Loading...
HomeMy WebLinkAboutApplication - PermitGarfield County Building & Sanitation Department 108 ih Street, Suite #401 Glenwood Springs, Co. 81601 Office-945-8212 In spection Line-384-5003 A m ount o f P ermit $ ())5sZO · 17 I Cl erk I N O . 10333 220~A GARFIELD l:UUN I 'I' OUIL..U11•u '"""""" • ••· • -· · . 10h 8 "' Street, Suite 401, Qleawood Bprh•l•• CO 81601 Pboae: 970·941S-S212 1 Fu: ll70·384-3470 /la•p•ctloa Llae: 970·384-11003 Pennlt No: ID ~3 Parcel/Schedule No: 239.5 ~ /2/-2 7-/8 b <gt o I 0 Alteration Addition 0 Move Carport: On·Site Sewage Site Plan Disposal o Remove Q Single 0 Double ~ ~-u6~(JJ 1 /V\.,Q~--. . :>'~(_. 6 . Setbacks: AGREEMEm" PERMISSION IS HEREBY ORANn:D TO 11-IE APPUCAm' liS OWNER. CONTRACTOR AND/OR nfE AOENT OF 11-IE CON'mACTOR OR OWNER TO CONSTRUCT ni£ STRUCTURE J.S DETAILED ON PLANS AND SPECIFICATIONS SUBMITTED TO AND REVIEWED BY nfE BUILDING DEPARTMENT. IN CONSIDERATION 01' niE ISSSUANCE OF nilS PERMIT, nfE SIGNER HEREBY AGREES TO COMPLY WlTii ALL BUILDING CODES AND LAND USE REOUUllONSADOJ>reD BY OARF1ELD COUN1Y PURSUANT TO Al111i01UTY GIVEN LN 30.28.201 CRS AS AMENDED. THE SIGNER F"URlliER AGREES niAT IP niE ABOVE SAID ORDINANCES ARE NOT FUU.Y COMPILED wmi IN THE LCOATION, ERECllON, CONSTRUCTION, AND USE OF' 11-IE ABOVE DESCRIBED STRUCTURE, 11-IE PERMIT MAY BE REVOKED BY NOTICE FROM THE COUNlY AND THAT THEN AND ni!';RE rr SHAU. BECOME NULLANQ VOID. THE ISSUANCE OF A PERMT BASED UPON PLANS, SPECII'lCATIONS AND OTHER DATA SHAU. NOT PREVENT THE BUILDING OFF1CW. FROM THEREAF'l1m REQUIRJNO 11-IE CORRECTION OF ERRORS IN SAID PLANS, SPECIFICATIONS AND OTHER DATA OR FROM PREVENTING BUILDING OPERATION BEING CARRIED ON nfEREUNDER WHEN IN VIOU.TION OF 11-IS CODE OR ANY OTHER ORDINANCE OR RECUU.TION OF THIS JURlSDIC110N. THE REVIEW OF SUBMITTED PLANS AND SPECIFICATIONS AND INSPECTIONS CONDUCTED THEREAFTER DOES NOT CONS1TTl1ll: AN ACCEPTANCE OF' ANY RESPONSIBIUTIES OR LIABUTIES BY GARFIELD COUNlY FOR ERRORS, OMISSIONS OR DJSCREPENCJES . THE RESPONSJ BILnY FOR THESE rTEMS AND IMPLEMENTATION DURING CONSTRUCTION RESTS SPECIFICI.ALLY Wlnf TiiE ARTICTECT, DESIGNER BUILDER. AND OWNER. COMMENTS AR.E .INTI:NDED TO BE CONSERVATIVE AND IN SUPPORT OF THE OWNERS LNTEREST. ~ I HEREBY ACKNOWLEDGE THAT I HAVE READ AND UNDERSTAND TliE AGREE~ ENT ABOVE tiNITIAL): _f"l.5 ___ _ Piov\(\ J ~0 \ \~\7..00~ i (5~ I ,q cJ ~ :t=\-l 0 l ~L~ Q f'-~ t 0 ll ~{'LGXJ~ i 1 5 0,C() L~tf lDl ~S ?dr~ f:FI~:d3 3-1-'o 7 . c.h<t*, Dd gQ ?.er ,~fec / The 'following items are required by Garfield County for a final inspection: 1. A final Electrical Inspection from the Colorado State Electrical Inspector; 2. Permanent address assigned by Garfield County Building Department posted where readily visible from access road; 3. A finished roof, a lockable house, complete exterior siding, exterior doors and windows installed, a complete kitchen with cabinets, a sink with hot & cold running water, non-absorbent kitchen floor coverings, counter tops and finished walls, ready for stove and refrigerator, all necessary plumbing; 4. All bathrooms must be complete, with washbowl, tub or shower, toilet stool, hot and cold running water, non-absorbent floors and walls finished and a privacy door; 5. All steps outside or inside over three (3) step s must have handrails, guard rails on balconies or decks over 30" high constructed to all IBC and IRC requirements; 6. Outside grading done to where water will detour away from the building; 7. Exceptions to the outside steps, decks and grading may be made upon the demonstration of extenuating circumstances, i.e. weather, but a Certificate of Occupancy will not be issued until all the required items are completed and a final inspection made ; 8. A final inspection sign off by the Garfield County Road & Bridge Department for driveway installation, where applicable; as well as a ny final sign off by the Fire District, and/or State Agencies where applicable . A CERTIFICATE OF OCCUPANCY WILL NOT BE ISSUED UNTIL ALL THE ABOVE ITEMS HAVE BEEN COMPLETED. ****CANNOT OCCUPY OR USE DWELLING UNTIL A CERTIFICATE OFOCCUPANCY (C.O .) IS ISSUED . OCCUPANCY OR USE OF DWELLING WITHOUT A C.O . WILL BE CONSIDERED AN ILLEGAL OCCUPANCY AND MAY BE GROUNDS FOR VACATING PREMISES UNTIL ABOVE CONDITIONS ARE MET. I understand and agree to abide by the above conditions for occupan D use _ and the issuance of a Certificate of Occupancy for the dwelling under building permit# I 3~3 Signature Bpapplicationfeb2006 IQ -I 2-2.0 a h Date 2Z.D 'Z 'It I I VALDA TIONIFEE DETERMINATION ;!4.~­ Applicant -~t(T)t( ~~£ Address Q ~ A!Jin #tO Date t7'f3., re ' Finished (Livable Area): Main '177 Upper 8'f{p Lower Other Subdivision / 12c>t.b~-e P"'-. d--. Lot/Block t g4- Contractor ~s~ Total Square Feet ./8 73 "t 74 k.B :::: /39 &'> 75. Ce 1 Valuation Basement: Unfinished Conversion of Unfinished to Finished Plan Check Fee for Conversion Valuation Garage: Valuation ?~ Y./8 Crawl Space: Valuation Decks/Patios: Covered Valuation Open Valuation Total Valuation !?I So3 r,.j Lo+ I '8/t; 2Zo2-A GARFIELD COUNTY BUILDING AND PLANNING 970-945-8212 MINIMUM APPLICATION REQUIREMENTS For SINGLE FAMILY DWELLING CONSTRUCTION Including NEW CONSTRUCTION ADDITIONS ALTERATIONS And MOVED BUILDINGS In order to understand the scope of the work intended under a permit application and expedite the issuance of a permit it is important that complete information be provided. When reviewing a plan and it's discovered that required information has not been provided by the applicant, this will result in the delay of the permit issuance and in proceeding with building construction. The owner or contractor shall be required to provide this information before the plan review can proceed. Other plans that are in line for review may be given attention before the new information may be reviewed after it has been provided to the Building Department. Please review this document to determine If you have enough information to design your project and provide adequate information to facilitate a phm review. Also, please consider using a design professional for assistance In your design and a construction professional for construction ofyour project, Any project with more than ten (I 0) occupants requires the plans to be sealed by a Colorado Registered Design Professional. To p~vide for a mo'7 understandabl.e plan in order to determine compliance with the building, plumbmg and mechantcal codes, appltcants are requested to review the following checklist prior to and during design. Applicants are required to Indicate appropriately and to submit the completed checklist at time of application for a permit. Plans to be Included for a Building Permit, must be on drafting paper at least I8"x24" and drawn to scale. I Plans must include a floor ·plan, a concrete footing and foundation plan, elevations all sides with decks, balcony, steps, hand rails and guard rails, windows and doors, in~luding the finish grade line and original grade. A section showing in detail, from the bottom of the footing to the top of the roof, including re-bar, anchor bolts, pressure treated plates, floor joists, wall studs and spacing, insulation, sheeting, house-rap, (which is required}, siding or any approved building material. Engineered foundations may be required. A window schedule. A door schedule. A floor framing plan, a roof framing plan, roof must be designed to withstand a 40 pound per square foot up to 7,000 feet in elevation, a 90 M.P.H. wind speed, wind exposure B or C, and a 3 6 inch frost depth. All sheets to be identified by number and indexed. All of the above requirements must be met or your plans will be returned. All plans submitted must be incompliance with the 2003 IRC. 1. Is a site plan included that identifies the location of the proposed structure or addition and distances to the property lines from each comer of the proposed structure(s) prepared by a licensed surveyor and has the surveyors signature and professional stamp on the drawing? Properties with slopes of 30% or greater must be shown on the site plan. (NOTE Section: 106.2) Any site plan for the placement of ariy portion of a structure within 50 ft. of a property line and not within a previously surveyed building envelope on a subdivision final plat shall be prepared by a licensed surveyor and have the surveyor's signature and professional stamp on the drawing. Any structure to be built within a . building envelope of a lot shown on a recorded subdivision plat shall include a copy of the buil 'ng envelope as it is shown on the final plat with the proposed structure located withi h nv. ope. Yes._.Lrr--' 2. Does th ite plan also include any other buildings on the property, setback easements and utility easements? Please refer to Section 5.05.03 in the Garfield County Zoning Resolution ifthe property you are applying for a building permit on is located on a comer lot. Special setbac do a ply. Yes~~--~-- 3. D?es site plan include w~en applicable the location of the I.S.D.S. (Individual Sewage Dt~posal Syst~) and the dtstances to the property lines, wells (on subject property and adJace"/Jfot~s}, streams or water courses? Yes~ 2 4. Does tlie site plan indicate the location and direction of the County or private road accessing the pro y es,__,.~-4l...c,....-1-- 5. include a foundation plan indicating the s~. location and spacing of all t I in accordance with the IRC or per stamped engineered design? 6. indicate the location and size of ventilation openings for under floor crawl spaces learances required between wood and earth? Yes'-l..k,'-'"...L.-- 7, indicate the size and location of ventilation openings for the attic, roof joist 8. 9. 10. II. 12. 13. spaces s ffi s? Yes • ......l""!-1.-'--- Do the include design loads as required by Garfield County for roof snow loads, (a minimum of 40 pounds per square foot up to & including 7,000 feet above sea level}, floor loads · d ads? · Yes'--1..-4~...1.-- Does the Jan include a building section drawing indicating foundation, wall, floor, and roof co ? Yes'-'.,.£.,4-l.....t.-- ing section drawing include size and spacing of floor joists, wall studs, ceiling t\o,•RP.T,S or joists or trusses? Does the Uding section drawing or other detail include the method of positiVe connection of ~e:'1ui~ams? · Does ::£LWtion plan indicate the height of the building or proposed addition from the undisturbed grade to the midpoint between the ridge and eave of a gable or shed roof or the top of t •qfl. (Building height measurement usually not to exceed 25 feet) Yes.--l..q.j...L.. .. 'T!-_ Does tb Ian iliclude any stov make and model and Colorad Yes No r zero clearance fireplace planned for installation including ht:!'P certifications or phase II EPA certification? 3 14. Does the plan include a maso comply with the IRC? 1replace including a fireplace section indicating design to Yes No~~~~---- 15. Does the plan include a windo schedule or other verification that egress/rescue windows from pin rooms and/or basements comply with the requirements of the IRC? Yes No __________ __ 16. Does t plan include a window schedule or other verification that windows provide natural dye ti tion for all habitable rooms? No. _______ _ 17. Do the tans indicate the location of glazing subject to human impact such as glass doors, glazing immediately adjacent to such doors; glazing adjacent to any surface normally used as· a walking surface; sliding glass doors; fixed glass panels; shower doors and tub enclosures and sP, safe glazing for these areas? Yes No. ______ _ 18. ation of all natural and liquid petroleum gas furnaces, boilers and water heaters o t lan? No. _____ _ 19. No _____ _ 20. Do yo understand that if you belong to a homeowners association, it is your responsibility to obtain written permission from the association, if required by that association, prior to subml g an application for a building permit? The building permit application will not be ace t · out it. Yes No ______ _ 21. Will t e only residential structure on the parcel? Yes·-e,..~"'-l---No Ifno-Explain:. ______ _ 23. :;qu th" tho miolm= &mMmoo 'homo""' booo ' lot i• 2Qft.wld•""' 20ft Yes No. ____ _ 4 24. Have you designed or had this p\an designed whi\e considering bui\ding and other Yes No · con3!:s'o co e requirements? . 25. · Do yo plans comply with all zoning rules and regulations in the County related to y!)ur 26. 27. 28. 29. 30. proper!' o[ne district? Yes No _____ _ Does th plan accurately indicate what you intend to construct and what will receive a final insp~' b e Garfield County Building Department? Yes No _______ __ Do you derstand that approval for design and/or construction changes are required ru:!ru: to the BPI! • t' o f these changes? · Yes No. _______ _ Do you· derstand that the Building Departl;llent will collect a "Plan Review" fee from you at the time of application submittal and that you will be required to pay the "Permit Fee" as well as any "Road Impact" or "Septic System" fees required, at the time you pick up your buil~l e it? Yes. · No. _______ __ Are yo aware that you must call in for an inspection by 3:30 the business day before the requested Inspection in order to receive it the following business day? Inspections will be made from 7:30a.m. to 3:30p.m. Monday through Friday. Inspections are to be caUe to 84-5003. Yes No _________ _ 31. Are yo aware that you are required to call for all inspections required under the IRC including approval on a final inspection prior to receiving a Certificate of Occupancy and occu y of the building? Yes No __________ __ 32. Are y aware that the Permit Application must be signed by the Owner or a written authority being given for an Agent and that the party responsible for the project must comply with th C Yes No·-~-------- 5 33. Are you aware that prior to submittal of a building permit application you are required to show proof of a driveway access permit or obtain a statement from the Garfield County Road & Bridg epartment stating one is not necessary? You can contact the Road & Bridge Depart en t -860 I. Yes No _____ _ 34. Do you u !lerstand that you will be required to hire a State of Colorado Licensed Electrician and Plumber to perform installations and hookups, unless you as the homeowner are perfo the work? The license number of the person performing the work will be requi a tjt f applicable inspection. Yes , ~ No ________ ~--- 35. . are, that on the front of the Building Permit Application you will need to fill in the Par chedule Number for the Jot you are applying for this permit on prior to submittal of a bu' din pe~ application? Your attention in this is appreciated. Yes V I No ________________ _ 36. Do you w that the Joe di rict may require you to submit plans for their review of fire safety issues? Yes I::>LT-b-+-:------No (please check with the · building department about t 37. Do you understand that if you are planning on doing any excavating or grading to the pro~ rlor ~suance of a building permit that you will be required to obtain a grading pe t? 1 Yes~+l-"'-':....;.. a. ZlbO) !'lotes: ~you have answered "No". o~ an f the questions, you may be required to provide this ~n~o~at1on at the r~quest of the Buildmg Official prior to beginning the plan review process. Delays ~n ~ssumgth~pemut are to ~e ~xpected .. Work may not proceed without the issuance of a permit. If 11 1s .det~rnuned by the Buildm~ Of~c~al that additional information is necessary to review the application and plans to determme nummum compliance with the adopted codes, the application 6 ~Q\ l~ ~ec;c &uc{ PLAN REVIEW CHECKLIST Applicant~ Date //• f!J•o(p Building vbngineered Foundation ~Driveway Permit ~urveyed Site Pl an ~Septic Permit and Setbacks ~adeffopography 30% ~ach Re sidential Plan Review Li st ~inimum Application Questionnaire -~division Plat Notes ~re Department Review _L---\i"iluation Determination/Fee s ~Lin e Plans/Stamps/Sticker -~h Conditions ~pplication Signed ~Reviewer To Sign Application _dafcel/Schedule No . __::::_ 40# Snowload LettCf-Man f. Hms. v::=-soils Report GENERAL NOTES: Planning/Zoning /property Line Setbacks .&ti_3oft Stream Setbacks fl A .Flood Plain ~uilding Height ~nino Sion-off --1:> 0 ~ad Impact Fee s ~A/DRC Approval JiL Graderropography 40 % £~ning Is sues __ Subdivision Plat Notes At ][ R 0 Nr J!UU: ID!CG', E: GOLF CLUB AND MOUNTAIN COMMUNJTY October 12, 2006 Garfield County Building Department I 08 81h Street Glenwood Springs, CO 8160 I RE: Approved Plans at Ironbridge Mountain Cottages LLC Dear County Representative, The following plans have been reviewed and approved by the Architectural Review Board of the Ironbridge Property Owners Association for use on Lot 186: Woodley Architectural Group "Ironbridge-Plan 2202" "Bid Set Redlines" dated May I, 2006 If you have any questions, please call me at (970) 384-5031. AZI-4 Paul Bambalicky Ironbridge Property Owners Association Representative 410 IRONBRIDGE DRJVE.GLENWOOD SPRINGS.COLORAD0.8!601 T: (970) 947-9800 F: (970) 928-8865 www.lronbridgeclub.com IJ• ''' ,\; :,_:, 'u,'l.,·;,' ;,·. ,•,/, ,, RE Cr~lV~D OCT 3 2.006 GAr< II , -:;oL nv BUILD ING & PLANNING ~ ~ ~ ~ ~ ~ ~ -«: --..--... ........ ........ -- ........ ........ ........ ........ ........ ........ ........ ........ ........ ........ ........ ........ ........ ........ ........ @.IT;_ ........ ........ E XHIBIT ~ ........ ........ ........ \ I ........ ........ ........ ........ ........ ........ ........ ........ ........ ........ ........ ........ ........ ........ ........ ........ ' ........ LOT LOT 18 6 MOD EL 2202 -A ........ ........ ........ 186 I I I ........ I ~~ I I I I I I I I I 1. NORTH AMER ICAN GREEN S150 EROSION CONTROL BLANKET (OR EQUIVALENT) IS TO BE PLACED ON ALL SLOPES GREATER THAN 3:1 2. MA INT AIN POSITIVE DRAI NAGE AWAY FRO M STRUC TU RES IN ALL DI REC TI ONS AT AL L TIMES . .3. CHANGES TO THE GRADING PLAN AND DRAINAGE SH AL L BE VER IFIED THRO UG H THE ENGINE ER OF RECORD PR I OR TO BE ING COMPLETED IN THE FIELD. PROPERTY DE SCRI BED AS: LOT 186, ACCORD ING TO THE FINAL PLA T IRON BR IDGE PLAN NED UNIT DEVE LOPMENT-PHASE II, FILINGS 1, 2 & .3, RECORDED AS RECEPTION NO. 702420, COUN TY OF GARFIELD , STATE OF COLORADO; AL SO KNOWN AS: 0096 BENT GRASS DRIVE • HIGH COUNTRY ENGINEERING, INC. 141NVERN ESS DRIVE EAST, STE F·120, E N GLEWOOD, CO 8011 2 PHONE (303) 1125<1544 FAX (303) 11250547 15 17 BLAKE A VENUE, STE 10 1,GLENWOOD SPRINGS, C08160 1 PHON E (970) 1145<1878 FAX (970) 943-2555 WWW.HCENO.COM I RO N BRIDGE CLUB GLENWOOD SPRINGS. COLORADO IRONBRIDGE PLOT PLAN LOT 18 6 DRAWN BY: SPG CHECKED BY. JRN DATE: 10/24/06 SCALE: 1 " t:~2Q• PROJECT 0: 205 1019.00 PAGE: F ILE: J:/SOSI<PROJ/205/ 1019/DW G/EJCHIBITS/LOTS/L OT 188 MOUNTAIN COTTAGE FREEDOM ~~[f_J}N~~O~T~N CONTRACT THIS CONSTRUCTION CONTRACT ("Contract") is made and entered into between IRON BRIDGE MOUNTAIN COTIAGES LLC, a Colorado limited liability company ("Contractor"), whose address is 410 lronbridge Road, Glenwood Sprin s, Colorado 8~o;1 whose telephone number is (970) 945-4300, and whose facsimile number is (970) 928-8865, and r LW. (\eltl J]J: 'l'-S . !{ ("Owner"),whoseaddressis l €. r !&2 . whose telephone number is 1 &1-:3'1 Si'. and whose facsimile number is This Contract is entered into this ~~ay of ~Cfu.a)ot!, 200-b. ("Effective Date"). This Contract is entered into in con'lflCtion with and pursuant to Contractor and Owner's Freedom Program Purchase and Sale Agreement dated 'Sep'r~?UbH ~ , 200~. Terms defined in the Freedom Program Purchase and Sales Agreement and used in this Contract shall hold the same definition in this Contract. The construction of the Residence on the Lot, each as defined in the Freedom Program Purchase and Sale Agreement shall be referred to herein as (the "House"). 1. Contactor's Scope of Work. Contractor's scope of work shall consist of construction services for the House as set forth below, which collectively shall be referred to herein as the ''Work." 2. Plans a. Contractor has prepared the following drawings, consistent with other homes in the Project, as defined in the Freedom Program ~rchase and Sale Agreement, and constructed by Contractor: L 2202. ·n ii. iii. _____ (collectively, the "Plans"). 3. Construction Services a. Contractor shall procure and pay for all permits, licenses, approvals and inspections required for the House. b. Contractor shall provide or cause to be provided all labor, materials, equipment and services to construct the House in a workmanlike manner, consistent with homebuilding· industry standards in Garfield County, pursuant to the Plans. Contractor shall not be responsible for furnishing or constructing any improvements or performing any work unless the same are specifically set forth in the Plans or in this Contract. 4. Owner's Responsibilities a. Owner shall cooperate with Contractor in securing any permits, licenses, approvals and inspections for the House. b. Upon Contractor's request, Owner shall provide all "Requested Information" to Contractor in a timely manner, and shall be available to meet with Contractor to approve plans and review the progress of the Work. Requested Information shall include, but not necessarily be limited to: i. proof of financing ii. change order requests iii. proof of necessary insurance c. Owner specifically agrees and acknowledges that financing for the House is the sole and exclusive obligation of Owner, and Owner's ability to obtain financing is not a condition precedent to Owner's obligations set forth in this Contract. Owner represents that Owner is qualified to obtain such financing and/or has available funds in the amount necessary to complete the House. Owner agrees to promptly seek and obtain any and all required financing for the House. Owner agrees to provide Contractor with proof, satisfactory to Contractor, that Owner's financing for the House has been finalized, and agrees that Contractor is not obligated to proceed with construction on the House until such proof is delivered to Contractor and the Closing of the Lot Page 1 of 8 has occurred. d. Owner agrees not to let or enter into any other contracts in connection with the House or the Lot without the prior written approval of Contractor. Owner acknowledges and agrees that entering into any contract or permitting any other contractor onto the Lot may impede the Contractor's ability to manage the cost of the House and timely complete performance of the Work as contemplated herein. Violation of this provision, shall, in addition to any other remedies set forth herein, permit Contractor to exercise its termination rights as specified herein. e. Within three (3) days after substantial completion of the Work, Owner shall notify all utility suppliers that Owner is responsible for utility expenses from and after the date of substantial completion. 5. Time a. Without limiting the foregoing, Owner agrees to provide all Requested Information to Contractor to start construction within three (3) months of the date on which the Closing ofthe Lot occurs. Should Owner delay commencement construction beyond said three (3) months, Owner shall pay Contractor the sum of Five Thousand Dollars ($5,000.00) per month, allocated for fractional portions of months ("Extension Fee"). The parties hereby agree that Contractor's actual damages for such Owner delay cannot be calculated now with certainty, and that Liquidated Damages are a reasonable estimate thereof. b. Provided that Owner has complied with all of its obligations hereunder, including but not limited to timely payment of all sums due to Contractor, and Owner has secured financing for the House and delivered satisfactory proof thereof to Contractor, and Closing of the Lot has occurred, Contractor shall commence construction at the House Site within sixty (60) days after the issuance of a building permit (the "Commencement Date"). c. Substantial Completion of the House shall occur within eight (8) months after the Commencement Date {the "Completion Dale"). The Completion Date may be extended on account of: i. labor disputes; ii. fire or other damage to the House; iii. material or labor shortages; iv. transportation delays; v. governmental action; vi. unusual weather conditions; vii. change orders or delays caused by Owner; viii. the failure of Owner to provide information and/or approvals in a timely manner; or ix. any other causes which are beyond Contractofs control or which may otherwise justify the delay; and x. Force Majeure events. d. Without limiting the foregoing, Owner agrees to provide all required information to Contractor to substantially complete construction by the Completion Date. Should either party delay Substantial Completion of the House beyond the Completion Date, the delaying party shall pay the other party the sum of Five Thousand Dollars ($5,000.00) per month, allocated for fractional portions of months as an Extension Fee. The parties hereby agree that actual damages for such delays cannot be calculated now with certainty, and that these Liquidated Damages are a reasonable estimate thereof. 6. Ownership of Plans. Owner agrees and acknowledges that the Plans, and any amendments or revisions thereto, are and shall remain the sole and exclusive property of Contractor, and Owner agrees not to sell, transfer, assign, · use, copy or share the same with any person or entity without the prior and express written consent of Contractor, which may be withheld in Contractor's sole discretion. 7. Contract Price. a. ~~~~l!~~~~~~~~=:~~~D5o~ll~a~ffi~(~$~26(~~~.~~~.o~~f)(~"C6o~n~tr~~~t~P~ri~c~~"~)fcro;~~ performance of I ark, which amount shall be paid in accordance with the payment provisions set forth in this Contract. b. Owner acknowledges that upon the execution of any change orders during the course of construction, the Contract Price may increase, and in such event Owner shall pay to Contractor such increase upon execution of the change order, and prior to Contractor's performance of any work in connection with the change ord,er. 8. Payment Procedure. Page 2 of 8 a. Owner shall make, or cause Owner's lender to make, progress payments for the Work in accordance with the schedule attached hereto as Exhibit A ("Draw Schedule") or at any Intermediate point based on the percentage of completion of work at that time identified by inspection. Progress payments shall be delivered to Contractor within five (5) days after Owner's receipt of Contractor's request for payment, which requests for payment shall include appropriate lien waivers from all parties who provided labor and/or materials applicable to the previous request for payment. b. In the event that at any time the amount of Owner's loan available for distribution is less than the amount of the Contract Price remaining to be paid, Owner shall deposit the difference into a construction control account and execute a customary construction control agreement with respect to the holding and distribution of said sum prior to Contractor's obligation to commence or continue construction at the House Site. Owner shall be responsible for the payment of any fees in connection with the construction control. c. Within ten (10) days after substantial completion of the Work, Owner shall pay all remaining amounts due under this Contract. d. All monies not paid when due as provided herein shall bear interest at the rate of eighteen percent (18%) per annum. e. In the event any installment is not paid when due, Contractor may exercise any remedy set forth in this Contract or exercise any other legal and/or equitable rights which may be necessary or appropriate to enforce this Contract. 9. Changes in the Work a. Buyer understands, acknowledges and agrees that the Contract Price includes only the items set forth in the document attached hereto as Exhibit B ("Features List"). These are referred to herein as ('Standard Selections"). b. Additions, upgrades, and/or optional items which are made available to Owner shall be selected, contracted and paid for in a separate contract with Contractor or by Change Order. c. Contractor may offer pre-designed and priced options for each Residence to Owner. i. Options which change the architectural design of the Residence, such as an additional garage bay, are referred to as architectural options {'Architectural Options"). ii. Options which change the materials and colors of the Residence, such as carpet type and/or color, are referred to as design options ('Design Options"). iii. Together these are often referred to as ("Options'). d. Changes to the Work that are not a pre-designed and priced Architectural Option or Design Options are referred to as change orders ("Change Orders"). i. All change orders shall specify the following: 1. ·the change in the Work, 2. the adjustment to the Contract Price, if applicable, and 3. the adjustment to the Completion Date, if applicable. e. Changes in the Work can only occur by purchasing an Architectural Option, purchasing a Design Option or by written Change Order prepared and approved by Contractor. f. Options will be offered to the Owner, provided the following conditions have been adhered to: i. Options must be selected in a timely manner. Each Option is assigned one of three dates which are referred to as design selection 1 ('DS1"), design selection 2 ("DS2") and design selection 3 ("DS3"). DS1 is six weeks prior to the start of construction, DS2 is prior to the start of construction and DS3 is 45 days after the start of construction. ii. Should Owner fail to select Options on or before the applicable design selection date, Seller shall have the right to either install the standard selection or deny the Option. iii. Architectural Options shall be selected concurrently with the execution of this Agreement, and the cost of each Architectural Option shall be added to and included in the Purchase Price. iv. Design Options shall be selected subsequent to the execution of this Agreement. Payment in the amount of 100% of the price of each Design Option shall be due when each Design Option is ordered. . g. ALL PAYMENTS FOR DESIGN OPTIONS ARE NON-REFUNDABLE TO OWNER h. All Option purchases and change orders shall be executed by both the Owner and the Contractor and paid for by Owner, prior to the commencement of the work set forth therein. i. In the event that any increase in the cost of construction arises because of a change in applicable governmental regulations taking effect after the date of this Contract, such revision or condition shall be the Page 3 of8 basis for a change order and Contractor shall receive appropriate compensation for making such change. 10. Possession and Use of the Lot. Upon the Closing of the Lot, Owner is deemed to have conveyed to Contractor an absolute and exclusive right to possess and use the Lot. Owner shall not enter the Lot unless accompanied by an authorized representative of Contractor. Owner shall not instruct, direct or otherwise contact Contractor's laborers, subcontractors or consultants. Contractor shall permit access to the Lot by inspectors of Owner's lender. Contractor shall return possession of the Lot to Owner at the time that all payments and obligations required of the Owner have been fully paid and performed by the Owner. If possession of the House and Lot is taken by the Owner before Owner's obligations set forth in this Contract are fully performed and without the prior written consent of Contractor, Owner shall be deemed to have accepted the Work as complete and satisfactory, in compliance of all of Contractor's obligations hereunder. 11. Walk Through. a. Upon notice from Contractor to Owner, Owner and Contractor shall schedule a walk-through of Owner's home and shall compile a list of any items which are materially not in accordance with approved plans and specifications, or do not materially conform to Garfield County standards. Contractor shall repair, replace or otherwise remedy the items within a reasonable time after Substantial Completion. b. Notwithstanding the fact that additional work may be required to correct the items, if the House has reached Substantial Completion, then no funds shall be withheld from Contractor for these items. c. After Substantial Completion, the Limited Seller's Warranty included in the Freedom Program Purchase and Sale Agreement shall apply. 12. No Assignment. This Contract shall not be assigned by Owner or Contractor to any other party except after the prior written consent of Owner or Contractor, which consent may be reserved in Owner's or Contractor's sole discretion. If Owner or Contractor assigns any of Owner's or Contractor's rights under this Contract to any other party In violation of this provision, said assignment shall be void and of no effect, and Owner shall be in default hereunder. Notwithstanding the foregoing, Contractor consents to a collateral assignment of this Contract to Owner's lender pursuant to Owner's agreement with its lender. 13. Insurance. a. Owner shall procure and maintain during the term of this Contract the following policies of insurance: i. Course of Construction insurance in the amount of the Contract Price; ii. Homeowner's insurance, and a fire and extended risk insurance policy, covering the House and Lot, in an amount not less than the Purchase Price, together with insurance covering loss or damage to Owners personal property, and Owner's personal liability for injuries which may be sustained within the Property; and iii. Comprehensive General Liability Insurance in the amount of $1,000,000. b. Contractor shall maintain during the term of this Contract: i. Workers compensation insurance, as required by law. 14. Termination of the Contract upon Termination of the Freedom Plan Purchase and Sale Agreement. .This Contract shall be deemed terminated upon the termination of the Freedom Plan Purchase and Sale Agreement for any reason. In such event, unless the cause of such termination is the default of Contractor as seller under the Freedom Plan Purchase and Sale Agreement, Contractor shail be entitled to retain all other amount(s) previously paid to Contractor or otherwise due to Contractor under this Contract. 15. Contractor's Right to Stop Work and Terminate Contract. In addition to all other remedies set forth in this Contract, in the event that any payment is not made in full within ·five (5) days after such payment Is due, or Owner fails to perform any of its duties under this Contract within ten (1 0) days after written notice from Contractor, Contractor may stop the Work until payment is made or Owner fulfills its duties. Should the Work be stopped for a period of fifteen (15) days or more upon Owner's failure to make a progress payment or as a result of any other act, omission or neglect of the Owner, then Contractor may, upon providing written notice to Owner, terminate this Contract. Upon such termination, the Contractor may recover from the Owner payment for all work completed and for any loss sustained by the Contractor for materials, equipment, tools, or machinery to the extent of actual loss thereon, plus an amount equal to the Contractor's anticipated profit under this Contract, plus interest on the foregoing amounts at the rate of eighteen percent (18%) per annum. Page 4 of 8 16. Alternative Dispute Resolution. Owner and Contractor agree to be bound by the alternative dispute resolution procedures set forth in the Declaration. Any and all claims, disputes and controversies arising between Owner and Contractor, whether before or after Closing, relating to this Contract or its subject matter, including, but not limited to, any alleged construction defect, shall be submitted to final and binding arbitration. 17. Notices. All notices required by this Contract shall be in writing and shall be given by any of the following means to the below listed addresses or fax numbers: a. certified or registered mail, postage prepaid, return receipt requested, in which case notice shall be deemed delivered three (3) business days after the postmark date; b. recognized commercial overnight courier, in which case notice shall be deemed delivered one (1) business day after receipt for delivery by the courier; c. telecopy transmittal ("fax"), in which case notice shall be deemed delivered upon fax confirmation of transmission to the Intended party; or d. personal delivery, in which case the notice shall be effective when received. e. Notice shall be given to Contractor to: 410 lronbridge Dr. Glenwood Springs, CO 81601 Notice shall b. given to wn 3iJ ke.,t~ f. g. Notice of change of address shall be delivered by written notice in the manner described in this section. Rejection or other refusal to accept a notice or the inability to deliver a notice because of changed address of which no notice was given shall be deemed to constitute receipt of the notice sent. 18. Contractor's Limited Warranty. Contractor shall provide a one-year limited warranty on the house as provided for in the Freedom Program Purchase and Sales Agreement. 19. Contractor's Disclaimers. Contractor makes no representation or warranty, and shall in no event be responsible for the following: a. Hazardous materials (as defined by applicable law) in the House or on the Lot; b. Homeowner's association assessments and/or properly taxes applicable to the Lot; c. Owne~s financing of the Work; d. Any work or materials not supplied or installed by Contractor pursuant to this Contract; or e. All of the matters described in the disclosures and disclaimers set forth in the Freedom Plan Purchase and Sale Agreement, which disclosures and disclaimers are fully incorporated herein by this reference. 20. General Provisions. a. This Contract shall be governed by the laws of the State of Colorado. Jurisdiction and venue for any action concerning this Contract shall be in Garfield County, Colorado. b. In the event of any litigation or other proceedings between the parties concerning this Contract, the prevailing party shall be entitled to the payment by the non prevailing party of all of its reasonable attorneys' fees, court costs, and litigation expenses. c. This Contract constitutes the entire agreement between the parties and any prior understandings, agreements or representations of any kind whatsoever preceding the date of this Contract shall not be binding upon either party except to the extent that they are specifically incorporated into this Contract. d. This Contract shall be binding upon and Inure to the benefit of the parties hereto and to their respective heirs, representatives, successors and permitted assignees. This Contract is intended for the exclusive benefit of Owner and Contractor and is not intended and shall not be interpreted as conferring any benefit on any third party. e. This Contract and any amendments to this Contract may be executed in any number of counterparts, each of which shall be deemed an original and all taken together shall constitute one and the same agreement. Fax copies of this Contract and any amendments to this Contract and fax signatures thereon shall have the same Page 5 of 8 force, effect, and legal status of originals. f. If any provision of this Contract is or shall become invalid or unenforceable, the remaining provisions of this Contract shall not be affected. g. Time is of the essence in each and every term and provision of this Contract. All references to days herein shall be deemed to refer to calendar days unless otherwise specified. In the event that the final date for performance of any act required by this Contract falls on a Saturday, Sunday, or legal holiday, such act may be performed on the next day which is not a Saturday, Sunday, or legal holiday. h. The waiver of a breach of any provision in this Contract shall not be construed as a waiver of any other breach of the same or other provision of this Contract, including the time of performance of any provision. i. Owner understands that this Contract is a legally binding contract. Owner represents and warrants that Owner has read the terms and conditions of this Contract, and has had a full and fair opportunity to consult with legal counsel of Owner's own choosing concerning this Contract. EXECUTED to be effective as of the date of the date first written above. CONTRACTOR: OWNER: Page 6 of8 '. FUHRMANN ENGINEERING SERVICES, LLC STRUCTURAL CONSULTANTS April23, 2007 Iron bridge 410 Ironbridge Drive Glenwood Springs, CO Attn: Mike Woelke Subject: Dear Mike: Post Tensioned Slab-on~Grade Certification 0096 Bent Grass Drive Lot 186, lronbridge Community Garfield County, Colorado PLAlTE RIVER PLAZA SLOO. 1205 S. PLAITE RIVER OR., STE 100 DENVER, 00 80223 OFFICE {303) 715·9885 FAX {303)715-9890 Per your request, we visited the subject site on July 13, 2007 to observe the tendon stressing operations for post-tensioned slab-on-grade design. At the time of our observation, one tendon broke during the stressing operation. Refer to the attached sketch for location of broken tendon. AU remaining tendons were stressed within acceptable tolerances and appear to be in general confonnance with the construction. Per our discussion with the foundation contractor, Perfonnance Design, the broken tendon was rethreaded with a 7/16" cable and stressed as required. Our office was not present to observe the stressing of this cable. Based on this infonnation and our experience with the foundation contractor1 it is our opinion that this tendon was most likely installed correctly. The tendon tails may be cut off and the anchor cavities grouted with a high strength, non~shrink grout From our observations and the repair stated above, we have concluded that this foundation has been constructed in accordance with the approved construction documents and guidelines set forth b-y the Post Tensioning Institute. All required observations and the subsequent letters by this office for the Post Tensioned Slab-on-Grade Foundation System which includes the Trench Beam and Steel Observation including Ufer Rod, and Tendon Placement (pre-pour) Observation have been approved by this office. We also note that the required insulation has been installed per our structural details and the International Residential Code, 2003 Edition. No further observations are required. Please call if you have any questions. Sincerely1 Fuhrmann Engineering Services, LLC ~!! Matthews. Peterson, ~.l; .•. rrr . 9 ~:; ~-. Q:\lETTER s.Ironbridge Homes\lronbridge _Lot I 86 _ T cndonSiressing.doc FUHRMANN ENGINEERING SERVICES, LLC STRUCTURAL CONSULTANTS May3, 2007 Ironbridge Golf Club & Sporting Community 410 Ironbridge Drive Glenwood Springs, CO 81601 Attn: Mike Woelke RE: Tendon Placement (pre-pour) Inspection 0096 Bentgrass Drive Lot 186 Iron bridge Subdivision Garfield County, Colorado Dear Mike: PLAITE RIVER PlAZA BLDG. 1205 S. PLATTE RIVER OR., STE 200 DENVER, CO 80223 OFFICE (303) 715-9885 FAX (303) 715·9890 Per your request, we visited the subject site on April 30, 2007 to observe the tendon placement and interior trench beams of the post-tensioned slab-on-grade. The dimensions, geometry, and required options have not been verified at this time. The contractor assumes responsibility for the accuracy of all building dimensions, locations on lot, foundation elevations, and the slab step layout. The installation of the tendons and interior stiffened beams appeared to be in general conformance with the construction plans. We observed the top of grade appeared to be at the correct elevation to maintain the slab thickness per plan. It is the responsibility of the contractor to verifY slab thickness and tendon layout remain as observed during concrete placement. No other items were observed at this time. Please call if you have any questions. Sincerely, Fuhrmann Engineering Services, LLC ~~-rP---- Matthew S. Peterson, PTI #1919 MSP:kab attachments file FUHRMANN ENGINEERING SERVICES, LLC STRUCTURAL CONSULTANTS May 3,2007 Ironbridge Golf Club & Sporting Community 410 Ironbridge Drive Glenwood Springs, CO 8160 l Attn: Mike Woelke RE: Trench Beam and Steel Observation including Ufer Rod 0096 Bentgrass Drive Lot 186 Ironbridge Subdivision Garfield County, Colorado Dear Mike: PLAlTE RIVER PLAZA BLDG. 1205 S. PlAin: RIVER OR., STE 200 DENVER. CO 80223 OFFICE (303) 715·9885 FAX (303) 715·9890 Per your request, we visited the subject site on April30, 2007 to observe the construction of the trench beams of the post-tensioned slab-on-grade. The dimensions, geometry, and required options have not been verified at this time. The contractor assumes responsibility for the accuracy of all building dimensions, locations on lot, foundation elevations, and the slab step layout. The trench beam depth, width, and required steel placement appeared to be in general conformance with approved construction documents. Also, we observed the required l-inch polystyrene foam (extruded) insulation was placed in the trenches at the exterior of the building footprint per plan and is temporarily to the trench wall. We also observed that an Ufer rod was placed at the time of the wall steel installation. No other items were observed at this time. Please call if you have any questions. Sincerely, Fuhrmann Engineering Services, LLC ~~/2---.. MatthewS. Peterson, PT! #1919 MSP: kab Attachments file ...... ,.._,. •••. ,.._,. . ··-·-,_,. i 'i : ~;,., .. : 6~~ : /,'.,. ( : .'~ """ [(ll-1 ~ ~ r& '?.; i I I / I~ N C-9.1 ' I tm; 1~0-. I k;:. :; I ii_ R1f ,_ I ~ l! I-I Kilt 1®1' r ' k;: 1 I r=: ~4. ~ JY j A·•· ' ' ...., ~& ! !1.·•·. ' r.o• ,_,. ,.._,.. 'POST-TENSIONED SLAS-0~-GRADE FOUNDATION PLAN -ELEVS A,B,&C lttl'tt 111 Slltcf ra.o It F%.1 rOll OCTAil.$ It l<Ef'I£U.:. IIOT!S. 1/? • l'~o· COUNTY OF GARFIELD -BUILDING DEPARTMENT CORRECTION NOTICE 108 8th St., Suite 201 Glenwood Springs, Colorado Phone (970) 945-8212 Job located at 00 9'6 &::fr~ PermitNo.-4/.~G?.~~~~<---------------------------- I have this day inspected this structure and these premises and found the following corrections needed: 1)-dd-Uk~~r ~,~~,/~­ ~, ~cW/~~-~ You are hereby notified that the above correction must be inspected before covering. When correction(s) have been made, call for inspection at 970-384-5003. Date /1-<j-o 7 20 ---=---- Building Inspector L?h~~ _-' Phone (970) 945-8212 IXTIERIOR Address No.----+-----+---- Drainage -------lr-------,1---__ Decks-support & clearance to Decks-stairs & ralls ---+-----,1----- Exterlor locks ---~-1------,f----- INTIRIOR GARAGE Fire wall separation_---'\r-----+----- Service doors-Hi" min. -'lr---+----- Door (20 min.) w/auto closer- Mach. equip. 18" above floor _______ _ No opening Into sleeping ~rea BASEMENT·CRAWL A~ A Access -------'\----1------ /nsulatlon -------}~----­ Headroom/Stairs'-----/--~----­ Ventilation -------1-----''-<---- FINAL CHICKLIIT MECHANICAL ROOM Boiler ___ -:-----+---- Hot water ---'\-----1----- F.A. gas/oli_--'\----1----- Fioor draln __ -\---1----- Ciearance'---+-1------ Air con. system __ -\-7'------- Hot water heater-------- Combustion air·--------- Gas piping, vaives ____ ---,,L-__ LPG Drain------+--- FIREPLACE/STOVE Glass doors _________ _ Cerlifled by: _________ _ REMARKS (continue on back) STAIRWAYS / Headroom (6'6") --'~--+-----­ Rolling & guardrails --\\.__....,/"------- Width __ ~---------­ Rise & run---------,"---- KITCHEN Clearance above grill ---l---1------ Exhau'st fan ------1c-+-----,.L- BroUer exhaust (1 hr. chase) ----,L __ _ BEDROOMS Egress'-----\---+---- Smoke detector --+---I------ BATHROOMS Exhaust fan ___ --1c-+------ Shatterproof glass __ .l..J'-------- OTHER 1 .l~ ~---- INSPECTION WILL NOT BE MADE UNLESS THIS CARD IS POSTED ON THE JOB 24 HOURS NOTICE REQUIRED FOR INSPECTIONS BUILDING PERMIT GARFIELD COUNTY, COLORADO Date Issued~:':'.b.:0.1. •• zoned Area .....•...••..........•......... Permit No ... JO..~ ....... . AGREEMENT In consideration of the issuance of this permit, the applicant hereby agrees to comply with all laws and regulations related to the zoning, location; construction and erection of the proposed structure for which this permit is granted, and further agrees that if the above said regulations are not fully complied with in the zoning, location, erection and construction of the above described structure, the permit may then be revoked by notice from the County Building Inspector and IMMEDIATELY BECOME NULL AND VOID. This Card Must Be Posted So It is Plainly Visible From The Street Until Final Inspection. INSPECTION RECORD Footing Foundation ALL LISTED ITEMS MUST BE INSPECTED AND APPROVED BEFORE COVERING- WHETHER INTERIOR OR EXTERIOR, UNDERGROUND OR ABOVE GROUND. THIS PERMIT IS NOT TRANSFERABLE For Inspections Call384-5003 108 8th Street Glenwood Springs, Colorado APPROVED DO NOT DESTROY THIS CARD oate~lt./tiZ ev ,_,r/__.~ Lof-I g ltJ IF PLA~-COVER WITH CLEAR PLASTIC Parcel Detail Page I of 3 Garfield County Assessor/Treasurer Parcel Detail Information Assessor/Ireasurei Property Sean;h I Assessor Sul:)_s!<t.Q\!m I Assessor Sales S_earch Clerk &Kec.:ordeLReceptioiLSenrc.:h Basic BllilciingC:hantcteristics I Tmtli1forn:mtio11 Parcel Detail I Value Detail Sales Detail I Residential/Commercial Improvement Detail Land Detail I Photographs I Tax Area II Account Number II Parcel Number II Mill Levy I I 090 II R043358 II 239512127186 II 67.519 I Owner Name and Mailing Address IKELL Y, GEORGE W III & STACEY K I I2204ELKLN I IBASALT, CO 81621 I Legal Description lsECT,TWN,RNG: 12-7-89 SUB:IRONBRIDGE IPUD, PHASE II, FILING I, 2 & 3 ILOT:186 PRE:R041489 BK:!596 PG:871 IBK: 1565 PG:600 BK: 1560 PG:438 IBK:1560 PG:431 BK:1057 PG:0745 IBK: 1028 PG:768 BK: 1028 PG:597 IBK:I006 PG:743 BK:1861 PG:406 IRECPT:7!0681 BK:1861 PG:405 IRECPT:7!0680 BK:1822 PG:287 IRECPT:702424 BK:1822 PG:283 IRECPT:702422 BK: 1822 PG:250 IRECPT:702421 BK: 1782 PG:269 IRECPT:694479 BK:1782 PG:264 IRECPT:694478 BK:1747 PG:l IRECPT:686745 BK:1218 PG:738 IRECPT:572583 BK:1218 PG:715 I http:l/www .garcoact.com/assessor/parcel.asp?Parce!Number=239512127186 11117/2006 Parcel Detail Page 2 of3 IRECPT:572582 BK:1217 PG:266 IRECPT:572131 BK:1206 PG:852 IRECPT:569200 BK: 1206 PG:780 IRECPT:569199 BK:1206 PG:768 IRECPT:569197 BK:1206 PG:734 IRECPT:569195 BK:1206 PG:662 IRECPT:569194 BK:1206 PG:637 IRECPT:569192 BK:1206 PG:629 I IRECPT:569191 BK:1206 PG:574 I IRECPT:569190 BK:1063 PG:0578 I IBK:1063 PG:0571 I Location Physical Address: 1196 BENT GRASS DR GLENWOOD SPRINGS! Subdivision: I IRONBRIDGE PUD, PHASE II, FILING 1, 2 & Land Acres: I 0 Land Sq Ft: 115,130 I Section II Township II Range I 12 II 7 II 89 I Property Tax Valuation Information II II Actual Value II Assessed Value I I Land: 5,19oll 1,5101 I Im[!rovements: oil 0 I Total: 5,19011 1,5101 Sale Date: 111116/2006 Sale Price: 11198,000 Basic Building Characteristics Number of Residential lo I Buildings: Number of Commllnd lo I Buildings: No Building Records Found http://www.garcoact.com/assessor/parcel.asp?Parce!N umber=239512127186 11117/2006