Loading...
HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT BLCO-7-12-2551 EnCana Oil & Gas Communication Equipment Building Long Ridge, SWSE, Sec 19, T5S, R95W Parachute, Colorado 1) ALL WORK SHALL COMPLY WITH THE 2009 IBC, TIA-222, OSHA, FCC, EPA REGULATIONS, AND MANUFACTURERS SPECIFICATIONS. 2) ALL WORK MUST COMPLY WITH THE CONDITIONS OF THE CURRENT LAND USE PERMIT. 3) ROOMS WITH STORAGE BATTERY SYSTEMS HAVING A LIQUID ELECTROLYTE CAPACITY OVER 50 GALLONS, OR A LITHIUM -ION CAPACITY OF 1000 POUNDS USED FOR STAND BY POWER REQUIRES ONE (1) HOUR SEPARATION PER IBC, TABLE 508.2.5. (IF APPLICABLE) 4) LOCKS, LATCHES, LANDINGS PER 2009 IBC, SECTION 1008. 5) LIGHT AND VENTILATION PER 2009 IBC, CHAPTER 12. 6) FIELD VERIFY C.D.O.H. INSIGNIA AFFIXED FOR FINAL INSPECTION. 7) ELECTRICAL FINAL APPROVAL IS REQUIRED FOR FINAL/COMPLETION INSPECTION. 8) TOWER CONSTRUCTION SHALL BE INSPECTED BY THE ENGINEER ON RECORD. FINAL APPROVAL REPORT REQUIRED AT FINAL/COMPLETION INSPECTION OF EQUIPMENT ROOM. `./ c copy