Loading...
HomeMy WebLinkAboutApplication - PermitProject Address 2130 CR333 SILT, CO OWner lnfonnatlon BJ M LTD Garfield County Building & Plann ing Department 1 08 8th Street Suite 401 G lenwood Springs , CO 81601· Phone: (970)9-45·8212 Fax: (970)384·3470 Pan:eiNo. Subdivision 240106400128 Addre&& 408 Rifle CT Broomfield CO 80020 Permit NO. BLC0-2-11-1907 Pennft Type: Commercial Building Wotk Classification: New Pennit status: Active Issue Date: 2/18/2011 Expires: 08/17/2011 Section Township Range Phone Cell 303-494-9258 Contractor(s) Phone Primary Contractor Required Inspections: Valenus Compressor Services, LP (713)744·6144 Proposed ConstnucUon I Details Job trailer for use during Hunter Mesa Compressor Station. FEES DUE FEES PAID Yes Valuation: $ 6,480.00 Total Sq Feet: 720 Fee Amount lnv Total Paytype Amt Paid Amt Due Commercial Building Fee Manufacture Fee Plan Check Fee Total: Friday, February 18, 2011 $139.25 $400.00 $90.51 $629.76 lnv # BLC0-2·11·20821 S 629.76 Credit Card Credit Card 5584 .75 $45.01 $0.00 ForiR&,.-ctlanecall : 1 (888)868-5306 Inspection IVR See Permit Record Building Department Copy 2 I \ I 2 3 4 5 6 7 8 9 GARFIELD COUNTY BUILDING PERMIT APPLICATION I 08 8'b Street, Suite 40 I, Glenwood Springs, Co 8160 I Phone: 970-945-8212 I Fax: 970-384-3470 /Inspection Line: 970-384-5003 www.gurficld-c ounty.com Parcel No: (!his infoiTillltion is available ntthe assessors orlicc 970-945-9134) 2401-064-00-128 Job Address: (if on address has not been llSsigncd, plc:ISc provide Cr, Hwy ur Street Nrunc & City) or and legal description 2130 County Road 333 Silt, CO 81652 Lot No : Block No: Subd./ Exemption: Owner: (property owner) Mailinfl Address: Ph: BJM Limited 408 Ri e Ct. Broomfield, CO 80020 303-410-2900 Contractor: Mailin~ Address: Ph: Valerus Compression Services, LP 919Mi amSte1000HoustonTX77004J 713-744-6144 Architect I Engineer: Mailing Address: Ph: Dean W. Briggs, P.E. P.O.Box40537GardenCity,ID83714 208-871-0200 S~ Ft. of Building: 72 S% Ft. or Acres of Lot: 57 .71 acres He~ht: 13'-" Usc of Building : Job trailer for use during construction of the Valerus-Hunter Mesa Compressor Station Describe Work: AltPh; AltPh: AltPh: No . of Floors: 1 Installation of a CDOH approved modular job trailer. Please call Phil Vaughan 970-625-5350 when permit is ready 10 Cluss of Work: !l New o Alteration o Addition II Garage: Septic: o Attached 0 Dctnched oiSDS oCommunity 12 Driveway Permit: Owners valuation of Work: $1,500 installation fees s NOTICE Al!!!!!!r!!l:· This application foro Building l'ennit must be oigned by the Owner of the property, described above. or an authorized agent. If the signature below io not that of the Owner, a sc:porate lcll"r of authority. signed by the Owner, must be provided "1th this Application. L~g•l Aocrss. A Building Permit cannot be irmd withour proof of legal and adequate access to the property for purposes of mspecrions by the Building Department Olhrr Ptrmlls. Multiple sc:parotc permits may be n:quiral: (I) Slllt~ Electrical Permit, (2) County ISDS Penni!. (3) another permit n:quin:d for usc on the property identified abol'e, e.g State or County Highway/ Roud Access or n State WllSiewater Ooschargc Permit. Void Prrmll, A Building Permit becomco null ond void if the work aurhorizcd is nol commenced within 180 days of the date of tssuonce and if work is suspcndcd or ob.-lndoned for a period of ISO days after commencement. CERTIFICATION I hcrcby certify thai I bn\·c n:Dd Ibis Application and tholthe info"""tion contained abol'e is true and correct. I understand that the Building Ocpanmcnt accepts the Application. along with the plans nnd spccific:llions nnd other data submitted by me or on my behalf (submit101ls). based upon my certification as to occurocy. Assuming completeness of the suboninals and approval ofdois Application, a Building 1'<-nnit will be issued granting permission to 111<:, as 0..11er,1o construct the structun:(s) and fuilirics delailcd on the submirtals reviewed by the Building Department. In consideration of the issuance oflhe Building Pcrmit.lagrcc that I and my aaents will comply with provisions ofony federal. state or local lzlw regulating the work and the G:ufoeld County Building Code,ISOS rc:Kulat ions and •Pf'lieable hind usc regulations (County Rcgul31ion(s)). I ll<knowlcdgc thatlhe Building Permit may be suspended or n:wkcd. upon notice from lhc County. if the IOQtion , constnKtion or usc oflhc structurc(s) and facilil)1ics), described above, 11n: nut in romplillnce "ilh County Rcgulotion(s) or any other DJllllieable low. I hereby grant permission to lhc Building lkpartmcnt to enter lhc property. described above. to inspc:CIIhc work. I funhcr acknowledge thotlhc inuancc of the Building Permit docs 001 pn:vcru the Building Officia l from : (I) requirins the concction of errors in lhc subminals. if My, disc:ol'crcd oflcr issuance; or (2) stopping construction or usc of the s11UC111rc(s) M facilil)1ics) if such is in violntion of County Rcgularion(s) or any olher opplicublc lnw. Rc:\·iow of this Application. including submiltals, and inspections of the work by the Building Dcpanment do not constirutc an accc:pl:lncc of n:sponsibility or liability by the County of cnors, omissions or discrcponcics. A•lhe O~~>ncr. I ocknowlcdge that responsibility for complioncc wilh fedcnl. state and local laws Md County Regulations rest with me and my authorized agents. induding -..ilhout limi101tion my Dn:hitect designer, ensincer nnd/ or builder. I HEREBY ACKNOWLEDGE. ntAT I HAVI! READ AND UNDI!RST AND THE NO TIC£ & C£RTIFICA TIOS ABOVE: ~-0\~~ OWNERS SIGNATURE - V\ v:. ~-l~-ll ~ERWf~i ~i~~ '55(p ~· O\\-oo 2/15/2011 DATE STAFF USE ONLY Adjusted V11IU11tlon : Manu home Fee : 6,'-180.00 o .SI L/00 . 00 ISDS Fee: Fees P11id : Bal11nc:e Due: -df>L\5·0\ S84. 75" Setb11c:ks : Z5', ZSj /0 OCCGroup: 15 ConstType: DATE Mise: Fees: ISDS No & Issued Date: Jim Wilson From: Sent: To: Subject: Jim, Phil Vaughan [phil@pvcmi.com) Tuesday, August 30, 2011 5:55 PM Jim Wilson Permit Partial Refund #1907 Thanks for the voice mail last week. Please issue a partial refund for permit #1907 back to my firm that was not constructed. Thanks for your assistance! Sincerely, Phil Vaughan Phil Vaughan Construction Management, Inc. 1038 County Road 323 Rifle, CO 81650 970-625-5350 1 .. Memo TO: Becky Wheelersburg FROM: Phil Vaughan CC: BLM Limited DATE: 8/31/2011 RE: BLC0-2-11-1907 ~ APPROVAL BY ANDY SCHWALLE~ NO REASON FOR REFUND: STOP construction AMOUNT OF REFUND: $ 139.25 !5. g.)l-1} THE REFUND SHOULD BE MAILED TO: •. NAME: Phil Vaughan MAILING ADDRESS: 1038 County Road 323 Rifle, CO 81650 VENDOR#: ~ S ~ '-J ACCOUNT#: O:J 0-~ ACCOUNT NAME{)\~~ f Invoice Date Vendor Name PHIL VAUGHAN Remittance Address 1038 CR 323 RIFLE CO 81850 Vendor Invoice Number 8/3112011 08312011 Fund 100 Garfield Coun Vendor Number 2584 Dept Sub Dept Account 17 070 3400 Purchase Order Number If Purchase Order is complete checkbox: Lioe Item Project # (If (64 Cbaraccen or appUcable) i.ell) BUILDING REVENUE SpccialloatrucdoiUI For Warrant Invoice BriefDucripdoa Dollar (64 Cbaraccen or wa) Amouot REFUND FOR BUILDING PERMIT# 1907 $139.25 Prepared By: BECKY WHEELERSBURG Total s 139.25 - By algolag below, I cerdfy tb:n aU ite ·e• bave beea received, loapecced, aod accepted; aod tbat tbla amouot is correct aod proper for paymenL Depanmeot Head Approval: DATR: September 2, 2011 PHIL VAUGHAN The following items are required by Garfield County for a final Inspection: 1) A final Electrical Inspection from the Colorado State Electrical Inspector. 2) Permanent address assigned by Garfield County Building Department and posted at the structure and where readily visible from access road. 3) A finished roof; a lockable building; completed exterior siding; exterior doors and windows installed; a complete kitchen with cabinets, sink with hot & cold running water, non-absorbent kitchen floor covering, counter tops and finished walls, ready for stove and refrigerator; all necessary plumbing. 4) All bathrooms must be complete, with washbowl, tub or shower, toilet, hot and cold running water, non-absorbent floors, walls finished, and privacy door. 5) Steps over three (3) risers, outside or inside must be must have handrails. Balconies and decks over 30" high must be constructed to alliBC and IRC requirements including guardrails . 6) Outside grading completed so that water slopes away from the building; 7) Exceptions to the outside steps, decks, grading may be made upon the demonstration of extenuating circumstances., i.e. weather. Under such circumstances A Certificate of Occupancy may be issued conditionally. 8) A final inspection sign off by the Garfield County Road & Bridge Department for driveway installation, where applicable; as well as any final sign off by the Fire District, and/or State Agencies where applicable. A CERTIFICATE OF OCCUPANCY (C.O.) WILL NOT BE ISSUED UNTIL~ THE ABOVE ITEMS HAVE BEEN COMPLETED. A C.O. MAY TAKE UP TO 5 BUSINESS DAYS TO BE PROCESSED AND ISSUED. OWNER CANNOT OCCUPY OR USE DWELLING UNTIL A C.O. IS ISSUED. OCCUPANCY OR USE OF DWELLING WITHOUT A C.O. WILL BE CONSIDERED AN ILLEGAL OCCUPANCY AND MAY BE GROUNDS FOR VACATING PREMISES UNTIL ABOVE CONDITIONS ARE MET. I understand and agree to abide by the above conditions for occupancy, use and the issuance of a C .O. for the building identified in the Building Permit. 2115/11 OWNERS SIGNATURE DATE Bapplicationdcccmbcr2007 Building Plan Review Description of Work: Job trailer for use during Hunter Mesa Compressor Station. Bin#: Location Address: 2130 CR 333 SILT, CO Case Manager: David Bartholomew Plan Case Number: BLDG-2-11-6731 Parcel: 240106400128 Application Date: 0211512011 I Building Engineered Foundation f'l(A Driveway Permit / Surveyed Site Plan !Jj/1 I Septic Permit and Setbacks / Grade/Topography 30% Nj /t L Attach Residential Plan Review List / Minimum Application Questionnare ;Jf1 Subdivision Plat Notes !l!/lt Fire Department Review / Valuation Determination/Fees 7 Red Line Plans/Stamps/Sticker / Attach Conditions 7 Application Signed I , Plan Reviewer To Sign Application 7 Parcel/Schedule No. / 40# Snowload Letter-Manu. Homes )Jjtl ' Soils Report Co11tacts Owner: B J M LTD Applicant: B J M L TO Applicant Phone: 303-494-9258 Emait Planning/Zoning / Property Line Setbacks / 30ft Stream Setbacks 7. Flood Plain B uilding height 7 zoning Sign-off )J(/1 Road Impact Fees /I( A HOAIDRC Approval / Grade/Topography 40% I Planning Issues I Subdivision Plat General Comments: V)fht,,rj, m 6 1 'I ?0. tJ o (i.ro P;,.9."o tu~U) /JI'J'HJI-/ee I ?9. it> ,R0/1 ~/'ee 9o.5/ ~~ ;:ee. -crc;o. 00 621r 7b -~.>. o I - GARFIELD COUNTY BUILDING AND PLANNING 970-945-8212 MINIMUM APPLICATION REQUIREMENTS FOR CONSTRUCTION OF COMMERCIAL OR MULTI-FAMILY RESIDENTIAL BUILDINGS Including NEW CONSTRUCTION ADDITIONS ALTERATIONS And MOVED BUILDINGS In order to understand the scope of the work intended under a permit application and expedite the issuance of a permit it is important that complete information be provided. When reviewing a plan and it's discovered that required information has not been provided by the applicant, this will result in the delay of the permit issuance and in proceeding with building construction. The owner or contractor shall be required to provide this information before the plan review can proceed. Other plans that are in line for review may be given attention before the new information may be reviewed after it has been provided to the Building Department. Please review this document to determine if you have enough information to design your project and provide adequate information to facilitate a plan review. Also, please consider using a design professional for assistance in your design and a construction professional for construction of your project. Any project with more than ten (10) occupants requires the plans to be sealed by a Colorado Registered Design Professional. To provide for a more understandable plan and in order to determine compliance with the building, plumbing and mechanical codes, applicants are requested to review the following checklist prior to and during design. Plans to be included for a Building Permit must be on draft paper at least 18"x 24"" and drawn to scale. Plans must include a floor plan, a concrete footing and foundation plan, elevations all sides with decks, balcony steps, hand rails and guard rails, windows and doors, including the finish grade and original grade line. A section showing in detail, from the bottom of the footing to the top of the roof, including re-bar, anchor bolts, pressure treated plates, floor joists, wall studs and spacing, insulation, sheeting, house-rap, (which is required), siding or any approved building material. Engineered foundations may be required. Check with the Building Department. A window schedule. A door schedule. A floor framing plan, a roofing framing plan, roof must be designed to withstand a 40 pound per square foot up to 7,000 feet in elevation, a 90 M.P.H. windspeed, wind exposure B or C, and a 36 inch frost depth. All sheets need to be identified by number and indexed. All of the above requirements must be met or your plans will be returned. All plans submitted must be in compliance with the 2003 IBC, IPC, lMC, IFGC, and IFC. Applicants are required to indicate appropriately and to submit completed checklist at time of application for a permit: 1. Is a site plan included that identifies the location of the proposed structure, additions or other buildings, setback easements, and utility easements showing distances to the property lines from each comer of the proposed structure prepared by a licensed surveyor and has the surveyors signature and professional stamp on the drawing? Slopes of 30% or more on properties must be show on site plan. (NOTE: Section 106.2) Any site plan for the placement of any portion of a structure within 50 ft. of a property line and not within a previously surveyed building envelope on a subdivision final plat shall be prepared by a licensed surveyor and have the surveyors signature and professional stamp on the drawing. Any structure to be built within a building envelope of a lot shown on a recorded subdivision plat, shall include a copy of the building envelope as it is shown on the final plat with the proposed structure located within the envelope. YesX --- 2. Does the site plan when applicable include the location of the I.S.D.S. (Individual Sewage Disposal System) and distances to the property lines, wells (on subject property and adjacent properties), streams or water courses? This information must be certified by a licensed surveyor with their signature and professional stamp on the design. Yes Not necessary for this project _X __ 3. Does the site plan indicate the location and direction of the State, County or private road accessing the property? YesX 4. Is the I.S.D.S. (Individual Sewage Disposal System) designed, stamped and signed by a Colorado Registered Engineer? Yes Not necessary for this project_X __ 5. Are the plans submitted for application review construction drawings and not drawings that are stamped or marked identifying them as "Not for construction, for permit issuance only", "Approval drawings only", "For permit issuance only" or similar language? Y esX Not necessary for this project __ _ 6. Do the plans include a foundation plan indicating the size, location and spacing of all reinforcing steel in accordance with the building code or per stamped engineered design? Yes_X__ Not necessary for this project __ 2 7. If the building is a pre-engineered structure, is there a stamped, signed engineered foundation plan for this building? Yes __ Not necessary for this project_X __ 8. Do the plans indicate the location and size of ventilation openings for under floor crawl spaces and the clearances required between wood and earth? Yes __ Not necessary for project_X __ 9. Do the plans indicate the size and location of the ventilation openings for the attic, roof joist spaces and soffits? Yes_X __ Not necessary for this project __ 10. Do the plans include design loads as required under the IBC or IRC for roof snowloads, (a minimum of 40 pounds per square foot in Garfield County)? YesX __ Not necessary for this project __ 11. Do the plans include design loads as required for floor loads under the IBC or IRC? Y es_X __ Not necessary for this project __ 12 . Does the plan include a building section drawing indicating foundation, wall, floor, and roof construction? Yes_X __ Not necessary for this project __ 13 . Is the wind speed and exposure design included in the plan? Y es_X __ Not necessary for this project __ 14. Does the building section drawing include size and spacing of floor joists, wall studs, ceilingjoists, roof rafters or joists or trusses? Yes_X __ Not necessary for this project __ 15. Does the building section drawing or other detail include the method of positive connection of all colwnns and beams? Yes_X __ Not necessary for this project __ 16 . Does the elevation plan indicate the height of the building or proposed addition from the undisturbed grade to the midpoint between the ridge and eave of a gable or shed roof or the top of a flat roof? (Check applicable zone district for building height maximum) Yes_x __ Not necessary for this project __ 3 17. Does the plan include any stove or zero clearance fireplace planned for installation including make and model and Colorado Phase II certifications or Phase II EPA certification? Yes __ Not necessary for this project_X __ 18 . Does the plan include a masonry fireplace including a fireplace section indicating design to comply with the IBC or IRC? Yes __ Not necessary for this projectX __ 19. Does the plan include a window schedule or other verification that egress/rescue windows from sleeping rooms and/or basements comply with the requirements of the IBC or IRC? Yes __ Not necessary for this project~ 20. Does the plan include a window schedule or other verification that windows provide natural light and ventilation for all habitable rooms? Yes_X __ Not necessary for this project __ 21. Do the plans indicate the location of glazing subject to human impact such as glass doors, glazing immediately adjacent to such doors; glazing adjacent to any surface normally used as a walking surface; sliding glass doors; fixed glass panels; shower doors and tub enclosures and specify safety glazing for these areas? Yes_X __ Not necessary for this project __ 22. Do the plans include a complete design for all mechanical systems planned for installation in this building? Yes_X __ No Not necessary for this project'---- 23. Have all areas in the building been accurately identified for the intended use? (Occupancy as identified in the IBC Chapter 3) Yes_x __ Not necessary for this project'---- 24. Does the plan indicate the quantity, form, use and storage of any hazardous materials that may be in use in this building? Yes __ Not necessary for this project~ 25 . Is the location of all natural and liquid petroleum gas furnaces, boilers and water heaters indicated on the plan? Yes__ Not necessary for this project_X __ 26. Do the plans indicate the location and dimension of restroom facilities and if more than four employees and both sexes are employed, facilities for both sexes? Yes __ Not necessary for this project_X __ 4 27. Do the plans indicate that restrooms and access to the building are handicapped accessible? Yes __ Not necessary for this project_X __ 28. Have two (2) complete sets of construction drawings been submitted with the application? Yes_X __ 29. Have you designed or had this plan designed while considering building and othe r construction code requirements? YesX 30. Does the plan accurately indicate what you intend to construct and what will receive a final inspection by the Garfield County Building Department? YesX 31. Do your plans comply with all zoning rules and regulations in the County related to your zone district? For corner lots see supplemental section 5.05 .03 in the Garfield County Zoning Resolution for setbacks. YesX --- 32 . Do you understand that approval for design and/or construction changes are required prior to the implementation of these changes? Yes_x __ 33 . Do you understand that the Building Department will collect a "Plan Review" fee from you at the time of application and that you will be required to pay the "Permit" fee as well as any "Se ptic System" or "Road Impact" fees required, at the time you pick up your building permit? Yes~ 34. Are you aware that you are required to call for all inspections required under the IBC including approval on a final inspection prior to receiving a Certificate of Occupancy and occupancy of the building? YesX 35. Are you aware that the Permit Application must be signed by the Owner or a written authority be given for an Agent and that the party responsible for the project must comply with the Uniform Codes? Yes_x __ 36. Are you aware that you must call in for an inspection by 3:30 the business day before the requested inspection in order to receive it the following business day? Inspections will be made between 7:30a.m. and 3:30p.m. Monday through Friday. Inspections are to be called in to 384-5003. YesX 5 37. Are you aware that requesting inspections on work that is not ready or not accessible will result in a $50.00 re-inspection fee? YesX 38. Are you aware that prior to submittal of a building pennit application you are required to show proof of a legal and adequate access to the site? This may include (but is not limited to) proof of your right to use a private easement/right ofway; a County Road and Bridge pennit; a Colorado Dept. of Highway Pennit including a Notice to Proceed; a pennit from the federal government or any combination. You can contact the Road & Bridge Department at 625-860 I. See Phone book for other agencies YesX 39. Do you understand that you will be required to hire a State of Colorado Licensed Electrician and Plumber to perfonn installations and hookups? The license number will be required at time of inspection. YesX 40. Are you aware, that on the front of the building pennit application you will need to fill in the Parcell Schedule Number for the lot you are applying for this penn it on prior to submittal of the building pennit application? Your attention in this is appreciated. Yes_x __ 41. Do you know that the local fire district may require you to submit plans for their review of fire safety issues? Yes_X __ (Please check with the building department about this requirement) 42. Do you understand that if you are planning on doing any excavating or grading to the property prior to issuance of a building penn it that you will be required to obtain a grading pennit? Yes _x __ Not necessary for this project __ 43. Did an Architect seal the plans for your commercial project? State Law requires any commercial project with occupancy of more than 10 persons as per Section 1 004 of the IBC to prepare the plans and specifications for the project. Yes Not Necessary for this project _x ____ _ 44 . If you anticipate obtaining a water tap from the City of Rifle, please provide a letter indicating that the City will provide water service. No building pennit application will be accepted without such a letter. Yes 6 I hereby acknowledge that I have read, understand, and answered these questions to the best of my ability. 2/15/11 Signature Date 970-625-5350 Phone: ______ ( days); _________ (evenings) Valerus-Hunter Mesa Compressor Stat.-JobTrailer Project Name: a 2130 County Road 333 Silt, CO 81652 Project Address: ________________ _ Note: On any of these questions you may be required to provide this information. If required information is not supplied, delays in issuing the permit are to be expected. Work may not proceed without the issuance of the permit. *If you have answered "Not necessary for this project" on any of the questions and it is determined by the Building Official that the information is necessary to review the application and plans to determine minimum compliance with the adopted codes, please expect the following: A. The application may be placed behind more recent applications for building permits in the review process and not reviewed until required information has been provided and the application rotates again to first position for review. B . Delay in issuance of the permit. C . Delay in proceeding with construction. BpcommDec2007 7 CONDITIONS OF PERMIT BLC0-2-11-1907 Hunter Mesa Compressor Station Job Trailer 2130 CR-333 Silt, Colorado 1) ALL WORK MUST COMPLY WITH THE 20091BC AND MANUFACTURERS INSTALLATION SPECIFICATIONS. 2) ALL WORK MUST COMPLY WITH THE CONDITIONS OF THE CURRENT LAND USE CHANGE PERMIT. 3) PROVIDE INSPECTOR WITH ENGINEER STAMPED PIER AND HOLDOWN SCHEDULE FOR 60FT TRAILER LENGTH AT FOUNDATION INSPECTION. 4) LOCKS, LATCHES, LANDINGS PER 2009 IBC, SECTION 1008. 5) LIGHT AND VENTILATION PER 2009 IBC, CHAPTER 12. 6) ELECTRICAL FINAL APPROVAL IS REQUIRED FOR CO/FINAL INSPECTION. 7) MANUFACTURED OFFICE BUILDING APPROVED FOR JOB TRAILER ONLY. r. I ~ j I j I I ~ 3.i l LAND USE CHANGE PERMIT FOR A PORTION OF A 578.71-ACRE PARCEL OF LAND OWNED BY B.J.M.LTD LOCATED TWO (2) MILES SOUTH OF THE GARFIELD COUNlY AIRPORT ON CR 333 IN THE SW% OF SECTION 30, .TOWNSHIP 6 SOUTH, RANGE 92 WEST OF THE 6TH PM, GARFIELD COUNTY. PARCEL NO# 2401-064-00-128 In accordance with and pursuant to the provisions of the Garfield County Unified Land Use Resolution of 2008, as amended, and Resolution No. 2011-of of the Board of County Commissioners of Garfield County, state of Colorado, hereby authorizes , by Land Use Change Permit, the following activity: A COMPRESSOR STATION CONSISTING OF FIVE (5) NATURAL GAS COMPRESSION UNITS,. EACH WITH AIR-X-CHANGE COOLER UNITS AND ALL OF WHICH WILL BE HOUSED WITHIN INDIVIDUAL ACOU$TIC BUILDINGS. The Land Use Change Permit is issued subject to the conditions set forth in the above-mentioned resolution, and shall be valid only during compliance with such conditions and other applicable provisions of the Garfield County Unified Land Use Resolution of 2008,· as amended, Building Code, and other regulations of the Board of County Commissioners of Gartield County, Colorado. ATTEST: . J ,. ""'':"!•·' • ., j::!ll. cM.,·k •• L"'· JAN 27 19m I!Clcvp&.Qa e.;;-:HD.21. MlwllED ~RF, Rf:<:oRI.l£11 CERriPICATE OF LIMI~.P~RTNERSHIP aoox 564 r£ct367 2!: B • .J. M. L'l'l>. Tho undersigned, dcsiril~ to for~ A lindtcd p~rtncruhip pursuant to tho law:~ of tho StQte o( COlorado, hCJ~cby ccrti~:V o.~; fol.lovG: 1. Tho name of tho partncr~hip is B • .J.H. LTD . 2. 'l'bo c~r>lotor of tl1n bu:Jine:~s itS to ~cquirc title to certain rcnl c~tatc and other o.ssetu uGod in connection with o~ devoted to such prop~rty, :~ubjcct to eortmin liabilitio~ rclat<Xl t:hnroto; to hold such :lsset:s Cor invc:oblent purpos•tll und to conduct any businctos upcr::~tionu in connection thorowi th a: :~hell ba determined by thu p~rtnors . J. ~ho location of the principal place or businon~ uhall be at lUCie, colorn<lo, or at such other pl:~.co :lt> the qcnoral partner sn:lY d<ttermintl. -1. 'lhc:\ na1110 :and pJ.ncc oF ro~idcncc: of eocb IIK!naber: 1o ar. follow3: Gcnttr~l I.'<Jrt.ncr ~ Dnrbmra J. Horri~ Limited Partner~ ~ Jako Shaeffer l'rieda Sh4cHor 1\dclretls 20 south 3SI:h Stroot Boulder, Colorado 80303 0447 Rond 346 Rifle, Oolorndo 816~0 044.1 aond 346 nitlc, Colorado 01650 5. The term for which tho partnorahip is to c"ist co.-:nco!l upon the oxccul:ion ot: Artic:l.os or .t.i111itod Partner- ship by tho partners ;md tho proper filing of thi~ certificate and !lhall tor'lllinatc upon the\ h.lppcning of cny of the following even to: {a) The sale of all of the putncrship property; (b) Tho conoont or all 9enural pnrtncr~; or ·' -·--··---------------------------------------~~ CU'J< 56<1 rAGt368 (c) ·111~ death. rotircr~o':lt or ina~ity of tJ10 lact ourvivin9 gonoral partnor or tho tniluro of tho curviving 9oncral pnrtnBr, or partnoro, to cXQrci~o nn election to continuo the buz:in111111 :\S providod in tho 1\rt.icloc of L~itcd Partnership. 6. "rho a1110unt of caah and o dez:cription or and thll agreed voluo ot the other property ccntribut~d by tho limited partners oro au follows: Ill) each contribut.ccS by thu limited partners:: None (b) A doocription of ~nd the ayruod value of tho other property contributed by lieitod partncrc nrc ao follows: n•ol Estate and iftProv~ntz:: J:.lce Shllaffcr Pricc!a Shaeffer $ !1,000.00 s 9,000.00 7 . No nclclition:ll contrillut.ion:: h.'\va bcc•l agr-cud to be modo by any limited partner. 8. llo t.imu han bc"n o9reccl upon . ..,ho11 the contribution oi ~ho li~itod pftrtnor iu ta ll¢ returned. 9. Tho :dm:c of thq protitl!, or the othex eoropol\ant.ion by way ot inco~ which the li~itcd partner~ alll111 raeoivc by rc:.oon of their contribution9, i s ns follows: ~ Jake Shouftor Fr ioda SliDe f tor 37.5 37.5 10. 111t:1 lilaitc<l partner haa ~ ric;nt to sl!blltit.\ltc .;,n aa9igncc ~s contributor in hi~ ploco by o!(cring ~11 or any p:1rt: of Jlio intaraGt in the pnrtnorohip to tho otl~er portl\oro "'itll the ri<Jht of acceptaneo o~: rojcctio~< of a bono £ide written offor, cubjcct. to Arttclo xz of tho Article~. 11. Tho gcmcrill portr~ers ore given tho right. to 11d:nit oddition~l limited partnorc and to admit ony cucco~cor in intcrcot to o 90ncral ?Ortner os a llmitcd partnnr ln the ~annor Qat forth in tho ,\rticlo~. 12. No right 11:. !filion to nny limitocl pnrtnor to priority o\"c!:" other l.i..alitod portnora 011 to contributions or as to ll. On the danth, rctlrOMnnt or ino~nity of ~ ~onorol put'tner the z:(<ft:ain i ng 9cncr ol )lllrtnc't', or po:rtnorc, !Ulvc the 11flm' 564 racE369 right to cloct whether to continua tho limited p:n:tnoz:JJhip or Cli:saolvo and tCll:n\inat.e tho ::ramn. rccuivc propo~ty othor tl~n c:t!th in roturn for h$.~ contri- bution. 15. Uncli!X' the ptovil:ionc of tl1o 1\l·t.iclc:s of Limited Partnership. tho qanor:tl ~rtnC!r!:l hnvc the upocific .:..uthority to onteX' into any :tgroun.ontz:. 1)rov idinq !;or the mllnllg<~naont, O<llc) or otllDJ' dispooition or p:u,tnor:;h ~p M:ulot:a ond nny one or mo:r:o or cuch ganul:ztl ~rtncrc bra nuthorizod to uxecuto any and all clocumont• neccseary to convey or tran:~fcr title t.o >tny auch A!fllet:J, subject to Article IX of the hrticlc::. Dato4 this 15th doy of August, A.O. 19BO . ~~.cP.~~f!1~ ~'X'oda Sh:uldar LIMITP.D PhRTRERS STATE OP CW.ORl\00 COUNTY OF GARFIELD '1'nc forO!J011l9 CC1."tiflcato of Lilllitecl t'u~tnex-Ghip wus 8Ub~eribcd and oworn to before me this 15th d~y of August, A.D. 1980, by Ba~bArA J. Hor:i::, a8 Gcnor~l Partner, ~nd Jake Shaeffer and PricdA Sl~offor, ~s LiMited Pnrtnors, of B. J. •1. Ltd. , a Limited PartnerF.hip. WITNESS my b~nd and offleinl coal. My coTIIJIIission expirc:u 8/.3o 18:=. -3-souldor, color~o ·*'.I J .... /~ '.?.' SURFACE FACILITY EASEMENT This EASEMENT AGREEMENT is made and eotercd into effective as of the 1st day of May, 2007 (the "Effective Dafej by and between BJM, Ltd.~ a J.jmifM Partomsbip. whose principal place of business is 408 Rifle Court, Broomfield, Colorado 80020 (hcrciDafter '-orantor") and Autero Resource$ Pipeline Corporation, whose principal piKe of business is 1625 11• Street, Suite 300. Denver. Colorado 80202 (hereinafter "Oranteej. WHEREAS, Grantor owns certain property (the "Lands; located in the SW /4 Section 3D-T6S-R92W Garfield County, Colorado that Grantee is interested oocUpying for the purpose of installing. constructing. operating and mqjntaining certain gas handling facilities for collectiDg, separatin& compressin& dehydrating. treating and/or processing gas produced from wells into Gmntee~s pipeline system; and WHEREAS, Grantor desires to grant an exclusive easement to Grantee fur such purposes; NOW, 111EREFORE, in c:onsideration of the mutual promises conWned bercio, the receipt and sufficiency of which is hereby acknowledged, the parties enter into this Easement Agr=nent ("Easement; as follows: 1. Grant of Easement. Gnmtor hereby grants to Gran~ its successors and assigns, a free and unobstructed easement described on Exhibit A, to lay, construct, inspect, maintain, repair, operate, alter, replace; relocate, change the size 0~ abandon in place and remove at will, in whole or in part, pipelines for the transportation of oll, gas, petroleum and other gases, fluids or substances which can be traosportecl through a pipeUne and all appudeoaDt &cilities thereto, including without limitation, all drips, valves, fittings, ~ aerial markers, graphite and steel anodes and other devices for the control of pipeline corrosion, and similar appurtenances as may be necessary or convenient in the operation of said pipelinc(s) over, across, under and upon the 1ands described in Exhibit A, for the purposes of installing, constructin& operating and maintaining certain gas handling facilities for collecting, separatin& compressing, dehydrating, treating and/or processing gas produced from wells into Grantee's pipeline system. Grantee shall bave the right to expand or oontract the size of the Easement during the tenn of the Easement, at its sole discretion, as long as such expansion or contraction is coofined to the five {5) acre site described on the attached Exhibit A. 2. Term of Easemeqt. The term of the Easement shall be perpetual, from and after the Bffecti.ve Date, until canceUed in writing by Grantee. 3. Purpose of F!!'T"!'t. This Basement is granted for the purpose of allowing Onmtee the right to install, co~ operate, repair and maintain, on the Lands, a compression station, dehydration facilities, uming fapilities, processing facilities, Sudllcel:amcm~ wwyrcjJalcpbp spn ~. ac.). L..__.;:;...:..=;_=.~----~----------'-..:......----"----------"--·--· -- ptv .f ; .az;a;e;c: •·. 't« .. ... . -~ ~~II.W MPfl.l.n1MMIH IMI Rec.pUontl: 7Zlft2 1412112117 1Z:24:H PI! 8:1919 P:IJM4 Je't!, ftl!!!fJ~ CO 2 of 1 Reo FM:S35.ee Doa Fe1:8.IGI GMf't..._.. -UJ•o • separation equipment, btnldings, pipeline connections, tanks. buildings, and fixtures necessary, in its judgment, for the safe and successful operation of the facilities. Grantee shall have the full, ftee, and exclusive use of the surface of the Lands during the term of this Easement. together with tbe right of ingress and egress to and 1ivm the Lands, and ~ over, and across other ·lands owned by Grantor. The route of the access road to the Lands shall be ag;eed upon between Grantor and Grantee, and Grantee shall co~ct an~ majntain such access road from Co~ Road 333 to the LaDds at its sole cost and risk. 4. Eaujpment Ownership and Termiwmon. All equipment, fixtures, and facilities pW:ed on the Lands by Gran~ shall be and remain the property of Grantee. Grantee sbal1 notify Grantor in writing if it wishes to terminate the Easement. Upon notification of termination of this Easement, Grantee sball have a reasonable time, not to exceed 180 days, in which to remove all of Grantee's equipment, fixtures, aDd facilities. However, Grantee shaD be aUowed to abandon in-place all below ground piping by purging such piping with inert gas, water or mud and assigning such piping to Otaotor. Following the termination of this Easement, Grantee shall restore the Lands, within reasonably acceptable industry ~ to its original condition as required by all applicable rules, orders, laws and tegnlations. S. ~-Grantor sball pay the real ...., taxes on the Lands. Grantee shall pay all business property, personal property, ad valorem or other similar taxes assessed against any struc~ ~ equipment, fixtures, and f8cilities placed on the Lands by Grantee. 6. Site Maiptm•rg, Grantee shall construct and meintsin a security fence around the perimeter of the Easement area where any of the above ground equipment is located. The fencing material sba1l be approved by the Grantor. The access gate sba11 be kept locked and secure when Grantee's personnel are not present The color used for painting the facilities and used on the side of any buildings housing the equipment shall also be approved by Grantor. The access road(s) to the site shall be properly graded, drained. graveled and maintained by Otantcc for the term of the Easement Grantee sbalJ keep the Easement fi:ee and clear of all debris, litter and noxious weeds. Grantee sball operate and maintain the Easement and all equipment located on the Easement in accordance with all applicable rules, laws, orders and regulations. 7. Access to Records. Grantor shall have access to Grantee's construction, operation and maintenance drawings and records, including ~y required reports. notices, plans, tests or other documents during Grantee's normal business hours in the office where Grantee maintains such records. However. Grantor may be required to sip a Confidentiality Agreement prior to reviewin$ such data or information if such information requested by Grantor is not within t1Je public domain. ' I • ·~ • • I ' ' 8. AssiemnenL This rights granted herein may be assigned in whole or in part. 9. CovCIUIDt Rwming with the Land. This Easement, and all of its terms and provisions shall extend to and be binding on the heirs, devisees~ executors, administmlors, representatives, successors and assigns of Grantor and Oranme and shall be a covenant running with the Land. 10. Uabllity and !ndsnnific&tiou. Grantee coveuants and agrees to fully defend, protect, indemnify and hold harmless Orautor, its officers, directors, parln~ principals, employees and agents, from and against any and all claims, demand or cause of action and any associated liability, east or expense (including but not limitm to reasonable attorney fees and costs incurred in defense of Grantor and its agents), for any damages or losses incurred in connection with Grantee's constructi~ operation or maintenaoce activities located on the Easement or upon any of the equipment located thereon. 11. Ap_plication of Law· This Easement shall be applied and construed in accordance with Colorado law, without regard to 1he conflicts of laws principles 1hercof. Additioually, Onmtee shall comply with all applicable rules, orders and regulations of the Colorado Oil &: Gas Conservation Commission ("CCGCCj, or its successor organization, in connection with Grantee's operations upon the Lands for the term of the Easement 12. Recorded .Document This Easement shall be recordea by the Orantee, and a copy of the recorded document sball be provided to Grantor. (I'HE REMAINDER OF TinS PAGE IS INTENTIONALLY LEFT BLANK) L._ __________________ • .._, -...;;..·· __,_. ---------·--· .. -- '7"t 0 •• • •' ..... • 0 ·.~ .. 0 .... , .. ' ~ ·--· '~ ... ·.,~·! , . :t"·,. •o • In witness whmo( Grantor and Grantee have executed this Agreement on the dates set forth in 1he acknowledgments below. GRANTOR: B.JM.LTD. By; /.iur.dn.L Z;; ~ Name: Barbeu'a J. rris GRANTEE: ANTERO RESOURCES PIPELINE CORPORATION ~=~~~~~~~~~ Name: Mark D. Mauz Title: Vice President ACJ(NOWLEDGMENTS STATE OF COLORADO § COUNIY OF Qu.• 6• ,t/ ~ The foregoiDg iustrumeDt is acknowledged before me this Z. ( ,. day of A~ 2007, by Barbara J. Morris, on behalf of~ Ltd. Witness my hand 8Dd official seaL My cxnnmjssioo expires: h 2. Y].i>ll STATE OF COLORADO § § COUNTY OF DENVBR § Witness my hand and offici~~: .. My commission expires: ~ s.rr.:c Easemalt Apcmcnt '!I'W!!.oiled...,.,..cga My Commission E)cpiAIS 0511912007 surr.:c F.ecsneal~ WWW,gUmclm!jygn a!!l! EXHIBIT A (see auadted lUTey plaa) . ' .......... ~ ......... ...... i ·~·Fii I Ill I ,._.., ow. ... owaa aKA _, UDM _, U12Ac.. 8..J.M.J.:m -3 U30Ac. ~ .-.~c. eo.pnaor Site EUiblt B.J.M. LTD. Phperty SbMe t. Lut311111 Lut_., Sec. 30. TOWIIIIIip 68. R811Ff2 W Gfllll &Ia P.M.. Camdy of Garfield, &!lie ofColcadD. . - 8.ULL10. ft'IOJ.cJ64.410-128 ---- a .. ua. Lm. 112401.(164.0Q.l21 c..pnaor Site EsJdltlt B.J.M. LTD. Property Sial!: laLot3 IIIII La14, Sec. 30. '10wiiiWp 6 S.RDF92 W ofdllt&k P.M., OMit)'ofGm&ld, 51* ofeaa.lo. • ,r .,. • • ..... A I'ARICI'I. 01' LUfD srru.tJBIII GOURIIMBin" LOT .t AND OCJValtJIDI1' Un" .f 01' s.:tiOll 30, 20WJIIIMP6 SOUJII. JWfGil9lllt'JI81'01'mBSDmfMfliiCII'A£. MBRIDMW. CDUiriYOI' adPJIIDSD!BCJII'Clrlf.OIWJO. &VD.PJUIICZtCWI..UD_, IDIS.I'A.It21alt.tRT DJIP PJN''AB~ CXWl+i !fiO:tltOAT'IJfll $UUJffti&SJ'C'XlRIIMCJII'a:nolr :tONIIIUJIIIJIUIICM'J.S. JKl JISIN6 I'OfRfDIII J'UI:lir; 2'JII'lllarMJIJ'IWJn .,._JJJIJIZI"70DBIOIIITCJII' &aDN&4 1-=s lflJw:w"&.t1!UJ ~ DfUa!IIJIS'IH'.WIV66.DIIIBSr,mBifCIIIIOJ~.f6S..fJ .PUr, 27BICB81151"311W'a +f&Of /Cn';mD\2 S05'1faWW.fH.GJillolm 2JIDIIK:B lr&S'IH35"1V.SM..DJIIIBJ:'IRMCB81J'SJ'S6"1FMIJ.IISI'liBr.Tiflrlallfff'S'r.W1V3D.85 .PJia'2DJJIBIGD'OI'........, IWDMIICIELOJP.LIIJDQ)IIri'NJDIIUs.DOOACBSMlllll C:Wl.BII!. RIGIITOF WAY DBSCRIPnON A A SDliPOI' LAliD .snuullllf~lm'.f OP .-:nDW 30. 2DIDSNIPIS.w.JUJJI; IWI08 a waJ'cwnm6DaflJIJIIIICI'AI.AIDIIIWt t:OlJitf'rtwtM-.oS!ldBOI' aJUJIWlO. SN.Psn~~~>or IAIID I.J'DIO u..sna:rmttAa~.srnaormBJIOUOMIIIO DISQCBD~ IX1MMirJWWJ AM!fB tiOUIIIfii//II'OQRIQ:R 01' SBCIJOif 30AII AUJIIIlllliiCAP J.S. Ml. lSIHii JIOOIIDIII ~ DIBNCilfDJ'\QSt:l A&OJIIO nm Wlrln'.UUOI' &41DIIBICDOf(30 ~ l'Df'2DDB :ntrSI'Oilri'OI' BIICIIJfJiliiO: JJIBIIICIII.MWIIOS41D wamRI.YI.ID _,'OT3l"JI: A£01110 MID aamrRr.ld 17./Zl ,_,.2tM IOIIITOI'IJiliiliSIICIJUif;1fti!IRSIDJ~ A£C»>IMID CIUmlll1JimM7.:MSJIIIIrr2DA l'ODfJ'CWnauat'S wtallafiWD~ CXIRIIBRSIICnDif :»..as~ 1257.22; n.taarCX1IIrJJimMJ.JIJIOiiMDIV/rrOI' llmiii:SIICIJOI ... 'Vr.IJ"JI:A£01110 SUD CiUD&fiiDr _,._,.nzr. 2RIIIIICS a:lfiDimiD A£01110 MIDaanauD~827.JO IBS!'toA I'OIIfTONtRB lf&S'IJial.riiiOIIl'OII WAYOI''nllt0tamlri'IPJIU8~ 2RB J1IRiaat WRBM:ItllWDIJOUJ'IIVIIIt/J CXIfriiD SIC7mlf SO MAiiiSS78 ~ J.n&a .PU2' RJOHrOF WAY DBSCRIPlJON B A CRJPOI' LAliD am.IADIIIOCWBitJIMBifJ' LOt 3 OIISICJJQW 3Q. lOW--6~ JWar aa wmn'OllmB Sflmll'lliiiCIM£ ~ OIJII1lti'YOI'~SDU8or COWP4IlO, MIDBIJIII'Ol' LdD U'INO J:J.5,_,.1011ACllmSCJ/117RBIOUDWDO Dl!!ln!JMD CUDslrl.llrBt aBDIIfiDM7KI'mBSOfiJtiiiiii8'TaliUDC#~ MINI AWI8UIICAI"L8. .110. ISIH6 mu.DIII~ 2MIM3 MIJ~ALOI/OmB...,.UifliOI'SiiiDSIIICnDir:tO l413.0f l'flll1'10~1011trt:Jft Wldlftt 7JI.IMZl&UllWI&uD WJI!mriU'UIIB811'091fJ'B A£01110&UD aarJZRUIIB 7&.41 nlaJO'IIIIl~ ---=-S.UOSOI11fii1BW'CDRN.IR SIICIIDII :tO B&UlB SIH'38'4SIV l.f'l.f.W J1Dr. -~. -.. ~~·:. ,_ .... , """~ '-4-"-o ~ ANTERO RESOURCES Antuo Resources 162517th Street De~ CoiOBdo 80202 Office 303.357.7310 Fo1~ lQ3357.7315 STATEMENT OF AUTJIORITY Pursuant to C.R.S. §38-30-172, the undersigned executes this Statement of Authority on behalf of Antero Resources Pipeline Corporation, a Delaware Corporation. an entity other than an individual, capable of holding title to real property (the .. Entity"'), and states as tbllows: The name of the Entity is Antero Resources PipcJine Corporation, and is funned under the lnws of the state of Delaware. The mai1ing address for the Entity is 1625 17 111 Street, Denver, Colomdo 80202. The und(..>rsigned hereby certifies that Mr. Mark D. Mauz, Vice President, at the mailing address of 1625 17111 Street, Denver, Colorado 80202, had the full and proper corporate power and authority on behalf of the Entity to enter into that certain land lease agrc.-ement between the Entity and Barbara J. Mol'ris on May I, 2007. Signature: Name (printed): Title: (f) STATE OF-=-=---·_) ) COUNTY OF~ V ) ~~~~-- Glen C. Warre , Jr. President, Chief · ial Otticer and Secretary Antero Resources Pipeline Corporation ****•*** The foregoing instrument was acknowledged betbrc me this \ ~duy of~ Witness my hand and official seaL My commission expires: 1J f1?} dD I £ I (SEAL) - ILYJH£ HOWELL Notary Public State or Colorado r CONSENT AND AUTHORIZATION Leaseholder to Third Party Agent -Hunter Mesa Project Oalc: July 2S. :wt 0 Tt) (htdidd Cuunly Builtling und Plmtning Department: As Ot':.mtc~ ul'thc Surl;tcc f-acility Easement dated May I. 20()7 lhr the suhjcct pmpcrly dc...;crihcd and depicted below, Antoru Resources l,ipdinc Curporutiun ( .. Anh .. 'fo") gives Cllnscnt ond authorizatiun m Valcrus Compri!Ssion Sct'vici.'S, I ,P tn he its duly aulhOI'ii':cd ill!Cill in preparing. and submitting an application f{n· a Land Usc Change f'crmit, g.rading p~!nnit <tntl ossoci<ltcd building. pcnnit$, f(,r the cunstructi1m nnd operation of o 5-unit natura( gas compressor station mul dchydmli~m Htdlity that will connect the site wirh th"~ existing gathering system pipeline. Pm·ccl I 1.15~ ac\'cs~ Parcel 2 -1.5 I 2. acres: and t>arccl 3 2.330 ncrcs. Of l,~trc~J Number 240 I -064-00-128: , ........ _, t+LOfOO •O t .. loto'oottt!•••t f•,..,,,t;'lto .. tl .. • '"til l•ttl•t•• I l' ttl.,, ... .,, ...... ,_.,,,,. •• I \2 I II • '''''"' ..... , .. , \thtt'"'"" ,,:)C. 1:-11 r : c I ,..,,.,., '\otl1ro ... ._ c ·t• ~.,a ,.,., ..... t tf~ tl .... , ... , ....... , t 't• ott•h• It f,,.,.,, '·•r I If .t~o• .. · .... '•t' I• It tl •, fl t t '111 .\t ' ;•,•:• \t t!\l ''.t.'• • l~t If I • 't "'If • -'' ,,._. •, ., •••• ,.,,., .... ,.t:: '•\thm:•\•·~!• -:., .. t •• ;-.~.h ... "' •• •~ •t .\~ .. n · • ,. &~t:< • , ... flU \\I n ,t t ,, • ~ ........ ... 1 A • "'l r 'll• ., ..... •I ·~ ..... <f'.fftt .. ::_: ::: r -1- , I , ......•• ,H' ... I \ ...... ·~·· ......... h . \o tot t~ I 'll···f t l'•fl••·''' t ........ ... f .,, '•oru••l'l ~1•U I ••• $ I ~~ .._,tt 1 ,,,.,. t.o•tu:t1 ,, .. ••••• \,,, • . • ..... .... ··--· .,., I•! t: I ,. ' ,.....,_ ... .,.,.. ~~ •• ANTERO RESQUR(:ES Antero Resour~ 7625 17111 Saeet Oenve~ Colorado 80202 Offict 303.357.7310 fax 303J57.7l15 STATEMENT OF AUTHORITY Pursuant to C.R.S. §38~30-172. the undersigned executes this Statement of Authority on behalf of Antero Resources Pipeline Corporation ~ a Delaware Corporation, an entity other than an individual, capable of holding title to real property (the ·•Entity''), and states as follows: The name of the Entity is Antero Resources Pipeline Corporation, and is fonned under the laws of the state of Delaware. Tho mailing address tor the Entity is 1625 17m Street, Denver, Colomdo 80202. The undersigned hereby certifies that Mr. Alvyn A. Schopp, Vice President, at the mailing address of 1625 17111 Street, Denver, Colorado 80202, had the full and proper corporate power o.nd authority on behalf of the Entity to authorize Valerus Compressjon Servic~, LP (or any of its affiliates) to construct a compressor station on lhat certain Hunter Mesa compression site, which is the land teased from Barbara J. Morris on May 1, 2007. Signature: Name (printed): Title: STATEOF W _) ) COUNTY OF!)( \'\UJ ( ) en,J President. C tef Financial Officer and Secretory Ant en• Resources Pipeline Corporation The foregoing instrument was acknowledged before me this }~day of Oc:b\o{;v': 2010by _______ ,onbehalfof _______ __,,n _ _,_ ____ -=-- Witness my hand and otlicial seal. My commission expires: ~t:; I at>Vit ILmtE HOWEU. Notary Public State of ColOradO / . STATEMENT OF AUTHORITY Pursuant to C.R.S. §38-30-172, the undersigned executes this Statement of Authority on behalf ofValerus Compression Services, LP. a Texas limited partnership. an entity other than an individual, capable of holding title to real property (the "Entity"), and states as follows : The name of the Entity is Valerus Compression Services, LP and is fonned under the laws of Texas. The mailing address for the Entity is 919 Milam Street, Suite 1000, Houston, Texas 77002. The name of the pel'son authorized to represent the Entity is Kerry Galvin, its Senior General CounseL Senior Vice President and corporate Secretary. Authority is hereby granted to the person named above to bind the Entity in the authorization of ERO Resources Corp. (through Aleta Powers, its duly authorized representative) and Phil Vaughn Construction Management, Inc. (through Phil Vaughn, its duly authorized representation) to prepare, submit and execute permit applications for the Antero Resources Hunter Mesa Compressor Station in Garfield County, Colorado as well as authorize the aforementioned companies througlt their respective representatives to speak at any public hearings regarding such permit applications, if reguired. The authority granted hereunder is limited solely to the above-mentioned purposes. This Statement of Authoti ty will expire on the earlier to occw· of 1) the date the above- referenced permits have been secured fl'Om Garfield County or 2) May 31, 2011. Signature: f'Ji:; ~ Name (pl'inted): Peter Lane Title: CEO and Managing Director Valerus Compression Services, LP ******** STATEOFTEXAS ) ) COUNTY OF HARRIS ) The foregoing instrument was acknowledged before me this 11th day of October, 2010 by Peter Lane, on behalfofValerus Compression Services LP, a Texas limited partnership. Witness my hand and official seal. ~ 'I# /? () My commission expires : January 24, 2011/11 ~ ~,..,...........,,..,...,,..,.,.,.,.~_. fRobyn nderwood .. . . /;~~;~1.~1:~,-ROBYN M UNDERWOOD (Notary Public) l • 6~·?J "} NOTAR'/ PUBLIC -----(SEAL)__. -\:<J· .. ~·.;.,t---Stfl!o..cLTexss ---·----~-----·­···t!!;~~'!···· Comm.l:xp. 01 ·24 ·2011 .... ._,___, :