Loading...
HomeMy WebLinkAboutPermit Inspection Card.' INSPECTION WILL NOT BE MADE UNLESS THIS CARD IS POSTED ON THE JOB 24 HOURS NOTICE REQUIRED FOR INSPECTIONS BUILDING PERMIT GARFIELD COUNTY, COLORADO Date Issued.~/L!)o.'S •• zoned Area ........••...........•......... Permit No .•••. !f &..aC ............ . AGREEMENT In consideration of the issuan~e of this permit, the applicant hereby agrees to comply with all laws and regulations related to the mning, location; construction and erection of the proposed structure for which this permit is granted, and further agrees that if the above said regulations are not fully complied with in the mning, location, erection and construction of the above described structure, the permit may then be revoked by notice from the County Building Inspector and IMMEDIATELY BECOME NULL AND VOID . • Setbacks Front Sjde Sjde Rear This Card Must Be Posted So It is Plainly Visible From The Street Until Final Inspection. ~ .. ~ INSPECTION RECORD Footing Lo-J .... Foundation / tJ .. -:it.rosTIJ- Underground ~lumbing Insulation Rough Plumbing b .. )..1-D~ · ALL LISTED ITEMS MUST BE INSPE~ED AND APPROVED BEFORE COVERING - WHETHER INTERIOR OR EXTERIOR, UNDE~GROUND OR ~OVE GROUND. THIS PERMIT IS NOT TRANSFERABLE For Inspections Call 384-5003 108 ~th Street Glenwood Springs, Colorado C APPROVED DO NQT DE ~TROY THIS CARD Date lt·l!t·oSey. /M~ lj IF PLAeED OUTSIDE -OVER WJTH CLEXR PLASTIC "'