Job No. 114 496A
Subject: Observation of Excavation, Proposed Jaime Residence, 3911 County Road
100, Garfield County, Colorado
Dear Mr. Revilla:
As requested, a representative of Hepworth-Pawlak Geotechnical, Inc. observed the
excavation at the subject site on November 3, 2014 and performed backfill compaction
testing on November 14 and 18, 2014 to evaluate the soils exposed for foundation
support. The findings of our observations and recommendations for the foundation
design are presented in this report. The services were performed in accordance with our
agreement for professional engineering services to you, dated November 4, 2014.
The proposed residence will be a single story double -wide modular home supported on a
spread footing foundation. The foundation has been designed based on an assumed
allowable soil bearing pressure of 2,000 psf.
At the time of our initial visit to the site, the foundation excavation had been cut in one
level from 0 to 4 feet below the adjacent ground surface and filled about 2 feet deep at the
west end. The soils exposed at design footing elevation consisted of natural sandy silt
and clay in the majority of the excavation and recently placed, relatively soft sandy silt
and clay fill at about the westernmost 10 feet of the building area. No free water was
encountered in the excavation and the soils were slightly moist. Results of swell -
consolidation testing performed on two relatively undisturbed samples of the natural
sandy silt and clay, presented on Figure I, indicate relatively low compressibility under
existing low moisture conditions and light Ioading, a low to moderate collapse potential
(settlement under constant load) when wetted, and high compressibility potential under
additional loading. A large bulk sample of the on-site sandy silt and clay fill was
obtained and tested for standard Proctor to provide a reference value for compaction
testing. The Proctor test results are presented on Figure 2.
Parker 303-841-7119 • Colorado Springs 719-633-5562 • Silverthorne 970-468-1989
Porforio Revilla
November 19, 2014
Page 2
We recommended to you to remove the existing fill from below footing areas and bear on
the underlying natural soils or replace it with structural fill, compacted to at least 98
percent of standard Proctor density to re-establish design footing grade.
The fill at the west end of the building area was reportedly re -worked and on November
14 we performed a nuclear gauge compaction test at the west footing line. The test
indicated relatively low compaction at moisture content about 4 percent below optimum.
The upper foot of under footing fill was then removed and the exposed fill surface was
reportedly re -compacted using a walk -behind double drum vibratory roller. The top foot
of fill was then replaced with compacted 3.i inch aggregate base course. A nuclear gauge
test performed on November 18 in the compacted aggregate base course below the west
footing line indicated the material was compacted to 98 percent compaction as
recommended. Our field compaction test reports are attached for reference.
Considering the conditions exposed in the excavation and the nature of the proposed
construction, spread footings placed on the undisturbed natural soil or suitably compacted
structural fill designed for an allowable soil bearing pressure of 2,000 psf can be used for
support of the proposed residence with a risk of settlement due to the variable bearing
conditions. The exposed soils tend to compress when wetted and there could be post -
construction settlement of the foundation if the bearing soils become wet. The settlement
could be 1 to 2 inches assuming a limited depth of wetting and compressible soils of
about 10 feet. Footings should be a minimum width of 20 inches for continuous walls
and 2 feet for columns. Loose and disturbed soils in footing areas should be compacted.
The bearing soils should be protected against frost and concrete should not be placed on
frozen soils. Exterior footings should be provided with adequate soil cover above their
bearing elevations for frost protection. Continuous foundation walls should be reinforced
top and bottom to span local anomalies such as by assuming an unsupported length of at
least 14 feet. Foundation walls acting as retaining structures should also be designed to
resist a lateral earth pressure based on an equivalent fluid unit weight of at least 55 pcf for
on-site soil as backfill. It will be critical to keep the bearing soils dry to prevent
settlement and building distress. Backfill placed around the structure should be
compacted and the surface graded to prevent ponding within at least 10 feet of the
building. Landscape that requires regular heavy irrigation, such as sod, and sprinkler
heads should not be located within 10 feet of the foundation and preferably only consist
of xeriscape.
Job No. 114 496A
Porforio Revilla
November 19, 2014
Page 3
The recommendations submitted in this letter are based on our observation of the soils
exposed within the foundation excavation and do not include subsurface exploration to
evaluate the subsurface conditions within the loaded depth of foundation influence. This
study is based on the assumption that soils beneath the footings have equal or better
support than those exposed. The risk of foundation movement may be greater than
indicated in this report because of possible variations in the subsurface conditions. In
order to reveal the nature and extent of variations in the subsurface conditions below the
excavation, drilling would be required. It is possible the data obtained by subsurface
exploration could change the recommendations contained in this letter. Our services do
not include determining the presence, prevention or possibility of mold or other biological
contaminants (MOBC) developing in the future. If the client is concerned about MOBC,
then a professional in this special field of practice should be consulted.
If you have any questions or need further assistance, please call our office.
Sincerely,
HEPWORTH - PAWLAK GEOTECHNICAL, INC.
Thomas J. Westhoff, CET
Reviewed by:
Steven L. Pawlak, P.E.
TJW ksw
Attachments Figure 1, Swell -Consolidation Test Results
Figure 2, Proctor Compaction Test Report
Earthwork Compaction Test Reports dated 11`14, 1814
Job No. 114 496A
Compression
Compression %
0
1
2
3
4
5
6
7
0
1
2
3
4
5
6
7
__,0
Moisture Content = 8.4 percent
Dry Density = 95 pcf
Sample af: Sandy Silt and Clay
From: Bottom of Excavation at Northeast Corner,
11-3-14
Compression
upon
wetting
0.1
1.0 10
APPLIED PRESSURE - ksf
100
_„,3
Moisture Content = 9.1 percent
Dry Density = 97 pcf
Sample of: Very Sandy Silt and Clay
From: Bottom of Excavation at East Side, 11-3-14
Compression
upon
wetting
0.1
1.0 10
APPLIED PRESSURE - ksf
100
114 496A
H
Hepworth—Pawlak Geotechnical
SWELL -CONSOLIDATION TEST RESULTS
Figure 1
` COMPACTION TEST REPORT
-
112.5
110
°,
1
1 ..
I
Will
1
107.5
•
,_
0
a
N
c
ru
a'
in
105(
hh
•
102.5
ZAV for
Sp.G. =
2 40
9
100
10,5 12 13.5 15 16.5 18 19.5
Water content.
Test specification: ASTM D 698-OOa Method A Standard
Elevl
Depth
Classification
Nat.
Moist.
Sp.G.
LL
PI
% >
#4
% <
No.200
USCS
AASHTO
TEST RESULTS
MATERIAL DESCRIPTION
Maximum dry density m 110.0 pcf
Optimum moisture = 13.5 %
Sandy Silt and Clay
Project No. 1 14496A Client: Porforio Revilla
Project: 3911 County Road 100, Garfield County, Colorado
o Location: Under Footing Fill Sample Number: 231-14
Remarks:
Figure 2
Hepworth-Pawlak Geotechnical, Inc.
Glenwood Springs, Colorado
Tested By: KO
Checked By: TJW
Gtech
HEPWORTH - PAWLAK GEOTECHNICAL
5020 County Road 154
Glenwood Springs, Colorado 81601
Phone: 970-945-7988
Fax: 970-945-8454
hpgeo a(�hpgeotech.com
Earthwork Compaction Testing Report
Client: Porforio Revilla
105 Summit Drive
Unit B
Carbondale, Colorado 81623
Job No.: 114496A Day: Friday
Date: 11/14/14
Page: 1 of 1
Project: Proposed Jaime Residence, 3911 County Road 100, Garfield County, Colorado
Weather: Cloudy, calm, snow overnight Temperature: 26° at 8:30 am
Earthwork Contractor: Porforio Revilla
Equipment Used:
Mini -hoe, Wacker RT walk -behind double drum roller
Description of Earthwork Fill below west footing line of proposed residence was tested. Results indicate
Tested: unacceptable compaction at about 4 percent below optimum moisture.
Verbal Communication: Porforio Revilla was informed of our test results.
Placement and Compaction Procedure: Not observed by HP Geotech.
Lift Thickness: Max. Rock Size:
Compactor(s) Used:
Test
No.
Location
Moisture
Conditioning:
Number of Passes:
Nuclear Gauge Moisture/Density Test Results
Fill below west footing One
Depth or
Elev.
Field Dry
Density
(pcf)
Field
Moisture
Content
Field
Comp.
(%)
1
5' N of SW building corner
footing
grade
93.8
9.5
85
Min.
Comp.
Req.
(%)
98
Proctor
Lab No.
231-14
Proctor Sample Reference:
Lab No.
Method
Description
Max. Dry
Dens. (%)
Opt.
Moist. (%)
231-14
ASTM D 698
Sandy Silt and Clay
110.0
13.5
THIS rtcrun i rncaeNTS OPINIONS AS A RESULT OF OUR UBSERVATIONSOF FILL PLACEMENT, WE NAVE RELIED ON THE CONTRACTOR TO CONTINUE APPLYING THE RECOMMENDED
COMPACTIVE EFFORT AND MOISTURE TO FILL DURING THE TIMES WHEN OUR OBSERVER IS NOT OBSERVING OPERATIONS
THE NUCLEAR DENSOMETER METHOD OF TESTING WAS USED IN SUBSTANTIAL ACCORDANCE WITH ASTM D 6938
TJW/
Thomas J. Westhoff, CET Steven L. Pawlak, P.E.
Field Technician Reviewed By
Gtech
HEPWORTH -PAWLAK GEOTECHNICAL
Client: Porforio Revilla
105 Summit Drive
Unit B
Carbondale, Colorado 81623
Project:
5020 County Road 154
Glenwood Springs, Colorado 81601
Phone: 970-945-7988
Fax: 970-945-8454
hpgeo hpgeolech.com
Earthwork Compaction Testing Report
Job No.:
114496A Day:
Date:
Page:
Tuesday
11/18/14
1 of 1
Proposed Jaime Residence, 3911 County Road 100, Garfield County, Colorado
Weather: Clear, calm, dry
Earthwork Contractor:
Temperature: 35° at 2:00 pm
Porforio Revilla
Equipment Used:
Description of Earthwork
Tested:
Verbal Communication:
Mini -hoe, Wacker RT walk -behind double drum roller
314 inch aggregate base course placed as fill in the westernmost 10 feet of
proposed building area was tested. Results indicate acceptable compaction at
about 1.7 percent below optimum moisture.
Porforio Revilla was informed of our test results. He stated that they had
removed a foot of the fill and then compacted the exposed surface with several
passes of the walk -behind roller. The top foot was then replaced with 314"
aggregate base course compacted with the walk -behind roller.
Placement and Compaction Procedure:
Not observed by HP Geotech.
Lift Thickness:
Compactor(s) Used:
Max. Rock Size:
Moisture
Conditioning:
Number of Passes:
Test
No.
Location
Nuclear Gauge Moisture/Density Test Results
Fill below west portion of building
area
Depth or
Elev.
Field Dry
Density
(pcf)
Field
Moisture
Content
Field
Comp.
(%)
1
Center of west footing line
footing
grade
130.2
5.8
98
Min.
Comp.
Req.
(%)
98
Proctor
Lab No.
Typ.
Proctor Sample Reference:
Lab No.
Method
Description
Max. Dry
Dens. (%)
Opt.
Moist. (%)
Typ.
TYIC OL 6f1oT deccc..Tc.
ASTM D 698
�n...,n.,.. . n . nwn•,. r w� w
314 Inch aggregate base course (typical value)
..... ..-�.�.-�� �... -. _ ��_ _-_ _
134.0
7.5
COMPACTIVE EFFORT AND MOISTURE TO FILL DURING THE TIMES WHEN OUR OBSERVER IS NOT OBSERVING OPERATIONS
THE NUCLEAR DENSOMETER METHOD OF TESTING WAS USED IN SUBSTANTIAL ACCORDANCE WITH ASTM O 6938
WE HAVE RELIED ON THE CONTRACTOR TO CONTINUE APPLYING THE RECOMMENDED
TJW/
Thomas J. Westhoff, CET Steven L. Pawlak, P.E.
Field Technician
Reviewed By