Loading...
HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT BLCO-2-15-3527 Harvey/Nesbit, LLC Office Addition/Mtn. Pest Control 3758 Hwy 82 Glenwood Springs, CO 1) ALL WORK MUST COMPLY WITH THE 2009 IBC, IMC, IPC, IFGC, IFC, IECC AND MANUFACTURERS INSTALLATION SPECIFICATIONS. 2) PRIOR TO CONSTRUCTION, CONTACT LOCAL FIRE DISTRICT FOR PERTINENT IFC REQUIREMENTS. FIRE DISTRICT FINAL APPROVAL REPORT I5 REQUIRED FOR FINAL/COMPLETION INSPECTION. 3) PROVIDE AN ENGINEER WET SEALED, SIGNED, AND DATED LETTER AUTHORIZING USE OF THE UNSEALED STRUCTURAL PLANS AT FOUNDATION INSPECTION. 4) ELECTRICAL PERMITTING & INSPECTIONS BY THE COLORADO STATE ELECTRICAL BOARD. 5) ELECTRICAL ROUGH IN APPROVAL IS REQUIRED PRIOR TO FRAME INSPECTION. 6) ELECTRICAL FINAL APPROVAL I5 REQUIRED FOR FINAL/COMPLETION INSPECTION. 7) LOCKS, LATCHES AND LANDINGS PER 2009 IBC, SECTION 1008. 8) LIGHT AND VENTILATION PER 2009 IBC, CHAPTER 12.