Loading...
HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT BLRE-12-14-3485 Sanchez Drywall, Inc TBD Cliffrose Way, Pinyon Mesa GWS, Colorado 1) SEE PLAN ATTACHMENTS FOR BUILDING REQUIREMENTS. 2) OPEN -HOLE SOILS REPORT IS REQUIRED AT FOOTING INSPECTION, 1200 PSF. 3) A LOT IMPROVEMENT CERTIFICATE, SEALED BY A COLORADO LICENSED SURVEYOR, IS REQUIRED AT FOUNDATION INSPECTION TO VERIFY COMPLIANCE OF BUILDING ENVELOPE, SPECIFICALLY AT ROOF PROJECTIONS. 4) PROVIDE ENGINEERED TRUSS SHOP DRAWINGS AT FRAMING INSPECTION, TCLL 40 PSF. 5) ELECTRICAL ROUGH IN APPROVAL IS REQUIRED AT FRAMING INSPECTION. 6) ELECTRICAL FINAL INSPECTION IS REQUIRED FOR CO/FINAL INSPECTION.