HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT
BLRE-12-14-3485
Sanchez Drywall, Inc
TBD Cliffrose Way, Pinyon Mesa
GWS, Colorado
1) SEE PLAN ATTACHMENTS FOR BUILDING REQUIREMENTS.
2) OPEN -HOLE SOILS REPORT IS REQUIRED AT FOOTING INSPECTION, 1200 PSF.
3) A LOT IMPROVEMENT CERTIFICATE, SEALED BY A COLORADO LICENSED SURVEYOR, IS
REQUIRED AT FOUNDATION INSPECTION TO VERIFY COMPLIANCE OF BUILDING
ENVELOPE, SPECIFICALLY AT ROOF PROJECTIONS.
4) PROVIDE ENGINEERED TRUSS SHOP DRAWINGS AT FRAMING INSPECTION, TCLL 40 PSF.
5) ELECTRICAL ROUGH IN APPROVAL IS REQUIRED AT FRAMING INSPECTION.
6) ELECTRICAL FINAL INSPECTION IS REQUIRED FOR CO/FINAL INSPECTION.