Loading...
HomeMy WebLinkAboutApplicationSCANED Community Development Department 108 8th Street, Suite 401 Glenwood Springs, CO 81601 (970) 945-8212 www.Rarfield-countv.com TYPE OF CONSTRUCTION ® Commercial/Multi-Family BUILDING PERMIT APPLICATION Demolition ❑ Manufactured Home (SF or Duplex) ❑ Residential (SF, Duplex, orTownhome) ❑ Reroof INVOLVED PARTIES Property Owner: Encana Oil & Gas (USA) Inc Phone: ( 305 ) 623-2300 Mailing Address: 370 17th Street, Suite 1700. Denver, CO 80202 Kuersten Construction (general) Contractor: Westem Slates Reclamation (sub) 0113 Powerline Road, RItle, CO 81650 Mailing Address: 1560 0 Road, Loma, CO 81524 970 625-8210 Phone; ( 970 ) 858-7982 Architect: NIA Phone: ( Mailing Address: Engineer: Rock Solid Solutions Phone: ( 970 ) 903-3028 Mailing Address: 195 Lodgepole Circle, Parachute, CO 81635 Manufactured Home Installer: N/A Phone: ( Mailing Address: PROJECT NAME AND LOCATION Describe Work: Build an approximately 1,039 linear foot animal barrier fence around P-32 water impoundment Job Address: SESE Section 32 Townshi• 5S Ran s e 95W Assessor's Parcel Number: 213527300015 sub. Lot Block Owner's Valuation of Work: $ 6,000 Property Size (Sq.Ft or Acres): —26.442 acres Sq.Ft of Building: Class of Work: Garage: Septic: Type of Heat: N/A Height: 8 ft # of Floors: NIA ® New ❑ Alteration ❑ Addition ❑ Attached ❑ OWTS O Natural Gas 0 Propane ❑ Repair ❑ Move/Relocation O Detached O Community Driveway Permit: 0 Exempt 0 Electric 0 Other O Permit #: NOTICE Authority. This application for a Building Permit must be signed by the Owner of the property, described above, or an authorized agent. If the signature below is not that of the Owner, a separate letter of authority, signed by the Owner, must be provided with this Application. Legal Access. A Building Permit cannot be issued without proof of legal and adequate access to the property for purposes of inspections by the Building Division. Other Permits. Multiple separate permits may be required: (1) State Electrical Permit, (2) County OWTS Permit, (3) another permit required for use on the property identified above, e.g. State or County Highway/ Road Access or a State Wastewater Discharge Permit. Void Permit. A Building Permit becomes null and void if the work authorized is not commenced within 180 days of the date of issuance and if work is suspended or abandoned for a period of 180 days after commencement. CERTIFICATION I hereby certify that I have read this Application and that the information contained above is true and correct. I understand that the Building Division accepts the Application, along with the plans and specifications and other data submitted by me or on my behalf (submittals), based upon my certification as to accuracy. Assuming completeness of the submittals and approval of this Application, a Building Permit will be issued granting permission to me, as Owner, to construct the structure(s) and facilities detailed on the submittals reviewed by the Building Division. In consideration of the issuance of the Building Permit, I agree that! and my agents will comply with provisions of any federal, state or local law regulating the work and the Garfield County Building Code, OWTS regulations and applicable land use regulations (County Regulation(s)). I acknowledge that the Building Permit may be suspended or revoked, upon notice from the County, if the location, construction or use of the structure(s) and facility(ies), described above, are not in compliance with County Regulation(s) or any other applicable law. I hereby grant permission to the Building Division to enter the property, described above, to inspect the work. I further acknowledge that the issuance of the Building Permit does not prevent the Building Official from: (1) requiring the correction of errors in the submittals, if any, discovered after issuance; or (2) stopping construction or use of the structure(s) or facility(ies) if such is in violation of County Regulation(s) or any other applicable law. Review of this Application, including submittals, and inspections of the work by the Building Division do not constitute an acceptance of responsibility or liability by the County of errors, omissions or discrepancies. As the Owner, I acknowledge that responsibility for compliance with federal, state and local laws and County Regulations rest with me and my authorized agents, including without limitation my architect designer, engineer and/ or builder. 1 hereby acknowledge that I have read and understand the Notice and Certification above as well as have provided the required information which is correct and accurate to the best of my knowledge. 1/2 SS -- Date /Op/'oa Property Owner Print and Sign OFFICIAL USE ONLY Spedal Conditions: Adjusted Valuation: 4,60). = Pian Check Fee: 48/ yr Permit Fee: 1R,5, as Manu home Fee: \\I a Misc Fees: OM Total Fees: i . C24'481.`11 Fees Paid: Balance Due: '75/5 a`.5 BP No: OWTS o: FMC -M13 II - Setbacks: 2.5-3 OCC Group: Const Type: Zoning RI_ BUILDING / PLANNING DIVISION : y` 17?t4.3 / 2T /( igned Approval , ate ke L[ %•61`5 Contacts Building Plan Review Description of Work: Insta119039 linear ft animal barrier fence Bin #: Location Address: Sec32, TOSS, R95W PARACHUTE, CO General Information Case Manager: David Bartholomew Plan Case Number: BLDG -1-15-8204 Parcel: 213527300015 Application Date: 01128/2015 Owner: EnCana Oil and Gas Applicant: EnCana Oil and Gas Applicant Phone: (970)285-2656 Email: jasoneckman@encs Building Planning/Zoning 1 r 4 Engineered Foundation 11 Driveway Permit / 30ft Stream Setbacks Surveyed Site Plan / Flood Plain Septic Permit and Setbacks , _Building height GradelTopography 30% / Zoning Sign -off Attach Residential Plan Review ListRevei ieImpact Fees Minimum Application Questionnare fr/1* HOA/DRC Approval Subdivision Plat Notes J Grade/Topography 40% IFire Department Review _ planning Issues 7 / Valuation Determination/Fees Subdivision Plat f Red Line PlanslStampslSticker property Line Setbacks Attach Conditions Application Signed Plan Reviewer To Sign Application ParcellSchedule No. /vl4 40# Snowload Letter - Manu. Homes A791 Soils Report Thursday, January 29, 2015 General Comments: V141/1 v/i &ve /0,5 Sai!%l/ SPU' NOTE: If any required information is missing, delays in issuing the permit are to be expected. If determined by the Building Official that additional information is necessary to review the application and/or plans for compliance, the application may be placed on hold until the required information is provided. Work may not proceed without the issuance of a permit. The Building Division will collect a Plan Review fee at time of application submittal. The Permit Fee, as well as any Septic or Road Impact fees will be collected when the permit is issued. The permit application must be signed by the owner or by a person having written authority from the owner to act as their representative. I hereby acknowledge I have read, understand, and will abide with the requirements of this checklist. /6/21 e4.1 ire .7 Property Oder Print and Sign J Date /z� Garfield County Community Development Department 108 811' Street, Suite 401 Glenwood Springs, CO 81601 (970) 945-8212 www.garfield-countv.com COMMERCIAL OR MULTI -FAMILY BUILDING PERMIT APPLICATION CHECKLIST COMMERCIAL OR MULTI -FAMILY BUILDING PERMIT APPLICATION CHECKLIST In order to understand the scope of work intended and to expedite the issuance of a permit, it is important that complete information be provided. Please review this document to determine if you have adequate information to design your project and to facilitate a plan review. APPLICATION FORM: Please make sure the following information is provided on the application. • Parcel number obtained from the County Assessor's Office. • Job address (assigned physical address). • Legal Description: lot, block, filing, subdivision or tract, section, township and range. • Owners name, mailing address, phone, fax, or cell. • Contactors name, mailing address, phone, fax, or cell. • Architect/Engineer's name, mailing address, phone, fax or cell. • Building size, height, number of stories, lot size. • Use of building (commercial) • Class of Work (new, addition, alteration, repair, demo, move, other) • Description of work. • Type of heating (natural gas, propane, electric, other) • Sewer system (Community or OWTS), also see other items below. • Garage (attached or detached) • Driveway permit (please see other items below) • Valuation (labor and materials) OTHER ITEMS: • If you anticipate obtaining a water -tap from the City of Rifle, please provide a letter indicating that the City will provide water service. (Required to submit building permit application). • OWTS requires a septic permit application to be submitted with the building permit application. • A separate electrical permit must be obtained from the State of Colorado Electrical Board. • At the time of building permit submittal, you are required to show proof of legal and adequate access to the site. This may include proof of right to use a private easement, County Road & Bridge permit, or Colorado Department of Highway permit, including a Notice to Proceed. The County Road & Bridge Department can be reached at 970-625-8601. • If you anticipate excavating or grading prior to issuance of a building permit, you will be required to obtain a separate grading permit. • If you belong to a Homeowners Association, it is your responsibility to obtain written approval, if required. • Provide copies of any Resolutions and/or Land Use Permits associated with this property. • Projects with more than 10 occupants require plans sealed by a Colorado Licensed Design Professional. Occupant load shall be calculated by IBC Table 1004.1.1. • A Colorado State Licensed Electrician and Plumber must perform installation and hook-ups. BUILDING PLANS: 2 sets of plans must be submitted. Plans must be 18"x24" minimum size, complete, identical, legible, and to scale. Certain projects may also require a third copy of the plans be submitted to the local Fire District for review prior to permit issuance. All plans will be checked at the counter for completeness. If any of the required information is missing, the building permit application cannot be accepted. SITE PLAN: Please make sure the following information is provided on the site plan. • Property address/legal description. • North Arrow and Scale on each page. • Show all property lines, building envelopes, flood plain, and easements. • Provide setback distances from boundaries, buildings, septic, well, and waterways. • Location and direction of the county or private road and driveway accessing the property. • Proposed and existing structures include sheds, barns, decks, patios, and any other buildings. • Existing and proposed grade, positive drainage around structure (to be contained on site). • Streams, rivers, creeks, springs, ponds and ditches. • Existing and proposed wells, septic tanks, leach fields, and other systems. (if applicable) • Retaining walls (engineer stamped detail required for walls over 4 ft, measured from bottom of footing to top of wall). NOTE: Any site plan depicting the placement of any portion of the structure within 50 feet of a property line or not within an established building envelope shall be prepared, stamped, and signed by a licensed surveyor. For structures to be built within a building envelope, provide a copy of the recorded subdivision final plat with the proposed structure located in the building envelope. COVER SHEET: • Project identification. • Project address and/or legal description. • Design specifications to include building use and occupancy classification, type of construction, building height and area calculations, occupant load, and fire sprinkler systems. ARCHITECTURAL PLANS: Please provide the following information on the architectural plans. • Per C.R.S. 12-4-112; Structures designed with an occupant load exceeding 10 require Colorado State Licensed Design Professional stamped plans. • Minimum 4 elevations (N,S,E,W) • Floor plans for each level including dimensions and scale noted. • Clearly label each room or space (office, storage, mechanical, elevator, etc). • Wall types; clearly labeled and referenced. Identify all fire resistive wall construction. • Construction details for all fire resistive elements referenced on floor plans and cross sections. Include wall, floor/ceiling, roof/ceiling, shaft wall assemblies, and structural frame. Provide the fire resistive listing number referenced on each assembly detail. (ex. UL P123) • Window & door sizes, types, and operation and direction of swing noted on the floor plan. • Specify roof slope/pitch, roof covering, and siding materials. • Energy design specifications/details for R -values, U -factors, and SHGC's per IECC. • Stair and guard details specifying rise, run, height and spacing. • Accessibility; show compliance with accessibility requirements for all elements of the building per IBC, Chapter 11 and ICC/ANSI A 117.1, ADA, FHA, and UFAS. STRUCTURAL PLANS: Please provide the following information on the structural plans. • Per C.R.S. 12-4-112; Structures designed with an occupant load exceeding 10 require Colorado State Licensed Engineer stamped plans. • Engineered foundation design per soils report. Geotechnical report referenced. • Design specifications to include roof and deck snow load, wind and seismic design, frost depth. • Foundation plan showing complete footing and foundation dimensions. • Footing and foundation details specifying reinforcement referenced on plans. • Framing plans for each floor level and roof. All beams, columns, joists, rafters, trusses and all live/dead loads specified. • Framing /connection details referenced on plans. • Pre -manufactured structures require an engineers stamp, signature, and date. MECHANICAL PLANS: Please provide the following information on the mechanical plans. • Per C.R.S. 12-4-112; Structures designed with an occupant load exceeding 10 require Colorado State Licensed Engineer stamped plans. • Energy design calculations and details verifying compliance with the 2009 IECC. • Floor plans for each level showing size, location and materials of all ductwork, plenums, return and outside air intake registers. • Size and location of all combustion air ductwork and openings. • Size, type and termination of all gas appliance flues and vents. • Location of all fire and combination smoke/fire dampers. • Equipment schedule for all mechanical equipment (boiler, furnace, exhaust fans, etc). • Commercial kitchen hood location, hood and duct sizes, CFM calculations. PLUMBING PLANS: Please provide the following information on the plumbing plans. • Per C.R.S. 12-4-112; Stnactures designed with an occupant Toad exceeding 10 require Colorado State Licensed Engineer stamped plans. • Floor plans for each level showing DWV layout and sizing, materials, slope and sewer location. • Water piping materials, length and size of pipe, water meter location, fixture unit demands, location and type of backflow prevention devices. • Gas piping materials, length and size of pipe, gas meter location, and BTU/hour demands. • Additional piping plans for roof/deck drains, condensate, medical gas, etc. • Plumbing fixture schedule for all plumbing equipment. • Commercial kitchen plumbing fixtures, food preparation equipment, grease interceptors, etc. ELECTRICAL PLANS: Please provide the following information on the electrical plans. • Per C.R.S. 12-4-112; Structures designed with an occupant load exceeding 10 require Colorado State Licensed Engineer stamped plans. • Floor plans for each level showing location of lighting fixtures, switches, receptacles, emergency exit signs and lighting, and panel location. • Diagram showing service entrance, conduit/wire size, main disconnect size, grounding electrode/conductor size, feeder conduit/wire size, transformers and generators. • Panel schedule showing bus/breaker sizes, circuit description, voltage, phase, amperage, etc. LINN Energy January 28, 2015 235 Callahan Avenue Parachute, CO 81635 Phone: (970) 285-2200 Andy Schwaller Building Department Garfield County 108 8th Street, Suite 401 Glenwood Springs, CO 81601 Re: Garfield County Resolution 2013-48 P-32 Produced Water Impoundment and Material Handling Facility Dear Mr. Schwaller, Attached is a Building Permit application for the animal barrier fence that was constructed around the P-32 water impoundment. This application is being submitted to accommodate Condition of Approval number 10 of the Land Use Permit. Legal and adequate access to the site was established during Land Use Permitting process and is shown in the Carry and Earning Agreement included with this permit. LINN Energy has the authority to construct the fence as evidenced by the Letter of Authority signed by Encana and Partial Assignment of Oil and Gas Lease and the Carry and Eaming Agreement. When LINN purchased Berry Petroleum's assets in the Piceance Basin all authorizations for Berry's operations transferred to LINN. The project site is located in the southern portion of Encana's North Parachute Ranch property. A copy of the LINN's Adjacent Surface and Mineral Ownership Map that was included in the original Land Use Permit application is included with this application package. A copy of the Land Use Permit is included with this application. Two complete sets of construction drawings are included. Please contact us if you have any questions regarding this fence. Sincerely, Tom Hogelin Construction Foreman www.linnenergy.com www.Iinnco.com