HomeMy WebLinkAboutConditions of Permit.pdfCONDITIONS OF PERMIT
BLRE-12-14-3471
Scott Dillard
Storage Shed w/Carport
21 CR 126
GWS, Colorado
1) ALL WORK MUST COMPLY WITH THE 2009 IRC AND MANUFACTURERS SPECIFICATIONS.
2) SEE PLAN ATTACHMENTS FOR BUILDING REQUIREMENTS.
3) PROPOSED STRUCTURE IS TO BE BUILT ON AN EXISTING MONOLITHIC SLAB. MONO SLAB
APPROVAL, SEALED BY A COLORADO LICENSED DESIGN PROFESSIONAL, SPECIFICALLY AT
THE COLUMN SUPPORTING THE UPPER LEVEL, IS REQUIRED FOR FRAMING INSPECTION.
SEE ATTACHED PHOTOS.
4) PROVIDE AN APPROVAL REPORT, SEALED BY A COLORADO LICENSED DESIGN
PROFESSIONAL, FOR MODIFICATIONS OF FRAMING MEMBERS AND CONNECTIONS,
SPECIFICALLY THE 8 X 12 BEAM OVERHANG AND BRACE AT FRAMING INSPECTION.
5) IF APPLICABLE, ELECTRICAL ROUGH IN APPROVAL IS REQUIRED AT FRAME INSPECTION.
6) ELECTRICAL FINAL APPROVAL IS REQUIRED FOR FINAL/COMPLETION INSPECTION.