HomeMy WebLinkAbout5.0 Traffic Impact Study- Sept. 2006GRAND RIVER PARK GRAVEL PIT TRAFFIC IMPACT STUDY Prepared for: Banks and Gesso, LLC 720 Kipling Street, Suite 117 Lakewood, CO 80215 Prepared by: Felsburg Holt & Ullevig 6300 South Syracuse Way, Suite 600 Centennial, CO 80111 303/721-1440 Project Manager: Jenny A. Young, PE Project Engineer: Ryan D. Germeroth, El FHU Reference No. 06-151 September 2006 Grand River Park Grave! Pit Traffic Impact Study TABLE OF CONTENTS Page I. INTRODUCTION-- 1 II. EXISTING CONDITIONS 4 A. Land Use- 4 B. Roadway System 4 C. Traffic Volumes 4 D. Capacity Analysis 6 III. FUTURE TRAFFIC CONDITIONS 7 A. Background Traffic 7 B. Site -Generated Traffic 7 C. Traffic Impacts 14 D. Design Considerations 14 E. State Highway Access Permit Requirements 14 IV. SUMMARY AND RECOMMENDATIONS 15 APPENDIX A TRAFFIC COUNTS APPENDIX B EXISTING LEVELS OF SERVICE APPENDIX C SHORT TERM LEVELS OF SERVICE APPENDIX D LONG TERM LEVELS OF SERVICE 1 FELSBURG (d HOLT & ULLEVIG Grand River Park Gravel Pit Traffic Impact Study LIST OF FIGURES Page Figure 1. Vicinity Map 2 Figure 2. Site Plan 3 Figure 3. Existing Traffic Conditions 5 Figure 4. Year 2007 Background Traffic Conditions 8 Figure 5. Year 2030 Background Traffic Conditions 9 Figure 6. Site Generated Traffic 11 Figure 7. Year 2007 Total Traffic Conditions 12 Figure 8. Year 2030 Total Traffic Conditions 13 LIST OF TABLES Table 1. Average Annual and Daily Trip Generation 7 Table 2. Hourly Trip Distribution 10 IIFELSBURG 1 (HOLT & 1 ULLEVIG Grand River Park Gravel Pit Traffic Impact Study I. INTRODUCTION The Grand River Park Gravel Pit, a sand and gravel mine located on 180 acres of land just south and west of the Town of Silt, is located to the west of County Road (CR) 311 on CR 346. The property would include parking for employees, a sand and gravel mining operation, processing plant, and aggregate storage area. An access to the site is proposed to be located on CR 346 to the west of CR 311. Figure 1 illustrates the location of the project and the adjacent roadway network and Figure 2 illustrates the site plan. This analysis documents peak hour traffic conditions, describes the existing roadway network, forecasts and distributes site -generated traffic volumes, and analyzes the effect of the site - generated traffic in combination with the background traffic growth for both Short Range Future and Long Range Future scenarios. The Short Range Future analysis assesses conditions when the plant reaches its projected full annual production in 2007; the Long Range Future analysis assesses conditions in 2030. piFELSBURG Ci HOLT & ULLEVIG Page I • FELSBURG (4 HOLT & ULLE VI G North Colorado giver 70 CR 346 cp Silt CR 346 PROJECT SITE w 4,4 cg 31 1 Figure 1 Vicinity Map Grand River Park /IA, 06-151, 9/20/06 } ,, 1 I' • pi. y 1\`� y.' �. A•3 A•44 s _ —..iv.=,, r -r'1 a � ' r— 'r7,1 -/.----...-':..... 1 i4 r F 1/11 ry I' Y9 v.'Y • 1• Ka 1 0 Z Grand River Park TIA, 06-151, 9/11/06 Grand River Park Gravel Pit Traffic Impact Study II. EXISTING CONDITIONS A. Land Use The area in and around the proposed mining operation is primarily vacant agricultural/ranch land. The Town of Silt is located northeast of the site across Interstate 70 and the Garfield County Airport is located directly west of the site on CR 346. B. Roadway System The following existing roads in the vicinity of the site would be affected by project traffic. • CR 346 (Airport Road) borders the site to the south and extends from CR 311 to Rifle. The posted speed limit is 35 miles per hour (mph). • CR 311 is to the east of the site and connects CR 346 with the 1-70 frontage road. The posted speed limit is 35 mph. • CR 315 (Mamm Creek Road) is to the west of the site and intersects with CR 346 just south of the 1-70 interchange. • Interstate 70 Frontage Road borders 1-70 in the vicinity of the site and connects to 9th Street in the Town of Silt just south of the interstate. C. Traffic Volumes AM and PM peak hour turning movements were recorded in the vicinity of the site at the following intersections: • 1-70 Frontage Road/CR 311 • CR 311 1 CR 346 • CR3151CR346 In addition, daily traffic volume counts were conducted on the 1-70 Frontage Road and on CR 346. Currently, the 1-70 Frontage Road carries approximately 3,000 vehicles per day (vpd) and CR 346 carries approximately 600 vpd. The existing traffic volumes are shown on Figure 3 and the count data are provided in Appendix A. . FELSBURO (4 HOLT & ULLEVIG Page 4 IPFELSBURG ri HOLT & ULLEVIG LEGEND XXX(XXX) = AM(PM) Peak Hour Traffic Volumes XXXX = Daily Traffic Volumes x/x = AM/PM Peak Hour Unsignalized Intersection Level Of Service _s_ = Stop Sign Not to Scale North 7r m 1-70 Frontage Road r 590 CR 346 7(8) 6(20) 3044 12(8) —,- 67(115) 67(115) Figure 3 Existing Conditions Grand River Park TlA, 06.151, 9112106 Grand River Park Gravel Pit Traffic Impact Study D. Capacity Analysis Traffic operations were evaluated at the three count intersections using methods documented in the Highway Capacity Manual, Transportation Research Board (TRB), Third Edition, 2000 (HCM-2000). HCM-2000 defines traffic operations by a level of service (LOS), which is a qualitative measure based on the average delay per vehicle at a controlled intersection. LOS is described by a letter designation ranging from A to F, with LOS A representing very little delay and LOS F representing extreme delay. Unsignalized intersection analyses report LOS ratings for each critical movement. For LOS analyses, a 5 percent heavy vehicle value was used in the calculations. This percentage represents the amount of the total traffic in the vicinity of the site related to heavy vehicles and is based on data collected by the Colorado Department of Transportation (CDOT) on US 6 through the Town of Silt. As seen on Figure 3, the stop controlled approaches operate at LOS B or better during both peak hours. Analysis worksheets are included in Appendix B. ni FELSSURG 0HOLT & ULLEV1G Page 6 Grand River Park Gravel Pit Traffic Impact Study III. FUTURE TRAFFIC CONDITIONS Future traffic conditions consist of two components: background traffic (traffic growth that is anticipated as a result of population and employment increases in the region in the future) and site traffic (traffic associated with the proposed development). Future capacity analyses serve as a means to assess whether the existing and proposed infrastructure is adequate to accommodate both components of future traffic, and to determine locations where additional capacity is needed. This section discusses the procedures used to determine future traffic conditions in the first year of full plant production (2007) and in the long-range planning year (2030), and assesses level of service with and without the project in each year. A. Background Traffic Background traffic for 2007 and 2030 was determined by estimating the incremental increase in traffic that is anticipated due to regional growth. Other proposed developments in the area include Ferguson Crossing and Stillwater Ranch but site traffic from these developments was not included in the background traffic since their timing is unknown and so that the impacts related specifically to Grand River Park would be more apparent. The average CDOT 20 year growth factor for US 6 and 1-70 in the vicinity of the site is 1.47, which is a rate of approximately 2 percent per year. This rate was used to estimate the increase in traffic for both future scenarios. The 2007 and 2030 background traffic conditions are shown on Figures 4 and 5. B. Site -Generated Traffic Site generated traffic comprises only those trips originating or terminating at the proposed sand and gravel operation. The Institute of Transportation Engineers (ITE), Trip Generation Manual, Seventh Edition, 2003 does not contain trip generation rates for a gravel mine land use; therefore, trip generation was estimated based on operational information provided by the applicant. It is estimated that the site will have an annual production of 500,000 tons of sand and gravel. This production rate will likely occur approximately one year after initial start-up; thus full production is anticipated in 2007. Full production is expected to last only ten to fifteen years but the year 2030 was still used as the long range scenario to be conservative since this is the time frame generally considered in traffic studies. The plant will have six employees at full production and there will be approximately four service vehicles that visit the site daily. Table 1 summarizes the average annual vehicles and the average daily (vpd) number of sand and gravel delivery trucks, service vehicles, and employee trips from the site at full production. Table 1. Average Annual and Daily Trip Generation Trip Type Annual Average Daily (vpd) Sand and Gravel Delivery Trucks 24,695 174 Service Vehicles (4 per day) 1,168 8 Employees (6 total) 2,336 16 Total 28,199 198 PFELSBURG r, HOLT l ULLEVIG Page 7 IP (4 FELSBURG HOLT & ULLEVIG LEGEND XXX(XXX) = AM(PM) Peak Hour Traffic Volumes XXXX = Daily Traffic Volumes x/X = AM/PM Peak Hour Unsignalized Intersection Level Of Service = Stop Sign FN Not toScale North -.7— ala 1-70 Frontage Road G4 et E— 10(10) 5(20) //b < rn 'Cf N - ';:1-1) 2 10(25) J i j L• --"5(10) 5(5) I5(20)_f — T 1 5(5)� 5(5) 1 ;: r2 V,If M T 600 CR 346 J 3105 10(10)--- 70(115)-4 0(10)---70(115)-. `fir t,o 00 Figure 4 Year 2007 Background Traffic Conditions Grand River Park TA, 06.151, 9/12/06 .FELSBURG (4 HOLT Si. ULLEVIG LEGEND XXX(XXX) = AM(PM) Peak Hour Traffic Volumes XXXX = Daily Traffic Volumes x/x = AM/PM Peak Hour Unsignalized Intersection Level Of Service = Stop Sign t 15(40) 10(15) ,F— 10(5) -44 1-70 Frontage Road 15(15) 10(30) el eo 600 4835 15(15)—i - 110(150) 5(15)l10(150) b/b — 4 a/a 85(45) 15(10) VV Not to Scale North 25(30)_t 10(5)— I0(10)-4, CR 346 110(85) i 10(10)--Y Figure 5 Year 2030 Background Traffic Conditions Grand River Park TIA, 06-151, 9/12/06 Grand River Park Gravel Pit Traffic Iinpact Study On a typical day, the site would generate approximately 198 vehicle trips. Table 2 shows the distribution of these trips throughout the day. The hourly distribution is based on conversations with the plant manager at a similar plant located west of the City of Longmont. Approximately 20 of the trips would occur during the AM peak hour of adjacent road traffic, and approximately 16 trips would occur during the PM peak hour. The AM and PM peak hour project trips assigned to each roadway are shown on Figure 6. It is anticipated that 50 percent of the traffic will go eastbound on 1-70 and the other 50 percent will go westbound on 1-70. Approximately half of the westbound traffic has been distributed west on CR 346 since this will be a more convenient route for truckers headed westbound. The distribution percentages were estimated based on traffic distribution patterns for delivery trips and employee trips identified by the owner. The site -generated traffic assignments were added to the background traffic volumes in each analysis year to produce the 2007 and 2030 total traffic shown on Figures 7 and 8, respectively. Table 2. Hourly Trip Distribution Hourly Distribution Sand/Gravel Service Vehicles Emp oyees Total In Out In Out In Out In Out Total 5:00-5:59 AM _ 0 - 0 0 6:00-6:59 AM 11% 5 9 4 9 9 18 7:00-7:59 AM 11% 7 9 1 1 2 10 10 20 8:00 - 8:59 AM 8% 9 7 9 7 16 9:00 - 9:59 AM 8% 9 7 1 10 7 17 10:00 - 10:59 AM 9% 7 8 1 7 9 16 11:00-11:59 AM 9% 7 8 2 7 10 17 12:00-12:59 PM 8% 4 7 1 1 2 7 8 15 1:00 - 1:59 PM 9% 8 8 8 8 16 2:00 - 2:59 PM 8% 7 7 7 7 14 3:00 - 3:59 PM 9% 8 8 8 8 16 4:00 - 4:59 PM 8% 7 7 1 1 8 8 16 5:00 - 5:59 PM 2% 6 2 4 6 6 12 6:00-6:59 PM 3 2 3 2 5 7:00-7:59 PM 0 0 0 Total 1 100% 87 87 4 4 8 8 99 99 198 PFELSI�URG HOLT & `` ULLEVIO Page 10 •FELSBURG (4HOLT & ULLEVIG LEGEND xXX(XXX) = AM(PM) Peak Hour Traffic Volumes 1-70 Frontage Road XXXX = Daily Traffic Volumes L 3(2) 48 Cs▪ ] Vj M▪ CS 145 7(6) 7(6) 145 j n FN Not to Scale North 3(2)--t CR 346 7(6)— t m U Figure 6 Site Generated Traffic Grand River ParkTIA, 06-15i, 9112/06 .FELSBURG (4 HOLT & ULLEVIG LEGEND XXX(XXX) = AM(PM) Peak Hour Traffic Volumes XXXX = Daily Traffic Volumes /g = AM/PM Peak Hour Unsignalized Intersection Level Of Service = Stop Sign 15(30) 5(10) 5(5) 1-70 Frontage Road 10(10) 5(20) a \ ala alb ett In 3250 10(10) 75(120) JI c4 ala b/b-4l t_ 5(5) 15(40) 735 t___ 55(30) -- 10(5) 17"/:\\71 Not to Scale North 15(20)_t 5(5)--1- 5(5)-4, 1 5(5)_t CR 346 75(60)) 20(30)—r 5(5)—* a/a —} Figure 7 Year 2007 Total Traffic Conditions Grand River Park TIA, 06-151, 9/13106 •FELSBURG r4 HOLT & ULLEVIG LEGEND XXX(XXX) = AM(PM) Peak Hour Traffic Volumes XXXX = Daily Traffic Volumes x/x = AM/PM Peak Hour Unsignaiized Intersection Level Of Service �– = Stop Sign n O kr) kr) t -- '42N t 20(45) 10(15) 10(5) a/a 1-70 Frontage Road 15(15) 10(30) ��—a/b 05 Lei in in kr) in 4980 15(15) 115(185) a/a b/b t— 5(5) 25(60) 1080 85(45) 15(10) Not to Scale North 210(0— �r 10(10)— o00 opo 30(45j� CR 346 115(90)____t100 Figure 8 Year 2030 Total Traffic Conditions Grand River Park TIA,06-151,9113166 Grand River Park Gravel Pit Traffic Impact Study C- Traffic Impacts Using HCM-2000 methods, unsignalized level of service analyses were conducted based on the future total peak hour traffic volumes. The results of these analyses are summarized on Figures 7 and 8, and worksheets are included in Appendices C and D. For future scenarios, the stop controlled approaches within the study area operate at LOS B or better with existing lane geometry both with and without site traffic. D. Design Considerations The land use proposed for the site would result in a significant increase in side street truck traffic at the site access intersection with CR 346; 87 of the 99 outbound daily trips from the site would be sand and gravel trucks. These heavy vehicles require significantly longer time to accelerate to the posted speed limit, and therefore would require larger gaps in traffic to turn onto CR 346. This is particularly relevant for the sand and gravel trucks, which would be fully - loaded on the outbound trip. Even though CR 346 is not a state highway, the Colorado State Highway Access Code was used to determine acceleration and deceleration requirements for the access to the site. The classification category RB (Rural Highway) was used for this study. Due to the low peak hour volumes at the site access and the posted speed limit of 35 mph, acceleration lanes are not needed on CR 346. In addition, deceleration lanes are not required due to the low volumes but should be implemented so that trucks can safely exit CR 346. Based on the RB classification in the State Highway Access Code, both an eastbound left turn lane and a westbound right turn lane should be constructed with a declaration length of 310 feet, including a 120 -foot taper (10:1 ratio). A traffic impact study was completed in 1995 for the proposed Stillwater Ranch development. The proposed residential development is located east of the Grand River Park Gravel Pit site. The traffic study shows an access aligning with the intersection of CR 346 and CR 311 and recommends improvements at that intersection, including a separate eastbound left turn lane. Because the Grand River Park Gravel Pit traffic will impact this intersection, it is recommended that the gravel pit pay a proportionate share of the cost (based on number of trips generated) to construct this turn lane when it is constructed as part of the Stillwater Ranch development. E. State Highway Access Permit Requirements The current daily traffic along the 1-70 Frontage Road west of CR 311 is approximately 3,000 vpd. The proposed site is estimated to generate 145 trips per day on the 1-70 Frontage Road, which equates to a five percent increase over the current level of traffic on 9d1Street. Since this increase is less than 20%, the State Highway Access Code considers this a minor modification to the existing access permit on the Frontage Road. Thus, an access permit from the Colorado Department of Transportation is not required. . FELSBURG (4 HOLT & ULLEVIG Page 14 Grand River Park Gravel Pit Traffic Impact Study IV. SUMMARY AND RECOMMENDATIONS Grand River Gravel Pit is a sand and gravel mine located on CR 346 to the southwest of the Town of Silt. The property would include parking for employees, a sand and gravel mine, processing plant, and aggregate storage area. The site is projected to generate approximately 200 daily trips, with 20 of these trips during the AM peak and 16 of these trips during the PM peak. Based on the results of the traffic analysis, the existing, Short Range Future, and Long Range Future scenarios are projected to operate at acceptable LOS with the existing lane geometry and traffic control. In order for trucks to safely enter the site, the following roadway improvements are recommended. • Construct a 310 -foot deceleration lane for the eastbound left turns into the site from CR 346. • Construct a 310 -foot deceleration lane for the westbound right turns into the site from CR 346. Although not required to accommodate the gravel pit traffic, it is recommended that the Grand River Gravel Pit pay a proportionate share of the cost (based on trips generated) to construct an exclusive eastbound left turn lane at the CR 346/CR 311 intersection when it is constructed as part of the Stillwater Ranch development. A state highway access permit is not required because the proposed site is expected to increase the traffic along the 1-70 Frontage Road by only five percent, which is considered a minor modification to the existing access permit. IPFELSE'>URG C� HOLT & ULLEVIG Page 15 Grand River Park Gravel Pit Traffic Impact Study APPENDIX A TRAFFIC COUNTS • FELSBURG (41-[GLT & ULLEV1G Appendix A All Traffic Data Services, Inc 9660 W 44th Ave Wheat Ridge, CO 80033 www.alltrafficdata.net All Traffic Data fl.......Sa,a,.a tze Groups Printed- Unshifted Fife Name : 316&346AM Site Code : 00000000 Start Date : 8/15/2006 Page No : 1 08:00 AM 08:15 AM 08:30 AM 08:45 AM Total Grand Total Apprch % Total % 5 6 5 1 17 26 23.6 10.3 4 1 10 10 25 55 50 21.7 1 3 4 6 14 29 26.4 11.5 0 0 0 0 0 0 0 0 1 1 1 1 4 1 1 0 2 4 3 1 3 5 12 9 7 20 25 19.4 55.6 3.6 2.8 7.9 0 0 0 0 0 0 0 0 0 0 1 1 2 5 6.8 2 4 7 7 5 23 57 78.1 22.5 1 1 1 2 5 11 15.1 4.3 0 0 0 0 0 0 0 0 1 3 3 1 8 21 61.8 8.3 0 0 0 0 1 0 2 1 3 1 9 26.5 3.6 4 11.8 1.6 4l 2 F SO 0 • 0 1- n a Out 98 316 In r 1101 291 551 261 01 Right Thru Left Peds Total 1 2081 4 1 North 8/15/2006 07:00 AM 8/15/2006 08:45 AM Unshifted 4-1 i r Left Thru Ri.ht Peds 1 661 Out 1411 In Total 316 J zl 0, W 6I 0 a 0 bi A at 0 0 0 0 0 0 0 0 21 24 36 37 118 253 316 Southbound 346 Westbound 316 Northbound 346 Eastbound Start Time Left i Thru Right Peds Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds Int. Total 07:00 AM 07:15 AM 07:30 AM 07:45 AM 3 2 1 3 5 10 9 6 5 2 3 5 0 0 0 0 1 1 2 1 1 1 0 1 3 1 2 2 0 0 0 0 1 1 1 0 12 5 14 3 2 1 1 2 0 0 0 0 3 3 4 3 2 3 1 0 0 1 1 1 0 0 0 0 38 31 39 27 Total 9 30 15 0 5 3 8 0 3 34 6 0 13 6 3 0 135 08:00 AM 08:15 AM 08:30 AM 08:45 AM Total Grand Total Apprch % Total % 5 6 5 1 17 26 23.6 10.3 4 1 10 10 25 55 50 21.7 1 3 4 6 14 29 26.4 11.5 0 0 0 0 0 0 0 0 1 1 1 1 4 1 1 0 2 4 3 1 3 5 12 9 7 20 25 19.4 55.6 3.6 2.8 7.9 0 0 0 0 0 0 0 0 0 0 1 1 2 5 6.8 2 4 7 7 5 23 57 78.1 22.5 1 1 1 2 5 11 15.1 4.3 0 0 0 0 0 0 0 0 1 3 3 1 8 21 61.8 8.3 0 0 0 0 1 0 2 1 3 1 9 26.5 3.6 4 11.8 1.6 4l 2 F SO 0 • 0 1- n a Out 98 316 In r 1101 291 551 261 01 Right Thru Left Peds Total 1 2081 4 1 North 8/15/2006 07:00 AM 8/15/2006 08:45 AM Unshifted 4-1 i r Left Thru Ri.ht Peds 1 661 Out 1411 In Total 316 J zl 0, W 6I 0 a 0 bi A at 0 0 0 0 0 0 0 0 21 24 36 37 118 253 All Traffic Data Nos d YY lY Y 10 R9Rie F-rrvi,os Iur- All Traffic Data Services, Inc 9660 W 44th Ave Wheat Ridge, CO 80033 www, a ll tra ffic d a ta. net File Name : 316&346AM Site Code : 00000000 Start Date : 8/15/2006 Page No : 2 Peak Hour Analysis From 07:00 AM to 08:45 AM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 07:00 AM 07:00 AM 316 Southbound 346 Westbound 316 Northbound 346 Eastbound - Start Time Left ! Thru Right I Peds 1 App. Told Left j Thru I Right 1 Peds App. Toltl Left Thru Right I Peds I App, Tom Left Thru Right 1 Peds I App, To„J Peak Hour Analysis From 07:00 AM to 08:45 AM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 07:00 AM 07:00 AM 3 5 1 3 5 1 2 07:15 AM 2 10 2 0 14 1 1 1 0 3 1 5 1 0 7 3 3 1 0 7 31 07:30 AM 1 9 3 0 13 2 14 1 0 16 4 39 07:45 AM 3 6 5 0 14 1 1 2 0 4 0 3 2 0 5 3 0 1 0 4 27 Total Volume 9 30 15 0 54 5 3 8 0 16 3 34 6 0 43 13 6 3 0 22 135 App. Total 16.7 55.6 27.8 0 31.2 18.8 50 0 7 79.1 14 0 59.1 27.3 13.6 0 PHF .750 .750 .750 .000 .964 .625 .750 .667 .000 .800 .750 .607 .750 .000 .672 .813 .500 .750 .000 .786 .865 Out 551 316 In Total 1094 4 Right Thru Left Peds Peak Hour Data T North Peak Hour Begins at 07:00 AM Unshifted a r4 Left Thru Right Peds 38] Out In 316 811 Tota$ 2 rr -13 ati w cn 0 N O 0 All Traffic Data Services, inc 9660 W 44th Ave Wheat Ridge, CO 80033 www.alltrafficdata.net Ail Traffic Data tk-r61.r.ef fat, Groups Printed- Unshifted File Name : 316&346PM Site Code : 00000000 Start Date : 8/15/2006 Page No : 1 05:00 PM 05:15 PM 05:30 PM 05:45 PM Total Grand Total Apprch % Total % 3 9 5 6 23 42 23.7 9.8 11 13 13 5 42 85 48 19.9 12 12 6 1 31 50 28.2 11.7 0 0 0 0 0 0 0 0 0 0 0 6 10.3 1.4 1 4 1 1 7 15 25.9 3.5 2 6 5 2 15 37 63.8 8.7 0 0 0 0 0 0 0 0 2 1 0 1 4 16 7 9 15 47 11 116 8.3 87.2 2.6 27.2 0 0 2 6 4.5 1.4 0 0 0 0 0 0 0 0 8 6 5 4 23 44 74.6 10.3 0 0 1 3 4 9 15.3 2.1 0 3 0 2 5 6 10.2 1.4 m Out 1971 316 In 1771 501 851 421 01 :rt Thru Left Peds Total I 3741 North 4 8/15/2006 04'.00 PM 8/15/2006 05:95 PM Unshifted Left Thru Ri.ht Peds i 971 Out In 316 1 2301 Total O 0 1 0 0 0 0 0 0 0 0 55 62 46 41 204 427 316 Southbound 346 Westbound 316 Northbound 346 Eastbound Start Time Left Thru_ Right Peds Left Thru Right Peds Left Thru Right Peds Left . Thru J Right Peds Int. Total 04:00 PM 04:15 PM 04:30 PM 04:45 PM 2 5 5 7 8 5 15 4 8 3 12 7 0 0 0 0 2 1 1 1 2 0 2 4 2 3 10 7 0 0 0 0 1 2 1 3 12 16 19 22 0 1 1 2 0 0 0 0 6 7 4 4 2 0 1 0 2 0 0 1 0 0 0 0 42 55 56 70 Total 19 43 19 0 5 8 22 0 7 69 4 0 21 5 1 0 223 05:00 PM 05:15 PM 05:30 PM 05:45 PM Total Grand Total Apprch % Total % 3 9 5 6 23 42 23.7 9.8 11 13 13 5 42 85 48 19.9 12 12 6 1 31 50 28.2 11.7 0 0 0 0 0 0 0 0 0 0 0 6 10.3 1.4 1 4 1 1 7 15 25.9 3.5 2 6 5 2 15 37 63.8 8.7 0 0 0 0 0 0 0 0 2 1 0 1 4 16 7 9 15 47 11 116 8.3 87.2 2.6 27.2 0 0 2 6 4.5 1.4 0 0 0 0 0 0 0 0 8 6 5 4 23 44 74.6 10.3 0 0 1 3 4 9 15.3 2.1 0 3 0 2 5 6 10.2 1.4 m Out 1971 316 In 1771 501 851 421 01 :rt Thru Left Peds Total I 3741 North 4 8/15/2006 04'.00 PM 8/15/2006 05:95 PM Unshifted Left Thru Ri.ht Peds i 971 Out In 316 1 2301 Total O 0 1 0 0 0 0 0 0 0 0 55 62 46 41 204 427 A!1 Traffic Data Services, Inc 9660 W 44th Ave Wheat Ridge, CO 80033 www.alltrafficdata.net File Name : 316&346PM Site Code : 00000000 Start Date : 8/15/2006 Page No : 2 Peak Hour Analysis From 04:00 PM to 05:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 04:30 PM Ind. Total 04:30 PM 316 Southbound 346 Westbound 316 Northbound 346 Eastbound Start Time Left Thru Right Peds App Tong Left Thru Right Peds AN, Tota Left Thru Ri.ht Peds App. Tow Left Thru Right Peds AppT.ta Peak Hour Analysis From 04:00 PM to 05:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 04:30 PM Ind. Total 04:30 PM 5 8 3 0 16 1 10 13 1 19 1 0 21 4 2 0 0 6 56 04:45 PM 7 12 7 0 26 1 4 7 0 12 3 22 2 27 4 0 1 0 5 70 05:00 PM 3 11 12 8 05:15 PM 9 13 12 0 34 0 4 6 0 10 1 7 1 0 9 6 0 3 0 9 62 Total Volume 24 44 34 0 102 2 11 25 0 38 7 64 4 0 75 22 2 4 0 28 243 1/4 App. Total 23.5 43.1 33.3 0 5.3 28.9 65.8 0 9.3 85.3 5.3 0 78.6 7.1 14.3 0 PHF .667 .846 .708 .000 .750 .500 .688 .625 .000 .731 .583 .727 .500 .000 .694 .688 .250 .333 .000 .778 .868 0 o N 1 2131 Right Thru Left Peak Hour Data North Peak Hour Begins at 04:30 PM Unshitled r Left Thru RI ht Peds rwmiwrim 501 Out In 315 1 125 Total 4 3 -4 2 to N 0 C.0 0 no m 0 O Alf Traffic Data Services, Inc. Page 1 9660 W 44th Ave CR346 Wheat Ridge, CO 80033 www.alltrafficdata.net Site Code: 6 Start 15 -Aug -06 Time Tue 12:00 AM 01:00 02:00 03:00 04:00 05:00 06:00 07:00 08:00 09:00 10:00 11:00 12:00 PM 01:00 02:00 03:00 04:00 05:00 06:00 07:00 08:00 09:00 10:00 11:00 EB WB Totaf 2 0 2 0 0 0 3 1 4 0 1 1 1 2 3 12 12 24 1922 41 19,.'. 25 44 11 17 28 12 13 25 13 15 28 13 23 36 9 19 28 18 22 40 22 10 32 19 19 38 20 22 42 28 28 56 28 15 43 17 12 29 13 11 24 6 3 9 6 4 10 2 1 3 Total 293 297 590 Percent 49.7% 50.3% AM Peak 06:00 07:00 07:00 Vol. 19 25 44 PM Peak 17:00 17:00 17:00 Vol. 28 28 56 Grand Total 293 297 590 Percent 49.7% 50.3% ADT Not Calculated AEI Traffic Data Services, Inc. 9660 W 44th Ave Wheat Ridge, CO 80033 www.alltrafficdata.net Page 1 FRONTAGE RD E/O 9TH ST Site Code: 7 Start 15 -Aug -06 Time Tue EB WB Total 12:00 AM 11 3 14 01:00 2 0 2 02:00 0 2 2 03:00 4 4 8 04:00 6 7 13 05:00 48 49 97 06:00 81 95 176 07:00 98 166 264 08:00 89 112 201 09:00 93 85 178 10:00 87 87 174 11:00 77 107 184 12:00 PM 78 83 161 01:00 82 80 162 02:00 94 97 191 03:00 102 111 213 04:00 135 106 241 05:00 '140? 100 240 06:00 122 89 211 07:00 65 57 122 08:00 44 42 86 09:00 33 18 51 10:00 22 11 33 11:00 15 5 20 Total 1528 1516 3044 Percent 50.2% 49.8% AM Peak 07:00 07:00 07:00 Vol. 98 166 264 PM Peak 17:00 15:00 16:00 Vol. 140 111 241 Grand Total 1528 1516 3044 Percent 50.2% 49.8% ADT Not Calculated Grand River Park Gravel Pit Traffic Impact Study APPENDIX B EXISTING LEVELS OF SERVICE • FELSP.URG HOLT & l ULLEV1G Appendix B HCM Unsignalized Intersection Capacity Analysis 2: Frontage Road & County Road 311 Existing AM Peak aig... i;ity �. �, :-; p.r = t T E II BLS ti/8T N_BL Lane Configurations Sign Control Free Free Stop Grade 0% 0% 0% Volume (vehlh) 12 67 6 7 106 20 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 13 73 7 8. 115 . 22 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type None Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting. volume 86 70 49 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 86 70 49 tC, single (s) 4.1 6.4 6.2 tC, 2 stage (s) tF (s) p0 queue free % cM capacity (veh/h) DreTRIM NSW 2.2 100 1492. 3.5 3.3 88 98 923 1011 Volume Total 86 14 137 Volume Left 0 7 115 Volume Right 73 0 22 1700 1492 936 cSH Volume to Capacity Queue Length 95th (ft) Control Delay (s) Lane LOS Approach Delay (s) Approach LOS 0.05 0.00 0.15 0 0 13 0.0 3.4 9.5 A A 0.0 3.4 9.5 A ) k rseeti Y� .. 3.1 . n "�,7 , l n 7 yV U< m S'fi9 s...b. x,s. �, -.. _`. -4f.� +.cxx' 3 ¢..:, .:� Average Delay Intersection Capacity Utilization Analysis Period (min) 5.7 19.5% ICU Level of Service A 15 9/19/2006 Synchro 6 Report K:1061511SynchrolExistinglExisting AM,sy7 Felsburg Holt & Ullevig HCM Unsignalized Intersection Capacity Analysis 3: County Road 331 & County Road 311 ave eli# yM� Lane Configurations Sign Control Grade Volume (veh/h) Peak Hour Factor Hourly flow rate (vph) Pedestrians Lane Width (ft) Walking Speed (ftls) Percent Blockage Right turn flare (veh) Median type Median storage veh) Upstream signal (ft), pX, platoon unblocked vC, conflicting volume vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol tC, single (s) tC, 2 stage (s) tF (s) p0 queue free % cM capacity (veh/h) ..14"4'x` $:tal �ff 1 irece F W Volume Total Volume Left Volume Right cSH Volume to Capacity Queue Length 95th (ft) Control Delay (s) Lane LOS Approach Delay (s) Approach LOS Existing AM Peak 68 0.92 74 4 t Stop Stop 0% 0% 7 9 0.92 0.92 8 10 None None 134 72 101 53 0.92 58. Free 0% 33 0.92 36. 134 72 101 0 0 7.2 6.6 6.6 6.2 4.1 3.5 4.0 4.0 3.3 90 99 99 95 765 795 766 1076 82 67 36 29 74 0 36 0 0 58 0 29 768 1016 1604 1700 0.11 > 0.07 0.02 0.02 9 10.2 B 10.2 B 5 2 0 8.8 7.3 0.0 A A 8.8 4.0 A 2.2 98 1604 27 0.92 29 gft. seetior �,S {} 'nary g tigt .. _ :` k . t -.,, Average Delay 7.9 Intersection Capacity Utilization 20.8% Analysis Period (min) 15 ICU Level of Service 9/19/2006 Felsburg Holt & Ullevig Synchro 6 Report K:1061511SynchrolExistinglExisting AM.sy7 HCM Unsignalized Intersection Capacity Analysis 4: County Road 346 & County Road 316 Existing AM Peak ove _ent _.. EBS EI rgul3E24;W13 l- TO- -7 s [V_14_NBR SB1 SBT SBFT Lane Configurations Sign Control Stop Stop Free Free Grade 0%0% 0% 0% Volume (veh/h) 13 6 , 3 5 3 8 3. 34 6 9 `30 15 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 14 _7 - . 3 5 3 9 -3 37 7 10 33 16 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage . Right turn flare (veh) Median type None None Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 117 110 41 114 115 40 49 43 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 117 110 41 114 115 40 49 tC, single (s) 7.2 6.6 6.2 7.2 6.6 6.2 4.1. tC, 2 stage (s) tF (s) p0 queue free % cM capacity (veh/h) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 98 99 100 99 100 99 100 836 768 1022 843 763 1023 1539 43 4.1' 2.2 99 1546 rep, 0 S1 W t 1V SB na. Volume Total 24 17 47 59 Volume Left 14 5 3 10 Volume Right 3 9 7 16 cSH 837 905 1539 1546 Volume to Capacity 0.03 0.02 0.00 0.01 Queue Length 95th (ft) 2 1 0 0 Control Delay (s) 9.4 9.1 0.5 1.3 Lane LOS A A A A Approach Delay (s) 9.4 9.1 0.5 1.3 Approach LOS A A s9^s ham." ,�.,�T T`�a � t a.,-•--- ,K `a a 3 .# t x s rye d sz-r_ �x-r r.P.e� 3 i� '� � �` � �a-e• re � - °# T,, �' t f" - f. 4 ° L- fi �`'r S.r., ,� �..'.:k �..$r5 � i�'c<�c�.,.-e�': .'�.. .x} Average Delay 3.3 Intersection Capacity Utilization 15.4% ICU Level of Service A Analysis Period (min) 15 9/19/2006 Synchro 6 Report K:1061511SynchrolExistinglExisting AM.sy7 Felsburg Holt & Ullevig HCM Unsignalized Intersection Capacity Analysis 2: Frontage Road & County Road 311 Existing PM Peak DEBT ,E15VSIBL IIVBT NB � 7F�1 . Lane Configurations V Sign Control Free Free Stop Grade 0% 0% 0% Volume (vehlh) 8 115 20 8 82 9 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 9 125 22 9 89 10 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 134 123 71 None vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol tC, single (s) tC, 2 stage (s) tF (s) p0 queue free % cM capacity (veh/h) 134 4.1 2.2 98 1.433 123 71 6.4 6.2 3.5 3.3 90 99 851 983 ref Qn La # M,I' 8 1 1 1fa x Fu Volume Total Volume Left Volume Right cSH Volume to Capacity Queue Length 95th (ft) Control Delay (s) Lane LOS Approach Delay (s) Approach LOS 134 30 99 0 22 89 125 0 10 1700 1433 863 0.08 0.02 0.11 0 1 10 0.0 5.4 9.7 A A 0.0 5.4 9.7 A Average Delay Intersection Capacity Utilization Analysis Period (min) 4.3 26.0% 15 ICU Level of Service A 9/19/2006 Synchro 6 Report K:1061511SynchrolExistinglExisting PM.sy7 Felsburg Holt & Ullevig HCM Unsignalized Intersection Capacity Analysis 3: County Road 331 & CountOoad 311 —3. 44 -- Existing PM Peak • n Lane Configurations Sign Control Grade Volume (veh/h) Peak Hour Factor Hourly flow rate (vph) Pedestrians Lane Width (ft) Walking Speed (ftls) Percent Blockage Right turn flare (veh) Median type Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol tC, single (s) tC, 2 stage (s) tF (s) p0 queue free % cM capacity (veh/h) 4 t Stop Stop 0% 0% 54 5 6 29 0.92 0.92 0.92 0.92 59 :5 : 7 32 None None 128 93 164 Free 0% 43 0.92 47 128 93 164 0 0 7.2 6.6 6.6 6.2 4.1 3.5 4.0 93 99 790 768 4.0 3.3 99 97 702 1076 2.2 97 1.604 65 0.92 71 , i ectf lrWe #a ' K Volurne Total Volume Left Volume Right cSH Volume to Capacity Queue Length 95th (ft) Control Delay (s) Lane LOS Approach Delay (s) Approach LOS 64 59 0 788 0.08 7 10.0 A 10.0 A rSeotGeSx(l(timary'_ Average Delay Intersection Capacity Utilization Analysis Period (min) 38 47 71 0 47 0 32 0 71 986 1604 1700 0.04 0.03 0.04 3 2 0 8.8 7.3 0.0 A A 8.8 2.9 A .'h"�' , n , - ,�'� .+cP.x."� .'°32. _'f:?'dY 3,r�`„��-k�'-�°f'C�h'1�`�°'A?5-a-.•- 6.0 19.9% ICU Level of Seniice 15 A 9/19/2006 Felsburg Holt & Ullevig Synchro 6 Report K:1061511SynchrolExistinglExisting PM.sy7 HCM Unsignalized Intersection Capacity Analysis 4: County Road 346 & County Road 316 Existing PM Peak 4\ 4/ oerm.e`itVmf- EWIEBRt?BRIB�i�WRfBL NBNBiS; Lane Configurations Sign_ Control Stop ..: Stop Free Grade 0% 0% 0% Volume'(vehlh)22 . 2 4 2 11 25 7 64 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0,92 0.92 0.92 Hourly flow rate (vph) 24 .. 2 4 2 12 27 8 _ 70 Pedestrians Lane Width (ft) Walking Speed (ftls) Percent Blockage Right turn flare (veh) Median type None None Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 239 208 66 211 224 72 85 74 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 239 208 66 211 224 72 85 tC, single (s) 7.2 6.6 6.2 7.2 6.6 6.2 4.1 tC, 2 stage (s) tF (s) - 3.5 4.0 3.3 p0 queue free % 96 100 100 cM capacity (veh/h) 669 669 989 Free .. 0% 4 24. 44 34 0.92 0.92 0.92 0.92 4 26 48 37 3.5 100 722 Volume Total Volume Left Volume Right cS H Volume to Capacity Queue Length 95th (ft) Control Delay (s) Lane LOS Approach Delay (s) Approach LOS 30 41 24 2 4 27 4 37 701 844 1493 1507 0.04 0.05 0.01 0.02 3 4 0 1 10.4 9.5 0.7 1.9 B A A A 10.4 9.5 0.7 1.9 B A 4.0 3.3 98 97 655 982 2.2 99 1493 74 4.1 2.2 98 1507 82 111 8 26 Average Delay Intersection Capacity Utilization Analysis Period (min) 3.7 26.0% 15 ICU Level of Service 9/19/2006 Synchro 6 Report K:1061511SynchrolExistinglExisting PM.sy7 Felsburg Holt & Ullevig Gra►►d River Park Gravel Pit Traffic Impact Study APPENDIX C SHORT TERM LEVELS OF SERVICE (d FELSBURG HOLT & ULLEVVIG Appendix C HCM Unsignalized Intersection Capacity Analysis 2: Frontage Road & County Road 311 2007 Background AM Peak i1BL 11V AT Lane Configurations 4 Y. Sign Control Free Free Stop Grade 0% 0% 0% Volume (veh/h) 10 70 5 10 110. 20 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 11 76 5 11 120 22 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 87 71 49 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 87 71 49 tC, single (s) 4.1 6.4 6.2 tC, 2 stage (s) tF (s) 2.2 3.5 3.3 p0 queue free % 100 87 98 cM capacity (veh/h) 1490 923 1011, None E —61100:00:41 Volume Total 87 16 141 Volume Left Volume Right 76 0 22 cSH 1700 1490 935 Volume to Capacity 0.05 0.00 0.15 Queue Length 95th (ft) 0 0 13 Control Delay (s) 0.0 2.5 9.5 Lane LOS A A Approach Delay (s) 0.0 2.5 9.5 Approach LOS A 0 5 120 , •M _e oft SUrI<tm aryt ��-.. W ..:„ .: > 7�.�.`?�.R?; r�.i.: i � `,;,.�-��... -. R -�:�'-`�te�� :�^„w_3"�€..xi �'`.- * ''�.°-JF" Average Delay 5.7 Intersection Capacity Utilization 18.9% ICU Level of Service A Analysis Period (min) 15 9/19/2006 Synchro 6 Report K:\061511Synchro12007 Bckgrnd12007 Background AM.sy7 Felsburg Holt & Ullevig HCM Unsignalized Intersection Capacity Analysis 2007 Background 3: County Road 331 & County Road 311 AM Peak --► 4- MQ [i ij i'R'� .'ti nt xi _ I_��,y BI� ". BT Lane Configurations 4 t Sign Control Stop Stop Grade 0% 0% Volurne (veh/h) 70 5 10 ' 55 Peak Hour Factor 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 76 5 11 60 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type None None Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 141 76 109 0 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 141 76 109 0 0 tC, single (s) 7.2 6.6 6.6 6.2 4.1 Free O% 35 0.92 38 tC, 2 stage (s) tF (s) p0 queue free % cM capacity (veh/h) 3.5 4.0 90 99 754 789 4.0 3.3 2.2 99 94 98 757 1076 1604 30 0.92 33, Volume Total 82 71 38 33 Volume Left 76 0 38 0 Volume Right 0 60 0 33 cSH 756 1011 1604 1700 Volume to Capacity 0.11 0.07 0.02 0.02 Queue Length 95th (ft) 9 6 2 0 Control Delay (s) 10.3 8.8 7.3 . 0.0 Lane LOS B A A Approach Delay (s) 10.3 8.8 3.9 Approach LOS B A 1:61(0M01160.71~7 Average Delay Intersection Capacity Utilization Analysis Period (min) AVE74 .71 F. tykalitWat 7.8 20.8% ICU Level of Service 15 A 9/19/2006 Synchro 6 Report K:1061511Synchro12007 Bckgrnd12007 Background AM.sy7 Felsburg Holt & Ullevig HCM Unsignalized Intersection Capacity Analysis 4: County Road 346 & County Road 316 2007 Background AM Peak PregarMATOMS Lane Configurations Sign Control Grade Volume (veh/h) 15 Peak Hour Factor 0.92 Hourly flow rate (vph) 16 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol tC, single (s) tC, 2 stage (s) tF (s) 3.5 p0 queue free % 98 cM capacity (veh/h) 818 _ ," 4+ Stop 0% 5 0.92 5 None 5 0.92 5 5 0.92 5 4+ Stop 0% 5 0.92 5 None 10. 0.92 11 t 31NI�T 4+ Free 0% 5 35. 0.92 0.92 5 38 128 117 41 122 122 41 49 128 117 7.2 . 6.6 41 122 122 41 49 6.2 7.2 6.6 6.2 4.1 4.0 3.3 99 99 760 1022 3.5 99 830 4.0 3.3 99 99 754 1022 2.2 100 1539. NBR _L 5" Bp SBI 4 Free 0% 5 10 30. 15 0.92 0.92 0.92 0.92 5 11 33 16 43 43 4.1 2.2 99 1546 Piteraimmonmem Volume Total . 27 Volume Left Volume Right cSH Volume to Capacity Queue Length 95th (ft) Control Delay (s) Lane LOS Approach Delay (s) Approach LOS 16 5 839 0.03 3 9.4 A 9.4 A 22 5 11 891 0.02 2 9.1 A 9.1 A reMtio01S arY w .... Average Delay Intersection Capacity Utilization Analysis Period (min) 49 5 5 1539 0.00 0 0.8 A 0.8 60 11 16 1546 0.01 1 1.4 A 1.4 3.7 14.8% 15 ICU Level of Service A 9/19/2006 Felsburg Holt & Ullevig Synchro 6 Report K:1061511Synctiro12007 Bckgrnd12007 Background AM.sy7 HCM Unsignalized Intersection Capacity Analysis 2007 Background 2: Frontage Road & County Road 311 PM Peak 464 ' 191410 17-6 n MIN.60,130' Lane Configurations 'i Sign Control Free Grade 0% Volume (veh/h) 10 115 20 Peak Hour Factor 0.92 0.92 0.92 Hourly flow rate (vph) 11 125 22 f Pedestrians Lane Width (ft) Walking Speed (ftls) Percent. Blockage Right turn flare (veh) Median type Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol tC, single (s) tC, 2 stage (s) tF (s) p0 queue free % cM capacity (veh/h) 136 136 4.1 2.2 98 1430 i egt ai ene MINEB WW. 4 Free 0% 10 0.92 11 Stop 0% 85 0.92 92 None 10 0.92 1.1` 128 73 128 73 6.4 6.2 3.5 3.3 89 99 847 980 Volume Total Volume Left Volume Right cSH Volume to Capacity Queue Length 95th (ft) Control Delay (s) Lane LOS Approach Delay (s) Approach LOS 136 33 0 22 125 0 1700 1430 0.08 0.02 0 1 0.0 .5.1 A 0.0 5.1 `erg se fro 'Sumria.`� �l?�.._ �.. ps rY t Average Delay intersection Capacity Utilization Analysis Period (min) 103 92 11 859 0.12 10 9.8 A 9.8 A 4.3 26.3% 15 x ICU Level of Service A 9/19/2006 Felsburg Holt & Ullevig Synchro 6 Report K:1061511Synchro12007 Bckgrnd12007 Background PM.sy7 HCM Unsignalized Intersection Capacity Analysis 3: County Road 331 & County Road 311 2007 Background PM Peak Lane Configurations Sign Control Grade Volume (vehlh) Peak Hour Factor Hourly flow rate (vph) Pedestrians Lane Width (ft) Walking Speed (ftls) Percent Blockage Right turn flare (veh) Median type Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume vC1, stage 1 cont vol vC2, stage 2 conf vol vCu, unblocked vol tC, single (s) tC, 2 stage (s) tF (s) p0 queue free cM capacity (veh/h) Volume Total Volume Left Volume Right cSH Volume to Capacity Queue Length 95th (ft) Control Delay (s) Lane LOS Approach Delay (s) Approach LOS LL' EB Bfi INB�VILBR 0.W8.11: R E. d iVin 4 Stop ' Stop Free .. 0% 0% 0% 55 5 5 30 45 65 0.92 0.92 0.92 0.92 0.92 0.92 60 5 .. 5 33 49. 71 None ; None 133 98 168 133 98 168 0 0 7.2 6.6 6.6 6.2 4.1 3.5 4.0 4.0 . 3.3 92 99 99 97 783 763 697 1076 2.2 97 1604 E,WBY1 ;JR5 s x'14. • 74 65 38 49 71 60 0 49 0 0 33 781 999 0.08 0.04 7 3 10.0 8.7 B A 10.0 8.7 B A 0 71 1604 1700 0.03 0.04 2 0 7.3 0.0 A 3.0 Average Delay 6.0 Intersection Capacity Utilization 20.0% ICU Level of Service Analysis Period (min) 15 EMNINAMSOM A 9/19/2006 Felsburg Holt & Ullevig Synchro 6 Report K:1061511Synchro12007 Bckgrnd12007 Background PM.sy7 HCM Unsignalized Intersection Capacity Analysis 4: County Road 346 & County Road 316 _ f oveen#.: Lane Configurations Sign Control Grade Volume (veh/h) Peak Hour Factor Hourly flow rate (vph) Pedestrians Lane Width (ft) Walking Speed (ftls) Percent Blockage Right turn flare (veh) Median type Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol tC, single (s) tC, 2 stage (s) tF (s) p0 queue free cM capacity (veh/h) _.toe 13 ,N8RI1NBK11 2007 Background PM Peak 4\ t Stop Stop 0% 0% 20 5 5 5 10 0.92 0.92 0.92 0,92 0.92 22 5 5 5 11 None 239 209 68 215 239 209 68 215 7.2 6.6 6.2 7.2 3.5 97 669 4.0 99 668 3.3 99 987 3.5 99 715 761B11441,01P None 25 0,92 27 5 0.92 5 226 73 87 226 73 87 6.6 6.2 4.1 4.0 98 654 3.3 2.2 97 100 980 1490 4 Free. 65 5 25 0.92 0.92 0.92 71 .. ;5. 27. 76 76 4.1 2.2 98 1 504 . -ate' < - 4+ Free 0% 45 0.92 49, 35 0.92 38 Volume Total Volume Left Volume Right cS H Volume to Capacity Queue Length 95th (ft) Control Delay (s) Lane LOS Approach Delay (s) Approach LOS 33 43 22 5 5 707 0.05 4 10.3 B 10.3 B 27 837 0.05 4 9.5 A 9.5 A 82 114. 5 27 5 38 1490 1504 0.00 0.02 0 1 0.5 1.9 A A 0.5 1.9 Average Delay Intersection Capacity Utilization Analysis Period (min) 3.7 25.3% 15 ICU Level of Service A 9/19/2006 Felsburg Holt & Ullevig Synchro 6 Report K:1061511Synchro12007 Bckgrnd12007 Background PM.sy7 HCM Unsignafized Intersection Capacity Analysis 1: County Road 346 & Site Access 2007 Total AM Peak voi e; r a L en mu+r swo- Lane Configurations r Sign Control Free Free Stop Grade 0% 0% 09/0 Volume (veh/h) 5 20 15 5 5 5 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flout rate (vph) 5 22 16. 5 5 5 Pedestrians Lane Width (ft) Walking Speed (ftls) Percent Blockage Right turn flare (veh) Median type Median storage veh) Upstream signal (ft). pX, platoon unblocked vC, conflicting volume 22 49 16 TkatfalarA None vC1, stage 1 cont vol vC2, stage 2 conf vol vCu, unblocked vol 22 tC, single (s) 4.1. tC, 2 stage (s) tF (s) 2.2 p0 queue free % 100 cM capacity (veh/h) 1575 49 6.4 16 6.2 3.5 3.3 99 99 950 1054 Volume Total Volume Left Volume Right cSH Volume to Capacity Queue Length 95th (ft) Control, Delay (s) Lane LOS Approach Delay (s) Approach LOS 5 22 5 0 0 0 1575 1700 0.00 0.01. 0 0 7.3 0.0 A 1.5 16 5 11 0 0 5 0 5 5 1700 1700 999 0.01 0.00 0.01 0 0 1 0.0 0.0 8.6 A 0.0 8.6 A Average Delay Intersection Capacity Utilization Analysis Period (min) 2.2 14.2% 15 ICU Level of Service 9/19/2006 Synchro 6 Report K:1061511Synchro12007 Tota112007 AM.sy7 Felsburg Holt & Ullevig HCM Unsignalized Intersection Capacity Analysis 2: Frontage Road & County Road 311 --1► 1" ■_ 7 2007 Total AM Peak t Offerit . : _, ' DEBT" ; EBF 111 B fl�l�'f Lane Configurations Sign Control Grade Volume;(vehlh) Peak Hour Factor Hourty flow rate (vph). Pedestrians Lane Width (ft) Walking Speed (ftls) Percent Blockage Right turn flare (veh) Median type Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol tC, single (s) tC, 2 stage (s) tF (s) p0 queue free cM capacity (veh/h) Free 0% 10 0.92 11 4 Free Stop 0% 0% 75 5 10 115 20 0.92 0.92 0.92 0.92 0.92 82 5 11 :. 125 22`' 92. 92 4.1 2.2 100 1483 None 73 52 73 52 6.4 6.2 3.5 3.3 86 98 920 1008 Volume Total 92 16 147 Volume Left 0 5 125 Volume Right 82 0 22 cSH 1700 1483 932 Volume to Capacity 0.05 0.00 ' 0.16 Queue Length 95th (ft) 0 0 14 Control Delay (s) 0.0 2.5 9.6 Lane LOS A A Approach Delay (s) 0.0 2.5 9.6 Approach LOS A • Average Delay Intersection Capacity Utilization Analysis Period (min) 5.7 19.4% 15 ICU Level of Service 9/19/2006 Synchro 6 Report K:1061511Synchro12007 Tota112007 AM.sy7 Felsburg Holt & Ullevig HCM Unsignalized Intersection Capacity Analysis 3: County Road 331 & County Road 311 2007 Total AM Peak Lane Configurations 4 Sign Control Stop Grade 0% Volume (veh/h) 75 5 Peak Hour Factor 0.92 0.92 Hourly flow rate (vph) 82 5 Pedestrians Lane Width (ft) Walking Speed (ftls) Percent Blockage Right turn flare (veh) Median type None None Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 141 76 114 0 0 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 141 76 114 0 0 tC, single (s) 7.2 6.6 6.6 6.2 4.1 Stop 0% 10 0.92 11 !1IBRt • SBL A.SBRRfi Free 0% 55 35 35 0.92 0.92 0.92 60 38 38 tC, 2 stage (s) tF (s) p0 queue free % cM capacity (veh/h) 3.5 4.0 4.0 3.3 2.2 89 99 99 94 98 754. 789. 752 1076 1604 171 volume ! otai Volume Left Volume Right cS H Volume to Capacity Queue Length 95th (ft) Control Delay (s) Lane LOS isr 11 „RS 82 0 38 0 0 60 .0 38 756 1009 1604 1700 0.12 0.07. 0.02 0.02 10 6 2 0 10.4 8.8 . 7.3 0.0 B A A 6u Approach Delay (s) 10.4 8.8 3.6 Approach LOS B A WeircrilraTrannalTW Average Delay Intersection Capacity Utilization Analysis Period (min) 7.7 21.1% 15 ICU.Level of Service A 9/19/2006 Synchro 6 Report K:1061511Synchro12007 Tota112007 AM.sy7 Felsburg Holt & Ullevig HCM Unsignalized Intersection Capacity Analysis 4: County Road 346 & County Road 316 ` Lane Configurations 4+ Sign Control Stop Stop Grade 0% 0% Volume (veh/h) 15 5 5 Peak Hour Factor 0.92 0.92 0.92 Hourly flow rate (vph) -16 5 5 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type None None Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 144 128 41 133 133 41 49 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 144 128 41 133 133 41 49 tC single (s) 7.2 6.6 6.2 7.2 6.6 6.2 4.1 5 5 0.92 0.92 5 5 2007 Total } I AM Peak I t VBg aaIalsLIM, R BL,- ; T , S 4+ Free Free. 0% 0% 15 5 35 5 15 30 15 0.92 0.92 0.92 0.92 0.92 0.92 0.92 16 : 5 38 5 : 16 33: 16 tC, 2 stage (s) tF (s) 3.5 4.0 p0 queue free % 98 99 cM capacity. (veh/h) 792 747. Volume Total Volume Left Volume Right cSH Volume to Capacity Queue Length 95th (ft) Control Delay (s) Lane LOS Approach Delay (s) Approach LOS Average Delay Intersection Capacity Utilization Analysis Period (min) 3.3 3.5 99 99 1022 814 4.0 99 742 3.3 98 1022 ENAMISKIRIMMINWIK, 574 27 27 49 65 16 5 5 16 5 16 5 16 819 907 1539 1546 0.03 0.03 0.00 0.01 3 2 0 1 9.5 9.1 0.8 1.9 A A A A 9.5 9.1 0.8 1.9 A A 4.0 16.3% 15 2.2 100 1539 43 43 4.1 2.2 99 1546 ICU Level of Service 9/19/2006 Felsburg Holt & Ullevig Synchro 6 Report K:1061511Synchro12007 Tota112007 AM.sy7 HCM Unsignalized Intersection Capacity Analysis 1: County Road 346 & Site Access 2007 Total PM Peak Lane Configurations Sign Control Grade Volume (veh/h) Peak Hour Factor Hourly flow rate (vph) Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 49 vC1, stage 1 cont vol vC2, stage 2 conf vol vCu, unblocked vol 49 tC, single (s) 4.1 tC, 2 stage (s) tF (s) 2.2 p0 queue free% 100 cM capacity (veh/h) 1539. ykg 4- 4/ 1. Free Free 0% 0% 5 30 40 5 0.92 0.92 0.92 0.92 5 33 43 5 Stop 0% 5 .5 .. 0.92 0.92 5 5. None 87 43 87 43 6.4 6.2 3.5 3.3 99 99 904 1018 4 ori; cc 's } aE fawman-a tm 71471C,, tiall Volume Total 5 33 43 5 11 Volume Left 5 0 0 0 5 Volume Right 0 0 0 5 5 cSH 1539 1700 1700 1700 957 Volume to Capacity 0.00 0.02 0.03 0.00 0.01 Queue Length 95th (ft) 0 0 0 0 1 Control Delay (s) 7.3 0.0 0.0 0.0 8.8 Lane LOS A A Approach Delay (s) 1.0 0.0 8.8 Approach LOS A Average Delay 1.4 Intersection Capacity Utilization 14.2% Analysis Period (min) 15 ICU Level of Service A 9/19/2006 Felsburg Holt & Ullevig Synchro 6 Report K:1061511Synchro12007 Tota112007 PM.sy7 HCM Unsignalized Intersection Capacity Analysis 2: Frontage Road & County Road 311 2007 Total PM Peak 1— :749WEeffaNCW NBF Lane Configurations 4 Sign ControlFree Free Stop Grade 0% 0% 0% Volume (veh/h) 10 120 20 10 90. 10 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 11 130 22 11 98 11 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 141 130 76 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 141 130 tC, single (s) 4.1 6.4 tC, 2 stage (s) tF (s) 2.2 p0 queue free% 98 cM capacity-(veh/h) 1423 Mani' �. Volume Total 141 33 109 Volume Left 0 22 98 Volume Right 130 0 11 cSH 1700 1423 855 Volume to Capacity 0.08 0.02 0.13 Queue Length 95th (ft) 0 1 11 Control Delay (s) 0.0 5.1 9.8 Lane LOS A A Approach Delay (s) 0.0 5.1 9.8 Approach LOS A None 76 6.2 3.5 3.3 88 99 844 977 w Average Delay 4.4 Intersection Capacity Utilization 26.9% ICU Level of Service A Analysis Period (min) 15 9/19/2006 Synchro 6 Report K:\061511Synchro12007 Tota112007 PM.sy7 Felsburg Holt & Ullevig HCM Unsignalized Intersection Capacity Analysis 3: County Road 331 & County Road 311 Mb NA_ .; ? 1, L B ry 1WE3� �jNB i SBL ,SBI Lane Configurations 4 ti Sign Control Stop Stop Free Grade 0% 0% 0% Volume (veh/h) 60 5 5 30 45 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 65 5 5 33 49 Pedestrians LaneHidth (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 133 98 174 0 0 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 133 98 174 0 0 tC, single (s) 7.2 6.6 6.6 6.2 4.1 tC, 2 stage (s) None None tF (s) p0 queue free % cM capacity (veh/h) 3.5 - 4.0 4.0 3.3 2.2 92 99 99 97 97 783 763 692 1076 1604 2007 Total PM Peak 70 0.92 76 Volume Total 71 38 49 76 Volume Left 65 0 49 0 Volume Right 0 33 0 . 76 cSH 781 997 1604 1700 Volume to. Capacity 0.09 0.04 0.03 0.04 Queue Length 95th (ft) 7 3 2 0 Control Delay (s) 10.1 8.8 7.3 0.0 Lane LOS B A A Approach Delay (s) 10.1 8.8 2.9 Approach LOS B A Average Delay Intersection Capacity Utilization Analysis Period (min) 6.0 20.3% ICU Level of Service. 15 9/19/2006 Felsburg Holt & Ullevig Synchro 6 Report K:1061511Synchro12007 Tota112007 PM.sy7 HCM Unsignalized Intersection Capacity Analysis 4: County Road 346 & County Road 316 2007 Total PM Peak -10 ~ T 4 (aefrept5i3REg�zuflTrE�4-1 W13L11B�WBF2J�B�,NBT; IVBRSBSBF.Y�SR Lane Configurations 4 Sign Control Stop Stop Free Free Grade 0% 0% 0% 0% Volume (vehlh) 20 5 5 5 10 30 5 65 5 30 45 • 35 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 22 5 5 5 11 33 5 71 5 33 49 38 Pedestrians Lane Width (ft) Walking Speed (ftls) Percent Blockage Right turn flare (veh) Median type None None Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 255 220 68 226 236 73 87 76 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 255 220 68 226 236 73 87 tC, single (s) 7.2 6.6 6.2 7.2 6.6 6.2 4.1 tC, 2 stage (s) tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 p0 queue free % 97 99 99 99 98 97 100 cM capacity (veh/h) 647 656 987 701 643 980 1490 76 4.1 2.2 98 1504. pgrfa Volume Total. 33 49 82 120 Volume Left 22 5 5 33 Volume Right 5 33 5 38 cSH 688 844 1490 1504 Volume to. Capacity 0.05 0.06 0.00 0.02 Queue Length 95th (ft) 4 5 0 2 Control Delay (s) 10.5 9.5 0.5 2.2 Lane LOS B A A A Approach Delay (s) 10.5 9.5 0.5 2.2 Approach LOS B A Average Delay 3.9 Intersection Capacity Utilization 26.1 % ICU Level of Service A Analysis Period (min) 15 ,_ ..- WWWW.qtr M€` .� + b- 9/19/2006 Synchro 6 Report K:1061511Synchro12007 Tota112007 PM.sy7 Felsburg Holt & Ullevig Grand River Park Gravel Pit Traffic Impact Study APPENDIX D LONG TERM LEVELS OF SERVICE 1111 FELSBURG (4 1-10 L T ULLE\-'1G Appendix D HCM Unsignalized Intersection Capacity Analysis 2030 Background 2: Frontage Road & County Road 311 AM Peak )00%-fitaiirMitP Lane Configurations t..) Sign Control Free Grade 0% Volume (veh/h) 15 Peak Hour Factor 0.92 Hourly flow rate (vph) 16 Pedestrians Lane Width (ft) Walking Speed (Ws) Percent Blockage Right turn flare (veh) Median type Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol tC, single (s) tC, 2 stage (s) tF (s) p0 queue free % cM capacity (vehlh) 110 0.92 120 41-- iik\ d/IP I41% RITMTVIISVW.,ft0.00-- 4 *.ft Free Stop 0% 0% 10 15. 170 30 0.92 0.92 0.92 0.92 11 16 185 33 None 136 114 76 136 4.1 2.2 99 1430 114 76 6.4 6.2 3.5 3.3 79 97 868 977 ee p. Wiliff$75 Volume Total Volume Left Volume Right cSH Volume to Capacity Queue Length 95th (ft) Control Delay (s) Lane LOS Approach Delay (s) Approach LOS biabow 136 0 120 1700 0.08 0 0.0 0.0 27 11 0 1430 0.01 1 3.0 A 3.0 217 185 33 883 0.25 24 10.4 B 10.4 8 Average Delay Intersection Capacity Utilization Analysis Period (min) 6.2 27.6% ICU Level of Service A 15 9/19/2006 Felsburg Holt & Ullevig Synchro 6 Report K\061511Synchro12030 Bckgrnd12030 Background AM.sy7 HCM Unsignalized Intersection Capacity Analysis 3: County Road 331 & County Road 311 AM Peak 2030 Background JviavementriruEBT'Il1iBT �WBRG°_S_ Lane Configurations t Sign Control Stop Stop Free Grade 0% 0% 0% Vol ume(vehlh) 110 10 .15 85 55 45 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 120 11 :: 16 92 60 49 Pedestrians Lane Width (ft) Walking Speed (ftls) Percent Blockage Right turn flare (veh) Median type None None Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 220 120 168 0 0 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 220 120 168 0 0 tC, single (s) 7.2 6.6 6.6 6.2 4.1 tC, 2 stage (s) tF (s) p0 queue free % cM capacity (vehlh) 3.5 4.0 4.0 3.3 2.2 81 99 98 91 96 636 737 692 1076 1604 )11E4tRATROMATOZWPISIM;23- 5,78.1k, Volume Total 130 109 60 49 Volume Left 120 0 60 0 Volume Right 0 92 0 49 cSH 644 994 1604 1700 Volume to Capacity 0.20 0.11 0.04 0.03 Queue Length 95th (ft) 19 9 3 0 Control Delay (s) 12.0. 9.1 :. 7.3 0.0 Lane LOS B A A Approach Delay (s) 12.0 9.1 4.0 Approach LOS B A -54 C+ b h I C! atiQ ,,. r7 m.�� INI rk x .rA '" '.a?r - _�._ :F� - :. r.. -S' `-. i ...' ,Yr' ' ''.. 4M7 ' k r FW .. iMr017 Average Delay Intersection Capacity Utilization Analysis Period (min) 8.6 23.3% ICU Level of Service A 15 9/19/2006 Synchro 6 Report K:1061511Synchro12030 Bckgrnd12030 Background AM.sy7 Felsburg Holt & Ullevig HCM Unsignalized Intersection Capacity Analysis 4: County Road 346 & County Road 316 2030 Background AM Peak c k- 4\ t 4, Lane Configurations 4 4+ Sign Control Stop Stop Grade 0% 0% Volume (veh/h) 25 10 10 10 10 15 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 27 11 '11 11 11 16 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type None None Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 204 188 62 198 196 65 76 71 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 204 188 62 198 196 65 76 tC, single (s) 7.2 6.6 6.2 7.2 6.6 6.2 4.1 4. Free Free 0% 0% 10 55. 10 15 45 25 0.92 0.92 0.92 0.92 0.92 0.92 11 60 11 16 49. 27 tC, 2 stage (s) tF (s) p0 queue free % cM capacity (veh/h) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 96 98 99 99 98 98 99 717 689 994 727 682 990 1504 ISMArtiV,EMOMMIWAINN:InaTf 71 4.1 2.2 99 1511 Volume Total 49 38 82 27 11 11 11 16 11 757 803 1504 0.06 .0.05 0.01 5 4 1 10.1 9.7 1.0 B A A 10.1 9.7 1.0 B A Volume Left Volume Right cSH Volume to Capacity Queue Length 95th (ft) Control Delay (s) Lane LOS Approach Delay (s) Approach LOS IOW Wrortsciiii-,-orionw, Average Delay Intersection Capacity Utilization Analysis Period (min) 92 16 27 1511 0.01 1 1.4 A 1.4 ag-kAATIWWW-4, ,.*.fitiSPOW4TRA 4.1 18.3% ICU Level of Service 15 A 9/19/2006 Felsburg Holt & Ullevig Synchro 6 Report K:1061511Synchro12030 Bckgrnc112030 Background AM.sy7 HCM Unsignalized Intersection Capacity Analysis 2030 Background 2: Frontage Road & County Road 311 PM Peak Vlov Wr e -AwF E. WBt1 111f8CTWILWN Lane Configurations 4 ve Sign Control Free Free Stop Grade 0% 0% 0% Volume (veh/h) 15 150 30 15. 130 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 16 163 33 16 141 Pedestrians Lane Width (ft) Walking Speed (ftls) Percent Blockage Right turn flare (veh) Median type None Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 179 179 98 vC1, stage 1 cont vol vC2, stage 2 conf vol vCu, unblocked vol 179 179 98 tC, single (s) 4.1 6.4 6.2 tC, 2 stage (s) tF (s) 2.2 p0 queue free % 98 cM capacity (veh/h) 1378 15.:.. 0.92 16 3.5 3.3 82 98 784 950 Volume Total Volume Left Volume Right cSH 1700 1378 799 Volume to Capacity 0.11 0.02 0.20 Queue Length 95th (ft) 0 2 18 Control Delay (s) 0.0 5.2 10.6 Lane LOS A B Approach Delay (s) 0.0 5.2 10.6 Approach LOS B Average Delay Intersection Capacity Utilization Analysis Period (min) 179 49 158 0 33 141 163 0 16 "'7*'•'•''- _ ps "T€`c 4-• `'qtr �•� ° aki 5.0 31.5% ICU Level of Service A 15 9/19/2006 Synchro 6 Report K:1061511Synchro12030 Bckgrnd12030 Background PM.sy7 Felsburg Holt & Ullevig HCM Unsignalized Intersection Capacity Analysis 3: County Road 331 & County Road 311 2030 Background PM Peak f Nloverri_-rlr_ *3... ,_ .INB SBC. Lane Configurations 4 i Sign Control Stop Stop . Free Grade 0% 0% 0% Volume (veh/h) 85 10 10 45 70 100 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 92 11 11. 49 76 109 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median, type None None Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 207 152 261 0 0 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 207 152 261 0 0 tC, single. (s) 7.2 6.6 6.6 6.2 4.1 tC, 2 stage (s) IF (s) 3.5 4.0 4.0 3.3 2.2 p0 queue free °A° 86 98 98 95 95 cM capacity (veh/h) 676 699 608 1076 1604 MirOWLEMOrYWAVAMEWISMSWIWI yry., -fS Volume Total 103 60 76 109 Volume Left 92 0 76 0 Volume Right 0 49 0 109 cSH 678 944 1604 1700 Volume to Capacity 0.15 0.06 0.05 0.06 Queue Length 95th (ft) 13 5 4 0 Control Delay (s) 11.3 9.1 7.4 0.0 Lane LOS B A A Approach Delay (s) 11.3 9.1 3.0 Approach LOS B A RifeTWRSTMORN pyx Average Delay Intersection Capacity Utilization Analysis Period (min) 6.5 22.4% 15 ICU Level of Service A 9/19/2006 Synchro 6 Report K:1061511Synchro12030 Bckgrnd12030 Background PM.sy7 Felsburg Holt & Ullevig HCM Unsignalized Intersection Capacity Analysis 4: County Road 346 & County Road 316 M001,arnf -. MT OME T EBR fBi WBT 1 Lane Configurations 'a4+ Sign Control Stop . Stop Grade 0% 0% Volume (vehlh) 30 5 10 5 .15 40. 10 Peak Hour Factor 0.92 0.92 0,92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 33 5 11 5 16 43 11 Pedestrians Lane Width (ft) Walking Speed (ftls) Percent Blockage Right turn flare (veh) Median type None None Median storage veh) Upstream signal (ft) pX, platoon unblocked vC,`conflicting volume 380 334 106 342 359 114 136 120 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 380 334 106 342 359 114 136 120 tC, single (s) 7.2 6.6 6.2 7.2 6.6 6.2 4.1 tC, 2 stage (s) tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 p0 queue free % 94 99 99 99 97 95 99 cM capacity (veh/h) 518 559 940 578 542 930 1430 2030 Background PM Peak Free 0% 100: 10 0.92 0.92 109 . 11' 4+ Free 40 70 55 0.92 0.92 0.92 43 76 60 4.1 2.2 97 1450 Volume Total 49 65 130 179 Volume Left 33 5 11 43 Volume Right 11 43 11 60 cSH 580 756 1430 1450 Volume to Capacity 0.08 0.09 0.01 0.03 Queue Length 95th (ft) 7 7 1 2 Control Delay (s) 11.8 10.2 0.7 2.0 Lane LOS BB A A Approach Delay (s) 11.8 10.2 0.7 2.0 Approach LOS B B � rr<"c �- � � .at x':s`"a •F�.. xz -�• . a '���'�-a"".. � dx� � #.� �s�- r s'• t �� s �.' Otte sec�iort.S�rn:..,_.ry�?.�.���,'�-. ��;Y�.��: `��Y .�� � �.�� .��._.�. ate, ..L���. ` n � � :� INOM Average Delay 4.0 Intersection Capacity Utilization 31.8% ICU Level of Service A Analysis Period (min) 15 9/19/2006 Synchro 6 Report K:1061511Synchro12030 Bckgrnd12030 Background PM.sy7 Felsburg Holt & Ullevig HCM Unsignalized Intersection Capacity Analysis 1: County Road 346 & Site Access 2030 Total AM Peak Rah: 30 - Lane Configurations Sign Control Grade Volume (veh/h) Peak Hour Factor Hourly flow rate (vph) Pedestrians Lane Width (ft) Walking Speed (ftls) Percent Blockage Right turn flare (veh) Median type Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 33 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 33 tC, single (s) 4.1 tC, 2 stage (s) tF (s) 2.2 p0 queue free % 100 cM capacity (veh/h) 1560 FAct tir Free Free Stop 0% 0% 0% 5 30 25 5 5 5 0.92 0.92 0.92 0.92 0.92 0.92 5 33..: 27 :> 5. 5 5 Volume Total Volume Left Volume Right cSH Volume to Capacity Queue Length 95th (ft) Control Delay (s) Lane LOS Approach Delay (s) Approach LOS 5 33 5 0 None 71 27 71 27 6.4 6.2 3.5 3.3 99 99 923 .1040 27 5 11 0 0 5 0 0 0 5 5 1560 1700 1700 1700 978 0.00 0.02 0.02 0.00 0.0.1 0 0 0 0 1 7.3 0.0 0.0 0.0 8.7 A A 1.0 0.0 8.7 A ts'1.-� r ns �� � f `�� Y �Y'�� ',.C"a � b - ���'A �,� � .0 : f4ar t � h -a, r � �' ��z»�u� � £ask x s •s^v .� ritakg.7 ,]ri, 5 .'.fl��i$ :72. ' ,.. 'k- rr5 � -.' a < ,,rex"'}.i4", y:. .--xg..: ..� �rin � .,.-. yrs_ us. Vii, r '#s. .fir dx k.-�`'��`'�« --Z-4 '��'.` Average Delay 1.7 Intersection Capacity Utilization 14.2% ICU Level of Service A Analysis Period (min) 15 9/19/2006 Synchro 6 Report K:1061511Synchro12030 Tota112030 AM.sy7 Felsburg Holt & Ullevig HCM Unsignalized Intersection Capacity Analysis 2: Frontage Road & County Road 311 2030 Total AM Peak avenr6( 4IiTEB��RT_NF38- Lane Configurations Sign Control Grade Volume (veh/h) Peak Hour Factor Hourly flow rate (vph) Pedestrians Lane Width (ft) Walking Speed (ftls) Percent Blockage. Right turn flare (veh) Median type None Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 141 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol tC, single (s) tC, 2 stage (s) tF (s) .2.2 p0 queue free % 99 cM capacity (veh/h) 1423 4 V Free Free Stop 0% 0% 0% 15 115 10 15 175 30. 0.92 0.92 0.92 0.92 0.92 0.92 16 125 • 11 16 190 33 141 4.1 BITIMINR 117 79 117 79 6.4 6.2 3.5 3.3 78 97 865 973 NWIM A�te".'" h�f6 j<`;to'� Volume Total Volume Left Volume Right cSH Volume to Capacity Queue Length 95th (ft) Control Delay (s) Lane LOS Approach Delay (s) Approach LOS 141 0 125 1700 0.08 0 0.0 27 11 0 1423 0.01 1 3.1 A 0.0 3.1 tersetird ` it a l Average Delay Intersection Capacity. Utilization Analysis Period (min) 223 190 33 880 0.25 25 10.5 B 10.5 B IM�rr�� �� S �-r M RE* t €sem x:x ` M 6.2 27.9% ICU Level of Service A 15 9/19/2006 Synchro 6 Report 1C:1061511Synchro12030 Tota112030 AM.sy7 Felsburg Holt & Ullevig HCM Unsignalized Intersection Capacity Analysis 3: County Road 331 & County Road 311 2030 Total AM Peak Lane Configurations Sign Control Grade Volume (vehlh) 115 Peak Hour Factor 0.92 Hourly flow rate (vph) . 125. Pedestrians Lane Width (ft) Walking Speed (ftls) Percent .Blockage Right turn flare (veh) Median type Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 220 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol tC, single (s) tC, 2 stage (s) tF (s) p0 queue free % cM capacity (veh/h) �>3vBT 4 t Stop Stop 0% 0% 10 15 0.92 0.92 11 16 None None 120 174 5WtBR,tt7SBL SB.RR 's Free 0% 85 55 50 0.92 0.92 0.92 92. 60 : 54 220 120 174 0 0 7.2 6.6 6.6 6.2 4.1 3.5 80 636 4.0 99 737 4.0 98 687 3.3 91 1076. 2.2 96 1604 ect . LaFte la4- 1-7.13 1 • Volume Total Volume Left Volume Right cS H Volume to Capacity Queue Length 95th (ft) Control Delay (s) Lane LOS Approach Delay (s) Approach LOS 136 125 0 643 0.21 20 12.1 B 12.1 B i.f} tf$: rttrCtafy moi.°` h Average Delay Intersection Capacity Utilization Analysis Period (min) 109 0 92 992 0.11 9 9.1 A 9.1 A 60 54 60 0 0 54 1604 1700 0.04 0.03 3 0 7.3 0.0 A 3.8 8.6 23.6% 15 ICU Level of Service 9/19/2006 Felsburg Holt & Ullevig Synchro 6 Report K:1061511Synchro12030 Tota112030 AM.sy7 HCM Unsignalized Intersection Capacity Analysis 4: County Road 346 & County Road 316 2030 Total AM Peak Ilx o„verr�en_ ,4-g.,BL EBSrei �1� Lane Configurations Sign Control Stop Grade 0% Volume (veh/h) 25 10 10 Peak Hour Factor 0.92 0.92 0.92 Hourly flow rate (vph) 27 11 11 Pedestrians Lane Width (ft). Walking Speed (ftls) Percent Blockage Right turn flare (veh) Median type. None None Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 220 198 62 209 207 65 76 71 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 220 198 62 209 207 65 76 71 tC, single (s) 7.2 6.6 6.2 7.2 6.6 6.2 4.1 4.1 tC, 2 stage (s) tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2 p0 queue free % 96 98 99 98 98 98 99 99 cM capacity (veh/h) 693 677 994 713 670 990 1504 1511 Stop 0% 10 10 0.92 0.92 11 -, 11 20 10 0.92 0.92 22 11 Free 0% 55 0.92 60 �b513t5B��SB, Free 0% 10 . 20 45 25 0.92 0.92 0.92 0.92 11 22 49 27 0tht ari MMANM4 ; a n WW°' Volume Total 49 43 82 98 Volume Left 27 11 11 22 Volume Right 11 22 11 27 cSH 739 814 1504 1511 Volume to Capacity 0.07 0.05 0.01 0.01 Queue Length 95th (ft) 5 4 1 1 Control Delay (s) 10.2 9.7 1.0 1.7 Lane LOS B A A A Approach Delay (s) 10.2 9.7 1.0 1.7 Approach LOS B A 5 �`. � .^F S4i -4 c y u -- S- - a3� 1. i. � � - `t4'ir� f f i r »W4ti6tf$0. lata) s t'"t . i criZI .: , - 4 - �.:� -'4WA RM I �R ��. Average Delay 4.3 Intersection Capacity. Utilization 19.9% ICU Level of Service A Analysis Period (min) 15 9/19/2006 Synchro 6 Report K:1061511Synchro12030 Tota112030 AM.sy7 Felsburg Holt & Ullevig HCM Unsignalized Intersection Capacity Analysis 1: County Road 346 & Site Access 2030 Total PM Peak 7ar6 nt �EB1 E T�WBT 1l BI SBL SSR ° Lane Configurations + Sign Control Free Grade 0%° Volume (veh/h) .. 5 45 Peak Hour Factor 0.92 0.92 Hourly flow rate (vph) 5 49 65 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage. ,. Right turn flare (veh) Median, type Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 71 125 65 Free 0% 60 0.92 Stop 0% 5 5 5 0.92 0.92 0.92 5 5 5 None vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 71 tC single (s) 4.1 tC, 2 stage (s) tF (s) 2.2 p0 queue free % 100 cM capacity: (veh/h) 1511 Volume Total Volume Left Volume Right cSH Volume to Capacity Queue Length 95th (ft) Control Delay (s) Lane LOS Approach Delay (s) Approach LOS Average Delay Intersection Capacity Utilization Analysis Period (min) 125 65 6.4 6.2 3.5 99 860 5 49 65 5 11 5 0 0 0 5 0 0 0 5 5 1511 1700 1700 1700 920 0.00 0.03 0.04 0.00 0.01 0 0 0 0 1 7.4 0.0 0.0 0.0 9.0 A A 0.7 0.0 9.0 A 1.0 14.2% 15 3.3 99 990 -- �-i43 4 WIEMM 2'' w' Ste-} NUtic "ie'sTA ICU Level of Service 9/19/2006 Synchro 6 Report K:1061511Synchro12030 Tota112030 PM.sy7 Felsburg Holt & Ullevig HCM Unsignalized Intersection Capacity Analysis 2: Frontage Road & County Road 311 44- 2030 Total PM Peak Lane Configurations Sign Control Grade Volume (veh/h). Peak Hour Factor Hourly flow rate (vph). Pedestrians Lane Width (ft) Walking Speed (ftls) Percent Blockage Right turn flare (veh) Median type Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol tC, single (s) tC, 2 stage (s) tF (s) p0 queue free cM capacity (veh/h) Free 0% 15 0.92 16 185 30 0.92 0.92 201 33 217 217 4.1 2.2 98 1335 COMIVEVIff Volume Total Volume Left Volume Right cS H Volume to Capacity Queue Length 95th (ft) Control Delay (s) Lane LOS Approach Delay (s) Approach LOS 217. 0 201 1700 0.13 0 0.0 0.0 4 Free 0% 15 0.92 16 Stop 0% 135 0.92 147 None 15 0.92 16. 198 117 198 117 6.4 6.2 3.5 3.3 81 98 764 927 5_. 49 163 33 147 0 16 1335 778 0.02 0.21 2 20 5.2 10.8 A B 5.2 10.8 B itgai 21* Average Delay 4.7 Intersection Capacity Utilization 33.9% Analysis Period (min) 15 ICU Level of Service A 9/19/2006 Felsburg Holt & Ullevig Synchro 6 Report K:1061511Synchro12030 Tota112030 PM.sy7 HCM Unsignalized Intersection Capacity Analysis 3: County Road 331 & County Road 311 my re1 gt-W WM 'P , <M. Lane Configurations 4 1+ r Sign Control Stop Stop Free Grade 0% 0% 0% Volume (veh/h) 90 10 10 45 - 70 105 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 98 . 11 11 49 76 114 Pedestrians Lane Width. (ft) Walking Speed (ftls) Percent Blockage Right turn flare (veh) Median type None None Median storage veh) Upstream. signal (ft) pX, platoon unblocked vC, conflicting volume 207 152 266 0 0 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 207 152 266 0 0 tC, single (s) 7.2 6.6 6.6 6.2 4.1 tC, 2 stage (s) tF (s) 3.5 4.0 4.0 3.3 2.2 p0 queue free % 86 98 98 95 95 cM capacity (vehlh) 676 699 604 1076 1604 2030 Total PM Peak Volume Total 109 60 76 114 Volume Left 98 0 76 0 Volume Right 0 49 0 114 cSH 678 942 1604 1700 Volume to Capacity 0.16 0.06 0.05 0.07 Queue Length 95th (ft) 14 5 4 0 Control Delay (s) 11.3 9.1 7.4 0.0 Lane LOS B A A Approach Delay (s) 11.3 9.1 2.9 Approach LOS B A -Rge 4.SU nla `� °! ▪ fail i a° • - ttcs _ t� ;' a xtJaaArl Average Delay 6.5 Intersection Capacity Utilization 22.7% ICU Level of Service A Analysis Period (min) 15 9/19/2006 Synchro 6 Report K:1061511Synchro12030 Tota112030 PM.sy7 Felsburg Holt & Ullevig 7,1 HCM Unsignalized Intersection Capacity Analysis 4: County Road 346 & County Road 316 2030 Total PM Peak tltivernentAWEBEBT�'B2tNBL� 111B t1NBRNBIa= NB.'a NBA° SBLSBTSk Lane Configurations 4+ 44+ Sign. Control Stop Stop, Free Free Grade 0% 0% 0% 0% Volume (veh/h) 30 5 10 5 15- 45: 10 100 10 45 70 55 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 33 5 11 5 16 49 . '11 109 11 49 76 60 Pedestrians Lane Width (ft) Walking Speed (ftls) Percent Blockage Right turn flare (veh) Median type None... None Median storage veh) Upstream signal (ft), pX, platoon unblocked vC, conflicting volume 397 345 106 353 370 114 136 120 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 397 345 106 353 370 114 136 120 tC, single (s) 7.2 6.6 6.2 7.2 6.6 6.2 4.1 tC, 2 stage (s) tF (s) p0 queue free % cM capacity (veh/h) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 93 99 99 99 97 95 99 500 549 940 566 532 930 1430 4.1 2.2 97 1450 �at�cti ran Volume Total 49 71 130 185 Volume Left 33 5 11 49 Volume Right 11 49 11 60 cSH 564 761 1430 1450 Volume to Capacity 0.09 0.09 0.01 0.03 Queue Length 95th (ft) 7 8 1 3 Control Delay (s) 12.0 10.2 0.7 2.2 Lane LOS B B A A Approach Delay (s) 12.0 10.2 0.7 2.2 Approach LOS B B IffientAXIMan. Average Delay Intersection Capacity Utilization Analysis Period (min) = YViNOIMIM tV.43 4.2 32.1% ICU Level of Service 15 A 9/19/2006 Felsburg Holt & Ullevig Synchro 6 Report K:1061511Synchro12030 Tota112030 PM.sy7