HomeMy WebLinkAboutPermit Inspection Card.'
INSPECTION WILL NOT BE MADE UNLESS
THIS CARD IS POSTED ON THE JOB
24 HOURS NOTICE REQUIRED FOR INSPECTIONS
BUILDING PERMIT
GARFIELD COUNTY, COLORADO
Date Issued.~/L!)o.'S •• zoned Area ........••...........•......... Permit No .•••. !f &..aC ............ .
AGREEMENT
In consideration of the issuan~e of this permit, the applicant hereby agrees to comply with all
laws and regulations related to the mning, location; construction and erection of the proposed
structure for which this permit is granted, and further agrees that if the above said regulations
are not fully complied with in the mning, location, erection and construction of the above
described structure, the permit may then be revoked by notice from the County Building
Inspector and IMMEDIATELY BECOME NULL AND VOID . •
Setbacks Front Sjde Sjde Rear
This Card Must Be Posted So It is Plainly Visible From The Street Until Final Inspection.
~ .. ~ INSPECTION RECORD
Footing Lo-J ....
Foundation / tJ .. -:it.rosTIJ-
Underground ~lumbing Insulation
Rough Plumbing b .. )..1-D~ ·
ALL LISTED ITEMS MUST BE INSPE~ED AND APPROVED BEFORE COVERING -
WHETHER INTERIOR OR EXTERIOR, UNDE~GROUND OR ~OVE GROUND.
THIS PERMIT IS NOT TRANSFERABLE
For Inspections Call 384-5003 108 ~th Street Glenwood Springs, Colorado C
APPROVED DO NQT DE ~TROY THIS CARD
Date lt·l!t·oSey. /M~ lj
IF PLAeED OUTSIDE -OVER WJTH CLEXR PLASTIC
"'