HomeMy WebLinkAbout1.0 ApplicationWestern Slope Gas
Company
One Palk Central — 1515 Arapahoe Street
P. 0. Box 840 Denver Colorado 80201 (303) 534-1261
July 1, 1980
Mr. Davis S. Farrar, Assistant Planner
Garfield County Planning Department
Glenwood Springs, Colorado 81601
Dear Mr. Farrar:
JUL 9 1980
GARFIELD CU. i-
itR
Per our telephone conversation last week, please be advised that Western Slope
Gas Company intends to construct approximately 2.4 miles of 4" high pressure natural
gas pipeline in Western Garfield County for the purpose of gathering and trans-
porting natural gas to its customers in Western Colorado.
The location of the proposed gathering line is shown on the attached map. Most
of the proposed is on BLM lands with a small portion to be built on an easement to
be acquired from Young Ranches.
Also attached is proof of Western's regulation by the Colorado P.U.C. as re-
quested.
Construction will begin early fall 1980 and will take approximately 30 days to
complete. Restoration and revegetation will be done to BLM specifications with other
stipulations as may be required by Mr. Young.
If you have any questions or comments, please call me in Denver at (303) 571-
7681.
Very truly yours,
WESTERN SLOPE GAS COMPANY
J.W. Steck
Right -of -Way Agent
JWS:p1f
Attachments
Commissioners
EDWIN R. LUNDBORG, Chairman
EDYTHE S. MILLER
SANDERS G. ARNOLD
Executive Secretary
HARRY A. GALLIGAN. JR.
•
State of Colorado
RICHARD D. LAMM. GOVERNOR
DEPARTMENT OF REGULATORY AGENCIES
The Public Utilities Commission
500 STATE SERVICES BUILDING 1525 SHERMAN STREET
DENVER, COLORADO 80203
May 9, 1978
Western Slope Gas Company
c/o Public Service Company of Colorado
550 Fifteenth Street
Denver, Colorado 80202
Gentlemen:
ADMINISTRATION 1303) 892-3154
TRANSPORTATION 892-3171
FIXED UTILITIES 892-3181
COUNSEL 892-3188
The Commission has, for the last year or two, required each jurisdictional
utility to furnish to the Commission, answers to a "pass -on questionnaire".
The answers to the questionnaire were to be furnished to the Commission at
the time the utility filed for either rate relief or requested a pass -on
of costs. The "pass -on questionnaire" has also been referred to as "Appendix
A" and contained fifty questions.
We are now enclosing a revised "Appendix A Questionnaire" that contains only
twenty-four questions. The revised "Appendix A Questionnaire" will supercede
the old "pass -on questionnaire".
Your utility is requested to complete answers to the enclosed questionnaire
before June 15, 1978. Said answers should be submitted with an original and
two copies to the Chief of Fixed Utilities. The answers should be based on
a December 31, 1977, test year.
If your utility has furnished the Commission answers to the old "pass -on
questionnaire" based on a December 31, 1977, test year, you do not have to
furnishan_- - - . ii.rch 1 • • At that
time your utility shall file simultaneously with its annual report to this
Commission the answers to the enclosed questionnaire based on a December 31,
1978, test year.
The enclosed "Appendix A" questionnaire will be an annual requirement of your
utility. It should be completed each year using a December 31 test year and
filed with your annual report.
If you have any questions regarding this matter, please feel free to contact
the Fixed Utilities staff of this Commission.
.1I.
Very truly yours,
Harry A Galligan, Jr.
Executive Secretary
•
WESTERN SLOPE GAS COMPANY
COLO.. C. No. 2
Original 9
SHEET No
Colo PUC No 2 cancels
Colo PUC No 1 in its entirety CANCELS
SHEET No
MOFFAT CO.
A
RIO BLANCO CO.
0 Meeker
GARFIELD CO.
MESA CO.
Grand Valley
Debeque
0
Rifle
WESTERN SYSTEM
RIFLE -CRAIG AREA
LEGEND
Tronsmission Line ft=r,====w.m
County Line
Towns 0
Gathering System Points A
Craig
Q t- Hayden
1
New Castle
❑
Silt
Milner
0
Steamboat
Springs
ROUTT CO.
0
r�
N
EAGLE CO.
10.6 31
SCALE IN MILES
ADVICE LETTER No 55
DECISION OR
AUTHORITY No 8226
Frank B. Fry
I$ u1Na /110 CM
Vice President
TITLE
ISSUE DATE JulY 3, 1973
June 22, 1973
EFFECTIVE DATE