September 27, 1999
Mr. Mark Bean, Planning Director
Garfield County Courthouse
109 8th Street, Room 303
Glenwood Springs CO 81601
Northwest Colorado Council of Governments
P.O. Box 2308
Silverthorne CO 80498
RE: Spring Valley Sanitation District ("District")
Submittal of Site Applications
Gentlemen:
GARFIELD COUNTY
PLANNING DEPARTMENT
109 8TH ST. - SUITE 303
GLENWOOD SPRINGS, CO01.011
RECEIVED SEP 2 8 1993
The purpose of this letter is to transmit to you for review, on behalf of Spring Valley
Sanitation District, Site Applications for the following facilities:
1. Modification/Expansion of an Existing Wastewater Treatment Facility.
2. Construction of the Valley Lift Station.
3. Construction of the Lower Bench Lift Station.
Also being transmitted is an Engineering Report in support of the District's Site Applications.
The Engineering Report is applicable to all three of the applications.
The District notes that the applications and associated Engineering Report with respect to the
wastewater treatment facility addresses the applicable requirements as set forth in C.R.S. 25-
8-702 and 5 C.C.R. 1002-22.5 and 1002-22.6, which concern the modification or expansion
of an existing domestic wastewater treatment plant.
Please feel free to contact either this office or Gregory Hall at Leavenworth & Tester, P.C.,
the District's legal counsel, directly if you have any questions or if additional submittal
materials are required for your review.
September 27, 1999
Mark Bean and NCCOG
Page 2
Respectfully submitted,
SCHMUESER GORDON MEYER, INC.
7(i. le -t/
Dean W.Gordon, P.E.
President
DWG:Iec/1 503a08.3
Enclosures
cc: Mr. Greg Boecker, Chairman, Spring Valley Sanitation District
Lee Leavenworth, Esq., Leavenworth & Tester, P.C.
Lawrence Green, Esq.
Ann J. Castle, Esq.
John R. Schenk, Esq.
Glenn D. Chadwick, Esq.
SCHMUESER GORDON MEYER, INC
COLORADO DEPARTMENT OF PUiC HEALTH AND ENVIRONMENT
Water Quality Control Division
4300 Cherry Creek Drive South
Denver, Colorado 80246-1530
APPLICATION FOR SITE APPROVAL FOR MODIFICATION/EXPANSION OF:
AN EXISTING DOMESTIC WASTEWATER TREATMENT PLANT
APPLICANT: Spring Valley Sanitation District PHONE: 970/ 945-6399
ADDRESS: 2929 County Road 114
CITY, STATE, ZIP: Glenwood Springs, Colorado 81601
Consulting Engineer: Schmueser Gordon Meyer, Inc. Phone: 970/ 945-1004
Address: 1 18 West 6th Street, Suite 200
City, State, Zip: Glenwood Springs , Colorado 81601
A. Summary of information regarding existing wastewater treatment plant:
1. Existing Location (Legal Description): NE 1/4, NE 1/4, Section 9
Township: 7S Range: 88W County: Garfield
2. Type and capacity of treatment facility proposed: Processes Used Activated sludge (oxidation ditch),
ammonia removal, disinfection.
Hydraulic: 449,450 gal/day Organic: 999 lbs. BODS/day
Present PE: 520 Design PE: 4995 % Domestic: 100 % Industrial: -0-
3. Location of Facility:
Attach a map of the area which includes the following:
* (a) 5 -mile radius: all sewage treatment plants, lift stations, and domestic water supply intakes.
** (b) 1 -mile radius: habitable buildings, location of public and private potable water wells, and an
approximate indication of the topography.
See Figure 6. 1(a), Engineering Report. * * See Figure 6. 1(b), Engineering Report
4. Effluent disposal: Surface discharge to watercourse X
Subsurface disposal Land Application Evaporation
Other (list):
State water quality classification of receiving watercourse(s) Use protected, Aquatic Life - Cold Class 2 ,
Recreation - Class 2.
Proposed Effluent Limitations developed in conjunction with the Water Quality Control Division: *
BODS 30 mg/I SS 30 mg/I Fecal Coliform 200 /100 ml
Total Residual Chlorine 0.5 mg/I Ammonia 27 mg/I Other
*Proposed by Applicant. See Table 4. 1, Engineering Report.
5. Will a State or Federal grant/loan be sought to finance any portion of this project?
6. Present zoning of site area? AARD (2 acres/Li'iit)
No
Zoning within a 1 -mile radius of site? AARD; PUD
What is the distance downstream from the discharge to the nearest domestic water supply intake?
Name of Supply: 30 miles, Town of Silt
Address of Supply: Box 70, Silt, Colorado 81652
WQCD-3b (Revised 2/99)
L:IcVorms11503a01Viftsla.3b •
1 of 4
8.
9.
10.
1 1 .
1 2.
13.
B.
• •
APPLICATION FOR SITE APPROVAL FOR MODIFICATION/EXPANSION OF EXISTING TREATMENT PLANT
What is the distance downstream from the discharge to the nearest other point of diversion?
Name of User: Atkinson Canal, c/a Glenwood Land Company
Address of User: 525 East Cooper, Aspen, Colorado 81611
Who has the responsibility for operating the proposed facility? Spring Valley Sanitation District
Who owns the land upon which the facility will be constructed? Colorado Mountain College.
See Exhibit 9.2, Engineering Report
(Please attach copies of the document creating authority in the applicant to construct the proposed facility at this site.)
Estimated project cost: $3.0 million
Who is financially responsible for the construction and operation of the facility?
Spring Valley Sanitation District
Names and addresses of all municipalities and water and/or sanitation districts within 5 miles downstream of
proposed wastewater treatment facility site. None
(Attach a separate sheet of paper if necessary)
Is the facility in a 100 year flood plain or other natural hazard area? No
If so, what precautions are being taken?
Has the flood plain been designated by the Colorado Water Conservation Board, Department of Natural
Resources or other agency?
(Agency Name)
If so, what is that designation?
Please identify any additional factors that might help the Water Quality Control Division make an informed
decision on your application for site approval. See Engineering Report
(Attach a separate sheet of paper if necessary)
If the facility will be located on or adjacent to a site that is owned or managed by a federal or state agency,
send the agency a copy of this application for the agency's review and recommendation.
WQCD-3b (Revised 2/99) t:Icvorms\15o3ao1Wftsta.3b
2 of 4
• •
ATTACHMENT TO SITE APPLICATION
In accordance with C.R.S. 1981, 25-8-702 (2)(a), (b), and (c), and the "Regulations for Site
Applications for Domestic Wastewater Treatment Works", the Water Quality Control Division must
determine that each site location is consistent with the long range , comprehensive planning for the
area in which it is to be located, that the plant on the proposed site will be managed to minimize
the potential adverse impacts on water quality, and must encourage the consolidation of
wastewater treatment works whenever feasible.
in making this determination, the Division requires each applicant for a site approval for a domestic
wastewater treatment works to supply an engineering report which documents the need for the
modifications and construction, consistency with local wastewater facility plans and any approved
water quality management plans. The report shall be considered the culmination of the planning
process and as a minimum shall address the following:
Changes to the existing service area, population and loading projections;
Proposed additional or modified effluent limitations, as developed in coordination with the
Division;
Analysis of the performance of the existing treatment works;
Analysis of alternative means to treat additional loading or accomplish necessary process
modifications, in accordance with 22.3(1)(c), including any consolidation alternatives
recommended in the approved water quality management plan, if the plan recommends no
consolidation, that option does not need to be considered;
Changes in the financial system which will result from the proposed modification or
expansion, including changes to the fee structure;
Implementation plan and schedule, including estimated construction time and estimated date
on which the modified or expanded plant will be in operation.
Depending on the proposed project, some of the above items may not be applicable to address. In
such cases, simply indicate the non -applicability of those.
WQCD-3b (Revised 2/99)
LlcVorms%1503a01 \Jiflsta.3b
4 of 4
i i
APPLICATION FOR SITE APPROVAL FOR MODIFICATION/EXPANSION OF EXISTING TREATMENT PLANT
C. Recommendation of governmental authorities:
Please address the following issues in your recommendation decision. Are the proposed facilities consistent
with the comprehensive plan and any other plans, policies, and/or regulations for the area, including the 201
Facility Plan or 208 Water Quality Management Plan, as they affect water quality? If you have any further
comments or questions, please call (303)692-3500.
Recommend Recommend Signature of
- Date Approval Disapproval Comment Representative
1.
'`N\\Managernent
2.
Agency
City or ow (If .ite is inside boundary)
\ vim �
3.1.40iir
4. 0/4/4) X�
balth
,Itount (It site is outside mu cipal boundary)
�/�
5.
Loc. . .0 ho 1
I certify that I am familiar with the requirements
Treatment Works ". An engineering report,
DATE 9- ZE- 9? k.L
Wa _r Qualit Planning Agen
of the "Regulations for Site Applications For Domestic Wastewater
as described by the regulations, has been prepared and is enclosed.
Greg S Iinaricc r
gnature of Applicant Typed Name President SVSD
WQCD-3b (Revised 2/99) L IcUorms11503a01Wftsta.3b
3 of 4
COLORADO DEPARTMENT OF PU1PC HEALTH AND ENVIRONMENT
Water Quality Control Division
4300 Cherry Creek Drive South
Denver, Colorado 80246-1530
APPLICATION FOR SITE APPROVAL FOR CONSTRUCTION OR EXPANSION OF:
LIFT STATIONS AND INTERCEPTOR SEWERS
APPLICANT: Spring Valley Sanitation District PHONE: 970/ 945-6399
ADDRESS: 2929 County Road 114
CITY, STATE, ZIP:
Glenwood Springs, Colorado 81601
Consulting Engineer:
Address:
Schmueser Gordon Meyer, Inc. Phone: 970/ 945-1004
118 West 61h Street, Suite 200
City, State, Zip:
Glenwood Springs, Colorado 81601
A. Summary of information regarding lift station/interceptor sewer:
1. Proposed Location (Legal Description): NW 1/4, SW 1/4, Section 33
Township: 6S Range: 88W County: Garfield
2. Type and capacity of facility proposed: Major Processes Used Valley Lift Station
wet well/dry well type
Hydraulic: 300,300 gal/day Organic: 601 lbs. BODS/day
Present PE: -0- Design PE: 3003" % Domestic: 100 % Industrial: -0-
3. Location of Facility:
Attach a map of the area which includes the following:
1 -mile radius: habitable buildings, topography, and neighboring land uses.
See Figure 6.1(b), Engineering Report
4. Will a State or Federal grant/loan be sought to finance any portion of this project? No
5. Present zoning of site area?
AARD (2 acres/unit)
Zoning within a 1 -mile radius of site? AARD, PUD
6. What entity has the responsibility for operating the proposed facility? Spring Valley Sanitation District
WQCD-3c (Revised 2/99)
L:Uc\forms \1503a01-liftsta-3c.1.
• •
APPLICATION FOR SITE APPROVAL FOR CONSTRUCTION OF LIFT STATIONS AND INTERCEPTOR SEWERS
7. Who owns the land upon which the facility will be constructed?
Colorado Community College - See Exhibit 9.2, Engineering Report
(Please attach copies of the document creating authority for the applicant to construct the proposed facility at this site.)
8. Estimated project cost: $150,000.
Who is financially responsible for the construction and operation of the facility?
Spring Valley Sanitation District
9. Is the facility in a 100 year flood plain or other natural hazard area? NO
If so, what precautions are being taken?
Has the flood plain been designated by the Colorado Water Conservation Board, Department of Natural
Resources or other agency?
If so, what is that designation?
(Agency Name)
10. Please include any additional factors that might help the Water Quality Control Division make an informed
decision on your application for site approval. Valley Lift Station to be developed in conjunction
with the expansion of the existing Spring Valley Sanitation District VVastewater Treatment Facility,
which is subject to a concurrent 'Application for Site Approval for Modification/Expansion of an Existing
Domestic Wastewater Treatment Plant".
1 1 . The proposed lift station or interceptor sewer, when fully developed, will generate the following additional
load: Peak Hydraulic (MGD): 1 .35 (4.5 peaking factor) P.E. to be served: 3003
1 2. Describe emergency system in case of lift station and/or power failure.
responsible operating personnel.
Automatic dialers to
WQCD-3c (Revised 2/99)
L:\JcVonns\1503x01-liftsta-3c.1. 2
1 •
APPLICATION FOR SITE APPROVAL FOR CONSTRUCTION OF LIFT STATIONS AND INTERCEPTOR SEWERS
13. Name and address of wastewater treatment plant providing treatment: Spring Valley Sanitation District
2929 County Road 114, Glenwood Springs, Colorado 81601
14. The proposed lift station or interceptor sewer, when fully developed, will increase the loading of the
treatment plant to 100 % of hydraulic and 100 % organic capacity and Spring Valley
(Name of Treatment Agency)
Sanitation District agrees to treat this wastewater? ®Yes ❑ No
e s'Ae - •
(Date) (Signature and Title) '
B. If the facility will be located on or adjacent to a site that is owned or managed by a federal or state agency,
send the agency a copy of this application for the agency's review and recommendation.
C. Recommendation of governmental authorities:
2.
The application shall be forwarded to the planning agency of the city, town, or county in whose
jurisdiction(s) the lift station and/or interceptor sewer is to be located. The applicant shall obtain, from the
appropriate planning agency (agencies), a statement(s) of consistency of the proposal with the local
comprehensive plan(s) as they relate to water quality (subject to the provisions of 22.3(6)).
The application shall be forwarded to the water quality planning agency (agencies) for the area in which the
facilities are to be constructed and for the area to be served by those facilities. The applicant shall obtain,
from the appropriate planning agency (agencies), a statement(s) of consistency of the proposal with any
adopted water quality management plan(s).
If you have any further comments or questions, please call (303)692-3500.
Date
Recommend Recommend Signature of
Approval Disapproval Representative
Local Planning Agency
Water Quality Planning Agency
I certify that I am familiar with the requirements of the "Regulations for Site Applications For Domestic
Wastewater Treatment Works ", and have posted the site in accordance with the regulations. An engineering
report, as
described by the regulations, has been prepared and is enclosed.
DATE
WQCD-3c (Revised 2/99)
Signature of Applicant Typed Name
L:UcVorms\1503x01-liftsta-3c.1. 3
• •
ATTACHMENT TO SITE APPLICATION
In accordance with C.R.S. 1981, 25-8-702 (2)(a), (b), and (c), and the "Regulations for Site
Applications for Domestic Wastewater Treatment Works", the Water Quality Control Division must
determine that each site location is consistent with the long range , comprehensive planning for the
area in which it is to be located, that the plant on the proposed site will be managed to minimize
the potential adverse impacts on water quality, and must encourage the consolidation of
wastewater treatment works whenever feasible.
In making this determination, the Division requires each applicant for a site approval for a domestic
wastewater treatment works to supply an engineering report describing the project and showing
the applicant's capabilities to manage and operate the facility over the life of the project to
determine the potential adverse impacts on water quality. The report shall be considered the
culmination of the planning process and as a minimum shall address the following:
Name and address of the applicant;
A map identifying the site of the proposed facilities, topography of the area, and
neighboring land uses;
Service area including existing and projected population, and flow/loading
projections;
Identification of the treatment entity responsible for receiving and treating the
wastewater;
Legal arrangements showing control of site for the project life or showing the ability
of the entity to acquire the site and use it for the project life. Approval by the
Division of an application for site approval shall not be deemed to be a determination
that the proposed treatment works is or is not necessary, that the proposed site is or
is not the best or only site upon which to locate such a treatment works, or that
location of a treatment works on the site is or is not a reasonable public use
justifying condemnation of the site. Approval by the Division shall only be deemed
to be a determination that the site application meets the requirement of this
regulation 22 (5 CCR 1002-22).
Confirmation, in writing, from the wastewater treatment entity that it:
Will treat the wastewater;
Is not presently receiving wastes in excess of its design capacity as defined in its site
approval and/or discharge permit, or is under construction, or will be in a
phased construction of new or expanded facilities, and will have necessary
capacity completed and operational prior to the discharge from the new
interceptor or from the new or expanded lift station;
Is not presently in violation of any effluent parameters of its discharge permit or
operating under a Notice of Violation and/or Cease and Desist Order from the
Division resulting from discharge permit violations.
Evidence that the lift station and/or interceptor sewer will be operated and
maintained by a responsible person if the applicant is not the treatment entity; and
WQCD-3c (Revised 2/99) L:vcforms\lsoaaol-lfnsca-sc.i. 4
i
Implementation plan and schedule, including estimated construction time and
estimated start-up date.
Depending on the proposed project, some of the above items may not be applicable to address. In
such cases, simply indicate the non -applicability of those.
WQCD-3c (Revised 2/99)
5
COLORADO DEPARTMENT OF PUtIC HEALTH AND ENVIRONMENT
Water Quality Control Division
4300 Cherry Creek Drive South
Denver, Colorado 80246-1530
APPLICATION FOR SITE APPROVAL FOR CONSTRUCTION OR EXPANSION OF:
LIFT STATIONS AND INTERCEPTOR SEWERS
APPLICANT: Spring Valley Sanitation District PHONE: 970/ 945-6399
ADDRESS: 2929 County Road 114
CITY, STATE, ZIP:
Glenwood Springs, Colorado 81601
Consulting Engineer:
Address:
Schmueser Gordon Meyer, Inc. Phone: 970/ 945-1004
118 West 6th Street, Suite 200
City, State, Zip:
Glenwood Springs, Colorado 81601
A. Summary of information regarding lift station/interceptor sewer:
1. Proposed Location (Legal Description): NW 1/4, NE 1/4, Section 7
Township: 7S Range: 88W County: Garfield
2. Type and capacity of facility proposed: Major Processes Used Lower Bench Lift Station,
wet well/dry well type
Hydraulic: 28,000 gal/day Organic: 56 lbs. BODS/day
Present PE: -0- Design PE: 280 % Domestic: 100 % Industrial: -0-
3. Location of Facility:
Attach a map of the area which includes the following:
1 -mile radius: habitable buildings, topography, and neighboring land uses.
See Figure 6.1(b), Engineering Report
4. Will a State or Federal grant/loan be sought to finance any portion of this project? No
5. Present zoning of site area?
PUD
Zoning within a 1 -mile radius of site? AARD, PUD, Industrial, Commercial
6. What entity has the responsibility for operating the proposed facility? Spring Valley Sanitation District
WQCD-3c (Revised 2/99)
L:Vclforms11503a01-13ftsta-3c.2 1
APPLICATION FOR SITE APPROVAL FOR CONSTRUCTION OF LIFT STATIONS AND INTERCEPTOR SEWERS
7. Who owns the land upon which the facility will be constructed?
Colorado Community College - See Exhibit 9.2, Engineering Report
(Please attach copies of the document creating authority for the applicant to construct the proposed facility at this site.)
8. Estimated project cost: $125,000.
Who is financially responsible for the construction and operation of the facility?
Spring Valley Sanitation District
9. Is the facility in a 100 year flood plain or other natural hazard area? NO
If so, what precautions are being taken?
Has the flood plain been designated by the Colorado Water Conservation Board, Department of Natural
Resources or other agency?
(Agency Name)
If so, what is that designation?
10. Please include any additional factors that might help the Water Quality Control Division make an informed
decision on your application for site approval. Lower Bench Lift Station to be developed in conjunction
with the expansion of the existing Spring Valley Sanitation District Wastewater Treatment Facility,
which is subject to a concurrent "Application for Site Approval for Modification/Expansion of an Existing
Domestic Wastewater Treatment Plant".
1 1 . The proposed lift station or interceptor sewer, when fully developed, will generate the following additional
load: Peak Hydraulic (MGD): 0.14 (4.5 peaking factor) P.E. to be served: 280
12. Describe emergency system in case of lift station and/or power failure.
Automatic dialers to responsible operating personnel.
WQCD-3c (Revised 2/99) L:tc\forms\1503a01-liftsta-3c.2 2
APPLICATION FOR SITE APPROVOOR CONSTRUCTION OF LIFT STATIOOAND INTERCEPTOR SEWERS
13. Name and address of wastewater treatment plant providing treatment: Spring Valley Sanitation District
2.
2929 County Road 114, Glenwood Springs, Colorado 81601
14. The proposed lift station or interceptor sewer, when fully developed, will increase the loading of the
treatment plant to 100 % of hydraulic and 100 % organic capacity and Spring Valley
(Name of Treatment Agency)
Sanitation District agrees to treat this wastewater? cg Yes ❑ No
(Date)
(Signature and Title)
B. If the facility will be located on or adjacent to a site that is owned or managed by a federal or state agency,
send the agency a copy of this application for the agency's review and recommendation.
C. Recommendation of governmental authorities:
The application shall be forwarded to the planning agency of the city, town, or county in whose
jurisdiction(s) the lift station and/or interceptor sewer is to be located. The applicant shall obtain, from the
appropriate planning agency (agencies), a statement(s) of consistency of the proposal with the local
comprehensive plan(s) as they relate to water quality (subject to the provisions of 22.3(6)).
The application shall be forwarded to the water quality planning agency (agencies) for the area in which the
facilities are to be constructed and for the area to be served by those facilities. The applicant shall obtain,
from the appropriate planning agency (agencies), a statement(s) of consistency of the proposal with any
adopted water quality management plan(s).
If you have any further comments or questions, please call (303)692-3500.
Date
Recommend Recommend Signature of
Approval Disapproval Representative
Local Planning Agency
Water Quality Planning Agency
I certify that I am familiar with the requirements of the "Regulations for Site Applications For Domestic Wastewater
Treatment Works ", and have posted the site in accordance with the regulations. An engineering report, as
described by the regulations, has been prepared and is enclosed.
DATE
WQCD-3c (Revised 2/99)
Signature of Applicant Typed Name
L:VcVorms\1503a01•liftsta-3c.2 3
• STATE OF CIS8552mg
Bill Owens, Governor
Jane E. Norton, Executive Director
Dedicated to protecting and improving the health and environment of the people of Colorado
4300 Cherry Creek Dr. S.
Denver, Colorado 80246-1530
Phone (303) 692-2000
TDD Line (303) 691-7700
Located in Glendale, Colorado
http://www.cdphe.state.co.us
June 2, 2000
Laboratory and Radiation Services Division
8100 Lowry Blvd.
Denver CO 80230-6928
(303) 692-3090
Greg S. Boecker, President
Spring Valley Sanitation District
2929 County Road 114
Glenwood Springs, CO 81601
RE: Site Application #4486
Garfield County
Colorado Department
of Public Health
and Environment
Dear Mr. Boecker:
The Water Quality Control Division has reviewed and evaluated your site application and supporting documentation for the
mechanical wastewater treatment facility in the Northeast 1/4 of the Northeast'' /4, Section 9, Township 7 South, Range 88
West; and the Valley Liftstation in the Northwest 1/4 of the Southwest'/, Section 33, Township 6 South, Range 88 West;
and the Lower Bench Liftstation in the Northwest 1/4 of the Northeast 1/4, Section 7, Township 7 South, Range 88 West to
serve the Spring Valley Sanitation District to discharge to an unnamed tributary to Landis Creek.
We find your application to be in conformance with the Water Quality Control Commission's "Regulations for Site
Applications for Domestic Wastewater Treatment Works". Therefore, the site application is approved with the following
conditions listed below.
1. Based upon application information, the system design will be for:
Treatment Plant
Hydraulic Capacity - 0.44945 MGD
Organic Capacity - 999 # BODS/day
Valley Liftstation
Hydraulic Capacity - 0.3003 MGD
Organic Capacity - 601 # BODS /day
Lower Bench Liftstation
Hydraulic Capacity - 0.0280 MGD
Organic Capacity - 56 # BODs1day
2. Preliminary Effluent Parameter Values:
BODS - 30/45 mg/1 (30-day/7-day average)
TSS - 30/45 mg/1 (30-day/7-day average)
Fecal Coliform - 225/450 colonies/100 ml (30-day/7-day average)
Total Chlorine Residual - 0.019 mg/1 (daily maximum)
Total Ammonia - 5 mg/1 (30 -day average)
pH - 6.5 - 9.0 (minimum/maximum)
Oil and Grease - 10 mg/1 (daily maximum)
• •
Greg S. Boecker, President
Spring Valley Sanitation District
June 2, 2000
Page 2
3. Treatment Processes to be used - mechanical activated sludge wastewater treatment facility with
chlorination and dechlorination, lift stations and force mains
Design for values in excess of those contained above or failure to comply with any other conditions contained herein will render
this approval void and another site application will have to be processed.
4. This site approval will expire one year from the date of this letter if the construction of the project has not
commenced by that date. If expiration occurs, you must apply for a new site approval. Construction is
defined as entering into a contract for the erection or physical placement of materials, equipment, piping,
earthwork, or building which are to be a part of a domestic wastewater treatment works.
5. The design (construction plans and specifications) for the treatment works must be approved by the Division
prior to commencement of construction and all construction change orders initiating variances from the
approved plans and specifications must be approved by the Division.
6. The applicant's registered engineer must furnish a statement prior to the commencement of operation stating
that the facilities were constructed in conformance with approved plans, specifications, and change orders.
In accordance with Colorado Water Quality Control Commission regulations, this approval is subject to appeal as stated under
Section 2.2.5 (7) of "Regulations for Site Applications for Domestic Wastewater Treatment Works".
This approval does not relieve the owner from compliance with all county regulations prior to construction nor from
responsibility for proper engineering, construction, and operation of the facility.
Sincerely,
1///
J. 'avid Holm
Director
Water Quality Control Division
JDH:tlb
cc: Garfield County - Attn. Mark Bean
SGM - Attn. Dean Gordon
Leavenworth & Testor, P.C. Greg Hall
Thomas Bennett, Environmental Protection Specialist, WQCD
Dwain Watson, Environmental Protection Specialist, WQCD-Grand Junction
Susan Nachtrieb, Permits Unit Manager, WQCD
Plant Operator Certification Board, c/o WQCD