing to utilize an existing 186,000 gallon water storage tank for
fire protection purposes which is reportedly in the area. Staff is not familiar with this
location and the Rifle Fire Protection District has not indicated knowledge of the
location for this facility either. The Rifle Fire Protection District has indicated that flow
tests are necessary for this facility and that these tests should be conducted by a third
party. Further, the Rifle Fire Protection District has requested that a new review of the
hydrant spacing be conducted and that all hydrants and piping be installed per City of
Rifle standards. Staff recommends that the concerns identified within Exhibit M be
rectified to the satisfaction of the Rifle Fire Protection District prior to issuance of the
Special Use Permit. In addition, Staff recommends that a condition of approval be
added requiring that all hydrants and piping be installed in conformance with the City of
Rifle standards.
2) Street improvements adequate to accommodate traffic volume generated by the
proposed use and to provide safe, convenient access to the use shall either be in
place or shall be constructed in conjunction with the proposed use;
Staff Finding
The Applicant has represented that the hours of operation are to be 24 hours a day, 7
days per week. The traffic study indicates that trip generation from the site is to be
approximately 177 ADT. The report goes on to state that this translates in to 32 trips
during the AM peak and 48 trips during the PM peak. Overall, the Camper Park is to
increase the traffic on CR 319 by 13% while the AM and PM peak hours will be an
increase of 20% and 34% respectively.
Michael Erion, P.E. of Resource Engineering had the following comments regarding the
traffic analysis:
The traffic report assumes 2 average daily trips (ADT) per unit.
Given the nature of the proposed project and no on-site
commercial facilities for basic necessities, a trip generation of 4
ADT per unit is more reasonable. The traffic report should
address the adequacy of the existing CR 319 and the proposed
internal roads to accommodate the traffic volumes generated by
the proposed project. The report only states that the impact to
existing traffic volumes (15% to 30%) is minor.
It is Staff's opinion that since this facility is to be utilized primarily as permanent living
quarters and not recreational purposes that a traffic analysis based on Camper Parks is
not appropriate in this scenario. To this extent, Planning Staff agrees with the
comments provided by Michael Erion, P.E. regarding the traffic analysis. Staff
recommends that a new traffic analysis be conducted which uses projected traffic
demand based on a Mobile Home Park instead of a Camper Park and address the
adequacy of the existing CR 319 to handle the increase in traffic. As a result, Staff
recommends that a condition of approval be added which requires that a new traffic
19 319 Water Company — Camper Park
Special Use Permit
PC 4/23/2008
analysis be conducted which addresses both the concerns of Michael Erion, P.E. within
Exhibit L and takes into account a residential development (such as a mobile home
park) and not based on a recreational use. To this end, this standard has not been met.
The Garfield County Road and Bridge Department expressed no objection to this
application.
3) Design of the proposed use is organized to minimize impact on and from
adjacent uses of land through installation of screen fences or landscape
materials on the periphery of the lot and by location of intensively utilized areas,
access points, fighting and signs in such a manner as to protect established
neighborhood character;
Staff Finding
The subject property is located in a rural, increasingly industrial area adjacent to the
Rifle Airpark Annexation, the Garfield County Airport, and various gas related facilities
and well pads. In addition, this property is located at the base of the primary access to
County Road 319 for those who live on Grass Mesa.
The proposed use will have a visual impact to the surrounding natural environment
seen from County Road 319. Given the size, scale and location of this Camper Park, it
is not practical to screen this development with exception to the use of natural
vegetation. The Applicant is proposing to leave much of the native vegetation in place
which will help screen this development and soften its impact to those using County
Road 319.
Staff recommends that a condition of approval be added which requires all lighting to be
directed downward and inward toward the center of the property.
In addition, this site does possess a fairly high degree of wildfire danger. As such, the
Applicant should come to an agreement with the Rifle Fire Protection District in regards
to Exhibit M and in particular wildfire mitigation and campfire impact mitigation.
VII. SECTION 5.02 REQUIREMENTS FOR CAMPER PARKS
5.02.05 Site Plan for Mobile Home Park and Camper Park; General Requirements:
(1) Access: the park shall have access to a public street or highway;
(2) Drainage: the park shall be located on a well -drained site, graded for
rapid drainage and free from stagnant pools of water;
(3) Layout: the applicant shall also show on the plan all entrances and exits
to the park, driveways and walkways and the design and arrangement of all
mobile home spaces, camper spaces and any included service buildings.
Commercial facilities included or proposed as part of a park shall be
principally devoted to serving occupants of said park.
The Applicant proposes to access the site via an access easement across a
neighboring property to achieve connectivity with County Road 319. Prior to
issuance of the Special Use Permit, the Applicant shall execute an access
20 319 Water Company — Camper Park
Special Use Permit
PC 4/23/2008
easement or boundary line adjustment to guarantee legal access to the subject
property. If the Applicant chooses to do a boundary line adjustment to
accommodate the access point, the Applicant shall execute this process and
demonstrate that the process has been completed to the Planning Department
prior to issuance of the Special Use Permit.
5.02.07 Site Requirements Applicable Only to Camper Parks:
(1) Setback: Minimum setback requirements of the applicable zone district
regulations shall be observed on the periphery of the park;
(2) Camper Spaces:
(B) The area devoted to each camper space designed for camper
vehicles or trailers shall be adequate to accommodate the following
facilities and spatial requirements: Each space shall be provided with
a graveled vehicle and trailer parking space of length and width to
accommodate the type of camper or trailer by which the space is
intended to be occupied. Fireplaces, fire circles and picnic tables
shall be installed in sufficient quantities and in convenient locations to
satisfy occupants' needs for such facilities. Adequate traffic barriers
shall be provided to confine vehicles and trailers to driveways and
parking spaces. The minimum on -center distance between campers
or trailers shall be twenty (20) feet;
(3) Driveways:cam er spaces shall abut tuuPon a driveway graded for drainage
and maintained in a rut -free and dust -free condition an w is provides
unobstructed access to a public street or highway; the minimum unobstructed width
of such driveways shall be fifteen (15) feet for one-way traffic or twenty-five (25) feet
for two-way traffic, providing no parking is permitted thereon. An additional eight (8)
feet of width shall be required for each parallel parking lane constructed adjacent
thereto, or twenty (20) feet for each lane of perpendicular or angle parking adjacent
thereto.
Following review of the proposed Road Layout, it appears that these requirements are met.
5.02.08 Water Supply and Distribution; General Requirements:
(1) A domestic water supply that is in compliance with the drinking water standards
of the Colorado Department of Health shall be provided in each mobile home and
Camper Park. Where a municipal supply of water of satisfactory quantity, quality and
pressure is available, connection shall be made thereto and its supply used
exclusively. When such a municipal water supply is not available, a central water
supply system may be developed and used if it meets standards of the Colorado
Department of Health;
(2) Every well or suction line of the water supply system shall be located and
constructed in such a manner that neither underground nor surface contamination
will reach the water supply from any source;
21 319 Water Company — Camper Park
Special Use Permit
PC 4/23/2008
(3) The treatment of a private water supply shall be in accordance with applicable
laws and regulations;
(4) Water Distribution System:
(A) The water supply system of the park shall be connected by pipes to all
mobile homes, buildings and other facilities requiring water;
(B) All water piping, fixtures and other equipment shall be constructed and
maintained in accordance with state and local regulations and requirements
and shall be of a type and in locations accepted by the County Environmental
Health Officer;
(C) The system shall be so designed and maintained as to provide a pressure
of not less than twenty (20) nor more than eighty (80) pounds per square
inch, under normal operating conditions, at service buildings and other
locations requiring potable water supply;
(D) A minimum horizontal separation of ten (10) feet shall be maintained
between all domestic water lines and sewer lines;
(E) Underground stop and waste valves shall not be installed on any water
service.
Please see discussion above relating to Section 5.03 of the Zoning Resolution.
5.02.10 Water Supply and Distribution Requirements Applicable Only to Camper Parks:
(1) Source of Supply: The water supply shall be capable of supplying fifty (50)
gallons per space per day for all spaces lacking individual water connections and a
hundred (100) gallons per space per day for all spaces provided with individual
water connections;
(2) Individual Water Connections: If facilities for individual water service connections
are provided, the following requirements shall apply:
(A) Riser pipes provided for individual water service connections shall be so
located and constructed that they will not be damaged by the parking of travel
trailers or campers;
(B) Water -riser pipes shall extend at least four (4) inches above ground
elevation unless recessed in a box or sleeve. The pipe size shall be three-
quarter (3/4) inch;
(C) Adequate provisions shall be made to prevent freezing of main service
lines, valves and riser pipes;
(D) Valves shall be provided near the outlet of each water service connection.
They shall be turned off and the outlets capped or plugged when not in use;
-22-
319 Water Company — Camper Park
Special Use Permit
PC 4/23/2008
(3) Watering Stations:
(A) Each camper vehicle or trailer parking area shall be provided with one (1)
or more easily accessible watering stations for filling water storage tanks.
Such water supply outlets shall consist of at least a water hydrant and the
necessary appurtenances and shall be protected against the hazards of
backflow and back siphonage;
Please see discussion above relating to Section 5.03 of the Zoning Resolution. In addition,
see Exhibit N from Jimmy Sills regarding this Section. It is required that all of these
requirements be complied with.
5.02.11 Fire Protection; General Requirements: Provisions sh-1l be m- •e for. ' '• • - . •• • - •f
fire. It shall be the responsibility of the duly authorized attendant or caretaker to
inform all tenants about means for summoning fire apparatus, sheriff's department
and park employees Jin open fires shall be lef unattended at any time.
(1) Portable Fire Appliances:
(A) Approved facilities shall be provided for fighting fires in ordinary
combustible materials (Class A), readily accessible to all park occupants, in
readily visible locations. Such facilities shall consist of a hose of a type usable
in all weather, permanently attached or in cabinets immediately adjacent to
the hose connection so located that any part of any mobile home, travel
trailer or camper vehicle can be reached with a garden hose stream;
(B) One (1) or more approved carbon dioxide or dry chemical extinguishers of
a type suitable for flammable liquid or electrical fires (Class B and Class C)
shall be located either in an open station so that it will not be necessary to
travel more than a hundred (100) feet to reach the nearest extinguisher, or
inside each mobile home and camper at the owner's responsibility and
verified by the park operator;
(C) Appropriate arrangements shall be made to prevent freezing of fire
fighting equipment.
The Applicant is proposing to utilize an existing 186,000 gallon water storage tank for fire
protection purposes which is reportedly in the area. Staff is not familiar with this location and the
Rifle Fire Protection District has not indicated knowledge of the location for this facility either.
The Rifle Fire Protection District has indicated that flow tests are necessary for this facility and
that these tests should be conducted by a third party. Further, the Rifle Fire Protection District
has requested that a new review of the hydrant spacing be conducted and that all hydrants and
piping be installed per City of Rifle standards. Staff recommends that the concerns identified
within Exhibit M be rectified to the satisfaction of the Rifle Fire Protection District prior to
issuance of the Special Use Permit. In addition, Staff recommends that a condition of approval
be added requiring that all hydrants and piping be installed in conformance with the City of Rifle
standards. See Exhibit N for more details from the Applicant.
5.02.13 Sewage Disposal; General Requirements: An adequate sewage system shall be provided in
each mobile home park and camper park for the purpose of conveying and
- 23 -
319 Water Company — Camper Park
Special Use Permit
PC 4/23/2008
disposing of all sewage. Such system shall be designed, constructed and
maintained in accordance with state and local laws.
(1) Sewer Lines: All sewer lines shall be located in trenches of sufficient
depth to be free of breakage from traffic or other movements and shall
maintain a minimum horizontal separation of ten (10) feet from all domestic
water lines. Sewers shall be at a grade which will insure a velocity of two (2)
feet per second when flowing full. All sewer lines shall be constructed of
materials accepted by state or local laws and shall meet design criteria of the
Colorado Department of Health;
(2) Sewage Treatment and/or Discharge: Where the sewer lines of the park
are not connected to a public sewer, all proposed sewer disposal facilities
shall be approved by the Environmental Health Officer prior to construction.
Effluents from sewage treatment facilities shall not be discharged into any waters of
the State except with prior approval of the Colorado Department of Health.
5.02.15 Sewage Disposal Requirements Applicable Only to Camper Parks:
(1) Individual Sewer Connections: If facilities for individual sewer connections are
provided, the following requirements shall apply:
(A) The sewer riser pipe shall have at least a four (4) inch diameter, shall be
trapped below the ground surface and shall be so located on the trailer space
that the sewer connection to the trailer system will approximate a vertical
position;
(8) The sewer connection shall have a nominal inside diameter of at least
three (3) inches, and the slope of any portion thereof shall be at least one-
eighth (1/8) inch per foot. All joints shall be watertight;
(C) All materials used for sewer connections shall be corrosive resistant,
nonabsorbent and durable. The inner surface shall be smooth;
(D) Provision shall be made for plugging the sewer riser pipe when a trailer
does not occupy the space. Surface drainage shall be diverted away from the
riser;
(2) Sink Wastes: No liquid wastes from sinks shall be discharged onto or allowed to
accumulate on the ground surface.
Please see discussion above relating to Section 5.03 of the Zoning Resolution.
5.02.16 Electrical Distribution and Communication Wiring: Each mobile home park shall, and each
camper park may, contain an electrical distribution system, consisting of wiring,
fixtures, equipment and appurtenances thereto which shall be installed and
maintained in accordance with the USA Standard "National Electrical Code, 1971"
and all subsequent amendments thereto. Telephone and cable TV systems may be
installed and maintained;
-24-
319 Water Company — Camper Park
Special Use Permit
PC 4/23/2008
All plans for the above services shall have the approval of the responsible utility prior
to county approval of park plans.
The Applicant understands the above mentioned requirements.
5.02.19 Supervision; General Requirements:
) (1) The duly authorized attendant or caretaker shall be in charge at all times to keep
the park, its facilities and equipment in a clean, orderly and sanitary condition;
(2) The owner shall be answerable for the violation of any provision of this
Regulation and other applicable County and State regulations. Copies of
Regulations shall be made available to the park residents by the park manager or
owner;
(3) Refuse Handling: the storage, collection and disposal of refuse in mobile home
parks and camper parks shall be so arranged as to create no health hazards, rodent
harborage, insect breeding areas, accident or fire hazards, orair pollution. All refuse
shall be disposed of at either a municipal or county designated landfill site;
(4) Pest Control: grounds, buildings and structures shall be maintained free of insect
and rodent harborage and infestation. Extermination methods and other measures
to control insects and rodents shall conform to the requirements of the County
Environmental Health Officer and the Colorado State Department of Health;
(5) Pet Control: no owner or person in charge of any dog, cat or other pet animal
shall permit it to run at large or commit any nuisance within the limits of any mobile
home or camper park.
The Applicant understands the above mentioned requirements. Staff recommends adding
these requirements as conditions of approval.
5.02.20 Miscellaneous Regulations Applicable Only to Camper Parks:
4 (1) The principal business of the park shall be to provide parking spaces for travel
trailers, camper vehicles and/or tent camping. Occupancy in camper parks by any
individual shall be limited to no more than one hundred twenty (120) days per year
in any one (1) or combination of camper parks in the County.
—� (2) Travel trailers and camper vehicles accommodated shall not exceed forty (40)
feet in length and eight (8) feet in width.
The Applicant has requested a waiver from 5.02.20(1) regarding the limit of 120 day
occupancy. Staff understands that this requirement was put in place to ensure that Camper
Parks are maintained as recreational facilities and not permanent residential facilities.
Planning Staff further understands that the Board of County Commissioners (BOCC)
contemplated this requirement in regards to the Draft Zoning Resolution on April 16, 2008.
At this meeting the BOCC decided to remove this requirement from the new draft land use
-25-
319 Water Company — Camper Park
Special Use Permit
PC 4/23/2008
code. Given this background, the Applicant has two ways to approach this "waiver": 1) The
Applicant can request a variance from this requirement from the Board of Adjustments, or
2) The Applicant can file an application with the Planning Department for the PC and
BOCC to consider a text amendment to the current Zoning Resolution (1978). Provided the
requirements for a Variance request, most notably hardship, and the recent decision by the
BOCC regarding this 120 day occupancy llimit, Staff suggests that the Applicant pursue a
Text Amendment to allow the PC and the BOCC to consider regulations to allow for park
occupants to stay longer than 120 days.
5 SUGGESTED FINDINGS
1. That proper public notice was provided as required for the hearing before the Planning
Commission.
2. That the hearing before the Planning Commission was extensive and complete and that all
interested parties were heard at that meeting.
3. That for the above stated and other reasons, the proposed Special Use Permit is NOT in the
best interest of the health, safety, morals, convenience, order, prosperity and welfare of the
citizens of Garfield County.
4. That the application is NOT in conformance with the Garfield County Zoning Resolution of
1978, as amended.
6 STAFF RECOMMENDATION
At this point, Staff finds the application to be deficient in the following areas:
1) The Applicant has not demonstrated that legal water is available to the Camper Park;
2) The Applicant has not demonstrated that the proposed wastewater disposal system
(ISDS) is adequate to accommodate the demand created by the Camper Park and or is
based on accepted engineering standards;
3) The Applicant has not adequately determined the traffic impact on the County Road
system;
4) The Applicant has not executed an access easement or boundary line adjustment to
guarantee legal access to the subject property;
5) The Applicant has not obtained a City of Rifle Watershed Permit (must be obtained prior to
site disturbance);
6) The Applicant needs to provide a current weed inventory and map. The Applicant must also
provide a weed management plan that reflects the inventory;
7) Soil management, revegetation, and reclamation plan and financial security, in accordance
with the Garfield County Weed Management Plan 2000, adopted by Resolution No. 2002-94
and recorded in the Office of the Garfield County Clerk and Recorder as Reception No.
580572, Book 1251, Page 566, as amendecf. The Applicant has provided the plant material
- 26
319 Water Company — Camper Park
Special Use Peimit
PC 4/23/2008
list and revegetation plan for the Mamm Creek Commons project. Staff assumes that they
want to utilize that plan for this project. The Applicant must quantify the area, in terms of
acres, to be disturbed and subsequently reseeded on road cut and utility disturbances. This
information will help determine the amount of security that will held for revegetation. Staff
recommends a revegetation security once this information is provided
8) The Applicant must provide a Soil Management Plan that includes:
Provisions for salvaging on-site topsoil.
A timetable for eliminating topsoil and/or aggregate piles.
The plan shall provide for soil cover if any disturbances or stockpiles will sit
exposed for a period of 90 days or more.
9) The Applicant has not submitted a solid waste disposal plan;
10) The Applicant has not obtained a permit from the CDPHE for a Community Water System;
11) The Applicant needs to meet with the Rifle Fire Protection District to find solutions to issues
raised within Exhibit M
Based on these deficiencies, Staff recommends that the Planning Commission recommend denial to
the Board of County Commissioners.
-27-
319 Water Company — Camper Park
Special Use Permit
PC 4/23/2008