HomeMy WebLinkAboutApplication - PermitGARFIELD COUNTY
BUILDING, SANITATION,
and PLANNING DEPARTMENT
109 8th, Stree~ Suite 303
Glenwood Springs, CO 8164)1(970) 945-8212
I No. 6896
JobAddress 1'5'71 C~!iYft u. }3~r~f a f/bo;
NatureofWork Building Permit
=-~~
Contractor ~
Amount ofPermit$ 1(53. 3 i.f
;ct(?-· d-7V75 ~&/)~ ck. ()-.· ;7'Z. 5'1
Date¥ fC// !Cj9(/
c.~
Clerk
GARFIELD COUNTY BUILDING PERMIT APPLICATION
GARFIEW COUNTY (GLENWOOD SPRINGS), COLORADO
'UilEPHONEo (970) 945-8212 INSPECTION LINE: (970) 945-9159
Applicant to complete numbered spaces only. PERMIT NO. ----"=0"-'f!~· '-'~L--PARCEL/SCHEDULE NO.------
LOT NO. BLOCK NO. SUBDIVISIONIEXEMPTION
2
3 llC. NO:
4
5 9Q. Fr. OF Bun:.DUo/0 /054-9Q.Fr.OFLOT ~0. OFPLOORS Z-
6 USE OF Bun:.DUo/0
7 DESCBJBE WORK:
8 ctA!a OF WOIIX: ~ tJAL'l'ERATION
9 ~ ,~~ CAilPOli,T; tJDOUBLE
10 . tJ DIUV£WAYPI!D.Mn' tJON SR1! SEWAGE: DIBPOIJAL (SilPT!c)
VAI.UA'OONOFWUIIX; S AOJUS'ImVALUA110N:S
SPECIAL CONDillONS;
NOTICE
A SEPARAn ELEGilliCAL PERMIT IS REQUIRED AND MUST BE ISSUED BY TIIE 1>JA1E OF
COWRAOO.
PLAN CHECK~
-/117
THIS PERMIT BECOMES NUll.. ~1) VOID IF WORK OR CONSTRUCTION
AUTHORIZED IS NOT COMMENCED WITHrn 180 DAYS, OR IF CONSTIWCTION OR
S9
WORK IS SUSPENDEDORABANDONEDFORAPERIODOF lBO DAYS AT ANYTIME TOTAL FEE: J/ r'3 • 3, (
0 0
PEru..llT fEE:
DATE PERMIT ISSUED:
AFIERWORKISCOMMENCED. 70 · f
r-------------------~ I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED TillS APPUCATION AND
KNOW TilE SAME TO BE TRUE AND CORRECT. AlL PROVISIONS OF LAWS
GOVERNING TillS TYPE OF WORK Wll..L BE COMPLIED WITH WHETHER SPECIFIED
HEREIN OR NOT. THE GRANTING OF A PERMIT DOES NOT PRESUME TO GIVE
AlJTHORITY TO VIOLATE OR CANCEL TilE PROVISIONS OF ANY OTHER STATE OR
LOCAL lAW REGULATING OR TilE PERFORMANCE OF
OCC:GROUP: CONST: ITPE:
ZONThl'G. SETBACKS:
.HO:ME: ISDS NO. &. FEE:
AGREEMENT
PERMISSION IS HEREBY GRANTED TO TIIE APPUCANT AS OWNER, CONTRACTOR AND/OR TIJE AGE..l<.IT OF THE CONTRACTOR OR OWNER TO CONSTRUCT TilE STRUCTIJRE AS
DETA.ll..ED ON Pl.A.."N"S Ah"'D SPECIFICATIONS SU"BMITTED TO AND REVIEWED BY Tim BUllDING DEPAR.ThfENT.
IN CONSIDERATION OF THE ISSUANCE OF TinS PERMIT, Tim SIGNER HEREBY AGREES TO COMPLY WIT1i All. BUll.DING CODES AND LAND USE REGULATIONS AIXIPTED BY
GARF:Iill.D COUNTY PURSUANT TO AUTHORITY GIVEN rn 30.28.201 CRS AS AMENDED. THE SIGNER FURTIIER AGREES TIIAT D" TIIE ABOVE SAID ORDINANCES ARE NOT FUllY
COI\fi'LIED WITH ill THE LOCATION, ERECTION, CONSTRUCTION AND USE OF TilE ABOVE DESCRIBED STRUCTURE, THE PERMIT :MAY THEN BE REVOKED BY NOTICE FRO!VI
TilE COUNTY AND TIIAT TI1EN AND THERE IT SHAlL BECOME NUlL AND VOID.
Tim ISSUANCE OF A PERMIT BASED UPON PLANS, SPECIFICATIONS AND OIBER DATA SHALL NOT PREVENT 'IHE BUI[J)ING OFFICIAL FROM THEREAFTER REQUIRING TilE
CORRECTION OF ERRORS lli SAID PLANS, SPECIFJCATIONS AND 01HER DATA OR FRO PREVENTING BUilDING OPERATION BEING CAARIED ON TIIEREUNDER WHEN IN
VIOLATION OF THIS CODE OR ANY 01HER. ORDINANCE OR REGULATION OF TinS JURISDICTION.
THE REVIEW OF TIIE SUBMI'ITED PLANS AND SPECIFICATIONS AND INSPECTIONS CONDUC1FJJ THEREAFTER DOES NOT CONSTITUfE AN ACCEPTANCE OF A.....,l.
RESPONSIDTI...ITIES OR LIABD..ITIES BY GARFIELD COUNTY FOR ERRORS, OMISSIONS OR DISCREPANCIES. Tim RESPONSffin..ITY FOR THESE IIL\iS AND ll\o:IPLEJ\..!Eh'TATlOK
DIJRING CONSTRUCTION RESTS SPECIFICALLY WITH TilE .ARCIIIrnCT, DESIGNER, BUILDER AND OWNER. CO:r-.1MENfS ARE INTENDED TO BE CONSER.V ATIVE A. 'NO IN SUPPORT
~~~~'ERSJNTEREST. 1_1 ;}~f .
._..,..sw ..... vv..., I HEREBY ACKNOWlEDGE THAT I HAVE READ AND UNDERST A.."'D THE AGREEMENI' ABOVE. urrmJNIT"IAL&!,JlL.::__,='-'~::!....-"'---'---'-~---
3'/cJ-5/q J' cl t-<g, D f/ f7'l-J:1'
~-/~ tr2.
The following items are required by Garfield County for a final inspection:
I. A final Electrical Inspection from the Colorado State Electrical Inspector.
2. A permanent address assigned by the Garfield County Building Department posted where
it is readily visible from an access wad.
3. A finished roof, a lockable house, complete exterior siding, exterior doprs and windows
installed, a complete kitchen with cabinets, a sink with hot & cold running water, kitchen
floor coverings, counter tops and finished walls, ready for stove and refrigerator, all
-necessary plumbing.
4. A complete bathroom, with wash bowl, tub or shower, toilet stool, hot & cold running
water, all floors and walls finished and a privacy door.
5. All steps inside or outside over three (3) steps must have handrails. All balconies or decks
over 30" high mush have guardrails constructed to meet all 1994 UBC requirements.
6. Outside grading done to where water will detour away from the building.
7. Exceptions to the outside ste_ps, decks and grading may be made upon the demonstration
of extenuating circumstances, i.e., weather, but a Certificate of Occupancy will not be
issued until all the required items are completed and a final inspection made.
A CERTIFICATE OF OCCUPANCY WILL NOT BE ISSUED UNTIL ALL THE ABOVE
ITEMS HAVE BEEN COMPLETED.
"*"*CANNOT OCCUPY OR USE DWELLING UNTIL A CERTIFICATE OF OCCUPANCY
(CO.) IS ISSUED. OCCUPANCY OR USE OF DWELLING WITHOUT A C.O. WILL BE
CONSIDERED AN ILLEGAL OCCUPANCY AND MAY BE GROUNDS FOR VACATION
PREMISES UNTIL ABOVE CONDITIONS ARE MET.
I understand and agree to abide by the above conditions for occupancy, use ~the issuance of a
Certificate of Occupancy for the dwelling under building permit # £_<"} t, .
Signature Date
c:/cbw/final. wpd
GARFIELD COUNTY
BUILDING and PLANNING
Owners agreement for a permit to build a garage prior to building a residence
I, -.! & E. L-D. I"R-U EBL...:0c.9 D state that the garage built as
authorized by the permit for which I am applying will be used exclusively for storage of
automobiles or personal possessions and not for any residentail dwelling or commercial
purpose. I also state that a building permit for my home will be issued with one ( 1) year
of this agreement.
Name
Date
•
GARFIELD COUNTY BUILDING AND PLANNING
970-945-8212
MINIMUM APPLICATION REQUIREMENTS
for
SINGLE FAMILY DWELLING CONSTRUCTION
including
NEW CONSTRUCTION
ADDITIONS
ALTERATIONS
and
MOVED BUILDINGS
In order to understand the scope of the work intended under a permit application and expedite the
issuance of a permit it is important that complete information be provided. Adequate and complete
information will prevent delays in the plan review process. Reviewing a plan and the discovery that
required information has not been provided by the applicant may result in the delay of the permit
issuance and in proceeding With building construction. The owner or contractor may be required to
provide this information before the plan review may proceed. This causes delays because other plans
that are in line for review may be given attention before the new information may be reviewed after
it has been provided to the Building Department.
Please review this document to determine if you have enough information to design your
project and provide adequate information to facilitate a plan review. If you do not, it may be
helpful to obtain a book titled "Dwelling Construction under the Uniform Building Code".
This book is available to you through this department at our cost. Also, please consider using
a design professional for assistance in your design and a construction professional for
construction of your project.
To provide for a more understandable plan in order to determine compliance with the building,
plumbing and mechanical codes, applicants are requested to review the following check list prior to
and during design. Applicants are required to indicate appropriately and to submit the completed
check list at time of application for a permit.
I
• •
1. Is a site plcm, included that indicates the distances of the proposed building or addition to
property 'es, other buildings, setback easements and utility easements?
'{es .
2. Does the site plan include the location of the I.S.D.S. (Individual Sewage Disposal System)
and the distances toproperty lines, wells (on subject property and adjacent properties),
streams o~ l"'lter corirses?
'{es f,., r-[/
3. Does the site plan indicate the location and direction of the County or private road accessing
the property]/
'{ es. __ v-"'----
4.
5.
6.
7.
8.
9.
10.
Do the plans include a foundation plan indicating the size, location and spacing of all
reinforcin--g g ~ et in accordance with the uniform building code or p~amped engineered
design? :/ '
'{ es. _ ___: __ _
Do the plans indicate the location and size of ventilation openings for under floor crawl
spaces and the clearances required between wood and earth?
'{es. __ ~---
Do the plans i!ldicate the size and location ofventilation openings for the attic, roofjoist
spacess and ~flits?
'{es /
Do the pla~nincl e design loads as required under the Uniform Building Code for roof
snow loads, (a · ·mum of 40 pounds per square foot in Garfield County), floor loads and
wind loads?
'{es __ _:_ __ _
Does the plan include a building section drawing indicating foundation, wall, floor and roof
construction? · /
'{ es. __ ..l::_ ___ _
Does the building_section drawing include size and spacing of floor joists, wall studs, ceiling
joists, roof r¥s or joists or trusses?
'{es './
Does the building section drawing or other detail include the method of positive connection
of all columm/and beams?
Yes, __ ~~---'-----
2
..
11. Does the plan indicate the height of the building or proposed addition from the highest point
of the building or addition measured at mid span between the ridge and the eave down to
existing grade contours?
Yes V
12. Does the plan include any stove or zero clearance fireplace planned for installation including
make and ;nodel and Colorado Phase II certifications or phase II EPA certification?
Yes v No ______ _
13. Does the plan include a masonry fireplace including a fireplace section indicating design to
comply with the Uniform Building Code <;;hapter 37?
Yes No V _ ___::____ ___ _
14. Does the plan include a window schedule or other verification that egress/rescue windows
from sleeping rooms and/or basements comply with the requirements of the Uniform Building
Code? ,/ Yes ' No -------
15. Does the plan include a window schedule or other verification that windows provide natural
light and ventjlation for all habitable rooms?
Yes '· · No -------
16. Do the plans indicate the location of glazing subject to human impact such as glass doors,
glazing immediately adjacent to such doors; glazing adjacent to any surface normally used as
a walking surface; sliding glass doors; fixed glass panels; shower doors and tub enclosures
and specifY Sl!fety glazing for these areas?
Yes r: /.A' No ------
17. Is the location of all natural and liquid petroleum gas furnaces, boilers and water heaters
indicated on the plan?
Yes t-l /I\ No ------
18. Do you understand that if you are building on a parcel of land created by the exemption
process or the subdivision process, are building plans in compliance with all plat notes and/or
covenants?.
Yes f·! '\ No -----
19. Do you understand that if you belong to a homeowners association, it is your responsibility
to obtain written permission from the association, if required by that association, prior to
submitting an application for a building permit? If you do not have written permission from
the association, do you understand that the plan check fee will not be refunded should the
architectural, committee deny or reject your building plans?
Yes IIi;> No -------
3
20. Will this be the only residential structure on the parcel?
Yes No If no-Explain t.J Dr-:;,-'k\·: ,'i ;,,: ~'/'. i-
22. Is this an application for the placement of a manufactured home?
Yes No~.---=--:--"-'---:--:-.
If yes, have you specified the size of the unit (min. 20ft. x 20ft.); live roofload (min. 40#);
wind design (min. wind speed of80 mph & 15 lb. wind load); foundation design; method of
anchoring?
Yes. ____ _
23. Have you designed or had this plan designed while considering building and other
construction code requirements?
Yes • No _____ _
24. Does the plan accurately indicate what you intend to construct and what will receive a final
inspection by .the Garfield County Building Department?
Yes ,./ No _____ _
25. Do you understand that approval for design and/or construction changes are required prior
to the application of these changes?
Yes 1 No ------
26. Do you understand that the Building Department will collect a "Plan Review" fee from you
at the time of application and that you will be required to pay the "Permit Fee" as well as any
"School Impact" or "Septic System" fees required, at the time you pick up your building
permit?
Yes No _____ _
27. Are you aware that twenty four (24) hour notice is required for all inspections?
Inspections will be made from Battlement Mesa to West Glenwood in the mornings and
from Glenwood Springs to Carbondale in the afternoon. Morning inspections must be
called in by 12:00 p.m. the day before; afternoon inspections must be called in by 5:00
p.m. the day before. Failure to give twenty four (24) hour notice for inspections will
delay your inspection one (1) day. Inspections are to be called in to 945-9159.
Yes \· No _____ _
28. Are you aware that you are required to call for all inspections required under.the Uniform
Building Code including approval on a final inspection prior to receiving a Certificate of
Occupancy 3Jild occupancy of the building?
Yes '/ No ______ _
4
29. Are you aware that the person signing thePermit Application, whether the
"Owner", "Agent of the Owner", "General Contract«", "Contracror", O£
otherwise, is the party responstble for the project complying with the Uniform
Building Code?
~/ Yes ___ _ No ___ _
30. If you are accessing a county road and do not have an existing driveway you will
need to acquire a driveway permit from Garfield County Road and Bridge. Their
phone number is 945-6111. You will need to show proof prior to the issuance of
the building permit.
I hereby acknowledge that I have read, understand and answered these questions to
the best of my ability .
..j~ti/,,Q_ 8 -2.4~98
signature date
Phone: 3 7 'I·., 8 ~~ys);
Project Name: wo~ 'I<.S Hop I OF "Pic.£.
;
ProjectAddress:4577 CouAJT'( ~At> ~'37
Notes:
If you have answered "No' on any of the questions, you may be required to provide this information at the
request of the Building Official prior to beginning the plan review process. Delays in issuing the permit
are to be expected. Work may not proceed without the issuance of a permiL If it is determined by the
Building Official that additional infonnation is necessary to review the application and plans to determine
minimum compliance with the adopted codes, the application may be placed behind more recent
applications for building permits in the review process and not reviewed until required information has
been provided and the application rotates again to first position for review, delay in issuance of the permit
or delay in proceeding with construction.
Per App 02.95 Effective August 15, 1995
5