Loading...
HomeMy WebLinkAbout3.0 CorrespondenceRECEIVEDAPRz42IT2 STAIE OF COLOI\ADO Bill Owens, Covernor Jane E. Norton, Executive Director Dedicated to protecting and improving the health and environment of the people of Colorado 4300 Cherry Creek Dr. S. Laboratory and Radiation Services Division Denver, Coiorado 80246-1530 8100 Lowry Blvd. Phone (303) 692-2000 Denver, Colorado 80230-5928 TDD Line (303) 691-7700 (303) 692-3090 Located in Clendale. Colorado http ://www. cd p h e. state. co. u s April22,2002 Mr. Keith Powers, PE. Colorado Deparlment of Transportation P.O. Box 2368 Eagle, CO 81631 Re: Site Application #4603 Garfield County Colorado Department of PublicHealth andEnvironment Dear IvIr. Powers: The Water Quality Control Division has reviewed and evaluated your site application and supporting documentation for construction of a wastewater treatment facility to be located in the NW 1/4 of the SW 1/4 of Section 5, T6N, R88W, to serve the Gnzzly Creek Rest Area, and to discharge to the Colorado River. Prior to the operation of the facility, a discharge permit will be required which will specify the final conditions and limitations of the operations of the facility. Enclosed is an application for the permit. We find your application to be in conformance with the Water Quality Contol Commission's "Regulations foittre Site Application Process". Therefore, the site application is approved with the following conditions listed below. 1. Based upon application information, the system design will be for: Average Daiiy Flow Capacity - 0.005mgd Organic Loading Capacify - 16.67lbs. BOD5/day Treatment Processes to be used - Septic tanks, recirculating packed bed filter, IIV disinfection 2. Preliminary Effluent Parameter Values: BOD5 -30145 mg/l (30-dayl7-day average) Suspended Solids - 30145 mg/l (30-dayl7 -day average) Fecal Coliform - 6,000/12,000 #/100 ml (30-day/7-day geometric mean) Design for values in excess of those contained in conditions 1 and 2 above, or failure to comply with any othei conditions contained herein, will render this approval void and another site application will have to be processed. 3. This site approval will expire one year from the date of this letter if the construction of the project has not commenced by that date. If expiration occurs, you must apply for a Mr. Keith Powers, PE. Colorado Department of Transportation Aprl|22,2002 Page2 of2 new site approval. Construction is defined as entering into a contract for the erection or physical placement of materials, equipment, piping, earthwork, or buildings that are to be a part of a domestic wastewater teatment works. 4. The design (construction plans and specifications) for the treatment works must be approved by the Division prior to cornmencement of construction. At present there is an outstanding request for a variance related to the loading rate of the filter system. This request must be resolved prior to approval of the system design. All construcfion change orders initiating variances from the approved plans and specifications must be approved by the Division. 5. The applicant's registered engineer must furnish a statement prior to the commencement of operation stating that the facilities were constructed in conformance w"ith approved plans, specifications, and change orders. In accordance with Colorado Water Quality Control Commission regulations, this approval is subject to appeal as stated under Section 22.8 (7) of "Regulations for the Site Application Process". This approval does not relieve the owner from compliance with all local regulations prior to conshuction nor from responsibility for proper engineering, conskuction, and operation of the facility. 'V*,/o,l,,tu J. David Holm Director Water Quality Control Division JDH:tlb .., \Gurfield County Planning DeparLment - Ath. Mark Bean, Director Church & Associates, Inc. - Attn Ed Church Thomas Bennett, Environmental Protection Specialist, WQCD Dwain Watson, Environmental Protection Specialist, WQCD-Grand Junction Susan Nachtrieb, Permits Unit Manager, WQCD Bill McKee, Upper Colorado Watershed Coordinator, WQCD Plant Operator Certification Board, CDPH&E